JA CONSULT (001739339 - W) JA PROJECT CONSULTANT SDN. BHD (1134298 - V) Contents Page 1. Introduction 02 2. Background 03 3. Team Structure 04 4. Services 16 5. Timeline 28 6. Our Clients 40 7. Projects 44 8. Corporate Data 54

CAUTION SLOW DOWN PEDESTRIAN TRAFFIC Introduction Background

Our philosophy in handling traffic and transportation JA Consult was established in 2008, since then it has limited company. is based on the notion of “seamless and effortless” successfully created a niche in ’s burgeoning mobility experiences. development landscape. In less than a decade in its setup, Thus, JA Project Consultant Sdn. Bhd. was incorporated JA Consult has managed to enlist as the preferred multi- in 2015, as a forward looking undertaking to expand JA Transportation infrastructures that provide mobility disciplinary engineering consultancy firm advising large Consult’s participations in the field of built environment, services to people and goods can be physically corporations and conglomerates on project development particularly in the field of traffic engineering and massive and harsh to both people and the natural requirements for their respective business premises. transportation planning. environment. These infrastructures could also conflict each other. Therefore it is imperative that The strength of JA Consult is attributed to the vast JA Project Consultant Sdn. Bhd. will continue JA Consult’s both human and environmental requirements are experience of more than 30 years brought into the firm mission to provide multi-disciplinary engineering Business Address and Contact Details mitigated and balanced while building transportation by the founding partners – Ir. Jackson I. Pereira and Ir. Dr. consultancy services, of the same time, their services 8- 02, KL Eco City Strata Office, infrastructures, at the same time all transportation Ashita S. Pereira. Their respective experiences working will be strengthened through further expansion of the Menara 1, Jalan Bangsar, facilities should be integrated to provide seamless and with international, national and local governments in transportation planning arm with new team members 59200 effortless travelling experience to travellers. addressing numerous transportation and technological whose background complement the founding partners. T: +603 2201 6193 challenges have suited their team to provide specialized As consultants we uphold the awareness of sustainable services that provide their clients with holistic engineering This expansion will reinforce JA’s commitment towards lifestyle especially when current transportation platforms. attaining sustainable development, particularly system is considered as one of the major contributing sustainable transportation at the local and global levels. factors for unsustainable environment. In response Their diligence in leading the team has won JA Consult wide Thus promoting sustainability in land development we advocate sustainable transportation and work commissions in traffic engineering, traffic management, activities through the transportation system is towards its accomplishment in order to sustain our transportation planning as well as infrastructure fundamental to JA’s integrated professional counsel to future generations. engineering. Based on these achievements, the partners clients. decided to expand their services further as a private

02 - Introduction Background - 03 Team Structure

1 Ir. Jackson I. Pereira Managing Director

2 Ir. Dr. Ashita S. Pereira 3 Syra Lawrance Maidin Director - Traffic & Transportation Associate

4 Claudia Maidin 5 Catherine Yong Administration Finance

13 14

6 Ir.Dr. Khoo Hooi Ling 7 Dr. Norzailawati Mohd Noor 8 Irman Haizal Sulaiman 9 Norhafizah Kamarul Zaman 10 Noor Khamisah Abd Aziz Traffic Consultant Consultant Senior Traffic Engineer Senior Transport Planner Senior Transport Planner

11 Wan Ramlah 12 Muhammmad Akmal 13 Muaid Abdulkareem 14 Tanvi Ambetkar Wan Mohamad Afif Ahmad Subki Traffic Engineer Traffic Engineer Transport Planner Transport Planner

04 - Team Structure Team Structure - 05 Name of Company : JA Project Consultant Sdn.Bhd. ( JA Consult ) Co. Registration : 1134298-V ( 001739339-W ) Corporate Data Date of Incorporation : 09/03/2015 ( 24/01/2008 ) Business Address : SO-8-02, Menara 1, No.3, Jalan Bangsar, KL Eco City, 59200, Kuala Lumpur Telephone : 603-22016193 Email : [email protected] Directors : Ir. Jackson I. Pereira Ir. Dr. Ashita S. Pereira Authorised Capital : RM400,000.00 Paid-up Capital : RM50,000.00 Ministry of Finance Malaysia : JA Project Consultant : 465-02043281 (Transportation Studies, Traffic Studies) JA Consult : 465-02041329 (Civil Engineering) Board of Engineers Malaysia : Reg.No. : 1615-1000-BC-1437 ( JA Project Consultant ) Reg.No. : 1608-1000-PN-172 ( JA Consult ) Banker : CIMB Bank Berhad Jaya Shopping Centre Section 14 L1-21 (First Flr), Jaya Shopping Centre Jalan 14/14, 46100 , Company Secretary : JSL Consultancy Sdn. Bhd. Auditor : Skrastin Lim No. 10-2, Jalan BK5A/3B , 47100 , Selangor.

