SIZEWELL C PROJECT – FINAL ITINERARY FOR SITE INSPECTIONS

NOT PROTECTIVELY MARKED

FINAL ITINERARY FOR SITE INSPECTIONS

NNB Generation Company (SZC) Limited. Registered in and Wales. Registered No. 6937084. Registered office: 90 Whitfield Street, London W1T 4EZ

NOT PROTECTIVELY MARKED

Final Itinerary for Site Inspections|

SIZEWELL C PROJECT – FINAL ITINERARY FOR SITE INSPECTIONS

NOT PROTECTIVELY MARKED

CONTENTS

1 INTRODUCTION ...... 1

2 ITINERARY FOR ACCOMPANIED SITE INSPECTIONS ...... 2 2.2 Arrangements for the day ...... 2

TABLES Table 2.1: Itinerary for Accompanied Site Inspection Day 1: Main Development Site ...... 4 Table 2.2: Itinerary for Accompanied Site Inspection Day 2: Main Development Site and Associated Developments ...... 7 Table 2.3: Itinerary for Accompanied Site Inspection Day 3: Associated Developments ...... 10

PLATES None provided.

FIGURES Figure 1: Accompanied Site Inspection Day 1: Main Development Site Figure 2: Accompanied Site Inspection Day 2 Part 1: Main Development Site and Green Rail Route Figure 3: Accompanied Site Inspection Day 2 Part 2: Sizewell Link Road Figure 4: Accompanied Site Inspection Day 3: Overview Map Figure 5: Accompanied Site Inspection Day 3: Two village bypass

NNB Generation Company (SZC) Limited. Registered in England and Wales. Registered No. 6937084. Registered office: 90 Whitfield Street, London W1T 4EZ

NOT PROTECTIVELY MARKED

Final Itinerary for Site Inspections|

SIZEWELL C PROJECT – FINAL ITINERARY FOR SITE INSPECTIONS

NOT PROTECTIVELY MARKED

1 INTRODUCTION

1.1.1 As requested by the Rule 6 letter [PD-011], this document sets out SZC Co.’s itinerary and points of interest for the Examining Authority to visit as part of its Accompanied Site Inspection. 1.1.2 The itinerary notes areas which are not publicly accessible or where the Applicant and/or other Interested Parties assist with identifying the relevant points of interest; and 1.1.3 The notes provided after the Unaccompanied Site Inspections in August 2020 [EV-001] and February 2021 [EV-002] note the locations already visited by the Examining Authority. 1.1.4 Some of the locations already visited are also referenced on the Accompanied Site Inspection itinerary presented in Section 2 of this document. The Applicant considers that these locations ought to be the subject of an Accompanied Site Inspection as well as an Unaccompanied Site Inspection, so that the Applicant and other Interested Parties can assist with directing the Examining Authority to the relevant points of interest. 1.1.5 The following locations, however, have been excluded from the itineraries, on the basis that they have already been visited by the Examining Authority, are not considered to require an additional Accompanied Site Inspection, and can be visited by the Examining Authority again as part of an Unaccompanied Site Inspection, if required:

off-site sports facilities (visited on 18th and 19th August 2020);

• fen meadow habitat at (visited on 19th August 2020);

• fen meadow habitat at Halesworth (visited on 20th August 2020);

• Westleton marsh harrier habitat improvement site (visited on 20th August 2020);

• Leiston Abbey first and second site (visited on 19th August 2020, 16th and 18th February 2021); and

• National Trust Dunwich Coastguard Cottages (visited on 20th August 2020 and 17th February 2021).

1.1.6 SZC Co. consulted East Suffolk Council, Suffolk County Council and RSPB, and has had regard to their comments in preparing this itinerary for submission to the Examining Authority.

