South Region Scores

SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Laurel11 11‐8515 US 25 DESIGN $137,130,000 IMPROVE CONNECTIVITY BETWEEN CORBIN AND 88.6 ENGINEERING LONDON FROM KY‐1006 TO US‐25E. (08CCN) 0 ‐ 10.475

Laurel11 11‐147 US 25 MAJOR WIDENING $33,930,000 REDUCE CONGESTION ON US‐25 FROM KY‐1006 TO KY‐2069; IMPROVE CONNECTIVITY FROM US‐ 87.9 9 ‐ 10.505 25 NEAR KY‐2069 TO KY‐229; IMPROVE KY‐229 FROM THE NEW CONNECTOR NORTH TO KY‐192; AND IMPROVE ACCESS TO THE SCHOOL FROM KY‐ 192 BYPASS. (06CCR)(10CCR)(12CCR)(14CCR)

Whitley11 11‐186 US 25 W MAJOR WIDENING $20,240,000 IMPROVE FREIGHT MOBILITY AND REDUCE CONGESTION ON US‐25W FROM KY‐727 TO KY‐ 86.6 28.1 ‐ 30.425 3041. (12CCR)(16CCR)

Rockcastle8 IP20190031 US 25 MAJOR WIDENING $8,668,000 ADDRESS SAFETY, MOBILITY, AND CONGESTION WITH ACCESS MANAGEMENT ALONG US‐25 85.2 15.116 ‐ 15.666 (RICHMOND STREET) FROM THE US‐25/US‐461 INTERSECTION TO I‐75.

Washington4 4‐8916.20 KY 55 RECONSTRUCTION $5,030,000 HEARTLAND PARKWAY: ADDRESS SAFETY AND MOBILITY ON KY 55 FROM THE 82.9 0 ‐ 4.551 MARION/WASHINGTON COUNTY LINE NORTH TO US‐150X IN SPRINGFIELD. (CONSTRUCTION SEGMENT 2)(2018BOP)

Russell8 IP20060251 US 127 RECONSTRUCTION $17,041,000 REDUCE CONGESTION AND IMPROVE SAFETY, CAPACITY AND MOBILITY ALONG US 127 FROM 82.0 17.872 ‐ 19.086 THE TO LAKEWAY DRIVE KY 379 IN RUSSELL SPRINGS.

Note: Projects may extend beyond county shown. Wednesday, September 18, 2019 Page 1 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Nelson4 4‐8308.10 US 150 MAJOR WIDENING $14,740,000 WIDEN US‐150 FROM KY‐49 TO NEAR KY‐ 245/WAL‐MART WIDENING. (06CCN) 81.8 0.44 ‐ 1.697

Russell8 IP20060250 US 127 RECONSTRUCTION $60,028,000 REDUCE CONGESTION AND IMPROVE CAPACITY, SAFETY AND MOBILITY ON US 127 BETWEEN THE 81.4 14.142 ‐ 18.195 WEST BYPASS OF JAMESTOWN TO THE CUMBERLAND PARKWAY. SEE SEGMENT 12 IN JUNE 1998 ADVANCE PLANNING STUDY

Pulaski8 IP20110194 KY 39 RECONSTRUCTION $6,652,000 IMPROVE SAFETY AND MOBILITY ALONG KY 39 BETWEEN KY 80 AND OAK LEAF LANE. 79.4 0.286 ‐ 1.13 Bell11 IP20160062 KY 74 CONGESTION $14,137,000 ENHANCING CUMBERLAND AVENUE FROM US 78.8 MANAGEMENT 25E TO 18TH STREET WITH STREET 15.19 ‐ 16.753 IMPROVEMENTS FOR VEHICLE AND PEDESTRIANS, AS WELL AS STORM WATER MANAGEMENT TO IMPROVE SAFETY, CONGESTION, AND ENVIRONMENTAL IMPACT.

Hardin4 IP20070175 PF 9999 NEW ROUTE $16,988,000 EXTENSION OF NEW GLENDALE ROAD FROM US 31W TO COMMERCE DRIVE IN ELIZABETHTOWN. 78.7 ‐

Taylor4 IP20100059 PF 9999 NEW ROUTE $12,898,000 EXTEND KY 3350 (CAMPBELLSVILLE BYPASS) FROM KY 289 TO US 68 ON THE EAST SIDE OF 77.5 ‐ CAMPBELLSVILLE.

Marion4 4‐8917 US 68 MAJOR WIDENING $12,050,000 HEARTLAND PARKWAY: MARION/TAYLOR LINE TO LEBANON BYPASS.(16CCN)(18CCN) 75.6 0 ‐ 9.364

Clay11 IP20080590 US 421 RECONSTRUCTION $43,948,000 ADDRESS SAFETY, CAPACITY, SURFACE CONDITION, AND ACCESS ISSUES FROM KY 3560 75.3 20.213 ‐ 24.016 (FOX HOLLOW ROAD) TO KY‐11 AT TREADWAY (LAUREL CREEK)

Wednesday, September 18, 2019 Page 2 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Lincoln8 8‐167 US 27 RECONSTRUCTION $52,300,000 US‐27 CORRIDOR FROM SOMERSET TO LEXINGTON. IMPROVE SAFETY AND REDUCE 74.8 11.169 ‐ 15.881 CONGESTION ON US‐27 FROM KY‐1247 TO EDUCATION WAY.

Grayson4 4‐8954 PF 9999 NEW ROUTE $16,900,000 EXTEND THE WILLIAM THOMASON BYWAY (KY 3155) FROM THE SOUTHERN INTERSECTION AT 74.8 ‐ KY 259 WESTERLY TO KY 54. (16CCN)(18CCN)

Nelson4 4‐8809 PF 9999 NEW ROUTE $13,270,000 NEW ROUTE BETWEEN US 62 AND KY 245 WEST OF BARDSTOWN. (16CCR)(18CCN) 74.3 ‐

Pulaski8 IP20070229 US 27 MAJOR WIDENING $22,946,000 REDUCE CONGESTION AND IMPROVE SAFETY, CAPACITY, AND MOBILITY ALONG US 27 74.1 6.624 ‐ 8.05 BETWEEN LEWIS BRAY ROAD AND GENERAL BURNSIDE ISLAND.

Laurel11 11‐147 US 25 MAJOR WIDENING $33,930,000 REDUCE CONGESTION ON US‐25 FROM KY‐1006 TO KY‐2069; IMPROVE CONNECTIVITY FROM US‐ 73.4 9 ‐ 10.505 25 NEAR KY‐2069 TO KY‐229; IMPROVE KY‐229 FROM THE NEW CONNECTOR NORTH TO KY‐192; AND IMPROVE ACCESS TO THE SCHOOL FROM KY‐ 192 BYPASS. (06CCR)(10CCR)(12CCR)(14CCR)

Taylor4 4‐142.30 PF 9999 NEW ROUTE $12,100,000 HEARTLAND PARKWAY: IMPROVE MOBILITY AND CONNECTIVITY VIA NEW CAMPBELLSVILLE 73.3 ‐ BYPASS FROM KY‐70 TO US‐68 EAST OF CAMPBELLSVILLE. SECTION 2. (2010BOP)(16CCR)

Laurel11 11‐8851 KY 80 RECONSTRUCTION $4,140,000 PROVIDE FRONTAGE ROADS ON BOTH SIDES OF KY 80 JUST WEST OF I‐75 EXIT 41 (MP 9.9 TO MP 73.1 9.9 ‐ 10.9 10.9) MAY INCLUDE RELOCATING EXISTING SIGNAL TO PROVIDE FOR ADEQUATE TURN LANE STORAGE AND IMPROVE CAPACITY.(14CCN)

Wednesday, September 18, 2019 Page 3 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Hardin4 4‐153.01 KY 251 PHASE I DESIGN $13,600,000 KY 251 IMPROVEMENTS FROM KY 3005 TO KY 434. 72.6 2.866 ‐ 6.288 Nelson4 IP20180030 US 31 E CONGESTION $2,257,000 INTERSECTION IMPROVEMENTS AT US 62 AND 71.6 MANAGEMENT US 31E. SEE 4‐80050.00 13.9 ‐ 14

Nelson4 IP20060232 US 62 MAJOR WIDENING $12,434,000 ADDRESS CONGESTION ALONG US 62 IN BARDSTOWN FROM KY 245 TO KY 605. 71.4 15.919 ‐ 17.234

Meade4 4‐8705 KY 79 RECONSTRUCTION $20,230,000 RECONSTRUCT KY 79 FROM KY 144 TO KY 1051. (12CCN)(14CCR)(18CCN) 71.2 4.411 ‐ 8.237

Knox11 11‐8857 KY 3439 SAFETY $7,970,000 IMPROVE SAFETY NEAR INTERSECTION OF US 25E AND KY 3439 BY PROVIDING SIDEWALKS TO 70.7 0 ‐ 0.897 AN AREA FREQUENTED BY PEDESTRIANS. (MP 0.0‐MP 0.9)(14CCN)

Nelson4 4‐396.10 US 150 RECONSTRUCTION $42,790,000 IMPROVE SAFETY, MOBILITY, AND GEOMETRICS ON US‐150 FROM THE TO 70.3 1.952 ‐ 7.653 THE NELSON/WASHINGTON COUNTY LINE. (2016BOP)(18CCR)

Green4 IP20180071 US 68 MINOR WIDENING $8,146,000 IMPROVE SAFETY AND PASSING OPPORTUNITIES ALONG US 68 FROM KY 61 IN GREEN COUNTY TO 70.0 14.287 ‐ 18.411 DAVIS ROAD IN TAYLOR COUNTY.

Wayne8 IP20080505 KY 90 MINOR WIDENING $32,709,000 REDUCE CONGESTION AND IMPROVE SAFETY, CAPACITY, AND MOBILITY OF KY 90 BETWEEN KY 69.9 12.721 ‐ 15.617 90X/KY 1275 IN AND KY 3106.

Wednesday, September 18, 2019 Page 4 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Washington4 4‐396.30 US 150 RECONSTRUCTION $9,432,000 ADDRESS SAFETY, MOBILITY AND GEOMETRIC ISSUES ALONG US 150 IN WASHINGTON COUNTY 68.9 2.5 ‐ 6.557 FROM 0.7 MILE EAST OF GRUNDY HOME ROAD (MILEPOINT 2.500) TO US 150 X (MP 6.557) AT THE OLD ST. CATHERINE'S COLLEGE. (2016BOP)

Washington4 4‐396.20 US 150 RECONSTRUCTION $12,278,000 IMPROVE SAFETY, MOBILITY, AND GEOMETRICS ALONG US‐150 FROM WEST OF OLD 67.6 0.426 ‐ 2.5 FREDERICKTOWN‐BARDSTOWN ROAD (KY‐1872) THROUGH GRUNDY HOME CURVE TO MAYFIELD LN (CR‐1336). (2016BOP)

Grayson4 IP20070153 US 62 RECONSTRUCTION $9,531,000 ADDRESS SAFETY, GEOMETRIC DEFICIENCIES AND DRAINAGE ALONG US 62 FROM THE PROPOSED 67.3 19.85 ‐ 20.787 LEITCHFIELD WESTERN BYPASS TO THE SOUTHERN INTERSECTION OF KY 259 IN LEITCHFIELD.