Corporate Data - 07 06 - Corporate Data Ir. Jackson I. Pereira Ir. Dr. Ashita S. Pereira Managing Director Director - Traffic & Transportation B.Eng. (Hons),Civil Engineering (UM) Ph.D Engineering (UTAR) P.Eng., MIEM M.Sc. Transportation Planning (UTM) Ir. Jackson I. Pereira has over 30 years of B.Eng. (Hons), Civil Engineering (UM) experience in Civil Engineering. His main focus of expertise is in infrastrucute jobs which include P.Eng., MIEM, MIP (Associate) communication, water engineering, drainage, Ir. Dr. Ashita has 30 years of experience in the sewerage power plant, airport infrastructure, field of traffic engineering and transportation roadworks, buildings and earthworks. He is also planning, having been involved in a wide range involved in traffic and highway engineering and of transportation related studies, both locally also looks into traffic management plans. and internationally. She has been involved in all the major rail schemes in the Valley, Penang and the East Coast. She is a firm believer of public transportation as the principal mode of transport.

The Team - 08 The Team - 09 Syra Lawrance Maidin Ir. Dr. Khoo Hooi Ling Associate Traffic Consultant Masters in Regional Planning (Cornell) Ph.D., National University of Singapore BA (Hons) Urban & Regional Planning M.Eng.Sc., University of Malaya (Louisiana) MIP (Graduate) B.Eng. (Civil) Hons, University of Malaya, P.Eng, MIEM Pn. Syra has more than 31 years of experience in the wide Ir. Dr. Khoo's expertise is in traffic engineering and area of urban and regional planning with special focus on modeling. She has more than 16 years of experience in strategic planning, transportation planning and people developing traffic simulation models. She is highly skilled mover systems. Her experiences include both practical as in using traffic simulation tools for managing traffic well as scholastic development. Her main concentration is in congestion and is ardent about employing advanced land use – transport integration and her area of interest is in technology to better manage traffic and transportation transit oriented development (TOD) with special emphasis system, i.e. Intelligent Transportation System. To date, on non-motorized transportation network linkages and the she has more than 50 publications in the international synergy between living and working places. journals and conferences.

10-The Team The Team - 11 Norhafizah Kamarul Zaman Irman Haizal Sulaiman Senior Transport Planner Senior Traffic Engineer B. Urp (Hons), Urban and Regional Planning, (UTM) Dip. Civil Engineering, (PSA)

MIP (Graduate) Mr. Irman Haizal is an experienced traffic engineer with over 14 years of experience in the field of traffic Ms. Norhafizah is a transport planner with engineering and transportation planning. He has over 12 years of experience in traffic engineering, experience in the MRT studies within the , traffic planning, traffic management plan, and LRT Studies in Penang and the East Coast Rail Link. planning for public transport system and project highway planning. His skills are transport modelling, traffic and pedestrian Her skills are in Traffic Impact Assessment studies which simulation, and junction analysis. He is well versed with involve transportation planning and detailed technical various transport modelling and simulation software. designs. She has experience in MRT Line 2, which involves designing ingress and egress to the stations, layby locations and the overall station, parking and traffic circulation.

12 - The Team The Team - 13 Our Team

Noor Khamisah Abd Aziz Senior Transport Planner Wan Ramlah Wan Mohamad Muaid Abdulkareem Transport Planner Traffic Engineer) B. Urp (Hons), Urban and Regional, (UTM) Bsc. Arch (Hons.) (IIUM), M. URP (IIUM) B.Eng (Civil), MEngSc (Traffic), Grad EA MIP (Graduate)

Ms. Noor Khamisah is a town planner with over 12 years of experience in town planning, business development, feasibility study, planning for the land and property Muhammad Akmal Afif Ahmad Subki Tanvi T. Ambetkar market research. Transport Planner Traffic Engineer She has experience in research studies such as B.Urp (Hons.) Urban & Regional Planning (IIUM) B.Tech (Civil Engineering), M.E (Const. Management) the Landscape Master Plan for Majlis Perbandaran Taiping. She also has experience in feasibility studies for new land and property market research and penetration.

