750 Lakhs Saitual, Keifang Prepared By, Horticulture Development

Total Page:16

File Type:pdf, Size:1020Kb

750 Lakhs Saitual, Keifang Prepared By, Horticulture Development Area : 5000 Ha Project Cost : 750 lakhs Saitual, Keifang Prepared by, Horticulture Development Officer, Directorate of Horticulture. 1 INDEX CHAPTER Page No. 1. Introduction --------------------------------------------3 2. Project Profile --------------------------------------------8 3. History of Project Villages & --------------------------------------------15 Basic Information 4. Participatory Rural Appraisal --------------------------------------------16 5. Problem Typology --------------------------------------------17 6. Project Intervention Plan --------------------------------------------20 7. DPR Plan Abstract --------------------------------------------21 8. Preparatory Phase. --------------------------------------------22 9. Work Plan Details --------------------------------------------23 10. Consolidation and Withdrawal Phase. ------------------------------------25 11. Capacity Building Institute Identified ------------------------------------26 12. Institutional & Capacity building Plan ------------------------------------27 13. Basic Profile of the project location -------- ---------------------------29 14. Maps of the project ------------------------------------30 15. Institutional mechanism& Agreements. ----------------------------------- 34 16. SWOT Analysis of PIA. ----------------------------------- 35 17. PIA & Watershed Committee details. ----------------------------------- 36 18. Convergence Plans. ----------------------------------- 37 19. Expected Outcomes. ----------------------------------- 39 20. Expected Estimate Outcomes. ----------------------------------- 41 21. Monitoring & Evaluation. ----------------------------------- 42 22. List of Institution identified for capacity building. ---------------------------43 23. Plan & Estimates for various activities. -----------------------------------44 24. Drawing for Various activities. -----------------------------------50 25. Micro-Watershed work Plan for one cluster Area under IWMP.--- -------56 26. Beneficiary Card Sample -----------------------------------57 2 1. INTRODUCTION: Land is a critically important national resource in which all human activity is based. Its efficient management is vital for economic growth and development of Rural Areas to harness the full potential of the available land resources and prevent its further degradation, development of rain fed area, degraded area is of great significance. Its management is complex and multi dimensional and its development requires scientific, holistic and innovative approach. Unprecedented population and cattle pressure and demands of Society on scarce land, water and biological resources and the ever increasing degradation of these resources is affecting the stability and resilience of our ecosystem and the environment as a whole. The expansion of human settlement and infrastructure, intensification of Agriculture, expansion of agriculture into marginal areas and fragile ecosystem emphasizes the need for integrated planning and management of resources. With ever increasing population, the needs of the people is also ever increasing. The population of Mizoram has now reached 10 lakhs resulting in increasing demand for commodities and lack of work for both the urban and rural population. Most of the rural population depends on shifting cultivation for their livelihood. Shifting Cultivation is practiced by clearing forest areas. The previous year’s jhumland is kept fallow for 5-6 year’s depending on the area available for cultivation for each village. Shifting Cultivation results in burning of large areas of forest including those that are not required for cultivation thereby destroying forest cover, there are fewer trees and shrubs to decrease the flow of water, hence only the top soil becomes wet leading to increased runoff speed of rain water resulting in low underground water table. Those natural springs we have that we so proudly say never runs dry have now become dry during the winter months. The water we have left barely meets the requirement for human consumption not to mention those required for irrigation of farmland. The thinning forest cover decreases moisture content of the soil making it unsuitable for plantation of trees and crops. Temperature also increases considerably because of this. Our once fertile lands will soon become deserts if we do not put a stop to shifting cultivation soon. Each watershed area under the project is a micro level effort to achieve the objective of watershed programme through treating under productive and hitherto unproductive lands and taking up allied activities for the benefits of the rural poor and landless. This project adopt a common strategy of multi-resource management involving all stakeholders within the watershed, who together as a group, co-operatively identify the resources, issues and concerns of the watershed as well as develop and implement a watershed plan with solutions that are environmentally, socially and economically sustainable. WATERSHED MANAGEMENT WORKS (56% of WORKS COMPONENT) Focus will be on:- 1. Developing water, land/degraded land and abandoned jhum land on watershed basis, keeping in view the capacity of land, local condition and needs. 