Whitley11 IP20070247 US 25 W RECONSTRUCTION $12,483,000 ADDRESS CONGESTION AND SAFETY ISSUES ON US 25W FROM KY 296 (MAIN STREET) TO JUST 67.2 10.823 ‐ 12.422 SOUTH OF KY 92 IN WILLIAMSBURG.

Nelson4 4‐8307.20 KY 245 MAJOR WIDENING $67,000,000 WIDEN KY‐245 FROM FLAGET HOSPITAL (MP 7.722) THROUGH COUNTY LINE (MP12.261 66.8 7.722 ‐ 12.261 NELSON/MP0.000 BULLITT) TO HAPPY HOLLOW RD (MP 4.425).

Grayson4 4‐8502.20 US 62 MINOR WIDENING $7,630,000 IMPROVE US 62 FROM JUST EAST OF BEEHIVE CURVE TO KY 224. CONSTRUCTION SEGMENT 2. 66.5 24.5 ‐ 25.5

Adair8 IP20060247 KY 55 RECONSTRUCTION $104,789,000 IMPROVE SAFETY ALONG KY 55 FROM US 127 TO CUMBERLAND PARKWAY. 66.2 0 ‐ 9.68

Wednesday, September 18, 2019 Page 5 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Harlan11 11‐269 / 11‐ PF 9999 MAJOR WIDENING $98,160,000 HARLAN‐VIRGINIA STATE LINE; RECONSTRUCT US‐ 269.10 421 FROM BARN BRANCH TO VIRGINIA STATE 66.1 ‐ LINE.(C‐PHASE UNDER 11‐269.10) Pulaski8 8‐9010 KY 635 SAFETY‐RR $9,600,000 SAFETY PROJECT TO RECONSTRUCT KY 635 TO 65.9 SEPARATN ELIMINATE AT GRADE RAILROAD CROSSING AND 6.902 ‐ 7.673 REPLACE WITH RAILROAD SEPARATION CROSSING AT SCIENCE HILL, IN PULASKI COUNTY. (2016BOP)

Whitley11 IP20130079 US 25 W RECONSTRUCTION $9,742,000 RECONSTRUCTION OF US 25W FROM TOWN HILL TO CORDELL RD TO IMPROVE SAFETY AND 65.7 13.335 ‐ 14.635 ADDRESS GEOMETRIC DEFICIENCIES.

Hardin4 4‐198 PF 9999 NEW ROUTE $26,360,000 EXTEND RING ROAD FROM THE TO I‐65. "2 LANE INITIAL/4 65.6 ‐ LANE ULTIMATE" (12CCR)(14CCR)

Marion4 IP20180024 US 68 MINOR WIDENING $11,104,000 ADDRESS SAFETY, CONGESTION, AND MOBILITY AT THE EASTERN INTERSECTION OF US 68 AND 65.5 12.2 ‐ 12.8 KY 2154 AND ALONG US 68 AND KY 2154. IMPROVE THE INTERSECTION OF US 68/KY 2154 AND ALONG US 68 FROM THE ENTRANCE TO TG KENTUCKY TO THE PREVIOUS WIDENING AND ALONG KY 2154/C

Hardin4 4‐442 US 62 RECONSTRUCTION $22,500,000 IMPROVE SAFETY, MOBILITY AND GEOMETRICS ON US‐62 FROM I‐65 TO UPPER COLESBURG 65.5 20.104 ‐ 23.351 ROAD (CR‐1038)

Rockcastle8 IP20190151 KY 461 MAJOR WIDENING $28,954,000 ADDRESS SAFETY, CAPACITY AND ACCESS ISSUES ALONG KY‐461 FROM KY 1250 TO US 150. 65.4 4.213 ‐ 6.998

Hart4 IP20070181 PF 9999 NEW ROUTE $9,934,000 IMPROVE CONNECTIVITY BETWEEN KY 88 AND US 31W AND I‐65 TO IMPROVE SAFETY ON US 64.9 ‐ 31W AND KY 88 IN MUNFORDVILLE.

Wednesday, September 18, 2019 Page 6 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Pulaski8 IP20040026 KY 90 MAJOR WIDENING $36,359,000 REDUCE CONGESTION AND IMPROVE SAFETY, CAPACITY, AND MOBILITY ALONG KY 90 64.2 0 ‐ 2.75 BETWEEN THE WAYNE COUNTY LINE AND THE NEW CUMBERLAND RIVER BRIDGE.

McCreary8 IP20190036 US 27 MINOR WIDENING $6,266,000 IMPROVE SAFETY BY CONSTRUCTING MULTIPLE TURNING LANES INTO COMMUNITY PARK ROAD 64.0 10.9 ‐ 12 AND WHITLEY CITY ELEMENTARY SCHOOL.

Taylor4 IP20060236 US 68 MINOR WIDENING $11,479,000 HEARTLAND PARKWAY ‐ UPGRADE US68\KY 55 CORRIDOR FROM KY 1799 (AIRPORT ROAD) TO 63.5 7.404 ‐ 13.531 MARION C\L. SEE OPTION 2, SEGMENT 5, SECTION F IN 2005 HEARTLAND PARKWAY STUDY.

Hardin4 IP20060222 KY 434 MINOR WIDENING $4,450,000 ADDRESS GEOMETRIC DEFICIENCIES AND MAINTENANCE ISSUES ALONG KY 434 BETWEEN 62.9 0.025 ‐ 3.158 US 31W AND KY 251

Breckinridge4 IP20070151 KY 86 RECONSTRUCTION $19,880,000 ADDRESS SAFETY, GEOMETRIC DEFICIENCIES AND MAINTENANCE ISSUES ALONG KY 86 FROM US 62.9 15.957 ‐ 18.712 60 TO ROSETTA‐CORNERS ROAD. PRIORITY SECTION IDENTIFIED BY 4‐8901 (KY 86 SCOPING STUDY).

Whitley11 IP20190184 I 75 RECONSTRUCTION $13,016,000 IMPROVE SAFETY AND CONNECTIVITY WITH INTERCHANGE IMPROVEMENTS ON I‐75 AT EXIT 62.2 15 ‐ 15.8 15 GOLDBUG/WILLIAMSBURG.

Lincoln8 IP20080493 US 27 MAJOR WIDENING $54,973,000 CONTINUE ONGOING IMPROVEMENTS TO US 27 CORRIDOR FROM SOMERSET TO LEXINGTON. 61.9 3.127 ‐ 7.22 IMPROVE LEVEL OF SERVICE AND SAFETY ON US 27 FROM KY 328 TO KY 501 IN LINCOLN COUNTY.

Casey8 8‐8704 KY 49 RECONSTRUCTION $8,110,000 RECONSTRUCT BRUSHY CREEK HILL FROM MP 1.8 TO MP 2.8.(12CCN)(16CCR)(18CCN) 61.5 1.8 ‐ 2.8

Wednesday, September 18, 2019 Page 7 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Laurel11 IP20080616 KY 363 RECONSTRUCTION $7,020,000 ADDRESS HORIZONTAL ALIGNMENT ISSUES ON KY 363 FROM KY 3429 (PHILPOT ROAD) TO THE 60.8 8.2 ‐ 9.205 ROUNDABOUT AT KY 1006 WITH A STUDY ON ADDING AN ON/OFF RAMP TO I‐75 FROM KY 363.

Laurel11 11‐8514.10 KY 1006 MAJOR WIDENING $2,340,000 WIDEN 5TH STREET FROM MEYER BAKER RD TO THE KY‐192 BYPASS (10CCN)(2006KYD)(LET W/ 60.8 5.3 ‐ 5.8 11‐187)

Cumberland8 8‐8852 KY 90 RECONSTRUCTION $27,000,000 IMPROVE KY‐90 FROM NORRIS BRANCH ROAD EXTENDING WESTERLY TO PA DUERSON ROAD 59.9 5.182 ‐ 10.432 NEAR MARROWBONE. (14CCN)(18CCR)

Russell8 IP20060252 US 127 MINOR WIDENING $2,943,000 REDUCE CONGESTION AND IMPROVE CAPACITY, SAFETY AND MOBILITY ON US 127 BETWEEN THE 58.9 18.318 ‐ 18.8 INTERSECTION OF BERNARD LANE/CORTEZ LANE AND THE NORTHRIDGE SHOPPING CENTER TRAFFIC LIGHT IN RUSSELL SPRINGS.

Whitley11 IP20150112 KY 727 RECONSTRUCTION $6,286,000 IMPROVE SAFETY, ADDRESS GEOMETRIC DEFICIENCIES, REDUCE CONGESTION AND 58.4 0 ‐ 1.539 IMPROVE MOBILITY ON KY 727 FROM US 25W TO KY 3421.

Lincoln8 IP20190190 KY 698 RELOCATION $35,640,000 IMPROVE SAFETY AND GEOMETRICS ALONG KY 698 FROM MARTIN TR. TO US 27. 58.3 8.392 ‐ 12.705

Pulaski8 IP20190149 KY 461 MAJOR WIDENING $40,970,000 ADDRESS SAFETY, CAPACITY AND ACCESS ISSUES ALONG KY‐461 FROM 0.28 MILE SOUTH OF BUCK 57.6 3.55 ‐ 8.441 CREEK EXTENDING NORTHERLY TO PULASKI/ROCKCASTLE LINE.

Laurel11 11‐365 HR 9006 MAJOR WIDENING $10,280,000 REDUCE CONGESTION ON THE PARKWAY FROM RELOCATED KY‐30 TO KY‐192. 56.7 1.089 ‐ 3.877 (18CCR)

Wednesday, September 18, 2019 Page 8 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Taylor4 IP20160012 KY 210 MINOR WIDENING $35,608,000 ADDRESS SAFETY AND TRAVEL TIME RELIABILITY ALONG KY 210 FROM CAMPBELLSVILLE TO 56.3 0 ‐ 14.148 HODGENVILLE.

Green4 4‐397.12 US 68 RECONSTRUCTION $5,350,000 ADDRESS SAFETY, GEOMETRIC DEFICIENCIES AND MAINTENANCE ISSUES ALONG US 68 FROM 1600 54.6 9.682 ‐ 10.775 FEET WEST OF SOUTH THURLOW RD (MP 9.682) EXTENDING TO THE RUSSELL CREEK BRIDGE (MP 10.775) (3‐203.00 STUDY RECOMMENDATION #11)(DESIGN UNDER 4‐397)(2016BOP)(18CCN) Jackson11 IP20150019 US 421 CONGESTION $2,054,000 ADDRESS CONGESTION AND ACCESS CONCERNS 52.2 MANAGEMENT AT THE ENTRANCE INTO JACKSON COUNTY HIGH 13.45 ‐ 13.7 SCHOOL ON US‐421 WITH ITS INTERSECTION WITH EDUCATIONAL MOUNTAIN DRIVE AND MCCAMMON RIDGE RD.