14-12 - The The Team Team The Team - 15 Services

01 Traffic Engineering JA’s working philosophy is to combine integrated civil 02 Transportation Planning engineering, traffic engineering and transportation planning 03 Civil Engineering expertise in the field of construction, transportation 04 Traffic Management planning and traffic management with the deployment of advanced 05 Strategic Planning computing facilities and software for the success of our projects.

16- Services Services - 17 Traffic Engineering Scope of Works: 1 Traffic flow analysis 6 Transportation modelling 2 Junction analysis 7 Traffic management 3 Traffic impact assessment 8 Transportation Engineering 4 Traffic solutions 9 Traffic Circulation 5 Origin-Destination 10 Parking

Seamless and Effortless

18 - Services Services - 19 Transportation Planning

• Transportation planning is an 1 Scope of Works: activity where transportation 1 1 system of a place is established in 2 1 Transport needs assessments order to connect and move people 3 2 as well as goods in an efficient Public transportation manner. 1 3 Non-motorized transportation 0 • The transportation system 4 is established using multi- 4 5 4 Transport modes integration 3 disciplinary approach and suitable 1 5 9 Land use-transport integration transportation principles that are 2 able to enhance liveability of a place 7 6 Travel Demand Management

at all time. 6

8

Jarak antara persimpangan

Laluan pejalan kaki Seamless and Effortless

20 - Services Services - 21 Civil Engineering Strategic Planning

Civil engineering is a professional engineering discipline that deals with the design, construction, and maintenance of the physical and naturally built environment, including works like roads, bridges, canals, dams, and buildings

Scope of Works: Current Desired 1 Design Situation Future 2 Construction Scope of Works: 3 Structural 1 Develop sustainable transportation in achieving a 4 Soil & Foundation sustainable city Develop a practical transportation solution 5 Infrastructure 2 3 Develop a comprehensive road network Legend: Legend: JalanSedia Ada 4 To promote urban transportation to active Bicycle Lane (Coastal) JalanCadangan Baru Bicycle La ne (Internal) JalanCadangan Naik ta raf transportation and smart transportation Seamless and Effortless

22 - Services Services - 23 Traffic Management Scope of Works: Develop policies & measures for: 1 Traffic circulation; • Traffic management deals with the wider concept of managing road 2 Road-based public transport; based transport system which 3 includes private cars, commercial Management and control of parking and vehicles, buses, para-transit, servicing access; pedestrians, and non-motorized 4 Enforcement of traffic regulations; vehicles. 5 Road safety; • Traffic management provides 6 Pedestrians; physical measures as well as regulatory actions and policies in 7 Cyclists; improving the efficiency of road- 8 Non-motorised transport; based transport system. 9 Commercial vehicles; 10 Environmental management (such as traffic calming); 11 Transport system user information; 12 Demand management. Seamless and Effortless