2. Promoting overall economic development and improving Socio-economic condition of the poor and disadvantaged section inhabiting the project area. 3. Restoring ecological balance by harnessing, conserving and developing natural resources. i.e., land, water and vegetative cover. 4. Encouraging village community for sustainable community action for operation and maintenance of assets created and further development of potential of natural resources in the watershed. 3 5. Employment generation, poverty alleviation, community empowerment and development of human and other economic resources of the village. Watershed Management works will be taken up in multi-tier approaches as below:- 1. First Tier-Canopy/Ridge Area Treatment (a) Stoppage of Shifting Cultivation: As per the report of the Mizoram Remote Sensing Application Centre on 12th August, 2010, the soil cultivation of the State became critical which needs to be systematically addressed to check further degradation and soil erosion. According to MIRSAC report the vegetative cover of Mizoram is shown below:- Sl.No Total Geographical Area 21087 Sqm % 1 Soil loss due to weather, etc. 4352.36 Sqm 20.64 2 Virgin Forest 1537.25 Sqm 7.29 3 Open Forest 2047.55 Sq Km 9.71 4 Scrub land/degraded Forest 5193.73 Sq Km 24.63 5 Area covered by Lake, Pond and Rivers 139.17 Sq Km 0.66 6 Bamboo Forest 7816.94 Sq Km 37.07 Out of the total area of 21087 Sq Kms, 999.52 Sq Kms. have been annually degraded due to shifting cultivation. Hence, a shift from jhumming to permanent farming is the need of the day. (b) Afforestation: Besides the natural forest areas, more areas are proposed for afforestation under IWMP and other Schemes. Increased forest area will result in decrease of runoff water, soil water content and increased precipitation/rainfall, increased underground water table. (c) Prevention of soil erosion: Due to the hilly nature of Mizoram and deforestation, rain water easily erodes the fertile top soil. Fertility decreases considerably in places of minimal forest cover. To prevent more soil erosion, construction of terraces, afforestation and other means are proposed so that there will be minimum soil content in the runoff water. 2. Second Tier-Horticulture Crop Area Treatment:- (a) Construction of water harvesting structures and better utilization of water resources: Rainfall is still moderate and whatever rainfall we get, if we have proper harvesting structures, is more than enough for every household use without any other source of water. In place of permanent cultivation where natural streams are available for water harvesting using gravity and in those places where water is not available by gravity also, water harvesting should be encouraged. The harvested water can be used both for human consumption as well as for irrigating farmlands and will provide the required water during dry season. (b) Land Development: The areas covered under IWMP project are planned to be developed in such a way that the productivity will increase. The areas proposed for afforestation will be developed by making terrace. Construction of terrace will prevent unnecessary water runoff, thereby, recharging the water table. In places where permanent cultivation will be practiced, depending on the slope of the 4 terrain, terrace, bench terrace and contour trench will be constructed. Cultivation of commercial crops will be practiced in such places and irrigation facilities for dry season will be provided. (c) Gestation period treatment: The Permanent Horticulture crops planted in the 2nd Tier-Area will be mostly Orange, Hatcora, Nimbu, Litchi, Mango, Avocado and other cash crops. These crops will be harvested only after 5 years or more. During the gestation period, farmers and cultivators will be encouraged and assisted to introduce annual cash crops to meet their daily weeks. 3. Third Tier-Agriculture Crop Area Treatment: (a) Wet Rice Cultivation & Mixed Farming: In places of permanent cultivation, the land will be prepared in such a way that 2 – 3 crops can be planted in a year. This cannot be achieved with only the natural fertility of the land; therefore, provision will be made so that the cultivators can raise domestic animals in their farmland. The manure collected from animals can be used to fertilize the land making the crops produced in these farms entirely organic.
