Enerpac World Class Collection
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Manual Valves Repair Parts Sheet to Protect Your Warranty
Repair Parts Sheet Manual Valves L1257 Rev. J 09/13 For Date Codes Beginning with the Letters “B” and “C” To Protect Your Warranty, Use Only ENERPAC Hydraulic Oil. Enerpac recommends that all kit components be installed to insure optimum performance of the repaired product. Figure 1, Main Assembly 1 Apply Loctite 222 2 3 18 4 19 5 20 6 19 7 8 Torque item 7 to 28-34 ft. lbs. 22 [38-46 Nm] 9 23 TANK 25 24 10 11 26 12 30 28 13 14 27 15 16 17 29 28 Torque to 72-96 in. lbs. [8-11 Nm] Torque to 11-13 ft. lbs. [15-18 Nm] Identification - Early Production Manual Valves Early production manual valves contain both a valve code letter and valve code number. This letter and number are used to identify the valve model. See Table A. Example: Location of Code Letter ENERPAC X CBxxx.900 CxxxxC Date Code Location of Code Number Table A - Valve Code Chart - Early Production Manual Valves Model Previous Valve Code Equivalent Present Disc Model Previous Valve Code Equivalent Present Disc Number Valve Code Assembly Number Valve Code Assembly Letter Number Letter Number Example: Number Fig. 1, Item 16 Number Fig. 1, Item 16 (see Table B) (see Table B) ENERPAC VM-4 A CB317900 4-O-P-B-O CH542950 VM-3 G CB318900 3-O-P-B-O CH538950 Code Number Date Code VC-4 B CB317900 X-X-X-X-X 4-O-R-B-OCxxxxC CH542950 VC-3 H CB318900 3-O-R-B-O CH538950 VM-4L C CB317900 4-O-P-B-X CH542950 VC-20 I CB319900 4-C-R-B-O CH537950 VC-4L D CB317900 4-O-R-B-X CH542950 VC-20L J CB319900 4-C-R-B-X CH537950 VM-3LExample:E CB317900 3-O-P-B-X CH542950 VC-15L K CB319900 3-C-R-B-X CH537950 VC-3L F CB317900 3-O-R-B-X CH542950Location ofVC-15 Code LetteL r CB320900 3-C-R-B-O CH541950 ENERPAC X CBxxx.900 CxxxxC Date Code Location of Code Number Identification - Recent Production Manual Valves Recent production manual valves contain an alphanumeric valve code number. -
Repair Parts Sheet
Repair Parts Sheet POWERFUL SOLUTIONS. GLOBAL FORCE. Turbo II Air Pumps L2533 Rev. L 07/15 For Date Codes Beginning with the Letters “C”, “D” and “E” To Protect Your Warranty, Use Only ENERPAC Hydraulic Oil. Enerpac recommends that all kit components be installed to insure optimum performance of the repaired product. Note: Storing the pump in the vertical position may cause it to lose its prime. If pump loses its prime: 1. Remove cover. 2. Remove relief valve. 3. Fill chamber with oil. 4. Apply Loctite 545 to threads and torque to 10-12 ft-lbs. [14-16 Nm]. 5. Replace pump cover. See Figure 1 for gasket orientation detail and cover screw torquing sequence. ® TURBOII Contents: Figure 1 — Treadle Assembly, T Version ..................................2 Figure 7 — Air Motor Assembly ...............................................8 Figure 2 — Treadle Assembly, M, C, S Version ........................3 Figure 8 — Release Valve .........................................................9 Figure 2a & 2b – Handle Assembly, R Version .........................4 Figure 9 — Manual Valve ........................................................10 Figure 3 — Cover Assembly .....................................................5 Figure 10 — Pump Manifolds, PAS Version ...........................11 Figure 4 — Hydraulic Section Detail.........................................6 Figure 11 — Pump Manifold, PAC Version .............................11 Figure 5 — Seal Push Tool .......................................................7 Table 1 — Relief Valve Setting -
PAL User Manual Installation and Operation HTC PAL PAL HTC-Xt