NNB Generation Company (SZC) Limited. Registered in England and Wales. Registered No. 6937084. Registered office: 90 Whitfield Street, London W1T 4EZ

NOT PROTECTIVELY MARKED

Final Itinerary for Site Inspections | 1

SIZEWELL C PROJECT – FINAL ITINERARY FOR SITE INSPECTIONS

NOT PROTECTIVELY MARKED

2 ITINERARY FOR ACCOMPANIED SITE INSPECTIONS

2.1.1 The Examining Authority will determine who will attend the Accompanied Site Inspection. All those who visit the EDF Energy estate will be required to provide personal information for security prior to the visit and to bring an in-date passport or driving license with them on the day. 2.1.2 Subject to COVID-19 restrictions, the number of participants taking part in the Accompanied Site Inspections is likely to be limited. Due to the restriction in numbers, locations have been identified which are also visible from publicly accessible locations in the event the Examining Authority wish to visit the locations unaccompanied. 2.1.3 This itinerary has the approval for land access by landowners.

2.2 Arrangements for the day

COVID-19 mitigation measures

2.2.1 Lateral flow testing will be taking place in the morning at the Sizewell Sports and Social Club (Days 1 and 2) and Riverside Centre (Day 3). 2.2.2 On the main development site (Days 1 and 2), the use of 4x4 vehicles will be necessary. Due to the number of attendees and nature of the vehicles social distancing will not be possible within the vehicles. As such, a negative lateral flow test result will be required before boarding the vehicle, face masks must be worn inside at all times, unless medically exempt, and the windows will be down to promote a clean airflow. 2.2.3 For the associated developments (Days 2 and 3), a coach will be used to transport attendees between sites. Whilst this vehicle will have capacity to enable social distancing measures, a negative lateral flow test will still be required for the safety and comfort of attendees as well as the use of face masks on-board, unless medically exempt, and the opening of windows where practicable. 2.2.4 All attendees will have a lateral flow test on each day of the visit, as such attendees must arrive for the morning session (for either the morning visits or full day) or the afternoon session).

Lunch and restroom provisions

2.2.5 Lunch will be taken at the Sizewell Sports and Social Club (Days 1 and 2) and Riverside Centre (Day 3); attendees can bring their own or this can be provided. If attendees that wish to be provided with lunch, they must

NNB Generation Company (SZC) Limited. Registered in England and Wales. Registered No. 6937084. Registered office: 90 Whitfield Street, London W1T 4EZ

NOT PROTECTIVELY MARKED

Final Itinerary for Site Inspections | 2

SIZEWELL C PROJECT – FINAL ITINERARY FOR SITE INSPECTIONS

NOT PROTECTIVELY MARKED

write to the Planning Inspectorate to confirm this by 1 June 2021 and include any special dietary requirements so that catering arrangements can be made.

Clothing and Personal Protective Equipment (PPE) for the day

2.2.6 Attendees will be provided with the necessary PPE for the main development site visit (hi-vis jacket and hard hat) on the morning of the tour. 2.2.7 Whilst steel toe capped boots are not necessary, sturdy walking footwear is required for all visits and arms and legs must be covered at all times when on the main development site. As there are aspects of the site visits that require walking tours, attendees should sensibly dress to weather conditions. 2.2.8 A first aid kit will be provided on the coach, and a first aider will be available for the duration of the visits.

Route of the site visits

2.2.9 Table 2.1 to Table 2.3 summarise the itineraries for Accompanied Site Inspections. The points of interest are also shown on Figures 1-5. 2.2.10 Please note that whilst the Applicant will endeavour to visit every point of interest on the itineraries in the order listed on the tables, the order may change to account for the number of vehicles required for the visit.

2.2.11 Each attendee will be given an ‘ASI pack’ containing Tables 2.1 to 2.3 , as well as the accompanying figures (Figures 1 to 5).