Recommended publications
  • The Mizoram Gazette EXTRA ORDINARY Published Byauthority Regn
    The Mizoram Gazette EXTRA ORDINARY Published byAuthority Regn. No. NE-313(MZ) 2006-2008 Rs. 2/- per issue VOL - XXXVII Aizawl, Thursday 11.9.2008 Bhadra 20, S.E. 1930, Issue No. 367 NOTIFICATION No. B. 14016/30/07-LADNC, the 9th September, 2008. LushaiHills District (Administration ofJustice) Rules, 1953, Sec 2 (1) (i) in thuneihna a pek angin Mizoram Governor chuan a hnuaia J... tarian ViUage Council te tan A}·rNEXURE a tarlan ang hian an Boundary a siam a. Tunhma lama heng Village Council te tana boundary 10 siam tawh te chu a thiat nghal ani. It Amaherawh chu heng ramri te hi a tul anga enfiah theih a ni ang. 1 CHA\VILUNGVILLA.GE COUNCIL BOUNDARY 2. TLUNGVEL VILLAGE COUNCIL BOUNDARY 3. DARLAWNG VILLAGE COUNCIL BOUNDARY 4. PHULMAWI VILLAGE COUNCIL BOUNDARY 5. THINGSULTHLIAH, rtllNGSULTLANGNUAM LEHSELINGJOINTVILLAGE COUNCIL BOUNDARY 6. KEPRAN VILLAGE COUNCIL BOUNDARY 7. SAWLENG VILLAGE COUNCIL BOUNDARY 8. N. SERZAWLVILLAGE COUNCIL BOUNDARY 9. SATEEKVILLAGE COUNCIL BOUNDARY 10. MAUBUANG VILLAGE COUNCIL BOUNDARY 11. LENCHIM VILLAGE COUNCIL BOUNDARY 12. RUALLUNG LEH RULCHAWM VILLAGE COUNCIL BOUNDARY 13. DAIDO VILLAGE COUNCIL BOUNDARY 14. N.E.TLANGNUAM VILLAGE COUNCIL BOUNDARY 15. PHUAIBUANG VILLAGE COUNCIL BOUNDARY 16. KHAWLIAN VILLAGE COUNCIl BOUNDARY 17. MUALLUNGTHU VILLAGE COlJNCIL BOUNDARY 18. KELSIH VILLAGE COUNCIL BOUNDARY 19. MELRIATVILLAGE COUNCIL BOUNDARY 20. HUALNGOHMUN VILLAGE COUNCIL BOUNDARY Ex-367/2008 - 2 - 21. SAMTLANG VILLAGE COUNCIL BOUNDARY 22. FALKAWN VILLAGE COUNCIL BOUNDARY 23. N.KHAWLEK VILLAGE COUNCIL BOUNDARY 24. VANBAWNG VILLAGE COUNCIL BOUNDARY 25. LAMHERH VILLAGE COUNCIL BOUNDARY 26. ZAWNGIN VILLAGE COUNCIL BOUNDARY 27. SUANGPUILAWN VILLAGE COUNCIL BOUNDARY 28. SAILAM VILLAGE COUNCIL BOUNDARY 29.
    [Show full text]
  • Hydrological Observation Sites
    SITES UNDER NEIC, SHILLONG BRAHMAPUTRA & BARAK BASIN ORGANIZATION, CWC, SHILLONG, MEGHALAYA North‐East Investigation Circle, CWC, Shillong ANNEXURE‐I List of Hrdrological Observation Sites: NEID‐I, CWC, Silchar Date of SN. Site River Sub‐Division Type Latitude Longitude Frequency opening 02.07.2009, 1 Kashithal Sonai Sonai Irrigation Project Unit GDS 07.08.2009, 24°32'37''N 92°57'25''E Daily 01.05.2010 29.06.2009, 2 Kulicherra Rukni Rukni Irrigation Project Unit GDS 21.07.2009, 24°29'26''N 92°48'21''E Daily 01.05.2010 02.07.2009, Valley Bridge, North Eastern Investigation Sub‐ 3 Tuipui GDS 07.08.2009, 24°13'36''N 93°10'02''E Daily Tuipui Division‐5, Baite 01.05.2010 NEID‐II, CWC, Aizawl Date of SN. Site River Sub‐Division Type Latitude Longitude Frequency opening 1 Sihtlangpui Kolodyne Mizoram Investigation Sub‐Division GDSQ 01.01.2015 22°57'37''N 92°24'37''E Daily 2 Tuipui 'D' Kolodyne Mizoram Investigation Sub‐Division GDSQ 22.06.2013 22°54'50''N 93°56'40''E Daily 3 Mat‐1 Mat Mizoram Investigation Sub‐Division GD 23.09.2013 23°18'99''N 92°48'87''E Daily 4 Tlabung Karnaphuli Mizoram Investigation Sub‐Division GD 10.08.2013 22°53'54''N 92°28'26''E Daily 5 Mateswari Karnaphuli Mizoram Investigation Sub‐Division GDSQ 25.07.2013 22°56'25''N 92°31'32''E Daily North Eastern Investigation Sub‐ 6 Reiek Kai Tlawng G 07.08.2014 23°42'43''N 92°40'00''E Daily Division‐3 North Eastern Investigation Sub‐ 7 Turial Tuirial GD 30.07.2014 23°51'00''N 92°49'48''E Daily Division‐3 North Eastern Investigation Sub‐ 8 Dapchhuah Tut G 04.08.2014 23°46'09''N
    [Show full text]