McCreary8 IP20170028 PF 9999 NEW ROUTE $5,292,000 PROVIDE CONNECTIVITY AND IMPROVE MOBILITY FROM US 27 TO MCCREARY HIGH 51.9 ‐ SCHOOL.

Hart4 4‐441 PF 9999 ECONOMIC DEVEL $11,760,000 IMPROVE MOBILITY, CONNECTIVITY AND SAFETY BY ADDRESSING COMMERCIAL AND INDUSTRIAL 51.1 ‐ TRAFFIC MOVEMENT FROM US‐31W SOUTH OF KY‐218 TO I‐65. (16CCR)(18CCR)

Jackson11 IP20080605 US 421 RECONSTRUCTION $4,306,000 ADDRESS SUBSTANDARD HORIZONTAL AND VERTICAL ALIGNMENT OF US 421 IN THE CLOVER 51.1 26.5 ‐ 27 BOTTOM AREA NEAR THE STONE QUARRY.

Nelson4 IP20070193 US 62 MINOR WIDENING $7,988,000 ADDRESS CONGESTION AND SAFETY ALONG US 62 IN BARDSTOWN FROM GUTHRIE DR TO KY 51.0 15.262 ‐ 15.919 245 IN BARDSTOWN.

Wednesday, September 18, 2019 Page 9 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Clay11 IP20080592 US 421 RECONSTRUCTION $71,394,000 ADDRESS HORIZONTAL ALIGNMENT, SAFETY, SURFACE CONDITION, AND CONGESTION ISSUES 49.7 24.016 ‐ 32.824 ON US‐421 FROM KY‐11 AT TREADWAY (LAUREL CREEK) TO THE CLAY COUNTY/JACKSON COUNTY LINE.

Adair8 IP20040024 KY 3491 MINOR WIDENING $11,564,000 IMPROVE SAFETY AND REDUCE CONGESTION ALONG KY 3491 BETWEEN KY 80 AND RUSSELL 49.1 0 ‐ 1.286 CREEK BRIDGE.

Taylor4 4‐443 KY 70 RECONSTRUCTION $12,000,000 IMPROVE SAFETY, ACCESS, GEOMETRICS AND DRAINAGE ON KY‐70 IN CAMPBELLSVILLE FROM 48.1 0 ‐ 1.367 US‐68 TO COUNTRY VIEW COURT (CS‐1305)

Harlan11 11‐8703 US 119 MINOR WIDENING $5,050,000 PROVIDE A PASSING BAY ON US 119 FROM MP 1.2 TO MP 2.2 IN HARLAN COUNTY. 46.9 1.2 ‐ 3 (12CCN)(14CCR)(16CCR)

Rockcastle8 IP20070235 US 150 MINOR WIDENING $23,660,000 ADDRESS CAPACITY ISSUES FROM KY‐461 TO US‐ 25 IN MT. VERNON TO CONTINUE CORRIDOR 45.1 8.403 ‐ 10.205 IMPROVEMENTS TO US 150 AS IDENTIFIED IN THE 1998 PLANNING STUDY.

Knox11 11‐8713 KY 459 SAFETY $4,470,000 RAISE KY‐459 ABOVE FLOOD PLAIN FROM MP 3 TO MP 5, INCLUDING RAISING THE BULL RUN 44.7 3 ‐ 5 CREEK BRIDGE (INCLUDES 11‐8712).(12CCN) Hardin4 4‐20.01 I 65 I‐CHANGE $32,450,000 IMPROVE THE SAFETY AND INCREASE THE 44.5 RECONST CAPACITY OF THE I‐65/KY‐222 INTERCHANGE 85.313 ‐ 86.064 BASED ON EXISTING AND FUTURE NEEDS OF THE AREA. (2006BOPC)(08CCR)(10CCR)(14CCR) Nelson4 IP20070198 KY 605 SPOT $11,199,000 SPOT IMPROVEMENTS ALONG KY 605 FROM US 44.4 IMPROVEMENT 62 TO US 150. ESTIMATED TOTAL LENGTH: 2.0 3.608 ‐ 10.575 MILES.

Wednesday, September 18, 2019 Page 10 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Marion4 4‐8802 KY 49 SPOT $4,930,000 SPOT IMPROVEMENTS ON KY‐49 (MP 20.900 TO 44.3 IMPROVEMENTS MP 21.830) AS PER THE KY‐49 PLANNING STUDY. 20.823 ‐ 21.837 (14CCN)(18CCN)

Pulaski8 IP20100058 PF 9999 NEW ROUTE $15,411,000 PROVIDE CONNECTIVITY AND IMPROVED MOBILITY FROM KY 80 TO KY 1577. 43.8 ‐

Grayson4 IP20190055 US 62 MINOR WIDENING $15,733,000 ADDRESS SAFETY, GEOMETRIC DEFICIENCIES AND DRAINAGE ALONG US 62 FROM SCHOOLHOUSE 43.7 17.909 ‐ 19.85 ROAD TO THE PROPOSED LEITCHFIELD WESTERN BYPASS.

Lincoln8 IP20080492 US 27 MAJOR WIDENING $42,937,000 CONTINUE ONGOING IMPROVEMENTS TO US 27 CORRIDOR FROM SOMERSET TO LEXINGTON. 43.6 0 ‐ 3.127 IMPROVE LEVEL OF SERVICE AND SAFETY ON US 27 FROM KY 70 AT EUBANK IN PULASKI TO KY 328 IN LINCOLN COUNTY.

Marion4 IP20050037 PF 9999 RECONSTRUCTION $4,782,000 NEW ROUTE TO CONNECT WAREHOUSE ROAD TO KY 2154 (LEBANON BYPASS). ESTIMATED 43.5 ‐ TOTAL LENGTH: 0.8 MILES.

Hardin4 IP20060223 KY 1600 RECONSTRUCTION $7,988,000 ADDRESS SAFETY AND GEOMETRIC DEFICIENCIES ALONG KY 1600 FROM KY 361 TO THE 43.3 0 ‐ 3.316 ROUNDABOUT AT KY 220 IN RINEYVILLE

Lincoln8 IP20080494 US 27 MAJOR WIDENING $52,051,000 CONTINUE ONGOING IMPROVEMENTS TO US 27 CORRIDOR FROM SOMERSET TO LEXINGTON. 43.3 7.22 ‐ 11.169 IMPROVE LEVEL OF SERVICE AND SAFETY ON US 27 FROM KY 501 TO KY 1247 IN LINCOLN COUNTY.

Washington4 IP20080162 KY 555 MINOR WIDENING $27,486,000 HEARTLAND PARKWAY ‐ UPGRADE KY 555 CORRIDOR FROM US 150X IN SPRINGFIELD TO 42.7 0 ‐ 14.639 THE BLUEGRASS PARKWAY.

Wednesday, September 18, 2019 Page 11 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Leslie11 11‐8951 US 421 CONGESTION $2,220,000 CONSTRUCT RIGHT TURN LANE ON US 421 AT 42.3 MITIGTN INTERSECTION WITH KY 80. (16CCN)(18CCN) 21.236 ‐ 21.736

Russell8 IP20190165 PF 9999 NEW ROUTE $5,036,000 IMPROVE THE EXISTING ROUTE, CS‐2098 (ERIK LN), BY WIDENING AND EXTENDING IT TO 42.0 ‐ CONNECT TO KY 1381 (VOILS ROAD). THIS IMPROVEMENT WITH IMPROVE CONNECTIVITY AND WILL RELIEVE SOME CONGESTION ON US 127 DURING PEAK TRAFFIC VOLUMES.

Russell8 IP20180093 PF 9999 NEW ROUTE $4,593,000 IMPROVE THE EXISTING ROUTE, CS‐2098 (ERIK LN), BY WIDENING AND EXTENDING IT TO 42.0 ‐ CONNECT TO CR‐1091 (OLD CLEAR SPRINGS ROAD) NEAR LANDFILL ROAD. THIS IMPROVEMENT WITH IMPROVE CONNECTIVITY AND WILL RELIEVE SOME CONGESTION ON US 127 DURING PEAK TRAFFIC VOLUM

Green4 IP20180045 PF 9999 NEW ROUTE $36,613,000 EXTEND KY 3535 FROM ITS CURRENT TERMINUS TO THE HEARTLAND PARKWAY (KY 55) NEAR KY 41.9 ‐ 1701 IN TAYLOR COUNTY

Russell8 IP20190161 PF 9999 NEW ROUTE $4,077,000 IMPROVE THE EXISTING ROUTE, CS‐2078 (PROGRESS DRIVE) AND CS‐2067 (BRIAN 41.9 ‐ WALTERS DRIVE), BY WIDENING AND EXTENDING THEM TO JOIN. THIS IMPROVEMENT WITH IMPROVE CONNECTIVITY AND WILL RELIEVE SOME CONGESTION ON US 127 DURING PEAK TRAFFIC VOLUMES.

Nelson4 IP20060233 US 62 MINOR WIDENING $7,988,000 ADDRESS CONGESTION ALONG US 62 IN BARDSTOWN FROM US 150 TO GUTHRIE DRIVE. 41.4 14.633 ‐ 15.262

Wednesday, September 18, 2019 Page 12 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Russell8 IP20190162 US 127 MAJOR WIDENING $270,000 PRELIMINARY ENGINEERING STUDY FOR IMPROVING SAFETY, INCREASE MOBILITY AND 41.2 14.142 ‐ 18.902 CAPACITY FROM US 127X/CLEAR SPRINGS RD TO KY 80.

Russell8 8‐80007 US 127 SAFETY $420,000 ADD A RIGHT TURNING ON US 127 SOUTHBOUND BEGINNING AT THE EASTBOUND 40.8 17.5 ‐ 17.8 EXIT OF THE CUMBERLAND PARKWAY FOR 0.2 MILES(18CCN) Bell11 IP20180079 KY 441 TRANSPORTATION $13,013,000 TRANSPORTATION STUDY TO DETERMINE A 40.8 STUDY TRUCK ROUTE AROUND MIDDLESBORO FROM 0 ‐ 4.897 THE INTERSECTION OF KY 74 AND KY 441 TO US25E NORTH OF MIDDLESBORO. ALSO, SAFELY ADDRESS BIKE AND PEDESTRIAN TRAFFIC CONCERNS IN THE AREA.

Wayne8 IP20080504 KY 90 MINOR WIDENING $36,387,000 ADDRESS FUTURE CONGESTION AND ECONOMIC DEVELOPMENT ISSUES ON KY 90. IMPROVE 40.6 9.601 ‐ 12.721 LEVEL OF SERVICE AND SAFETY ON KY 90 FROM KY 90X/KY3284 TO KY 90X/KY 1275.