NNB Generation Company (SZC) Limited. Registered in England and Wales. Registered No. 6937084. Registered office: 90 Whitfield Street, London W1T 4EZ

NOT PROTECTIVELY MARKED

Final Itinerary for Site Inspections | 3

SIZEWELL C PROJECT – FINAL ITINERARY FOR SITE INSPECTIONS

NOT PROTECTIVELY MARKED

Table 2.1: Itinerary for Accompanied Site Inspection Day 1: Main Development Site Location Time Points of Interest/ Notes Location for Location for attendees to join parking the ASI Main 09:00 – Meet at Sizewell Sports and Social Club for safety briefing, Sizewell Sports Sizewell Sports Development site 10:00 lateral flow testing and use of restroom and facilities. Pick up and and Social Club and Social Club – Main drive to site in 4x4 vehicles car park, King car park, King Construction Georges Avenue, Georges Avenue, Area Leiston, IP16 4JX Leiston, IP16 4JX 10:00– Main Construction Area tour: (see Figure 1) 12:30 - View of existing Sizewell B site and sites for relocated facilities: o Coronation Wood development area (MDS1). o Sizewell A land to be used for relocated facilities (MDS2). o Pillbox Field (MDS3), note Rosery cottages (MDS4). - Visit the Sizewell Drain. - Main site tour on 4x4s o View proposed Sizewell C main construction area (MDS5). o Northern mound (MDS6). o Note the area within Sizewell Marshes SSSI. o Note the boundary of to Walberswick SPA/SAC/Ramsar site. o Site for SSSI Crossing (MDS7). 12:30 – 13:00 Lunch at Sizewell Sports and Social Club and use of restroom and facilities. Any additional attendees to meet at Sizewell Sports and Social Club by 12:15 for safety briefing and lateral flow testing.

NNB Generation Company (SZC) Limited. Registered in England and Wales. Registered No. 6937084. Registered office: 90 Whitfield Street, London W1T 4EZ

NOT PROTECTIVELY MARKED

Final Itinerary for Site Inspections | 4

SIZEWELL C PROJECT – FINAL ITINERARY FOR SITE INSPECTIONS

NOT PROTECTIVELY MARKED

Location Time Points of Interest/ Notes Location for Location for attendees to join parking the ASI Main 13:00 – Temporary Construction Area tour (with 4x4s): Sizewell Sports Development site 16:00 - Identify areas that fall outside the original EN-6 area. and Social Club – Temporary - Visit Water Management Zone 1 – natterjack toad area car park, King Construction (MDS8). Georges Avenue, Area - Note Goose Hill and Dunwich Forest (MDS9). Leiston, IP16 4JX - Stop at MDS10. Note the temporary construction area, (see Figure 1) main spoil management area, railhead location and the bat corridor. - Stop at Ash Wood Cottages (MDS11). - Walk north a short distance to note marsh harrier mitigation area (MDS12). - Stop at Lower Abbey Farm (MDS13) – walk a short distance east to note proposed bat barn, the combined flood mitigation area and wetlands. - Stop at Roundhouse (MDS14), note area for borrow pits (MDS15). - Stop at Potter’s Farmhouse (MDS16). - Go down Bridleway 19 by accommodation campus site (MDS17), note the sandpit. - Stop at Upper Abbey Farm and Cottages (MDS18). - Stop at main roundabout site (MDS19). Note Greenhouse Plantation. - Stop at the Abbey Care Home at Old Abbey Farm (MDS20). - Drive down Sandy Lane (west end), short walk to the north-eastern end of the reptile mitigation area (MDS21).

NNB Generation Company (SZC) Limited. Registered in England and Wales. Registered No. 6937084. Registered office: 90 Whitfield Street, London W1T 4EZ

NOT PROTECTIVELY MARKED

Final Itinerary for Site Inspections | 5

SIZEWELL C PROJECT – FINAL ITINERARY FOR SITE INSPECTIONS

NOT PROTECTIVELY MARKED

Location Time Points of Interest/ Notes Location for Location for attendees to join parking the ASI Note acid grassland and heathland creation and reptile receptor site at Broom Covert. - Walk along Leiston drain back towards Sizewell B site, where possible (subject to site conditions), otherwise, stop along the way. Note Kenton Hills and reptile receptor site (MDS22). Main 16:00 - - Meet any additional attendees at Sizewell Beach car Sizewell Beach Sizewell Beach Development site 17:30 park. Car Park, IP16 Car Park, IP16 – Sizewell Beach - Use of public facilities before walk begins. 4UH 4UH - Walk up the beach – note the following: (see Figure 1) o Note existing Sizewell B sea defences and Suffolk Coast Path (MDS23). o Locations for BLFs (MDS24 and MDS25). o Location for temporary surface water drainage outfall (MDS26). o Suffolk Shingle Beaches County Wildlife Site. o Note the boundary of Minsmere to Walberswick SPA/SAC/Ramsar site. 17:30 Close. Use of restroom facilities at Sizewell Sports and Social Club before departure if necessary.