24 - Services Services - 25 Seamless and Effortless

Timeline

26- Timeline Timeline - 27 JA Timeline

2014 2008 2009 2010 2012 2013 MMC-Gamuda Inception of Alam Sekitar Malaysia Sdn. Bhd. for DOE, Malaysia ERE Consulting Group for DOE, Malaysia Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) MRT Line 2, JA Consult Economic Planning Unit, Ultimate Essence Sdn. Bhd. Road tankers loading facility, PD-Lubricant Oil Blending Plant, Shell ERE Consulting Group for DOE, Malaysia Klang Valley Region Prime Minister’s Department, Malaysia Traffic Impact Assessment (TIA) Tanjong Langsat Port, Refinery Complex, Port Dickson, Negeri Sembilan Traffic Impact Assessment (TIA) Feasibility Study , Selangor DAL Group, Sudan SkyPark Terminal Rail Link, New Airport Development , Mukah, Sarawak Transportation Master Plan Subang Selangor Syarikat Prasarana Alsunut Residential Development OSK Property Holdings Bhd. ERE Consulting Group Traffic Impact Assessment (TIA) Khartoum Traffic Survey for DOE, Malaysia LRT 3 Ogun State Development, Nigeria OSK Property Holdings Bhd. Redevelopment of ATRIA, Traffic Impact Assessment (TIA) Perunding Atur Sdn. Bhd Traffic Study Traffic Impact Assessment (TIA) Damansara, Selangor Klang Valley Mass Rapid Transit System Roundabout / Junction Analysis Selangor Accolade Land Sdn. Bhd. Prime Minister’s Office access options, Brunei Abeokuta Urban Renewal Scheme Royal Selangor Golf Club Traffic Impact Assessment (TIA) Darul Salam Traffic Impact Assessment (TIA) Ashworth Mixed Development, Cheras, ERE Consulting Group for DOE, Malaysia Malaysian Environmental Resources Jalan Tun Razak, Selangor. Traffic Impact Assessment (TIA) Centre Sdn. Bhd. for DOE, Malaysia Kuala Lumpur Ogun State Government, Nigeria Seal Properties Bhd. Integrated Steel Mill, Teluk Kalong Industrial Estate, Traffic Impact Assessment (TIA) Malaysian Environmental Resources Centre Sdn. Transportation Master Plan Study Traffic Impact Assessment (TIA) Kemaman, Terengganu Sanitary Landfill, Lahat, Perak Bhd. for DOE, Malaysia Kementrian Pendidikan (MOE) DAL Group, Sudan Proposed New Government City in Ogun Bandar Permaisuri, Kuala Lumpur Traffic Impact Assessment (TIA) Design and Build Infrastructure Master Plan State, Nigeria Connaught Bridge Power Station, Selangor SJKT Sg. Alsunut Residential Development SOBA Residential Developers Ltd. Khartoum Transportation Master Plan Tradewinds Plantation Bhd. Primac Development Sdn. Bhd. Soba Residential Development, Karthoum, OSK Property Holdings Bhd. Transportation Master Plan Traffic Impact Assessment (TIA) Austral Meridian Sdn. Bhd Sudan. Addendum TIA 2011 Kota Putra Rubber City Rawang,Selangor Traffic Impact Assessment (TIA) ERE Consulting Group for DOE, Malaysia Redevelopment of ATRIA, Proposed Mixed Development, Traffic Impact Assessment (TIA) Damansara, Selangor Jalan Peel, Kuala Lumpur Solid Waste Incinerator ERE Consulting Group for DOE, Malaysia Cameron Highland, Pahang Sapura Holdings Bhd Accolade Land Sdn. Bhd. Traffic Impact Assessment (TIA) Tradewinds Berhad Transportation Master Plan Traffic Impact Assessment (TIA) Jeniang Transfer Scheme and Naok Reservoir, Traffic Impact Assessment (TIA) Cheras, Kuala Lumpur Kedah Proposed Mixed Development, Jalan Sultan Ismail, Kuala Lumpur

28- Timeline Timeline- 29 JA Timeline (Cont.)

2014 2015 2016 Sewan Bandaraya Kuala Lumpur Inch Kenneth Rubber Public JPBD Kedah AEON Malaysia Sdn. Bhd SSP Consortium (Gamuda) Inch Kenneth Jurutera Perunding Meinhardt (M) UOA Bhd (DBKL) Limited Alor Setar Urban Design and Traffic Study Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) Sdn. Bhd. Traffic Impact Assessment (TIA) Comprehnsive Traffic Study Transport Masterplan Building Height Guidelines Maluri, Cheras Penang LRT Stations , Ulu Langat, Selangor Traffic Impact Assessment (TIA) Sri Petaling, Kuala Lumpur Kuala Lumpur Inch Kenneth Development, LGM Jalan Ampang, Selangor TNB Headquarters, Kuala Lumpur

PR1MA AEON Malaysia Sdn. Bhd Sime Darby Bhd. Low Keng Huat Group Berhad Sime Darby Bhd. Titijaya Land Bhd Perbadanan Labuan Transport Masterplan Traffic Study Moroccan Government Comprehensive Development Plan Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) Land Development Blueprint Study Tanjung 12 PR1MA Development, Subang, Marrakech City Transport Masterplan Malaysian Vision Valley, Ampang Klang Brickfields, Kuala Lumpur Morocco Federal Territory of Labuan , Selangor Negeri Sembilan