Harlan11 IP20070244 KY 160 MINOR WIDENING $35,349,000 ADDRESS CAPACITY, ACCESS, SURFACE CONDITION, AND SAFETY ISSUES ALONG KY 160 40.3 10.981 ‐ 12.954 FROM US 119 TO KY 522.

McCreary8 IP20060248 US 27 MINOR WIDENING $31,042,000 IMPROVE SAFETY AND REDUCE CONGESTION ON US 27 BETWEEN KY 1567 AND KY 478. 40.3 6.991 ‐ 9.093 Hardin4 4‐154.3 US 31 W CONGESTION $11,500,000 IMPROVE MOBILITY AND REDUCE CONGESTION 39.7 MITIGTN ON US‐31W FROM US‐31WB TO CS‐2255 20.432 ‐ 28.4 (WILSON ROAD). (10CCR)(12CCR)(SEE 4‐154.30)

Wednesday, September 18, 2019 Page 13 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Larue4 4‐8911 KY 84 SPOT $1,940,000 SPOT IMPROVEMENTS ON KY 84 FROM 39.0 IMPROVEMENTS HODGENVILLE TO I‐65. 0 ‐ 6.561 (16CCN)(18CCN)(COMBINED WORK UNDER 4‐ 8909) Lincoln8 8‐80002 US 127 NEW $1,070,000 US 127 NEW TURNING LANE AT KY 1194(18CCN) 38.7 INTERCHANGE 6.8 ‐ 7.1

Marion4 IP20080737 PF 9999 BYPASS $34,007,000 CONSTRUCT SOUTHEASTERN LEBANON BYPASS FROM INDUSTRIAL DRIVE TO US 68 AT KY 2154. 38.6 ‐ ESTIMATED TOTAL LENGTH: 3.5 MILES.

Lincoln8 IP20190192 US 27 MAJOR WIDENING $25,756,000 CONTINUE ONGOING IMPROVEMENTS TO US 27 CORRIDOR FROM SOMERSET TO LEXINGTON 38.6 15.881 ‐ 18.155 FROM EDUCATION WAY (8‐167 TERMINI) TO COTTON AVE / KY 590 (8‐196 TERMINI).

Grayson4 IP20040013 KY 259 RECONSTRUCTION $2,143,000 INTERSECTION IMPROVEMENTS AT KY 737 AND KY 259 IN LEITCHFIELD 37.9 13.3 ‐ 13.459

Laurel11 IP20130063 CS 1156 RECONSTRUCTION $6,492,000 ADDRESS REALIGNMENT, SAFETY, AND CONGESTION OF MEYERS‐BAKER ROAD FROM KY 37.8 0 ‐ 0.636 1006 (5TH STREET) TO KY 363 (WHITLEY STREET). ADDRESS HORIZONTAL ALIGNMENT AND SIGHT‐DISTANCE ISSUES OF THE INTERSECTION OF MEYERS‐BAKER ROAD WITH KY 363.

Grayson4 IP20130045 KY 54 RECONSTRUCTION $27,186,000 ADDRESS SAFETY, GEOMETRIC DEFICIENCIES AND MAINTENANCE ISSUES ALONG KY 54 FROM KY 37.5 14.816 ‐ 18.466 2193 TO US 62 AT THE SQUARE IN LEITCHFIELD.

Wednesday, September 18, 2019 Page 14 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Taylor4 IP20110164 KY 289 RECONSTRUCTION $5,899,000 IMPROVE ACCESS, SAFETY AND GEOMETRIC DEFICIENCIES ALONG KY 289 IN CAMPBELLSVILLE 37.3 1.168 ‐ 1.9 FROM NORTH SHORE DRIVE TO KY 3350 (CAMPBELLSVILLE BYPASS)

Pulaski8 IP20110193 KY 39 RECONSTRUCTION $31,867,000 IMPROVE SAFETY AND MOBILITY ALONG KY 39 BETWEEN OAK LEAF LANE AND THE NORTHERN 37.2 1.13 ‐ 4.5 BYPASS.

Bell11 11‐217 KY 66 RECONSTRUCTION $14,240,000 RECONSTRUCT KY‐66 FROM 500' S OF NCL PINEVILLE TO KY‐221 37.1 0.289 ‐ 1 Laurel11 IP20060291 US 25 CONGESTION $21,706,000 ADDRESS CONGESTION, ACCESS MANAGEMENT, 37.0 MANAGEMENT AND SAFETY ISSUES ON US 25 NORTH FROM HAL 13.556 ‐ 16.7 ROGERS PARKWAY NEAR KY STATE POLICE POST TO KY 490.

Wayne8 8‐80005 KY 1275 SAFETY $323,500 IMPROVE CURVE ON KY 1275 AT KY 833/ROGERS GROVE ROAD AND RESURFACE FROM KY 1275 36.9 4.55 ‐ 4.75 FROM BELL LANE TO KY 833/ROGERS GROVE ROAD(18CCN)

Larue4 IP20150047 KY 61 MINOR WIDENING $21,132,000 ADDRESS SAFETY AND GEOMETRIC DEFICIENCIES ALONG KY 61 FROM NEAR SOUTH FORK RD (KY 36.8 0.876 ‐ 5.152 1906)(MP 0.876) AT MT. SHERMON TO THE SOUTHERN INTERSECTION OF SOUTH L AND N TPKE (KY 470)(MP 5.152).

Taylor4 IP20070200 KY 70 RECONSTRUCTION $6,016,000 ADDRESS SAFETY AND GEOMETRIC DEFICIENCIES ALONG KY 70 FROM 0.2 MI E OF ROBERTS RD 36.8 3.1 ‐ 4.1 (NEAR ELK HORN BAPTIST CHURCH) TO NEAR KY 76

Meade4 4‐8702 KY 79 RECONSTRUCTION $10,310,000 RECONSTRUCT KY 79 FROM KY 428 TO KY 144.(12CCN)(14CCR)(18CCN) 36.8 1.263 ‐ 4.411

Wednesday, September 18, 2019 Page 15 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Hardin4 IP20070169 KY 144 SAFETY‐HAZ‐ELM $4,579,000 SAFETY IMPROVEMENTS ALONG KY 144 IN RADCLIFF FROM KY 1646 TO US 31W INCLUDING 36.7 3.835 ‐ 4.85 RECONSTRUCTING THE INTERSECTIONS AT WOODLAND DRIVE AND AT KY 1646.

Lincoln8 IP20020003 PF 9999 NEW ROUTE $44,461,000 ADDRESS CONGESTION, LEVEL OF SERVICE AND CONNECTIVITY ON US 27 FROM HALLS GAP HILL 36.5 ‐ SOUTH OF STANFORD TO US 150 EAST OF STANFORD.

Pulaski8 IP20040029 KY 1577 RECONSTRUCTION $19,874,000 REDUCE CONGESTION AND IMPROVE SAFETY, CAPACITY AND MOBILITY ALONG KY 1577 36.0 0 ‐ 2.213 BETWEEN KY 1642 AND KY 3261 NEAR OAK HILL BAPTIST CHURCH IN SOMERSET.

Bell11 11‐8702 US 119 MINOR WIDENING $5,990,000 PROVIDE PASSING OPPORTUNITIES ON US 119 IN THE VICINITY OF MP 4.5 IN BELL COUNTY. 35.5 3.7 ‐ 5.2 (12CCN)(14CCR)(16CCR)

Knox11 IP20080608 KY 11 RECONSTRUCTION $12,855,000 CORRECT SUBSTANDARD ROADWAY GEOMETRICS AND ADDRESS SAFETY ISSUES 35.4 16.293 ‐ 18.293 FROM NORTH OF GIRDLER TO MILLS CEMETERY. (PART OF 1999 KY 11 CORRIDOR FEASIBILITY STUDY.)

Pulaski8 IP20180068 US 27 MAJOR WIDENING $12,523,000 IMPROVE SAFETY AND TRAFFIC FLOW ON US 27 FROM 0.05 MILES NORTH OF LOST LODGE RD. TO 35.2 10.38 ‐ 11.374 BOAT DOCK RD.

McCreary8 IP20070224 US 27 MINOR WIDENING $24,976,000 IMPROVE SAFETY AND REDUCE CONGESTION ALONG US 27, BY ADDING A 5TH LANE WHERE 35.0 4.608 ‐ 6.991 NEEDED FROM KY 2792 TO KY 1567.

Clay11 11‐364 KY 11 RECONSTRUCTION $10,100,000 CORRECT STANDARDIZED ROADWAY GEOMETRICS AND ADDRESS SAFETY ISSUES 34.9 7.2 ‐ 8.8 FROM SOUTH OF ENGINE BRANCH ROUTE TO US 421 (MP 7.2 TO MP 8.9).

Wednesday, September 18, 2019 Page 16 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Rockcastle8 IP20080501 KY 1326 MINOR WIDENING $11,181,000 RECONSTRUCT KY‐1326 FROM KY‐461 INTERSECTION TO QUARRY STREET (CS‐1075) IN 34.9 4.179 ‐ 4.996 MT. VERNON.

Pulaski8 IP20060249 KY 2292 MAJOR WIDENING $47,874,000 REDUCE CONGESTION AND IMPROVE CAPACITY, SAFETY AND MOBILITY KY 2292 BETWEEN US 27 34.9 0 ‐ 1.87 AND KY 1577 EXTENSION IN SOMERSET.

Nelson4 4‐287.10 US 31 E RELOCATION $48,000,000 BARDSTOWN‐LOUISVILLE; WIDENING AND ACCESS MANAGEMENT IMPROVEMENTS ON US‐ 34.6 16.835 ‐ 20.536 31E BETWEEN NAZARETH DRIVE AND KY‐509. (2004BOPC)

Taylor4 IP20090012 KY 658 MAJOR WIDENING $5,244,000 ADDRESS SAFETY AND CONGESTION ALONG KY 658 IN CAMPBELLSVILLE BETWEEN US 68 AND KY 34.4 0 ‐ 0.665 3518.

Green4 4‐8712 KY 61 MAJOR WIDENING $12,050,000 IMPROVE SAFETY AND MOBILITY ON KY‐61 FROM PITMAN CREEK BRIDGE TO DOC WARD RD 34.3 11.113 ‐ 14.093 (CR 1314). (12CCN)(14CCR)(16CCR)

Grayson4 IP20110149 KY 259 RECONSTRUCTION $18,185,000 ADDRESS SAFETY, GEOMETRIC DEFICIENCIES AND MAINTENANCE ISSUES ALONG KY 259 FROM 34.2 9.217 ‐ 11.761 BEAR CREEK ROAD (MP 9.217) TO NORTHERN INTERSECTION OF BLOOMINGTON ROAD (MP 11.761) SOUTH OF LEITCHFIELD

Larue4 IP20070186 US 31 E RECONSTRUCTION $25,032,000 ADDRESS SAFETY AND GEOMETRIC DEFICIENCIES ALONG US 31E FROM HODGENVILLE SQUARE TO 34.1 10.093 ‐ 14.78 THE NORTHERN INTERSECTION OF KY 470 AT WHITE CITY

Clay11 IP20080597 KY 11 RECONSTRUCTION $81,329,000 CORRECT SUBSTANDARD ROADWAY GEOMETRICS AND ADDRESS SAFETY ISSUES 34.1 8.891 ‐ 19.591 FROM US‐421 TO ONEIDA.