HTC PAL / PAL HTC-xt User Manual Installation and Operation PAL User Manual Installation and Operation HTC PAL PAL HTC-xt Printing History Edition 1 January 1999 Software Version 2.0 Edition 2 April 2003 Software Version 2.0 Edition 3 November 2009 Software Version 2.5 to 4.1.X Edition 4 March 2010 Software Version 2.5 to 4.1.X Edition 5 June 2010 Software Version 2.5 to 4.1.X Edition 6 March 2013 Software Version 2.6 to 4.3.X Original Instructions CTC Analytics AG reserves the right to make improvements and/or changes to the product(s) described in this document at any time without prior notice. CTC Analytics AG makes no warranty of any kind pertaining to this product, including but not limited to implied warranties of merchantability and suitability for a particular purpose. Under no circumstances shall CTC Analytics AG be held liable for any coincidental damage or damages arising as a consequence of or from the use of this document. © 1999 – 2013 CTC Analytics AG. All rights reserved. Neither this publication nor any part hereof may be copied, photocopied, reproduced, translated, distributed or reduced to electronic medium or machine readable form without the prior written permission from CTC Analytics AG, except as permitted under copyright laws. CTC Analytics AG acknowledges all trade names and trademarks used as the property of their respective owners. 1• HTC PAL / PAL HTC-xt User Manual Installation and Operation A. Safety Information Safety Information and Warnings for Users of the PAL System General Considerations The PAL System User Manual and related documents must be consulted by the user under all circumstances before a unit is put to use. -
Power Steering Gear, Sheppard M100 46.05 Automatic Relief Plunger Repair Procedure
Power Steering Gear, Sheppard M100 46.05 Automatic Relief Plunger Repair Procedure There is a relief plunger in the cylinder head and one The spring pin, flange, and plunger body should in the bearing cap. Follow the appropriate set of pro- be accessible for repair at this point. cedures for the relief plunger you are repairing. CAUTION Repair Procedure for the Do not allow the screwdriver bit to slip off the Cylinder Head Automatic plunger body. Damage to the bore could result. Relief Plunger NOTE: The relief plunger flange is held in place with patch lock and the threads are staked at 1. Turn off the engine, apply the parking brakes, the factory. It will require approximately 15 to 20 and chock the tires. lbf·in (150 to 205 N·cm) to remove the flange. 2. Open the hood or tilt the cab. For cab tilt instruc- 9. Carefully insert a screwdriver bit into the plunger tions, see Group 60 in this manual. bore to hold the slotted head of the relief plunger 3. Remove the steering driveline. For instructions, body in place. Using an open-end wrench to hold see Section 46.04, Subject 100. the flange in place, carefully turn the flange to remove the flange from the plunger body. See 4. Verify that the steering gear has automatic relief Fig. 2. Discard the flange. plungers. Steering gears with automatic relief plungers will have the word AUTO cast into the housing. See Fig. 1. Steering gears with auto- matic relief plungers also have plastic caps on the plunger bosses. -
Repair Parts Sheet Hydraulic Nut Splitters, NC-1319, NC
Repair Parts Sheet ® Hydraulic Nut Splitters, NC-1319, NC-1924, NC-2432, NC-3241, NC-4150, NC-5060, NC-6075 L1456 Rev. C 12/04 For Date Codes Beginning with the Letter A To Protect Your Warranty, Use Only ENERPAC Hydraulic Oil. Enerpac recommends that all kit components be installed to insure optimum performance of the repaired product. 1 2 4 5 3 6 8 7 9 10 Repair Parts List for Figure 1 Item Part NumberQty. Description NC1319 NC1924 NC2432 NC3241 NC4150 NC5060 NC6075 1 N/A N/A N/A N/A N/A N/A N/A Not sold separately 2 Std. Hardware 1 M8x1.25x10 Screw Std. Hardware 1 M10x1.25x10 Screw Std. Hardware Std. Hardware Std. Hardware 1 M12x1.75x10 Screw Std. Hardware Std. Hardware 1 M14x2x18 Screw 3 DC6532110 DC6533110 DC6534110 DC6535110 DC6536110 DC6537110 DC6538110 1 Spring 4 NCB1319 NCB1924 NCB2432 NCB3241 NCB4150 NCB5060 NCB6075 1 Moving Blade 5 DC6539013 DC6540013 DC6541013 DC6542013 DC6543013 DC6544013 DC6545013 1 Guide Block 6 Std. Hardware 1 M5x0.8x4 Screw Std. Hardware 1 M6x1x6 Screw Std. Hardware Std. Hardware Std. Hardware 1 M8x1.25x6 Screw Std. Hardware Std. Hardware 1 M10x1.5x12 Screw 7 DC6546040 DC6547040 DC6548040 DC6549040 DC6550040 DC6551040 DC6552040 1 Main Piston 8 DC6553503 DC6554503 DC6555503 DC6556503 DC6557503 DC6558503 DC6559503 1 O-Ring 9 DC6560030 DC6561030 DC6562030 DC6563030 DC6564030 DC6565030 DC6566030 1 Cylinder 10 CR400 CR400 CR400 CR400 CR400 CR400 CR400 1 Coupler ❚ DC6567816 1 2.5 mm T-Handle Wrench ❚ DC6568816 13 mm T-Handle Wrench ❚ DC6569816 DC6569816 DC6569816 DC6569816 1 4 mm T-Handle Wrench ❚ DC6570816 DC6570816 DC6570816 1 5 mm T-Handle Wrench ❚ DC6571816 DC6571816 DC6571816 DC6571816 DC6571816 1 6 mm T-Handle Wrench ❚ DC6572530 DC6572530 DC6573530 DC6573530 DC6574530 DC6574530 DC6575530 1 Case ❚ Not shown. -