Ekovest Berhad Matrix Group Bhd GMG Green Land Sdn. Bhd. EEC Sdn. Bhd. Setapak Heights Development Mampan Esa(Melaka) Sdn Bhd UOA Bhd GMG Green Land Sdn. Bhd. TIA for EIA Sendayan Techpark TIA for EIA Traffic Impact Assessment (TIA) Transport Study Sdn. Bhd. Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) DUKE3, Kuala Lumpur Seremban Hulu Langat, Kajang Pre-Feasibility of a New Highway Traffic Impact Assessment (TIA) Taman , , Melaka UOA Bangsar South City Proposed Mixed Development, Scheme Wangsa Maju, Setapak Banadar Permaisuri, Kuala Lumpur Nakano-Mitsui SSP Consortium (Gamuda) SCP () Sdn. Bhd. Low Yat Group Bhd. Low Yat Group Bhd. Inch Kenneth Kajang Rubber Public PR1MA Traffic Impact Assessment (TIA) Penang LRT TIA for DEIA Traffic Impact Assessment (TIA) AEH Capital Sdn. Bhd. Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) Limited Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) Penang Mitsui Outlet Mall, Penang Jalan Cheras, Kuala Lumpur Penang Rawang Lakes, Selangor Rawang Lakes, Selangor Traffic Impact Assessment (TIA) Kampung Bharu , Shah Alam Semenyih

MRCB Arkitek Urbanisma Sdn. Bhd. Emkay Group Tradewinds Berhad GAMUDA-MMC OSK Property Holdings Bhd PR1MA TIA for DEIA Transport Planning Traffic Study Traffic Impact Assessment (TIA) TIA for TMP Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) Penang Sky Cab, My Kampung SS18 Revival Pulau Banding, Perak Kuala Lumpur MRT2 SSP Line Sutera Damansara Sri Andalas, Klang Penang (CSR)

MRCB Arkitek Urbanisma Sdn. Bhd. Environment Asia Sdn. Bhd. (DOE) KUB TIA for DEIA Transport Planning GAMUDA-MMC Titijaya Land Bhd. Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) Penang Sky Cab, My Kampung SS18 Revival TIA for TMP Traffic Impact Assessment (TIA) Gua Musang, Kelantan Petaling Jaya, Selangor Penang Subang Jaya (CSR) MRT2 SSP Line Jalan Dang Wangi, Kuala Lumpur

30- Timeline Timeline - 31 JA Timeline (Cont.)

2017 2017

Titijaya Land Bhd. UOA Bhd MBPJ/ Urban Scale IIUM Properties (Urbanisma) AJM Planning & Urban Design Group (APUDG) Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) Traffic Study for Bus Shelter IIUM Masterplan Malaysia Vision Valley Local Plan Subang Pantai International Islamic University Malaysia (Transport Sector) Shah Alam Gombak Malaysia Vision Valley Tanda Warisan Sdn Bhd Traffic Impact Assessment (TIA) Puncak Niaga Properties Xin Hwa Trading & Transport Sdn Bhd UKM (Urbanisma) Akitek Akiprima Sdn Bhd Jalan Peel 2 (Austral Meridien) HSS Integrated Sdn. Bhd. (HSSI) Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) Transportation Study Traffic Impact Assessment (TIA) TIA for 8 ECRL Stations Puncak Niaga Shah Alam, Selangor Universiti Kebangsaan Malaysia East Coast Rail Line (ECRL) Petaling, Kuala Lumpur Ehsan Plant & Property Sdn Bhd Traffic Impact Assessment (TIA) Sapura Properties Nilai, Seremban Iktisas Planner Sdn. Bhd. / JPBD /MPKK Ideal Property Group Dunamis Consult UOA Bhd Traffic Impact Assessment (TIA) Rancangan Tempatan Kulim : Sektor Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) Putrajaya Wilayah, Penduduk & Sosioekonomi Penang International Airport Damansara, Kuala Lumpur Sri Petaling Kulim, Kedah Ehsan Plant & Property Sdn Bhd Local Plan (Transport Sector) Euro Saga Sdn. Bhd. Setiakon Engineering Sdn Bhd Majlis Bandaraya Shah Alam / ANZPSB B&G Global Property Sdn Bhd Johor Bharu AECOM Perunding Sdn. Bhd Traffic Impact Assessment (TIA) & Road Traffic Impact Assessment (TIA) Origin-Destination MBSA Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) Safety Audit (RSA) Bandar Sri Menjalara Shah Alam, Selangor Serendah, Hulu Selangor, ECRL Phase 1, Package 3 Kota Bharu Airport IIUM Properties ( Urbanisma) Traffic Impact Assessment (TIA) RAMRAIS & PARTNERS Ancubic Holdings Sdn Bhd China Communications Construction EEC Sdn. Bhd. Topview Housing Sdn Bhd International Islamic University Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) Company (CCCC)/ERE Transportation Study Traffic Impact Assessment (TIA) Malaysia (IIUM) Taman Desa Bangsar TIA for EIA Bus Rapid Transit Kota Kinabalu Kuala Lumpur East Coast Rail Line (BRTKK), Sabah (ECRL) Extention