Wednesday, September 18, 2019 Page 17 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Rockcastle8 IP20170046 PF 9999 NEW $16,049,000 TO IMPROVE SAFETY AND CONNECTIVITY ALONG 34.0 INTERCHANGE I‐75. THIS INTERCHANGE AT KY 1505 WILL ‐ ASSIST IN RELIEVING CONGESTION WHEN TRAFFIC SLOWING INCIDENTS OCCUR ON I‐75.

Clinton8 IP20120080 KY 558 RECONSTRUCTION $39,580,000 IMPROVE SAFETY AND MOBILITY OF KY 558 BETWEEN KY 90 AND KY 3045. 33.7 1.129 ‐ 7.729

Knox11 IP20080607 KY 11 RECONSTRUCTION $26,793,000 CORRECT SUBSTANDARD ROADWAY GEOMETRICS AND ADDRESS SAFETY ISSUES 33.6 10.118 ‐ 13.918 FROM US 25E NORTH OF BARBOURVILLE TO NORTH OF GIRDLER

Whitley11 IP20080623 KY 727 RECONSTRUCTION $7,806,000 ADDRESS SAFETY AND SURFACE CONDITION ISSUES ON KY 727 (WEST 5TH STREET) FROM 33.5 3.7 ‐ 4.48 POPLAR STREET TO WEST 4TH STREET IN CORBIN.

Meade4 IP20140011 KY 313 SAFETY‐HAZ‐ELM $2,412,000 WIDEN THE SHOULDERS ALONG KY 313 FROM THE KY 361/KY 1500 INTERSECTION IN HARDIN 33.3 0 ‐ 7.125 COUNTY TO US 60 IN MEADE COUNTY. THE HARDIN COUNTY MILEPOINTS ARE FROM 14.534 TO 15.238 AND THE MEADE COUNTY MILEPOINTS ARE FROM 0.000 TO 7.125.

Washington4 IP20070204 KY 152 RECONSTRUCTION $18,051,000 ADDRESS SAFETY AND GEOMETRIC DEFICIENCIES ALONG KY 152 EAST OF SPRINGFIELD FROM US 33.3 7.981 ‐ 12.5 150X TO 0.3 MILES EAST OF THE BEECH FORK BRIDGE.

Jackson11 IP20050028 US 421 RECONSTRUCTION $19,786,000 RECONSTRUCTION OF US 421 FROM SOUTHTREE TOWER ROAD TO CLOVER BOTTOM CREEK 33.3 21.421 ‐ 23.541 ROAD. (SEE SECTION 4 OF ALTERNATIVE 4 IN JANUARY 2005 US 421 ALTERNATIVE STUDY.)

Wednesday, September 18, 2019 Page 18 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Washington4 IP20070203 US 150 X SAFETY‐HAZ‐ELM $2,073,000 ADDRESS SAFETY ISSUES AT THE INTERSECTION OF US 150X AND KY 55 IN SPRINGFIELD. 33.0 2 ‐ 2.1

Knox11 IP20150109 US 25 E SAFETY‐HAZ‐ELM $1,356,000 IMPROVE SAFETY AND ADDRESS GEOMETRIC DEFICIENCIES OF INTERSECTION OF US 25E AND 33.0 10.83 ‐ 11.034 KY 2420.

Knox11 IP20130078 KY 1487 RECONSTRUCTION $9,206,000 IMPROVE SAFETY AND ADDRESS GEOMETRIC DEFICIENCIES, AS WELL AS FLOOD MITIGATION 33.0 0.687 ‐ 1.107 ON KY 1487 FROM NORTH OF MINTON RD (CS‐ 1044) IN BARBOURVILLE TO NEAR US 25E.

Rockcastle8 IP20190032 PF 9999 NEW ROUTE $270,000 PLANNING STUDY ON US 25 TO ADDRESS CONNECTIVITY FOR FUTURE DEVELOPMENT IN 32.9 ‐ MT. VERNON ON THE WESTERN SIDE OF I‐75 BETWEEN EXIT 57 AND EXIT 62.

Clay11 IP20110227 KY 2076 SAFETY‐HAZ‐ELM $5,394,000 IMPROVE EXISTING GEOMETRICS, ACCESS MANAGEMENT, AND IMPROVE SAFETY OF THE 32.8 0 ‐ 0.5 APPROACH TO THE US‐421/KY‐80 INTERSECTION.

Whitley11 IP20150022 KY 296 RECONSTRUCTION $5,343,000 ADDRESS SAFETY CONCERNS AND HORIZONTAL ALIGNMENT WITH CURVE JUST PASSED BRUSH 32.7 0 ‐ 0.824 ARBOR ROAD, AS WELL AS ADDING SIDEWALKS TO ROADWAY

Taylor4 IP20100056 KY 527 MINOR WIDENING $2,899,000 ADDRESS SAFETY AND GEOMETRIC DEFICIENCIES ALONG KY 527 IN CAMPBELLSVILLE FROM US 68 32.6 0 ‐ 1.124 TO KY 3350.

Green4 IP20000010 KY 61 MINOR WIDENING $42,821,000 ADDRESS SAFETY AND GEOMETRIC DEFICIENCIES ALONG KY 61 FROM THE ADAIR COUNTY LINE TO 32.4 0 ‐ 8.194 US 68 SOUTH OF GREENSBURG

Wednesday, September 18, 2019 Page 19 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Grayson4 IP20080155 KY 224 RECONSTRUCTION $8,679,000 ADDRESS SAFETY, DRAINAGE AND GEOMETRIC DEFICIENCIES ALONG KY 224 FROM US 62 IN 32.4 0 ‐ 0.804 CLARKSON TO THE WESTERN KY PARKWAY

Whitley11 IP20150107 US 25 W SAFETY‐HAZ‐ELM $2,220,000 ADDRESS SAFETY ISSUES WITH VERTICAL CURVE ALIGNMENT AT THE INTERSECTION OF US‐25W 32.4 27.2 ‐ 27.4 WITH HIGHTOP ROAD

Jackson11 IP20150020 US 421 SAFETY‐HAZ‐ELM $2,722,000 ADDRESS SAFETY AND HORIZONTAL ALIGNMENT OF THE CURVE ON US‐421 WITH ITS 32.2 1.5 ‐ 1.8 INTERSECTION AT KY‐3443

Hardin4 IP20090011 CS 2440 RELOCATION $7,462,000 REALIGNMENT OF SOUTH WILSON ROAD IN RADCLIFF TO CREATE A NEW INTERSECTION 32.1 4.915 ‐ 5.154 WITH THE NORTH WILSON ROAD REALIGNMENT AT WEST LINCOLN TRAIL BLVD

Jackson11 IP20150098 US 421 RECONSTRUCTION $7,104,000 ADDRESS SAFETY ISSUES WITH VERTICAL & HORIZONTAL ALIGNMENT ON US‐421 FROM 31.9 11.6 ‐ 12.6 MILEPOINT 11.600, EAST OF PILGRIMS REST RD (CR‐1007), TO 12.600, WEST OF RANGER STATION RD (FD‐289).

Nelson4 IP20150040 PF 9999 NEW ROUTE $20,681,000 SOUTHWEST CONNECTOR FROM US 31E SOUTH OF BARDSTOWN TO US 62 WEST OF 31.8 ‐ BARDSTOWN TO CONNECT WITH THE PROPOSED WESTERN BARDSTOWN CONNECTOR.

Knox11 IP20080609 KY 11 RECONSTRUCTION $45,057,000 CORRECT SUBSTANDARD ROADWAY GEOMETRICS & ADDRESS SAFETY ISSUES FROM 31.8 18.293 ‐ 22.694 MILLS CEMETERY TO KNOX COUNTY/CLAY COUNTY LINE. (ADDRESSED IN 1999 KY 11 CORRIDOR FEASIBILITY STUDY.)

Wednesday, September 18, 2019 Page 20 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Grayson4 IP20060216 KY 259 RECONSTRUCTION $7,672,000 ADDRESS SAFETY AND GEOMETRIC DEFICIENCIES ALONG KY 259 FROM THE NORTHERN 31.8 14.465 ‐ 15.553 INTERSECTION OF KY 3155 (LEITCHFIELD BYPASS) TO HANGING ROCK CHURCH RD

Casey8 IP20120078 KY 49 RECONSTRUCTION $13,298,000 IMPROVE SAFETY AND GEOMETRICE ALONG KY 49 FROM KY 1547 TO 0.02 MILES NORTH OF 31.7 8.008 ‐ 9.594 MARTIN CREEK ROAD.

Pulaski8 8‐121 KY 196 SAFETY $1,660,000 HORIZONTAL AND VERTICAL REALIGNMENT OF KY‐196 AT WHITE OAK CREEK FROM 1.0 MILE E 31.6 7.7 ‐ 8.2 OF WARNER ROAD TO 0.3 MILE W OF SIEVERS ROAD.(10CCR)(14CCR)

Harlan11 IP20110173 US 119 MINOR WIDENING $1,448,000 ADDRESS CONGESTION/CAPACITY ISSUES ON US‐ 119 NEAR CLEAR GLASS ROAD AND CONLEY 31.6 10.66 ‐ 10.79 LOOP.

Knox11 11‐8955 KY 3041 SAFETY $1,320,000 IMPROVE KY 3041 FROM MP 1.5 TO MP 2.0 TO INCREASE SAFETY AND PROVIDE ACCESS TO 31.1 1.5 ‐ 2 THUNDER GAP HORSE RACING TRACK. (16CCN)

Casey8 IP20120075 KY 49 RECONSTRUCTION $18,074,000 IMPROVE SAFETY BY IMPROVING THE GEOMETRICS ALONG KY 49, A MAJOR 31.1 0.114 ‐ 1.8 CONNECTOR ROUTE BETWEEN TWO CITIES.

Grayson4 IP20070156 KY 920 RECONSTRUCTION $11,270,000 ADDRESS SAFETY, GEOMETRIC DEFICIENCIES AND MAINTENANCE ISSUES ALONG KY 920 FROM US 31.0 0 ‐ 1.5 62 TO KY 3155 (LEITCHFIELD BYPASS)

Jackson11 IP20050026 US 421 RECONSTRUCTION $22,110,000 RECONSTRUCTION OF US 421 FROM SAND LICK ROAD TO CONGLETON HOLLOW ROAD. (SEE 30.8 16.891 ‐ 18.993 SECTION 2 OF ALTERNATIVE 4 IN JANUARY 2005 US 421 ALTERNATIVES STUDY.)