NNB Generation Company (SZC) Limited. Registered in England and Wales. Registered No. 6937084. Registered office: 90 Whitfield Street, London W1T 4EZ

NOT PROTECTIVELY MARKED

Final Itinerary for Site Inspections | 6

SIZEWELL C PROJECT – FINAL ITINERARY FOR SITE INSPECTIONS

NOT PROTECTIVELY MARKED

Table 2.2: Itinerary for Accompanied Site Inspection Day 2: Main Development Site and Associated Developments Location Time Points of Interest/ Notes Location for Location for attendees to join parking the ASI Main 08:30 – Meet at Sizewell Sports and Social Club for safety briefing, Sizewell Sports Sizewell Sports Development Site 09:00 lateral flow testing and use of restroom and facilities. and Social Club and Social Club – LEEIE, Aldhurst car park, King car park, King Farm habitat Georges Avenue, Georges Avenue, improvement Leiston, IP16 4JX Leiston, IP16 4JX area, Kenton Hills 09:00 – Walk to Land East of Eastlands Industrial Estate (LEEIE) 10:00 (MDS27): (see Figure 2) - Explain LEEIE site layout, note location for caravan site. - Note Crown Lodge (MDS28). - Note proposed pedestrian access A1/5 opposite houses on Valley Road. 10:00 – Aldhurst Farm habitat creation scheme (MDS29): Aldhurst Farm car 11:30 - Stop at Aldhurst Farm car park, walk east along new park, off Abbey pathways up to Lover’s Lane, note Leiston Drain road discharge, new paths and fencing, newly created grasslands, tree/scrub plantings and possible water vole translocation area.

Kenton Hills car park (MDS30): Kenton Hills car - Pick up from Lover’s Lane and drive to Kenton Hills car park, IP16 4UP park – note Leiston drain, proposed mammal crossing on Lover’s Lane, proposals for Lover’s Lane realignment, proposed bridleway link and improvements to Kenton Hills car park. - Waste recycling centre.

NNB Generation Company (SZC) Limited. Registered in England and Wales. Registered No. 6937084. Registered office: 90 Whitfield Street, London W1T 4EZ

NOT PROTECTIVELY MARKED

Final Itinerary for Site Inspections | 7

SIZEWELL C PROJECT – FINAL ITINERARY FOR SITE INSPECTIONS

NOT PROTECTIVELY MARKED

Location Time Points of Interest/ Notes Location for Location for attendees to join parking the ASI

Pick up any additional attendees for green rail route and drop off any attendees at parking locations (to be agreed in advance with attendees, if required). 11:35 – Use of public facilties at Sizewell Road. Sizewell Road Car 11:45 Park Green Rail Route 11:50 – Green Rail Route: 12:50 - Stop at Aldhurst Farm (GRR1) – walk down E- (see Figure 2) 363/006/0. - Walk up E-363/003/0 (GRR2) to north or south of Buckleswood Road, south of Buckle’s Wood (ancient woodland). 13:00 – 13:30 Lunch at Sizewell Sports and Social Club and use of restroom and facilities. Any additional attendees to meet at Sizewell Sports and Social Club by 12:45 for safety briefing. Sizewell Link 13:45 – Sizewell Link Road Pick-up from lay- Road 18:15 - Drive the route, stopping off at selected locations, as by north of Moat detailed below. Stop off at following locations (in east to Lane, , (see Figure 3) west direction): B1122. o Start journey along B1122 from lay-by north of Moat Lane on B1122 (SLR1). o Detour on Moat Road. o Theberton village (SLR2). o Theberton Hall (SLR3). o Pretty Road (SLR4) to Hawthorn Road (SLR5), noting points where the route of Sizewell link road would intersect these roads, including location of

