14 13 12 11 10 9 8 7 6 5 4 3 2 1 phase of the project.thephase of Manyhave listed existingon-streetareasprojects holders.theparkingAny those would of to areas which ParkingPermit are bedetermined duringdesignadjustments available upcoming the Accessible to designwould followDesignAccessibilitythe Standards. beprovidedareato a rest is If available onan propertyindividual consultation, pedestriantheandits of of space, volume traffic. project, results thestops, as transit such of location requirements, factors, Manyexteriorcontain travel projects these of whichpathsof for areapotention the a rest provisionwill of designprojectbasedtheandbephase ondecided ofnumerousupcoming placement the in for2021/2022below projects construction list in whichcapital showsof CityThe the a selection Ottawaof Design Accessibility Standards will beapplied greatestextent the possible. to 2021-2022 Capital Forecast Construction -AAC (ShortList)

Item 2022 2021 2021 2021 2021 April 30, 2021 2022 2022 2021 2021 2021 2021 2021 2021 2021

Construction Year CECIL AVENUE AVENUE CECIL DRIVE RIVERSIDE LIGHT RAIL TRANSIT WESTERN ROAD RICHMOND BOOTH STREET SIDE MAYFIELDEAST STREET- O-TRAIN EXPANSION LIGHT RAIL TRANSIT WESTERN ROAD GRANT ROBERT TERRY FOX DRIVE PXO CROXLEYROAD AT BERRIGAN ROAD INNES ROAD INNES LIGHT RAIL TRANSIT EASTERN Location DescriptionLocation BANK STREET BANK CRESCENT OFSOUTH KIMBERWICK PASTURE TUNNEYS AVENUE ROWANWOOD STREET WELLINGTON MONTGOMERY STREET GREENBORO STATION LINCOLN FIELDS ROUNDABOUT WITH REALIGNED DRIVE PALLADIUM 417 OFNORTH HIGHWAY NOT APPLICABLE OVERPASS 417 LIMITEAST HIGHWAY BLAIR ROAD BLAIR ROAD From Street From Page 1 Page WEST OF BANK OFSTREET BANK WEST CRESCENT OFSOUTH KIMBERWICK ROAD BASELINE AVENUE BROADVIEW PATHWAY RIVER OTTAWA AVENUE MCARTHUR LIMEBANK STATION BAYSHORE NOT APPLICABLE DRIVE CAMPEAU NOT APPLICABLE PASS BY- HAMLET BLACKBURN 417 HIGHWAY OFEAST TRIM ROAD To Street To New Sidewalks New Sidewalks New Transit Cycling Routes Cycling Routes New Sidewalks New Transit New Transit New Roads Cycling Routes Signals Traffic -Road Resurfacing Cycling Routes New Transit Type ofWork - 17 - 16 - 8 Chiarelli Rick Leiper - Jeff 15, - 7, Leiper - Jeff 15 Catherine McKenney - 14 - 12 MeehanAnne Carol - 22 Deans - Diane 10, - 20, Theresa Kavanagh- 8 -, Chiarelli 7, Rick - 6 Jenna -Sudds 4 - 3 Laura -Dudas 2,Tierney Tim - 11 , Laura -Dudas 2,Tierney Tim - 11 , Matthew - 1,Luloff Laura -Dudas 2 , WardDescription 17 16 15 phase of the project.thephase of Manyhave listed existingon-streetareasprojects holders.theparkingAny those would of to areas which ParkingPermit are bedetermined duringdesignadjustments available upcoming the Accessible to designwould followDesignAccessibilitythe Standards. beprovidedareato a rest is If available onan propertyindividual consultation, pedestriantheandits of of space, volume traffic. project, results thestops, as transit such of location requirements, factors, Manyexteriorcontain travel projects these of whichpathsof for areapotention the a rest provisionwill of designprojectbasedtheandbephase ondecided ofnumerousupcoming placement the in for2021/2022below projects construction list in whichcapital showsof CityThe the a selection Ottawaof Design Accessibility Standards will beapplied greatestextent the possible. to 2021-2022 Capital Forecast Construction -AAC (ShortList)

Item 2021 2022 2021 April 30, 2021

Construction Year MULTI USE PATHWAY LARSEN COURT TO COURT EAGLESON ROAD LARSEN MULTI PATHWAY USE MEYNELL AND STREET PERTH BIKE PARK FACILITY ALONG PLEASANT BILLINGS AVENUE Location DescriptionLocation NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE From Street From Page 2 Page NOT APPLICABLE NOT APPLICABLE NOT APPLICABLE To Street To Multi-Use Multi-Use Pathways Intersection Modifications Cycling Routes Type ofWork Allan - 23 Scott Moffatt - 21 - 18 WardDescription