Wednesday, September 18, 2019 Page 21 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Meade4 4‐8703 KY 79 RECONSTRUCTION $7,790,000 RECONSTRUCT KY 79 FROM KY 477 TO KY 428.(12CCN)(14CCR) 30.6 0 ‐ 1.263

Rockcastle8 IP20190150 KY 461 MAJOR WIDENING $34,955,000 ADDRESS SAFETY, CAPACITY AND ACCESS ISSUES ALONG KY‐461 FROM PULASKI/ROCKCASTLE 30.6 0 ‐ 4.213 COUNTY LINE TO KY 1250.

Jackson11 IP20050027 US 421 RECONSTRUCTION $20,732,000 RECONSTRUCTION OF US 421 FROM CONGLETON HOLLOW ROAD TO SOUTH TREE 30.3 18.993 ‐ 21.421 TOWER ROAD ON US 421. (SEE SECTION 3 OF ALTERNATIVE 4 IN JANUARY 2005 US 421 ALTERNATIVES STUDY) Green4 4‐8853 KY 88 SPOT $11,590,000 SPOT IMPROVEMENTS & IMPROVE EXISTING 30.2 IMPROVEMENTS ALIGNMENT ON KY 88 FROM 0.20 MILES WEST 8.996 ‐ 11.232 OF AKIN NARROWS OF PITMAN RD (MP 8.996) TO KY 61 (MP 11.232). (14CCN)(16CCR)(18CCN) Lincoln8 8‐80000 US 127 NEW $1,070,000 NEW TURNING LANE AT ARCADIA VIEW 30.1 INTERCHANGE DRIVE(18CCN) 9.4 ‐ 9.88

Clay11 IP20150097 PF 9999 NEW ROUTE $7,487,000 ADDRESS CONGESTION ON ADD HOLLOW ROAD ONTO US 421 BY REDIRECTING ONTO KY 80. 30.0 ‐ ALSO, ADDRESS BIKE AND PEDESTRIAN TRAFFIC IN THE AREA.

Pulaski8 IP20130149 KY 1247 RECONSTRUCTION $5,727,000 REDUCE CONGESTION AND IMPROVE SAFETY, CAPACITY, AND MOBILITY OF KY 1247 IN PULASKI 29.9 8.35 ‐ 8.45 COUNTY BETWEEN MP 8.38 AND 8.45 AT THE INTERSECTION OF KY 1247 AND KY 1575.

Larue4 IP20150048 KY 61 MINOR WIDENING $14,545,000 ADDRESS SAFETY AND GEOMETRIC DEFICIENCIES ALONG KY 61 FROM NEAR SOUTH L AND N 29.7 5.152 ‐ 8.031 TPKE(KY 470)(MP 5.152) TO THE INTERSECTION OF LINCOLN FARM RD (US 31E)(MP 8.031).

Wednesday, September 18, 2019 Page 22 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Grayson4 IP20130044 KY 54 RECONSTRUCTION $22,022,000 ADDRESS SAFETY, GEOMETRIC DEFICIENCIES AND MAINTENANCE ISUES ALONG KY 54 FROM THE 29.7 11.632 ‐ 14.816 EASTERN INTERSECTION OF KY 631 TO KY 2193 WEST OF LEITCHFIELD.

Grayson4 IP20070157 KY 1214 RECONSTRUCTION $6,568,000 ADDRESS SAFETY, GEOMETRIC DEFICIENCIES AND MAINTENANCE ISSUES ALONG KY 1214 FROM KY 29.6 14.028 ‐ 14.86 3155 (LEITCHFIELD BYPASS) TO US 62.

Larue4 IP20060230 KY 84 MINOR WIDENING $2,053,000 ADDRESS SAFETY AND GEOMETRIC DEFICIENCIES ALONG KY 84 FROM KY 357 TO KY 61 (LINCOLN 29.4 6.561 ‐ 8.449 PARKWAY) NEAR HODGENVILLE Lincoln8 IP20190071 US 150 SPOT $270,000 PRELIMINARY ENGINEERING STUDY FOR 29.4 IMPROVEMENT IMPROVING SAFETY AND ACCESS CONTROL 0 ‐ 5.467 ALTERNATES FROM DANVILLE TO STANFORD.

Harlan11 IP20060286 US 421 RECONSTRUCTION $151,497,000 CORRECT SUBSTANDARD ROADWAY GEOMETRICS AND ADDRESS CONDITION AND 29.4 17.107 ‐ 24.203 SAFETY ISSUES ON US 421 FROM US 119 TO KY 221

Casey8 8‐164 US 127 RECONSTRUCTION $11,810,000 RECONSTRUCT CURVE ON US‐127 AT DUNNVILLE. (02CCR)(04CCR) (10CCR)(12CCR) 29.3 1.9 ‐ 4.2

Cumberland8 IP20120082 KY 90 RECONSTRUCTION $6,671,000 IMPROVE SAFETY AND MOBILITY ON KY 90 BETWEEN ALLENS CREEK RD AND NORRIS 29.3 9.654 ‐ 10.432 BRANCH RD.

Whitley11 IP20130064 KY 727 SAFETY‐HAZ‐ELM $720,000 ADDRESS SAFETY CONCERNS AT THE INTERSECTION OF KY 727 AND KY 1259 IN 29.2 2.4 ‐ 2.5 SCUFFLETOWN

Breckinridge4 IP20160066 KY 261 SAFETY‐HAZ‐ELM $998,000 ADDRESS SAFETY AND GEOMETRIC DEFICIENCIES ALONG KY 261 AT THE S‐CURVES JUST NORTH OF 29.2 12.3 ‐ 12.6 FIRST STREET. SEE 4‐8903.00

Wednesday, September 18, 2019 Page 23 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Nelson4 IP20070197 KY 55 RECONSTRUCTION $21,933,000 ADDRESS SAFETY AND GEOMETRIC DEFICIENCIES ALONG KY 55 FROM US 62 IN BLOOMFIELD TO KY 29.2 3.841 ‐ 6.975 1066 IN SPENCER CO. SEE SECTION 3 IN JANUARY, 2001 SCOPING STUDY.

Green4 IP20060219 KY 61 MINOR WIDENING $8,192,000 ADDRESS SAFETY AND GEOMETRIC DEFICIENCIES ALONG KY 61 FROM 0.2 MILES SOUTH OF 29.1 24.144 ‐ 24.344 GREEN/LARUE COUNTY LINE TO KY 1906 AT MT SHERMAN IN LARUE CO

Nelson4 IP20040041 PF 9999 BYPASS $14,198,000 CONSTRUCT NORTHWESTERN BYPASS OF BARDSTOWN FROM KY 245 TO US 31E NORTH 28.9 ‐ TO RELIEVE CONGESTION AND IMPROVE CONNECTIVITY. TOTAL LENGTH: 2.0 MILES.

Hart4 IP20070185 KY 1140 RECONSTRUCTION $21,344,000 ADDRESS SAFETY, GEOMETRIC DEFICIENCIES AND MAINTENANCE ISSUES ALONG KY 1140 FROM US 28.8 0 ‐ 4.044 31W NORTH OF MUNFORDVILLE TO MT. VERNON/ROCKY HILL RD.

Pulaski8 IP20080499 KY 1642 RECONSTRUCTION $30,283,000 IMPROVE SAFETY AND CONGESTION ALONG KY 1642 FROM MP 0.00 ‐ MP 3.478 (KY 1577 OAK 28.7 0 ‐ 3.478 HILL RD.)

Laurel11 IP20080614 KY 229 RECONSTRUCTION $11,742,000 ADDRESS ACCESS AND SAFETY ISSUES ALONG KY‐ 229 FROM LEVI JACKSON STATE PARK ENTRANCE 28.4 8.837 ‐ 9.85 TO CONLEY ROAD.

Wayne8 8‐80006 KY 1275 MAJOR WIDENING $4,190,000 WIDEN KY 1275 TO FOUR LANES WITH FOUR FOOT SHOULDERS AND FIVE FOOT SIDEWALKS 27.7 4 ‐ 4.479 FROM KY 90 TO BELL LANE(18CCN)

Lincoln8 IP20120054 KY 1194 RECONSTRUCTION $14,989,000 IMPROVE SAFETY ON KY 1194 JUST EAST OF FROG BRANCH ROAD TO JUST EAST OF HANGING 26.9 1.5 ‐ 4.1 FORK CREEK IN LINCOLN COUNTY.

Wednesday, September 18, 2019 Page 24 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Clay11 11‐8861 KY 638 SAFETY $2,900,000 IMPROVE SAFETY AND SIGHT DISTANCE ALONG KY 638 (MP 6.7 TO MP 7.1) AND ITS 26.8 6.7 ‐ 7.1 INTERSECTION WITH KY 3476. (14CCN)(18CCN)

Nelson4 4‐8851 KY 1430 MINOR WIDENING $7,850,000 WIDEN TEMPLIN AVENUE BETWEEN CHAMBERS BLVD AND BEN IRVIN RD/KY 2737. 26.5 0.971 ‐ 1.613 (14CCN)(16CCR)

Casey8 8‐8703 KY 70 RECONSTRUCTION $15,370,000 RECONSTRUCT BELL HILL FROM MP 10.4 TO MP 11.9.(12CCN)(16CCR)(18CCN) 26.5 10.4 ‐ 11.9

Green4 4‐397.11 US 68 RECONSTRUCTION $5,500,000 ADDRESS SAFETY, GEOMETRIC DEFICIENCIES AND MAINTENANCE ISSUES ALONG US68 BETWEEN T 26.5 0 ‐ 9.682 DAVIS RD (MP 6.425) AND THE TOP OF RUSSELL CREEK HILL (MP 9.985). (3‐203.00 STUDY RECOMMENDATION #13) (DESIGN UNDER 4‐ 397)(2016BOP)

Green4 IP20110087 KY 61 SAFETY‐HAZ‐ELM $6,745,000 IMPROVE SAFETY BY ADDRESSING FLOODING ISSUES ALONG KY 61 AT THE CANEY FORK 26.1 2 ‐ 2.4 BRIDGE JUST NORTH OF THE ADAIR COUNTY LINE.

Wayne8 IP20080507 KY 90 MINOR WIDENING $66,175,000 REDUCE CONGESTION AND IMPROVE SAFETY, CAPACITY, AND MOBILITY OF KY 90 BETWEEN KY 26.1 23.077 ‐ 25.235 1568 IN WAYNE COUNTY AND MP 2.757 IN PULASKI COUNTY.

Clinton8 IP20150083 KY 738 SAFETY‐HAZ‐ELM $10,527,000 IMPROVE SAFETY AND MOBILITY OF KY 738 BETWEEN US 127 AND US 127X. 25.8 5.519 ‐ 6.706

Marion4 IP20070192 KY 84 RECONSTRUCTION $24,768,000 ADDRESS SAFETY AND GEOMETRIC DEFICIENCIES ALONG KY 84 FROM KY 527 IN RAYWICK TO KY 25.7 5.098 ‐ 9.71 426 WEST OF LEBANON.