NNB Generation Company (SZC) Limited. Registered in England and Wales. Registered No. 6937084. Registered office: 90 Whitfield Street, London W1T 4EZ

NOT PROTECTIVELY MARKED

Final Itinerary for Site Inspections | 8

SIZEWELL C PROJECT – FINAL ITINERARY FOR SITE INSPECTIONS

NOT PROTECTIVELY MARKED

Location Time Points of Interest/ Notes Location for Location for attendees to join parking the ASI Pretty Road overbridge (SLR4), connecting back on to B1122 south of Middleton Moor. o Trust Farm (SLR6) - if permitted to use private access road, subject to landowner approval, or can park up on B1122, if possible and walk up E- 396/023/0. o Middleton Moor (SLR7). o Fordley Road (SLR8) to Littlemoor Road (SLR9), before connecting back on to B1122 (noting points where the route of Sizewell link road would intersect and Oakfield House, on Fordley Road). o Littlemoor Road (SLR9) (note the location of ‘Middleton Moor link’ where roundabout will be (SLR10)). . Optional Stop – stop at Littlemoor Road, north of Littlemoor Spring, and walk Footpath E- 396/014/0 and E-584/016/0 for view of the East Suffolk line crossing (SLR_Opt). o Drive from Littlemoor Road to the A12, near future connection between Sizewell link road and A12 (Lay-by near The Red House Farm and Town Farm Lane – note location proposed for contractor compounds (SLR11)). o Drive down B1122 through the villages of Middleton Moor and Theberton.

NNB Generation Company (SZC) Limited. Registered in England and Wales. Registered No. 6937084. Registered office: 90 Whitfield Street, London W1T 4EZ

NOT PROTECTIVELY MARKED

Final Itinerary for Site Inspections | 9

SIZEWELL C PROJECT – FINAL ITINERARY FOR SITE INSPECTIONS

NOT PROTECTIVELY MARKED

Location Time Points of Interest/ Notes Location for Location for attendees to join parking the ASI 18:15 Close, return attendees to any parking locations, as required. Use of restroom facilities at Sizewell Sports and Social Club before departure if necessary.

Table 2.3: Itinerary for Accompanied Site Inspection Day 3: Associated Developments Location Time Points of Interest / Notes Location for Location for attendees to join parking the ASI Riverside Centre 09:00 – Meet at Riverside Centre for safety briefing, lateral flow testing Riverside Centre, Riverside Centre, 10:00 and use of restroom and facilities. Stratford St , IP17 1LL Andrew, IP17 1LL Northern Park 10:15 – Northern Park and Ride Darsham and Ride 11:00 - LVIA viewpoints – refer to ES Volume 3, Figure 6.4 Services, A12 [APP-362]. Main Road, IP17 (see Figure 4) - Note the proximity to the Darsham Train Station, Willow 3PW Marsh Lane and adjacent properties. Yoxford 11:15 - Yoxford Roundabout Roundabout 11:45 - Note Yoxford Conservation Area and Conservation Area extension. (see Figure 4) - Roadside Nature Reserve 197. - River Yox. - Note land associated with Heveningham Hall Estate. - Stop at Cockfield Hall. 12:00 – 12:30 Lunch at Riverside Centre and use of restroom and facilities.. Any additional attendees to meet at Riverside Centre by 11:45 for safety briefing and lateral flow testing. 12:30 Two Village Bypass

NNB Generation Company (SZC) Limited. Registered in England and Wales. Registered No. 6937084. Registered office: 90 Whitfield Street, London W1T 4EZ