  • Edited by – Ashis Roy
    Dam Edited by – Ashis Roy Dam a structure built across a stream, river, or estuary to store water. A reservoir is created upstream of the dam to supply water for human consumption, irrigation, or industrial use. Reservoirs are also used to reduce peak discharge of floodwater, to increase the volume of water stored for generating hydroelectric power, or to increase the depth of water in a river so as to improve navigation and provide for recreation. Dams are usually of two basic types - masonry (concrete) and embankment (earth or rock-fill). Masonry dams are used to block streams running through narrow gorges, as in mountainous terrain; though such dams may be very high, the total amount of material required is much less. The choice between masonry and earthen dam and the actual design depend on the geology and configuration of the site, the functions of the dam, and cost factors. Auxiliary works for a dam include spillways, gates, or valves to control the discharge of surplus water downstream from the reservoir; an intake structure conducting water to a power station or to canals, tunnels, or pipelines for more distant use; provision for evacuating silt carried into the reservoir; and means for permitting boats or fish to cross the dam. A dam therefore is the central structure in a multipurpose scheme aiming at the conservation of water resources. Water levels in the reservoir upstream is controlled by opening and closing gates of the spillway which acts as the safety valve of the dam. In addition to spillways, openings through dams are also required for drawing off water for irrigation and water supply, for ensuring a minimum flow in the river for riparian interests downstream, for generating power, and for evacuating water and silt from the reservoir.
    [Show full text]
  • Pseudolaguvia Virgulata, from Mizoram, India
    http://sciencevision.info Sci Vis 10 (2), 73 Research Report April-June, 2010 ISSN 0975-6175 On the new catfish, Pseudolaguvia virgulata, from Mizoram, India Lalramliana Department of Zoology, Pachhunga University College, Mizoram University, Aizawl 796001, India A new species of catfish was recently identi- fied from some major rivers of Mizoram. Heok Hee Ng and Lalramliana named the new catfish Pseudolaguvia virgulata, after its distinctively striped colour pattern (virgulata = “striped” in Latin). Besides its distinctive colour pattern, which consists of pale stripes running along the entire length of the body, a pale y-shaped marking on the head and brown stripes running through the caudal fin lobes, the new catfish also differs from congeners in other characters. These in- clude: head width 21.2–24.4% standard length; pectoral-fin length 28.5–29.1% standard length; length of dorsal-fin base 17.2–19.9% standard length; dorsal-spine length 21.5–24.0% standard length; serrated anterior edge of dorsal spine; thoracic adhesive apparatus reaching beyond base of last pectoral-fin ray; body depth at anus 14.5–17.4% standard length; length of adipose- fin base 12.9–15.0% standard length; caudal peduncle length 18.2–20.2% standard length; caudal peduncle depth 7.8–9.7 % standard length; snout length 48.0–54.9% head length; interorbital distance 29.3–35.2% head length; 29 –30 vertebrae. Pseudolaguvia virgulata was collected from river system, one of the three rivers that form clear, shallow, moderately flowing streams with the Ganges Delta. a predominantly sandy bottom.