Wednesday, September 18, 2019 Page 25 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Marion4 IP20120063 US 68 MINOR WIDENING $1,284,000 CONSTRUCT A LEFT TURN LANE ON US 68 AT KY 1404 NEAR THE MARION COUNTY HIGH SCHOOL. 25.5 12.97 ‐ 13.254 Hardin4 IP20070179 PF 9999 NEW $4,383,000 CONSTRUCT EASTBOUND ON AND WESTBOUND 25.4 INTERCHANGE OFF RAMPS ON THE BLUEGRASS PARKWAY AT KY ‐ 583.

Marion4 IP20080738 KY 49 MINOR WIDENING $4,400,000 ADDRESS COMMERCIAL TRAFFIC CONCERNS ALONG KY 49 FROM THE NEW INDUSTRIAL ROAD 25.3 18.25 ‐ 18.494 TO KY 2154 (LEBANON BYPASS) AND ALONG KY 2154 FROM KY 49 TO NORTH OF THE INDUSTRIAL ROAD OFF THE BYPASS.

Hart4 IP20120064 KY 88 RECONSTRUCTION $61,968,000 PRELIMINARY DESIGN TO ADDRESS SAFETY, GEOMETRIC DEFICIENCIES AND MAINTENANCE 25.3 5.123 ‐ 15.225 ISSUES ALONG KY 88 FROM KY 728 IN CUB RUN TO LOGSDON VALLEY ROAD. DESIGN OF OVERALL CORRIDOR.

Casey8 8‐8702 US 127 RECONSTRUCTION $2,880,000 CORRECT VERTICAL ALIGNMENT ON US 127 AND KY 1552 NEAR INTERSECTION.(12CCN) 25.1 18.746 ‐ 19.046

Hardin4 IP20120068 US 31 W SAFETY‐HAZ‐ELM $3,415,000 IMPROVE THE INTERSECTION OF US 31W AND KY 84 AT SONORA TO INCREASE SAFETY 24.8 4.1 ‐ 4.3

Cumberland8 IP20080491 PF 9999 BYPASS $22,216,000 IMPROVE SAFETY AND REDUCE CONGESTION ALONG KY 90/KY 61 IN THE WESTERN PORTION 24.6 ‐ OF BURKESVILLE BETWEEN KY 90 AND ROCKY BRANCH DRIVE.

McCreary8 IP20080495 KY 92 RECONSTRUCTION $236,881,000 IMPROVE SAFETY BY IMPROVING THE GEOMETRICS ALONG KY 92 FROM KY 1561 AT 24.3 0 ‐ 15.361 STEARNS TO MONTICELLO CITY LIMITS.

Wednesday, September 18, 2019 Page 26 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Hardin4 IP20090009 US 62 RECONSTRUCTION $17,149,000 ADDRESS SAFETY, GEOMETRIC DEFICIENCIES AND MAINTENANCE ISSUES ALONG US 62 EAST OF 24.3 23.351 ‐ 25.499 ELIZABETHTOWN FROM UPPER COLESBURG ROAD TO STOVALL ROAD.

Casey8 IP20080490 KY 1649 RECONSTRUCTION $20,056,000 IMPROVE GEOMETRICS OF KY‐1649 FROM MILE POINT 1.00 TO NEAR POPULAR SPRINGS ROAD 24.1 1 ‐ 3.281 FOR DEVELOPMENT OF FUTURE AIRPORT.

Wayne8 8‐394 KY 92 RECONSTRUCTION $12,830,000 RAISE GRADE TO PREVENT FLOODING FROM 0.5 MI EAST OF VALLEY VIEW DRIVE TO 0.7 MI W OF 23.9 10.62 ‐ 13.1 KY 1258. (12CCR)(14CCR)

Hart4 IP20070182 US 31 W MINOR WIDENING $17,192,000 ADDRESS SAFETY AND CONGESTION ALONG US 31W FROM GUTHRIE STREET IN HORSE CAVE TO 23.7 0.05 ‐ 2.875 SOUTH OF CAVERNA HIGH SCHOOL.

Casey8 IP20070222 KY 70 RECONSTRUCTION $146,521,000 IMPROVE SAFETY, MOBILITY, AND GEOMETRICS ON KY 70 BETWEEN KY 198 AT YOSEMITE TO KY 23.6 21.422 ‐ 32.65 1247 AT SCIENCE HILL.

Leslie11 IP20080618 US 421 RELOCATION $38,937,000 ADDRESS HORIZONTAL ALIGNMENT, SURFACE CONDITION, AND CONGESTION ISSUES IN ORDER 22.8 4.588 ‐ 7.195 TO IMPROVE CONNECTIBILITY, MOBILITY, AND SAFETY ON US 421 FROM TRACE BRANCH/WARBRANCH ROAD TO MOZELLE.

Marion4 IP20080159 KY 84 RECONSTRUCTION $27,676,000 ADDRESS SAFETY AND GEOMETRIC DEFICIENCIES ALONG KY 84 FROM THE NELSON COUNTY LINE 22.8 0 ‐ 5.098 TO KY 527 AT RAYWICK.

Leslie11 IP20110205 US 421 RECONSTRUCTION $70,522,000 RECONSTRUCT US 421 FROM THE LESLIE/HARLAN COUNTY LINE TO MP 2.00. 22.5 0 ‐ 2

Wednesday, September 18, 2019 Page 27 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Clinton8 IP20120079 US 127 X SPOT $10,496,000 REDUCE CONGESTION AND IMPROVE MOBILITY 22.3 IMPROVEMENT ON US 127X BETWEEN FERGUSON ST AND 3.895 ‐ 5.191 MCWHORTER RD.

Hardin4 IP20170082 CS 1297 RECONSTRUCTION $3,994,000 RECONSTRUCT INTERSECTION OF US 31W AT PEAR ORCHARD ROAD NW AND VETERANS WAY 22.1 0.932 ‐ 1.032

Hardin4 IP20090010 KY 1904 SAFETY‐HAZ‐ELM $1,833,000 INTERSECTION IMPROVEMENTS AT KY 1904 (BACON CREEK ROAD) AND CECILIA SMITH MILL 22.1 2.5 ‐ 2.55 ROAD JUST NORTH OF THE BRIDGE OVER WK PARKWAY TO INCREASE SIGHT DISTANCE AND IMPROVE SAFETY.

Meade4 IP20050005 KY 710 SAFETY‐HAZ‐ELM $960,000 ADDRESS SAFETY ALONG KY 710 AT KY 448 IN BRANDENBURG 21.9 8.143 ‐ 8.243

Lincoln8 IP20150127 PF 9999 NEW ROUTE $6,240,000 PROVIDE CONNECTIVITY OF KY 1194 IN LINCOLN COUNTY TO CONTINUE FROM MP 6.602 21.6 ‐ OVERLAND TO BROCK DRIVE NEAR WHERE IT CROSSES THE STANFORD CITY LIMITS IMPROVING CONNECTIVITY FROM EAST TO WEST OF THE COUNTY.

Rockcastle8 IP20080502 KY 2549 RECONSTRUCTION $4,861,000 ADDRESS ACCESS AND LANE WIDTH ISSUES ON KY‐2549 FROM ROCKCASTLE COUNTY 21.5 2.201 ‐ 2.63 INDUSTRIAL PARK #2 TO US‐150

Marion4 IP20080736 PF 9999 RELOCATION $7,403,000 REALIGN KY 2154 (CORPORATE DRIVE) VIA HENDRICKSON DRIVE TO KY 55, ALIGNING KY 21.3 ‐ 2154 WITH THE LEBANON BYPASS (KY 2154) ON THE WEST SIDE OF KY 55. ESTIMATED TOTAL LENGTH: 1.1 MILES.

Wednesday, September 18, 2019 Page 28 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Adair8 IP20150091 PF 9999 NEW $14,190,000 PROVIDE CONNECTIVITY AND IMPROVED 21.3 INTERCHANGE MOBILITY FROM IN THE WESTERN PORTION OF ‐ ADAIR COUNTY BY ADDING A NEW INTERCHANGE ON THE CUMBERLAND PARKWAY AT KY 80 NEAR GRADYVILLE.

Washington4 IP20060239 KY 152 RECONSTRUCTION $11,600,000 ADDRESS SAFETY AND GEOMETRIC DEFICIENCIES ALONG KY 152 EAST OF SPRINGFIELD FROM 0.3 21.2 12.5 ‐ 14.206 MILES EAST OF THE BEECH FORK BRIDGE TO KELLY SHOP ROAD. Laurel11 IP20150062 KY 3431 TRANSPORTATION $9,383,000 ADDRESS ACCESS, SAFETY, AND SURFACE 21.1 STUDY CONDITION ON KY 3431 FROM US 25E TO TYLER 0.65 ‐ 1.581 TRAIL. ALSO, SAFELY ADDRESS PEDESTRIAN TRAFFIC IN THE AREA.

Clinton8 IP20120081 KY 558 RECONSTRUCTION $31,332,000 IMPROVE SAFETY AND MOBILITY OF KY 558 BETWEEN KY 3045 AND THE END OF STATE 20.9 7.729 ‐ 10.753 MAINTENANCE IN RUSSELL COUNTY.

Adair8 IP20000063 KY 61 RECONSTRUCTION $76,977,000 RECONSTRUCTION FROM COLUMBIA BYPASS (KY 55) TO GREEN COUNTY LINE. SEE ALTERNATE 4 20.6 12.213 ‐ 19.745 PRIORITY SECTION IN DECEMBER 2002 SCOPING STUDY.

Hart4 IP20060227 KY 1846 RECONSTRUCTION $8,035,000 ADDRESS SAFETY, GEOMETRIC DEFICIENCIES AND MAINTENANCE ISSUES ALONG KY 1846 (SHORT 20.6 2.26 ‐ 3.802 CUT ROAD) FROM KY 218 TO US 31W NORTH OF HORSE CAVE. Whitley11 IP20070248 US 25 W TRANSPORTATION $122,063,000 ADDRESS ACCESS AND SAFETY ISSUES ON US 20.4 STUDY 25W FROM I‐75 NEAR CORBIN TO KY 90 16.375 ‐ 28.2 (CUMBERLAND FALLS STATE PARK ENTRANCE)

Taylor4 IP20090019 PF 9999 NEW ROUTE $13,472,000 CONSTRUCT A NEW ROUTE FROM KY 55 TO THE GREEN RIVER STATE PARK. 20.4 ‐

Wednesday, September 18, 2019 Page 29 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Wayne8 IP20070239 KY 1275 RECONSTRUCTION $52,291,000 IMPROVE SAFETY AND MOBILITY ALONG KY 1275 BETWEEN KY 90 AT MONTICELLO AND KY 1765 20.2 3.995 ‐ 10.634 NEAR CONLEY BOTTOM BOAT DOCK ROAD.

Marion4 IP20130138 KY 52 RECONSTRUCTION $11,651,000 ADDRESS SAFETY, GEOMETRIC DEFICIENCIES, AND MAINTENANCE ISSUES ALONG KY 52 FROM 20.1 4.685 ‐ 6.829 THE NORTHERN INTERSECTION OF KY 49 TO BURKES SPRING ROAD.