Twinwood Development Sdn Bhd Tetuan Grace Assembly of God Velcro Envirotech Sdn. Bhd AJM Planning & Urban Design Group SME Associates Sdn. Bhd. Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA TIA for EIA Seberang Perai Local Plan Traffic Impact Assessment (TIA) Bukit Jalil SS24, Petaling Jaya Tanjung Agas Oil & Gas (Transport & Infrastructure Sector) Maluri, Cheras Maritime Industrial Park, Pahang Seberang Perai

32 - Timeline Timeline-33 JA Timeline (Cont.)

2018 2018

Total Teamwork Sdn Bhd Welton Development Sdn Bhd AJM Planning & Urban Design Group (APUDG) Titijaya PKNP Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) UDG MyHSR Traffic Impact Assessment (TIA) Comprehensive Development Plan Telok Gong, Klang Jalan Imbi, Pudu Putrajaya, Melaka & Johor , Selangor Southern Perak Region Perak

UOA Bhd Urban Scale/ MBSA HSS Integrated Sdn. Bhd. (HSSI) Tradewinds Plantation Bhd /PAB OSK Property Holdings Berhad Traffic Impact Assessment (TIA) First Mile Last Mile Bus Shelter Study Transportation Studies Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) Bamboo Garden , Segambut Shah Alam Labuan Bridge, W.P Labuan Kedah Sentul, Kuala Lumpur

UOA Bhd MS Property Development Sdn. Bhd. GD Holdings Bhd AECOM Perunding Sdn. Bhd S P Setia Bhd Corporate Q KTM Ridership Study Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) Transportation Studies Traffic Impact Assessment (TIA) Bharu KTM Maran, Pahang ECRL Ridership Study , Shah Alam Vision Central, Nilai, Seremban

IDAC Urban Scale GD Holdings Bhd AECOM Perunding Sdn. Bhd Sato Kogyo Co. Ltd. Traffic Impact Assessment (TIA) TOD MBPJ Traffic Impact Assessment (TIA) Transportation Study Traffic Impact Assessment (TIA) Tanjung Agas, Pahang Petaling Jaya TOD Study for 7 ECRL Stations Mitsui Outlet Park, Penang PD-lot 5867, Port Dickson

ASIE Sdn Bhd Rawang Lakes Sdn. Bhd. Citiplan Networks Sdn. Bhd / Sunway Integrated Properties Sdn Bhd Veritas Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) Majlis Perbandaran Traffic Signage Study Traffic Impact Assessment (TIA) DBKL Sentul, Kuala Lumpur Rawang Traffic and Transport Study Sunway Velocity, Cheras East Coast Rail Line (ECRL) Phase 1 Land Use and Traffic Master Planning for Melawati - Kemensah

34- Timeline Timeline -35 JA Timeline (Cont.)