    [Show full text]
  • The Mizoram Gazette Published by Author,Ity
    Regd. No. NE 907 The Mizoram Gazette Published by Author,ity Vol XUI Aizawl Friday 2.11.1984 Kartika 11 S.B. 1906 Issue No. 44 , ;t)vernment of ,Mizoram PA!:tT I ,t.,;�"P8,;-,�,nents, Postings, Transfers, Powers, Leave and other F\;rsonal Notices and OrGers. ORDERS BY THE LT. GOV ERNOR (ADMINISTRATOR) NOTIFICATIONS , No.B. 20022j 1/84-EDN/3, the 29th October, 1984. The Lt. Governor of Mizoram is pleased to constitute a Co-ordination Committee of Archives with the following members and under the terms of reference shown below with immediate effect and until further order:- 1. 1) Chief Secretary Govt. of Mizoram. Chairman ...- 2) Deputy Commissioner Aizawl. Member 3) Education Secretary, Govt. of Mizoram. -do- Director of Education, Mizoram. -do- 54)) Dy Director Education. i/c Adult & Culture, Mizoram, Aizawl. -do- 6) President, District Council Court. -do- -7) Director of Agriculture, Mizoram. -do- '\. 8) Chief En,2ineer; P.W.D. Aizawl. - -do- 8) Su b-Diyisional Education Officer, Aizawl West.- ' -do- lO) Senior Executive Secretary, Mizoram Presbyterian Church. -do- l l) Representative of the Mizoram Baptist MIssion Church Lunglei -do-- 12) Representative of the Mizoram Roman Catholic Church, .Aizawl. --do- 13� Renresentative of the Mizoram Salvation Army, Aizawl. -do- 14) Superintendent of Archives -do- 15) Curator. J\1izoram· State Museum Mem ber Secretary. R-44/84 2 ' II. The function of the Co-ordi nation Committee of Archives is to implement the (i)main fWlctions of a Shte Record Office as follows:- To conccntrak in a single repos itory a]l the non current records, both , (a) Confidential and non-confidential of the State �ecretariat and the s ubor­ dingte t:1uthorities to it whether at the headqua'rters or elsewhere inc1udin£r District Divis'on' and coUectorate records and similar records I of the igh Court and othtr cou t; H r (b) To house th:m in a properly equipped building: (c) To arr.]I1.;e (IIld clarify them on Scientific principles; (d) To take such measures, as are required; for their preservation and reha- bilitation; .
    [Show full text]
  • Annual Report 2009-10
    Central Electricity Authority Annual Report 2009-10 ANNUAL REPORT 2009-10 lR;eso t;rs GOVERNMENT OF INDIA MINISTRY OF POWER CENTRAL ELECTRICITY AUTHORITY September 2010 I Central Electricity Authority Annual Report 2009-10 CENTRAL ELECTRICITY AUTHORITY Sewa Bhawan, R.K. Puram New Delhi – 110 066 CEA website: www.cea.nic.in Sub ordinate Offices : Regional Power Committees: 1. Member Secretary, Northern Regional Power Committee, 18-A, Shaheed Jit Singh Marg, Katwaria Sarai, New Delhi-110016. 2. Member Secretary, Eastern Regional Power Committee, 14 Golf Club Road, Tollygunge, Kolkata-700033. 3. Member Secretary, Western Regional Power Committee, Plot No. F-3, Opposite SEEPZ Complex, MIDC Area Marol, Andheri (East), Mumbai-400093. 4. Member Secretary, Southern Regional Power Committee, 29 Race Course Cross Road, Near Anand Rao Circle, Bangalore-560009. 5. Member Secretary, North-Eastern Regional Power Committee, Nongrimbah Road, Laitumkhrah, Shillong-793003. Regional Power Survey Offices: 1. Dy. Director, Regional Power Survey Office (North), 3rd Floor, 18-A, Shaheed Jit Singh Marg, Katwaria Sarai, New Delhi-110016. 2. Dy. Director, Regional Power Survey Office (East), Room No.201, C.G.O. Complex, ‘DF’- Block, Salt Lake City, Kolkata-700064. 3. Dy. Director, Regional Power Survey Office (West), 5th Floor, Plot No. F-3, Opposite SEEPZ Complex, MIDC Area Marol, Andheri (East), Mumbai-400093. 4. Dy. Director, Regional Power Survey Office (South), Letter Box No. 38, 6th Floor, ‘F’ Wing, Kendriya Sadan, Koramangala, Bangalore – 560034. Regional Inspectorial Organisations: 1. Superintending Engineer, Regional Inspectorial Organisation (North), 18-A, Shaheed Jit Singh Marg, Katwaria Sarai, New Delhi-110016. 2. Superintending Engineer, Regional Inspectorial Organisation (East), 14 Golf Club Road, Tollygunge, Kolkata-700033.