E321e-HFT Catalog
E321e ® A UNIT OF APPLIED POWER ® Hydraulic Power for all Industrial Applications Hydraulic Power for all Industrial Applications E321e ® ® Table of Contents Hydraulic Technology Worldwide H Introduction PAM-2000-Series, For your Safety and Basic Air Hydraulic Pumps ...................................... 88-89 Hydraulic Information, see our The World of Enerpac ................................................... 4 PGM-Series, new ‘Yellow Pages’. Atlas Gasoline Powered Pumps ........... 90-91 Cylinders (Hydraulic) 6-51 EGM-Series, Gasoline Pumps ............................. 92 Page: 93 Introduction ...................................................................... 6-7 Yellow Pages 93-104 Pullers, Manual and Hydraulic 140-155 RC-Series, Single-Acting Cylinders ........... 8-11 (Information Section) RC-Series, Cylinder Accessories ...................... 12 Introduction and Standards ................................... 93 Introduction ........................................................ 140-141 RCA-Series, Safety Instructions ................................................ 94-95 MP-Series, Mechanical Pullers ........... 142-143 Single-Acting Aluminium Cylinders ............ 13 Cylinder-Pump BHP-Series, Hydraulic Puller Sets ... 144-147 CLP-Series, Matching and Selection ............................................ 96 BMZ-Series, Single-Acting Pancake Cylinders ........ 14-15 Hydraulic Work Sheet ................................................ 97 Hydraulic Master Puller Sets ............ 148-149 RSM-Series, Basic Hydraulic System -
Builders Tools & Accessories
BUILDERS TOOLS & ACCESSORIES CONSTRUCTEURS OUTILS ET ACCESSOIRES Great Deals On Building supplies SHOP NOW & SAVE CONTENT Pages Tile Cutter & Accessories 286 Laminate Cutter & Accessories 290 Floor Roller Tools 294 Floor Scraper & Accessories 296 Glass & Tile Nipper 298 Glass Cutter Tool & Accessories 300 Tile Spacers & Tile Installation Tools 301 Tile Grout Removal Tools & Accessories 306 Grout Bag & Clean Up Accessories 307 Tile Grouting Sponge 308 Sawhorse & Brackets 310 Drywall Lifting Tools & Accessories 312 Drywall Sanding & Abrasive Accessories 315 Drywall Taping & Installation Accessories 318 Magnesium Bull Float & Accessories 320 Caulking Guns & Accessories 322 Pointed & Brick Trowels 326 Margin Trowels 328 Tuck Pointer Trowels 330 Concrete Groover 331 Drywall Trowel 332 Pool Trowels 333 Notched Trowels 336 Masonry Tools & Accessories 342 Grout & Cement Floats 344 Plastering Hawks & Taping Knives 348 Putty Knives - Flexible Blades 350 Mixing Paddles & Mud Pans 352 Tool Boxes and Storage 355 Bags, Pouches & Belts 358 Tarpaulins 365 Fencing & Barriers 370 Glass & Tile Nippers 372 Drywall Tools & Accessories 373 Plaster & Finishing Trowels 374 Tuck Pointer & Concrete Edgers 375 Floats & Plastering Hawk Accessories 380 Drywall Tools & Accessories 384 Grouting Tools & Mixing Paddles 385 Tile Cutter & Accessories Professional Tile Cutter 4-Ball Bearing Revolutionary Sliding High Mechanism Leverage Handle Tungsten-Alloy Japanese Cutting Wheel Over 10,000 linear feet of cut with a single wheel! Rubber Padded Bed Reinforced Heavy Duty -
BOLTING TOOLS Enerpac Bolting Tools