NOT PROTECTIVELY MARKED

Final Itinerary for Site Inspections | 10

SIZEWELL C PROJECT – FINAL ITINERARY FOR SITE INSPECTIONS

NOT PROTECTIVELY MARKED

Location Time Points of Interest / Notes Location for Location for attendees to join parking the ASI Two village - Meeting point at Riverside Centre, Stratford St Andrew bypass (TVB MP) o View of A12 current operation (see Figure 5) 12:45 – Two Village Bypass walkover Friday Street 16:00 - Pick up at Riverside Centre, Stratford St Andrew (TVB Farm, Molletts MP), drive through villages and all exit bus at Friday Farm, A12, Street Farm (TVB1). Farnham - Walk route North to South: o Friday Street Farm (TVB1) (via access track if permission granted, towards Mollett’s Farm connecting to E-137/029/0). o Mollett’s Farm (TVB2) (then connect back to E- 243/006/0, passing Palant’s Grove and Foxburrow Wood). o Note the ancient trees (97, 97 on Figure 5) as detailed in the Deadline 1 submission made by FERN. o Foxburrow Wood and parts of Palant’s Grove (TVB3) (along south of Foxburrow Wood, connect to E-243/003/0 towards Farnham Hall). o Note the ancient lane (TVB10) o Note the ancient trees (118, 119, 120 on Figure 5) as detailed in the Deadline 1 submission made by FERN.

NNB Generation Company (SZC) Limited. Registered in England and Wales. Registered No. 6937084. Registered office: 90 Whitfield Street, London W1T 4EZ

NOT PROTECTIVELY MARKED

Final Itinerary for Site Inspections | 11

SIZEWELL C PROJECT – FINAL ITINERARY FOR SITE INSPECTIONS

NOT PROTECTIVELY MARKED

Location Time Points of Interest / Notes Location for Location for attendees to join parking the ASI o Farnham Hall and surrounding properties (TVB4) (connecting to access road, south of Farnham at the Old Vicarage). o Pond Wood (TVB9) o The Old Vicarage (TVB5) (turn south past Nuttery Belt to Pond Barn). o Nuttery Belt (TVB6), travelling back towards Nuttery Belt, taking RoW E-243/001/0 on the west side of Nuttery Belt, then: . Option 1 (requires landowner permission to use accommodation access track): continue until reaching access track which connects to Park Gate Farm and Tinker Brook, if permitted by landowner (TVB7). This route will cross over the River Alde to the north of where two village bypass would cross the river. . Option 2: walk back to the road towards the Old Vicarage for pick up, either at Old Vicarage or to Farnham, view St Mary’s parish church in Farnham, and drive to Park Gate Farm. o Park Gate Farm (via Tinker Brook) (TVB8), noting junction with A12 and proposed location of the roundabout. 16:15 – Use of restroom facilities Riverside Centre, 16:30 Stratford St Andrew, IP17 1LL

NNB Generation Company (SZC) Limited. Registered in England and Wales. Registered No. 6937084. Registered office: 90 Whitfield Street, London W1T 4EZ

NOT PROTECTIVELY MARKED

Final Itinerary for Site Inspections | 12

SIZEWELL C PROJECT – FINAL ITINERARY FOR SITE INSPECTIONS

NOT PROTECTIVELY MARKED

Location Time Points of Interest / Notes Location for Location for attendees to join parking the ASI Southern Park 16:45– 17:30 Southern Park and Ride: Layby on the slip and Ride - On the drive to southern park and ride, stop over at road to the A12, Glemham Hall. north of Wickham (see Figure 4) - Note Little Glemham and Marlesford on the A12. Market in the - LVIA viewpoints (landscaping) – refer to ES Volume 4, parish of Figure 6.4 [APP-392]. - Drive through , note B1078 junction, as well as parking between Border Cot Lane and River Debden bridge noting street. 17:30 - Return to The Riverside Centre. 17:45

NNB Generation Company (SZC) Limited. Registered in England and Wales. Registered No. 6937084. Registered office: 90 Whitfield Street, London W1T 4EZ

NOT PROTECTIVELY MARKED

Final Itinerary for Site Inspections | 13

SIZEWELL C PROJECT – FINAL ITINERARY FOR SITE INSPECTIONS

NOT PROTECTIVELY MARKED

FIGURES Figure 1: Accompanied Site Inspection Day 1: Main Development Site Figure 2: Accompanied Site Inspection Day 2 Part 1: Main Development Site and Green Rail Route Figure 3: Accompanied Site Inspection Day 2 Part 2: Sizewell Link Road Figure 4: Accompanied Site Inspection Day 3: Overview Map Figure 5: Accompanied Site Inspection Day 3: Two village bypass