    [Show full text]
  • Page 1 of 2 NO.A.11013/12/2019-GAD
    NO.A.11013/12/2019-GAD GOVERNMENT OF MIZORAM GENERAL ADMINISTRATION DEPARTMENT ***** N O T I F I C A T I O N Dated Aizawl, the 4th July, 2019 In the interest of public service, the Competent Authority is pleased to order creation and transfer of various categories of posts for the Office of the Deputy Commissioner, Saitual District as shown below:- No of posts Total Sl. Pay Name of Post newly Remarks No. of No. Level created Posts 1 Deputy Commissioner 13 1 1 2 Addl. Deputy Commissioner 12 1 1 3 Election Officer 11 1 1 4 Sub-Deputy Commissioner 10 2 2 5 Superintendent 10 1 1 Existing 1 (one) post of Assistant in o/o SDO(C), Saitual and re-designated vide 6 Assistant 7 2 No.A.11013/1/08- 3 PAR(SSW) dt.12.08.2009 shall be retained by D.C. Saitual. 7 Steno-II 7 1 1 5 (five) out of 23 (twenty three) vacant posts of UDC upgraded vide 8 UDC 6 - No.A.11011/13/89- 5 GAD Dt.22.07.1991 under D.C. Aizawl shall be transferred to D.C. Saitual 7 (seven) out of 18 (eighteen) vacant posts of LDC created vide 9 LDC 4 - No.ABM.27/65/37 7 Dt.09.02.1967 under D.C. Aizawl shall be transferred to D.C. Saitual. 10 Driver 2 5 5 11 Despatch Rider 2 1 1 20 (twenty) vacant posts of Peon created vide No.GAD.44/72/11 12 Group ‘D’ 1 - 20 Dt.25.11.1972 under D.C.
    [Show full text]
  • The Mizoram Gazette Wuf,Cisftea
    " • �'lJ1I"it The Mizoram Gazette EXTRAORDINARY Wuf,Cisftea [,y Authority Regn. No. NE-313(MZ) VOL - XXXII Aizawl, Saturday 6.12.2003 Agrahayana 15, S.B. 1925, Issue No. 370 ELECTION COMMISSION OF INDIA Nirvachan Sadan, Ashoka Road, New Delhi -110 001. Dated: the 6th December, 2003 t • 15 Agrahayana,1925 (Saka) NOTIFICATION No. 30S/MIZ-LN2003 :- Whereas, in pursuance of Notification No.H. 11018/2/2003-CEO, issued by the Governor of Mizoram on 27th October, 2003 under sub-section (2) of Section 15 of the Representationof the People Act, 1951 (43 of 1951), a General Election has been held for the purpose of constitutinga new Legislative Assembly for theState ofMizoram; and Whereas, the results of theelections inall Assembly Constituencies in the said General Election have been declaredby the Returning Officers concernedexcept in20- Suangpuilawn(S T) Assembly Contituency, where counting of votes has not been completed. Now, therefore, in pursuance of section 73 of the Representation of the People Act, 1951 (43 of 1951), the Election Commission ofIndia hereby notifies the names of the Members elected for those constituencies,along withtheir party affiliation, if any, inthe SCHEDULEto this Notification. By order, K. AJAYA KUMAR SECRETARY ELECTION COMMISSION OF INDIA Ex--370/2003 - 2 - SCHEDULE TO NOTIFICATION NO. 3081MIZ-LAl2003 DATED �. 6TH DECEMBER,2003 OF ELECTION COMMisSION OF INDIA • Name of the State: Mizoram S1. No. and Name of Name of theElected PartyAffiliation (if any) Assembly Constituency Member l. Tuipang(ST) P.P.Thawla Maraland Democratic Front Indian 2. Saiha(ST) S. Hiato National Congress 3. Sangau(ST) H.Rammawi MIZO National Front 4.