Washington4 IP20070206 KY 433 RECONSTRUCTION $8,371,000 ADDRESS SAFETY AND GEOMETRIC DEFICIENCIES ALONG KY 433 FROM KY 53 WEST OF 19.3 6.311 ‐ 7.339 WILLISBURG TO KY 555. Jackson11 IP20130061 US 421 CONGESTION $1,443,000 ADDRESS CONGESTION AND SAFETY ISSUES ON 19.2 MANAGEMENT US 421 NEAR ITS INTERSECTION WITH KY 587 BY 10.5 ‐ 11.1 JACKSON COUNTY BOARD OF EDUCATION AND MIDDLE SCHOOL.

Breckinridge4 IP20150473 KY 992 MINOR WIDENING $825,000 ADDRESS SAFETY AND MAINTENANCE ISSUES ON KY 992 FROM NEAR THE ENTRANCE TO WHITE 18.7 11.5 ‐ 13.822 STONE ROCK QUARRY (MP 11.500) EXTENDING TO US 60 (MP 13.822). SEE 4‐8904.00

Laurel11 IP20190189 PF 9999 NEW ROUTE $1,508,000 ADDRESS ACCESS AND SAFETY ISSUES AT THE INTERSECTION OF KY 80 AND PAYNE TRAIL AND 18.5 ‐ BUSH ELEMENTARY SCHOOL BY BUILDING CONNECTOR ROAD FROM HAL ROGERS PARKWAY (HR 9006) TO KY 6264 (PAYNE TRAIL).

Leslie11 11‐5010 US 421 LANDSLIDE REPAIR $12,910,000 LANDSLIDE REPAIR ON US‐421 FROM 0.2 MILE SOUTH JCT. KY‐406 AT STINNETT NORTH 1.0 18.1 15 ‐ 16 MILE. (2002BOPC) (10CCR)(ADDITIONAL FUNDS FROM ITEM NO. 11‐8707 R,U,C)

Green4 IP20110089 KY 61 SAFETY‐HAZ‐ELM $1,845,000 IMPROVE SIGHT DISTANCE AT THE INTERSECTION OF KY 61/KY 565 NORTH OF GRESHAM. 18.0 5 ‐ 5.5

Wednesday, September 18, 2019 Page 30 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Washington4 IP20060240 KY 528 RECONSTRUCTION $12,091,000 ADDRESS SAFETY AND GEOMETRIC DEFICIENCIES ALONG KY 528 FROM US 150 (SPRINGFIELD 17.8 3.117 ‐ 7.144 BYPASS) TO KY 438.

Clinton8 8‐8600 PF 9999 RELOCATION $63,710,000 RELOCATE US 127 FROM KY 90 TO EXISTING US‐ 127 NORTH OF KY‐90 APPROX. 0.18 MILES EAST 17.7 ‐ OF THE INTERSECTION OF AARON RIDGE ROAD. (10CCN)(12CCR)

Hardin4 IP20090008 KY 1357 SAFETY‐HAZ‐ELM $1,191,000 RECONSTRUCT THE INTERSECTION OF KY 1357 (ST. JOHN ROAD) AND CECILIA ROAD WEST OF 17.5 13 ‐ 13.1 ELIZABETHTOWN TO INCREASE SIGHT DISTANCE AND IMPROVE SAFETY.

Marion4 IP20080739 PF 9999 NEW ROUTE $13,333,000 IMPROVE SYSTEM CONNECTIVITY AND DRAINAGE IN LEBANON BY EXTENDING MARTIN 16.7 ‐ LUTHER KING, JR AVE. ALONG THE OLD RAILROAD BED FROM KY 55S (SPALDING AVE.) TO THE LEBANON BYPASS APPROX. 1200' SOUTH OF KY 49.

Larue4 IP20070188 KY 84 RECONSTRUCTION $11,803,000 ADDRESS SAFETY AND GEOMETRIC DEFICIENCIES ALONG KY 84 BETWEEN WHITE CITY AND 16.6 10.99 ‐ 12.589 HOWARDSTOWN FROM PLOUVIEW RD TO WHELAN RD.

Marion4 IP20130139 KY 52 RECONSTRUCTION $13,057,000 ADDRESS SAFETY, GEOMETRIC DEFICIENCIES, AND MAINTENANCE ISSUES ALONG KY 52 FROM 16.5 6.829 ‐ 9.097 BURKES SPRING ROAD TO THE SOUTHERN INTERSECTION OF KY 49.

Whitley11 IP20160264 PF 9999 NEW ROUTE $2,359,000 CONSTRUCT A NEW ENTRANCE TO THE UNIVERSITY OF THE CUMBERLANDS FROM 16.4 ‐ SOUTH 2ND STREET UP THE HILL TO TIE INTO HUTTON WAY TO ACCOMMODATE BOTH VEHICLE AND PEDESTRIAN TRAFFIC. (16CCN)

Wednesday, September 18, 2019 Page 31 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Cumberland8 IP20040025 PF 9999 RELOCATION $39,493,000 IMPROVE SAFETY AND MOBILITY ALONG KY 449 BETWEEN KY 90 AND KY 1206. 16.1 ‐

Wayne8 IP20070240 KY 1275 RECONSTRUCTION $34,760,000 IMPROVE SAFETY AND MOBILITY ALONG KY 1275 BETWEEN KY 1765 AND KY 90 NEAR 16.0 10.634 ‐ 14.366 TOURISTVILLE.

Russell8 IP20150088 KY 76 RECONSTRUCTION $1,585,000 IMPROVE SAFETY AND MOBILITY ON KY 76 AT THE INTERSECTION OF KY 910 IN THE SALEM 15.4 5.731 ‐ 5.931 AREA.

Grayson4 IP20160073 PF 9999 NEW ROUTE $4,538,000 PROVIDE A CONNECTION FROM EAST WHITE OAK STREET TO WEST CARROLL GIBSON 15.1 ‐ BOULEVARD AT THE NEW JUDICIAL CENTER.

Russell8 IP20070236 KY 92 RECONSTRUCTION $37,449,000 IMPROVE SAFETY ALONG KY 92 BY IMPROVE GEOMETRICS ALONG THE ROUTE FROM US 127 15.1 6.999 ‐ 11.244 (COURT SQUARE) TO JAMESTOWN MARINA.

Clay11 11‐8864 CR 1286 SAFETY $7,045,000 IMPROVE GEOMETRICS ALONG URBAN CREEK ROAD (CR 1286) AND, INCLUDING 15.1 0 ‐ 3.067 INTERSECTIONS AT HAL ROGERS PARKWAY AND KY 687. (14CCN)(18CCN) Leslie11 IP20190187 PF 9999 TRANSPORTATION $1,622,000 NEW ROUTE CONNECTING KINGSPORT, 15.0 STUDY TENNESSEE TO LONDON, KENTUCKY. ‐ Marion4 IP20140024 KY 337 DRAINAGE $646,000 DRAINAGE IMPROVEMENTS ALONG KY 337 IN 14.2 IMPROVEMENT BRADFORDSVILLE BETWEEN THE EASTERN 4.265 ‐ 4.42 INTERSECTION WITH KY 49 AND 8TH STREET.

Adair8 IP20190146 PF 9999 RELOCATION $6,751,000 IMPROVE SAFETY AND MOBILITY ALONG KY 55 BY RELOCATING KY 55 NEAR KY 704 AND 14.1 ‐ RELOCATING TO KY 55 BYPASS.

Wednesday, September 18, 2019 Page 32 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Wayne8 IP20090015 PF 9999 NEW ROUTE $214,654,000 NEW CONSTRUCTION CONNECTING MONTICELLO TO THE LOUIE B. NUNN PARKWAY 13.7 ‐ IN PULASKI COUNTY, INCLUDING A NEW BRIDGE ACROSS LAKE CUMBERLAND. Knox11 IP20190030 US 25 E TRANSPORTATION $1,082,000 EXPLORE ACCESS MANAGEMENT 13.3 STUDY OPPORTUNITIES, AS WELL AS INCREASE SAFETY 8 ‐ 12 AND MOBILITY FOR VEHICLE, PEDESTRIAN AND BIKE TRAFFIC IN THIS HEAVILY CONGESTED AREA ON US‐25E IN BARBOURVILLE. Bell11 IP20080621 PF 9999 TRANSPORTATION $275,845,000 ADDRESS HORIZONTAL ALIGNMENT AND SAFETY 12.8 STUDY ISSUES ON KY 92 FROM US 25W IN ‐ WILLIAMSBURG TO US 25E AT FOUR MILE IN BELL COUNTY Clinton8 IP20190096 KY 829 SPOT $2,413,000 IMPROVE SAFETY AND MOBILITY ALONG KY 829 12.5 IMPROVEMENT BY IMPROVING THE GEOMETRICS FOR FUTURE 1 ‐ 1.8 MARINA DEVELOPMENT. Hardin4 IP20190034 KY 3005 TRANSPORTATION $541,000 TRANSPORTATION STUDY FOR CONNECTIVITY 12.1 STUDY ALONG THE EAST SIDE OF ELIZABETHTOWN. 8.829 ‐ 10.582 Harlan11 IP20180075 PF 9999 TRANSPORTATION $26,816,000 CONSTRUCT A NEW ROUTE TO ADDRESS ACCESS 11.2 STUDY ISSUE ON KY 72 FROM ALVA/BLACK STAR NEAR ‐ HARLAN/BELL COUNTY LINE TO LIGGETT, WHICH IS WEST OF THE CITY OF HARLAN Knox11 IP20160058 KY 11 TRANSPORTATION $104,192,000 RECONSTRUCT AND IMPROVE EXISTING 10.8 STUDY ALIGNMENTS, WITH SHOULDERS, OF KY 11 10.108 ‐ 22.694 FROM US 25E IN KNOX COUNTY TO THE US 421 IN CLAY COUNTY LINE (16CCN) Harlan11 IP20080600 PF 9999 TRANSPORTATION $164,247,000 ADDRESS CONGESTION, CAPACITY, 10.6 STUDY CONNECTIVITY, AND SAFETY ISSUES ON KY 72 ‐ FROM HARLAN/BELL COUNTY LINE TO US 421

Wednesday, September 18, 2019 Page 33 of 34 SHIFT 2020 Regional Score CountyDistrict Item # Primary Route Project Type Cost Estimate Project Description Max 100

Clinton8 8‐8601.30 PF 9999 RELOCATION $40,230,000 RELOCATION OF US‐127 FROM EAST OF THE AARON RIDGE RD AND OLD US‐127 10.3 ‐ INTERSECTION, EXTENDING NORTHERLY TO NORTH OF THE KY‐3063 AND OLD US‐127 INTERSECTION. (SEE 8‐108 AND 8‐115 FOR PE&ENV)(12CCR)

Wednesday, September 18, 2019 Page 34 of 34