2019 2019

Asia Pacific Environmental Consultants Sdn Bhd GD Holdings Bhd. AHS Engineering Sdn Bhd AJM Planning & Urban Design Group (APUDG) HSSI Sdn Bhd Traffic Impact Assessment (TIA) for EIA Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) Rancangan Kawasan Khas (RKK) Kuala Kubu Traffic Impact Assessment (TIA) for EIA Tampin, Negeri Sembilan Gembox, Negeri Sembilan Penang International Airport, Penang Bharu 2025 (Infrastructure Sector) New Route ECRL , Selangor Majlis Daerah Tampin Matrix Concept Holdings Bhd Setapak Height Development Sdn. Bhd. Minconsult Sdn Bhd Rancangan Tempatan Daerah Tampin Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) Comprehnsive Traffic Study (Transport Sector) Sendayan Irama Setapak, Gombak Jalan Subang Airport MMC-Gamuda Joint Venture Tampin, Negeri Sembilan Traffic Impact Assessment (TIA) Langkawi, Kedah Akiprima Arkitek Sdn. Bhd. Vanacres Sdn Bhd Protasco Development Sdn. Bhd./ IKRAM Rawang Lakes Sdn. Bhd. Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) Penchala, Damansara SS13 3K, Subang Rawang, Selangor Minconsult Sdn. Bhd. Tampin, Negeri Sembilan Ridership Study KTM Skypark, Subang Akiprima Arkitek Sdn. Bhd. YD Planners Sdn Bhd Minconsult Sdn Bhd Titijaya Land Berhad Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) Ridership Study Traffic Impact Assessment (TIA) Cheras, KL AJM Planning & Urban Design Group (APUDG) Petronas McDonald's , KTM Skypark Jalan Nipah Special Development Zone (NCER) Perak & Kedah

SP Setia Bhd. Rushdanmdsalleh Architect Matrix Concept Holdings Bhd Acer Venture Sdn.Bhd. Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) Citiplan Network Traffic Impact Assessment (TIA) Shah Alam, Selangor Petronas, Seberang Perai Laman Sendayan, Seremban Rancangan Tempatan Taman Dato Harun, Petaling Jaya Majlis Bandaraya Ipoh 2035 Ipoh, Perak

36- Timeline Timeline - 37 JA Timeline (Cont.)

2019 2020

AJM Planning & Urban Design Group (APUDG) KLCC Holdings (Petronas)/ Urban Scale Embun Terasek Sdn. Bhd. Rancangan Fizikal Negara Persisiran Pantai Rantau Kertih Masterplan Traffic Impact Assessment (TIA) Tembikar Wei Khing Sdn. Bhd. Peninsular of Malaysia & W.P. Labuan Kertih, Terengganu Jalan Manis, Cheras Traffic Impact Assessment (TIA) Klang Factory, Selangor

AJM Planning & Urban Design Group (APUDG) Foremost Wealth Management Sdn. Bhd. Rancangan Kawasan Khas (RKK) Kuala Kubu Traffic Impact Assessment (TIA) Waz Lian Holdings Sdn. Bhd. Glomics Tower Sdn. Bhd. Bharu 2025 (Transport Sector) Mahkota Cheras, KL Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) Kuala Kubu Bharu, Selangor Berapit - Sungai Lembu, Seberang Perai A&W Redevelopment, PJ

HSSI Sdn. Bhd. Traffic Impact Assessment (TIA) AJM Planning & Urban Design Group (APUDG) AJM Planning & Urban Design Group (APUDG) 2020 ECRL Section A Rancangan Tempatan Daerah Kuala Kangsar 2035 Rancangan Tempatan Pulau Pinang 2035 (Infrastructure Sector) (Transport Sector) Kuala Kangsar, Perak Pulau Pinang EKL Business Sdn. Bhd. Bijak Fajar Sdn. Bhd. Traffic Impact Assessment (TIA) Traffic Impact Assessment (TIA) AJM Planning & Urban Design Group (APUDG) Manjung Quarry, Perak Persiaran Sukan, Selangor Akiprima Arkitek Sdn Bhd Rancangan Tempatan Pulau Pinang 2030 Traffic Impact Assessment (TIA) (Infrastructure Sector) Semantan, KL Pulau Pinang Embun Terasek Sdn. Bhd. AJM Planning & Urban Design Group (APUDG) Ting Mee Land Sdn. Bhd. Traffic Impact Assessment (TIA) Rancangan Tempatan Daerah Kuala Kangsar 2035 Citiplan Network Traffic Impact Assessment (TIA) Jalan Utara, Imbi (Transport Sector) Rancangan Tempatan Daerah 2030 Garden Bay City, Kerteh Kuala Kangsar, Perak (Transport Sector) Kota Tinggi, Johor