    [Show full text]
  • World Bank Document
    MIZORAM HEALTH SYSTEMS Public Disclosure Authorized STRENGTHENING PROJECT (P173958) Public Disclosure Authorized Environmental and Social Management Framework (ESMF) Public Disclosure Authorized Draft Report Public Disclosure Authorized November 2020 Table of Content Executive Summary ............................................................................................................................. vi Introduction ........................................................................................................................................... 1 Background ......................................................................................................................................... 1 Environmental Profile of Mizoram ...................................................................................................... 1 Socio-Cultural and Demographic Profile of Mizoram ......................................................................... 3 Demographic Profile ....................................................................................................................... 3 Tribes of Mizoram ........................................................................................................................... 4 Autonomous District Councils in Mizoram ......................................................................................... 4 Protected Areas .................................................................................................................................. 4 Health Status
    [Show full text]
  • INTERVIEW LIST on 5Th AUGUST 2020
    ROOM B 201(9:30-12:30) 5 AUGUST (60 STUDENTS) Sl.No Name Fathers Name Contact Address 1 Cassidy B Phiapi P. Beingachhi 8837430244 Siaha, New Siaha 2 Barnaba Lalthlamuana Chalhuaia 9774840248 Govt.Complex 3 Mary Rose Chanchinmawii L. Khaimawng 7042402629 New Siaha 4 Vanlalhruaitluanga Vl. Hmangaihmawia 8731087582 N. Vanlaiphai 5 H.C.Lalmalsawmdawnga H C.Lalhnehzaua 7085077298 Cheural 6 Lalchhandama Lalruatkima 9077568226 Maubawk 7 Lalchhuanawmi Zosangliana 8974245268 Puilo 8 Priskil Lalnunziri S.Daniela 6009135106 Ralvawng 9 Malsawmtluanga Sailo Jonathan Sailo 9089664067 Chanmari West 10 J Lallawmsanga J Khawzaliana 8794922674 Biate 11 Lalremruati Biakthanmawia 8794678376 Tuikual North 12 Lallungmuani Khamsianthang 7628021401 Mimbung 13 S Thansonlian S Mangkhanpau 6909715683 Mimbung 14 H Vanlalrinnunga H Zirtluanga 6033154684 Maubawk Veng 15 R.Lalremtluanga R.Lalhmangaihzuala 6009006989 Bualpui V 16 Vanlalthlamuanpuii Lalrinliana 8014530110 Edenthar 17 C Lalhminghluii C Vanlalsiama 7005664720 Saron Veng 18 C. Hmingthanmawia Robert Lalhmingliana 8794034874 Zotlang 19 Zorammuana Siamkunga 7085115565 Ramhlun Venglai 20 G. Khupsangliana G. Damsiama 7629967410 Mimbung 21 Zodintluangi C.Malsawmliana(L) 8414007515 South Kanan 22 Lalremruati R. Rotluanga 8259888490 Chhiahtlang 23 Hmingmuanzuala H Kapthuama 8794993851 Vengthar Biate 24 Zothanpuia F. Pahlira 8787330015 Vairengte 25 H lalhmingmuana H Sangthuama 8787732766 Kawlbem 26 K Lalzemawii K Laltlanliana 9366413184 Chhiahtlang 27 Lawmsangzuali R. Lalbiaknunga 9383248396 North Vanlaiphai 28 K.Remsangpuii K.Lalfakawma 6909493287 Thingsulthliah 29 C. Lalnunpuii C.Lalhmuchhuaka 6909625534 Zamuang 30 R Zothanpuii R Thangdailova 8131958087 Champhai Zote 31 H. Lalhmingmuana H. Sangthuama 8787732766 Kawlbem 32 Lalrempuia R. Laltanpuia Late 9863223063 Chawnpui 33 R. Lalchhuanmawii Laldinleha 7629859428 Hmunhmeltha 34 Vanlalthawmliana Vanlalchaka Sailo 7630078096 Vaphai 35 C.Malsawmzela Zonunmawia 8416094796 Chawlhhmun 36 Lalfakmawii Malsawmthanga 7005971748 W.Lungdar 37 C.