E414e GB BOLTING TOOLS Enerpac Bolting Tools Enerpac's Bolting Solutions caters to the complete bolting work-flow, ensuring joint integrity in a Bolting Integrity Software variety of applications throughout industry: Visit www.enerpac.com to access our free on-line bolting software application Joint Assembly and obtain information on tool selection, bolt load From simple pipe alignment to complex joint positioning of large calculations and tool pressure settings. A combined application data sheet and joint completion report is structural assemblies, our comprehensive line of joint assembly also available. products range from hydraulic and mechanical alignment tools to PLC-controlled multi-point synchronous positioning systems. Controlled Tightening Enerpac offers a variety of controlled tightening options to best meet the requirements of your application. From mechanical torque multipliers to hydraulic, pneumatic and electric driven square drive wrenches, and from low profile hexagon torque wrenches to inter- connectable bolt tensioning tools; we offer the products you need for accurate and simultaneous tightening of multiple bolts. Joint Separation Enerpac also provides hydraulic nut splitters and a variety of mechanical and hydraulic spreading tools for joint separation during inspection, maintenance and decommissioning operations. High quality bolting solutions from the brand you can trust. See how Enerpac can make your bolting work-flow more accurate, safer and efficient. www.enerpac.com Bolting Tools Overview Tool Type and Functions -
ANNUAL REPORT 2020 Annual Report | 1
2020 ANNUAL REPORT 2020 Annual Report | 1 Enerpac Tool Group is a global leader in high-precision tools, controlled force products and solutions for precise heavy lifting. 110 Menomonee ~2300 100+ 100+ YEARS OF Falls, WI EMPLOYEES MANAGEMENT TEAM COUNTRIES HISTORY HEADQUARTERS YEARS EXPERIENCE PRODUCTS SOLD INTO Products Service and Extensive Global 'LYHUVLÀHG Cylinders/jacks, pumps, Rental Distribution Customer Base bolting tools, presses, Bolting, machining 1,500+ long-standing Customers include pullers, tools, Heavy and joint integrity distribution specialty dealers, Lifting Technology relationships national distribution, 3,500+ distributor and large OEM’s locations STRONG BRAND 13 VERTICAL MARKETS RECOGNITION Civil Construction Mining Oil & Gas Aerospace Premium Industrial Tools | Heavy Lifting Power Gen. & Utility Rescue Manufacturing Tools Military Service | Rental | Training Steel & Metal Paper/Wood 2ႇ+Z\9HKLFOH5HSDLU Industrial MRO Medical | Industrial Ropes 2Q+Z\9HKLFOH5HSDLU 2 | 2020 Annual Report 2020 REVENUE BY CATEGORY 2020 REVENUE BY GEOGRAPHY Australia 4% Services (Manpower/ Other 4% Rental) ~25% Other Americas 8% U.S. 37% Asia 11% Middle East 12% Products ~75% Europe 24% DELIVERING LONG TERM GROWTH Sustainable business model built on well-recognized brands, robust global distribution and broad reach of end markets Clear strategy DELIVERING to drive core growth above market and expand margins LONG TERM GROWTH Disciplined capital deployment Powered by strong balance sheet and free cash flow conversion Experienced leadership team Capable of executing to win DEPLOYING CAPITAL Invest in Reduce debt and Disciplined M&A Opportunistic ourselves to drive maintain a strong within tool space share buybacks organic growth balance sheet 2020 Annual Report | 3 DRIVING ORGANIC GROWTH WITH NEW PRODUCTS NEW PRODUCT DEVELOPMENT NEW PRODUCT VITALITY Focusing on innovation through Centers of Investment in NPD, which began Excellence (CoE) and field-based, product/market- in FY16, has driven acceleration in focused specialists new products as a percent of sales. -
Enerpac Tool Group Annual Report 2020
Enerpac Tool Group Annual Report 2020 Form 10-K (NYSE:EPAC) Published: October 26th, 2020 PDF generated by stocklight.com UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 FORM 10-K (Mark One) ☒ ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 For the fiscal year ended August 31, 2020 OR ☐ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 For the Transition period from to to Commission File No. 1-11288 ENERPAC TOOL GROUP CORP. (Exact name of Registrant as specified in its charter) Wisconsin 39-0168610 (State or other jurisdiction of (I.R.S. Employer incorporation or organization) Identification No.) N86 W12500 WESTBROOK CROSSING MENOMONEE FALLS, WISCONSIN 53051 Mailing address: P.O. Box 3241, Milwaukee, Wisconsin 53201 (Address of principal executive offices) (262) 293-1500 (Registrant’s telephone number, including area code) Securities registered pursuant to Section 12(b) of the Act: Title of each class Ticker Symbol(s) Name of each exchange on which registered Class A common stock, $0.20 par value per share EPAC NYSE Securities registered pursuant to Section 12(g) of the Act: None Indicate by checkmark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. Yes ☒ No ☐ Indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or Section 15d of the Act. Yes ☐ No ☒ Indicate by check mark whether the Registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months, and (2) has been subject to such filing requirements for the past 90 days. -
SBL-1100 Hydraulic Gantry
SBL-1100 Hydraulic Gantry Meets ASME B30.1-2009 Safety Standards Best in Class Standard Features SBL-1100 Series, Hydraulic Gantry ▼ Shown: SBL-1100 Precision Lift and Position of Heavy Loads The Ultimate in Safety and Control INTELLILIFT The Intellilift wireless control system is included with all Enerpac hydraulic gantries. The Intellilift • Octagonal boom provides superior strength and stability controller offers superior safety and control and includes the following • Wide tread width and dedicated skid tracks provide features: optimal drive surface • Encrypted bi-directional • Self-propelled roller track design minimizes ground communication that eliminates bearing pressure and eliminates wheel spin interference from other devices • Remote operation using multi • Self contained hydraulics in each gantry leg for channel wireless (2.4 GHz) or wired uncluttered work area (RS-485) control • Wireless controls for optimum visibility of load • High and low speed settings • Foldable boom section for easy transportation • Automatic synchronization of lifting with an accuracy of 1 inch (24mm) • Designed and tested to meet ASME B30.1-2009 safety standards • Automatic synchronization of travelling with an accuracy of 0.60 • Lloyds certified to 120% of maximum working load inch (15mm) • Overload and stroke alarms • Remote side shift control • Emergency stop switch ◀ SBL-1100 Series Gantry 2 SBL-1100 Series, Hydraulic Gantry Hydraulic Gantries Hydraulic Gantries are a safe, efficient way to lift and position SBL- heavy loads in applications where traditional cranes will not fit and 1100 permanent overhead structures for job cranes are not an option. Series Hydraulic Gantries are placed on skid tracks to provide a means for moving and placing heavy loads, many times with only one pick. -
SCREEN HARDWARE Windowanddoorparts.US Need
WindowAndDoorParts.US SCREEN HARDWARE CUSTOM MADE STANDARD ROLL FORM ALUMINUM WINDOW SCREEN ORDER FORM Account#_________________ Page# ____ of ____ Sold To:___________________________________________ Ship To: ___________________________________________________ __________________________________________________ ___________________________________________________________ __________________________________________________ ___________________________________________________________ __________________________________________________ ___________________________________________________________ Salesman__________________________ Supervisor__________________________ Purchase Order#_____________________________ Date______________________________ Quoted By___________________________ Customer #__________________________________ STEP 1 Measurement STEP 5 Crossbrace location Required_____ Not Required______ _____________" Width x _____________" Height Horizontal:______inches up from the bottom Note: On all screen frames screen measurements must be box to box. Vertical:______inches from the right rail Note: Maximum screen size is 45" x 80". Can not process orders for any screens larger than 45" x 80". STEP 6 Type of Corner Keys Plastic External Square Cut (Standard) _____ STEP 2 Identify Frame part #____________ Plastic Internal Mitered _____ Plastic External Mitered (Andersen Style) _____ Select frame finish. STEP 3 Note: Unless otherwise specified, all custom made window Mill_____ White_____ Almond_____ Beige_____ screens are manufactured with external