38- Timeline Timeline - 39 Our Clients

40 - Our Clients OurOur Our Clients Clients- Clients - 33 -37 41 Our Clients

EEC

Austral Meridian Sdn. Bhd AEH Capital Sdn. Bhd. GMG Green Land Sdn. Bhd. Bina Puri Amat Aramak Low Keng Huat Berhad Rawang Lakes Sdn. Bhd Sdn. Bhd

42 - Our Clients Our Clients - 43 New Government City TIA on TMP for Klang Valley Transportation Master Plan, Mass Rapid System Projects Ogun, Nigeria (MRT-SSP Line2)

01 TIA - Transport Project 04 Strategic Planning (Transport Sector)

02 TIA - Master Plans 05 Strategic Planning (Transport Study)

03 TIA - Land Use Specific 06 Strategic Planning (Development Plans)

44- Projects Projects - 45 Origin-Destination Study Malaysia Vision Valley Malaysia Vision Valley Connectivity and for Shah Alam Comprehensive Development Plan Local Plan 2045 Transport Study for Labuan City Council (MVV CDP) Transport Study (Transport Sector) Development Blueprint

46 - Projects Projects - 47 Transport Study on Proposed TIA for EIA Tanjung Agas Bus Shelter Master Plan Bus Rapid Transit for Renewal and Beautification of Oil & Gas Maritime and for Petaling Jaya, Kota Kinabalu, Jalan Tunku Abdul Rahman, KL Industrial Park Selangor Sabah

TGA Solutions Sdn. Bhd. EEC

48 - Projects Projects - 49

Traffic Flow Analysis on Seberang Perai Comprehnsive Traffic Study Traffic Impact Assessment for Proposed Tradewinds Local Plan (Jalan Lapangan Terbang Subang) Expansion of Penang International Mixed-Used Development (Transport Sector) Airport

Projects - 51 50 - Projects Shah Alam City Council (MBSA) Local Tampin District Local Plan Kuala Kubu Bharu (KKB) Specail Plan Seberang Perai Local Plan Plan 2030 (Transport Sector) Area (Transport & Infrastructure (Infrastrucrure Sector) Sector)

52 - Projects 53- Projects 54- Corporate Data Corporate Data - 55 KEMENTERIAN KEWANGAN MALAYSIA SIJIL AKUAN PENDAFTARAN FIRMA PERUNDING

: J60485276612530320 NO. SIJIL : 465-02043281 NO. RUJUKAN PENDAFTARAN : 15/06/2020 - 14/06/2023 TEMPOH SAH LAKU

Bahawa dengan ini diperakui syarikat : JA PROJECT CONSULTANT SDN. BHD. ( 1134298-V ) UNIT NO.SO-8-2, 8TH FLOOR STRATA OFFICE TOWER KL ECO CITY, NO.3 JALAN BANGSAR W.P. KUALA LUMPUR 59200 KUALA LUMPUR WILAYAH PERSEKUTUAN KUALA LUMPUR, MALAYSIA

Telah berdaftar dengan Kementerian Kewangan Malaysia dalam bidang bekalan/perkhidmatan di bawah sektor, bidang dan sub-bidang seperti di Lampiran A. Kelulusan ini adalah tertakluk kepada syarat-syarat seperti yang dinyatakan di Lampiran B. Individu yang diberi kuasa oleh syarikat bagi urusan perolehan Kerajaan adalah seperti berikut :

IR K S ASITHA 671021015242 PENGARAH

t.t

DATO' ZAMZURI BIN ABDUL AZIZ Bahagian Perolehan Kerajaan b.p. Ketua Setiausaha Perbendaharaan Kementerian Kewangan Malaysia

15/06/2020 Tarikh Berdaftar Dengan Kementerian Kewangan Malaysia :

(Sijil ini adalah cetakan komputer dan tidak memerlukan tandatangan)

56 - Corporate Data Corporate Data - 57 58 - Corporate Data Corporate Data - 59 Alone we can do so little; together we can do so much!

60 - Extras 61- Extras Team that eats together, stays together!

Photo from National Archive Collection: Kajang Train Station, 20 March 1964

Projects - 63 62 - Projects