    [Show full text]
  • MIZORAM S. No Name & Address of the ICTC District Name Of
    MIZORAM Name of the ICTC Name of the Contact Incharge / S. No Name & Address of the ICTC District Counsellor No Medical Officer Contact No Lalhriatpuii 9436192315 ICTC, Civil Hospital, Aizawl, Lalbiakzuala Khiangte 9856450813 1 Aizawl Dr. Lalhmingmawii 9436140396 Dawrpui, Aizawl, 796001 Vanlalhmangaihi 9436380833 Hauhnuni 9436199610 C. Chawngthanmawia 9615593068 2 ICTC, Civil Hospital, Lunglei Lunglei H. Lalnunpuii 9436159875 Dr. Rothangpuia 9436146067 Chanmari-1, Lunglei, 796701 3 F. Vanlalchhanhimi 9612323306 ICTC, Presbyterian Hospital Aizawl Lalrozuali Rokhum 9436383340 Durtlang, Aizawl 796025 Dr. Sanghluna 9436141739 ICTC, District Hospital, Mamit 0389-2565393 4 Mamit- 796441 Mamit John Lalmuanawma 9862355928 Dr. Zosangpuii /9436141094 ICTC, District Hospital, Lawngtlai 5 Lawngtlai- 796891 Lawngtlai Lalchhuanvawra Chinzah 9863464519 Dr. P.C. Lalramenga 9436141777 ICTC, District Hospital, Saiha 9436378247 9436148247/ 6 Saiha- 796901 Saiha Zingia Hlychho Dr. Vabeilysa 03835-222006 ICTC, District Hospital, Kolasib R. Lalhmunliani 9612177649 9436141929/ Kolasib 7 Kolasib- 796081 H. Lalthafeli 9612177548 Dr. Zorinsangi Varte 986387282 ICTC, Civil Hospital, Champhai H. Zonunsangi 9862787484 Hospital Veng, Champhai – 9436145548 8 796321 Champhai Lalhlupuii Dr. Zatluanga 9436145254 ICTC, District Hospital, Serchhip 9 Serchhip– 796181 Serchhip Lalnuntluangi Renthlei 9863398484 Dr. Lalbiakdiki 9436151136 ICTC, CHC Chawngte 10 Chawngte– 796770 Lawngtlai T. Lalengmuana 9436966222 Dr. Vanlallawma 9436360778 ICTC, CHC Hnahthial 11 Hnahthial– 796571
    [Show full text]
  • Variations in Water Quality Characteristics of Serlui River As Impacted by Serlui-B Hydel Project in Kolasib District, Mizoram
    International Journal of Scientific Research in _______________________________ Research Paper . Multidisciplinary Studies E-ISSN: 2454-9312 Vol.3, Issue.6, pp. pp.39-47, June (2017) P-ISSN: 2454-6143 Variations in water quality characteristics of Serlui river as impacted by Serlui-B hydel project in Kolasib district, Mizoram Sangeeta Sunar Department of Environmental Science, Mizoram University, Aizawl, Mizoram, India Corresponding author: [email protected], Mob. +91-9856286089 Available online at: www.isroset.org Received 10th May 2017, Revised 24th May 2017, Accepted 17th Jun 2017, Online 30th Jun 2017 Abstract- The Serlui river is one of the most important natural resource systems in Kolasib district, Mizoram, India. The present study was conducted for a period of one year i.e., from March 2015 to February 2016 to assess the impact of Serlui-B Hydel Project on the water quality of Serlui river, as river water is directly used for drinking and various other domestic purposes by the local people settled in vicinity. Altogether, three sampling sites were selected for detailed investigation along the river from upstream to downstream along the hydel project. The water samples were collected at monthly interval for analysis of various parameters namely, Temperature (22.2˚C-34.3˚C), pH (6.1-7.7), Electrical Conductivity (81µS-154µS), -1 -1 -1 Dissolved Oxygen (5.7-8.1mgL ), Biological Oxygen Demand (0.6-2.2mgL ), Acidity (31-68 mgL CaCO3), Total Alkalinity -1 -1 -1 -1 (18-70mgL CaCO3), Chloride (21-145.67mgL CaCO3), Phosphate-P (0.017-0.210mgL ) and Nitrate-N (0.14-0.60mgL ).
    [Show full text]