NNB Generation Company (SZC) Limited. Registered in England and Wales. Registered No. 6937084. Registered office: 90 Whitfield Street, London W1T 4EZ

NOT PROTECTIVELY MARKED

Final Itinerary for Site Inspections | 14

E - 5 NAME ID 1 5 / KEY 0 0 Coronation Wood Development Area MDES1 / 2 0/0 - 0 1 E-363/02 5 1 /0 1 SIZEWELL C AND ASSOCIATED 0 / Sizewell A Land MDS5 2 5 / DEVELOPMENT SITE BOUNDARIES 0 1

0 5 Pillbox Field MDS3 - 8 E / 0 DEMARCATION LINE Rosery Cottages MDS4 015/0 ! Sizewell C Main Construction Area MDS5 E-515/ MDS13 SUFFOLK COAST PATH

E

- ! Northern M5 ound MDS6 TO BE VISITED IN DAY 1

1

5

/ Site for SSSI0 Crossing MDS7 E REPTILE MITIGATION AREA

0 - 5 7 1 E WMZ / Natte/ rjack Toad Area MDS8 0 5 MARSH HARRIER MITIGATION / - 0 5 Goose Hill and Dunwich Forest MDS9 0 1 9 5 MDS15 SUFFOLK SHINGLE BEACHES /0 / 0 !

Temporary Construction Area MDS10 1

0 DRAIN

/ Ash Wood Cottages MDS11 0 ALDHURST FARM HABITAT CREATION Marsh Harrier Mitigation Area MDS12 MDS14 SCHEME Lower Abbey Farm MDS13 MDS16 ! MDS12 ! SPECIAL AREA OF CONSERVATION /0 ! Roundhouse 13 MDS14 5/0 -51 SITE OF SPECIAL SCIENTIFIC Area for Borrow PitEs MDS15 INTEREST (SSSI) Potter's Farm MDS16 MDS8 MDS11 ! SPECIAL PROTECTION AREA Accommodation Campus Site MDS17 ! MDS17 PUBLIC RIGHT OF WAY Upper Abbey Farm and Cottages MDS18 ! MDS9 FOOTPATH Main Roundabout Site MDS19 MDS10 ! ! 0 / BRIDLEWAY Old Abbey Farm E-515/M01D2S/020 1 1

0 Reptile Mitigation Area MDS21 / 5 BYWAY

1

5 Kenton Hills MDS22 - 0

/ E MDS18 RESTRICTED BYWAY ! 1 Existing Sizewell B Sea Defences and 2

MDS19 0 ! MDS7 / Suffolk Coast Path MDS23 3

! 6

3 Permanent BLF MDS24 - ! E 0 ! / MDS24 Temporary BLF 6 MDS25

0 0 / MDS6 0

/ 0 1 Temporary Surface Wa3 ter Outfall MDS26 ! 0 6 MDS25 /

3 3 - NOT PROTECTIVELY MARKED 6

E 3 - E COPYRIGHT ! MDS22 ! MDS20 ! Reproduced from Ordnance Survey map with the permission of MDS5 Ordnance Survey on behalf of the controller of Her Majesty's Stationery Office © Crown Copyright (2021). All Rights ! MDS26 reserved. NNB GenCo 0100060408. © Natural England material is reproduced with the permission of Natural England 2021.

PROW data sourced from Suffolk CC on 27/02/2019 under 13/0 E-363/0 OGL v3.0 are an interpretation of the Definitive Map and ! MDS23 Statement, not the Definitive Map itself, and should not be

0 relied on for determining the position or alignment of any public /

0 right of way. The data contains Ordnance Survey data © Crown

1

0 copyright and database right 2019.

/

3

6 0 / CWS: The Licensor grants to the End User a non-exclusive, 3 6 - non-transferable licence (revocable pursuant to the terms of 0 E

0

/ this End User Licence) to use Supplied Data for the End User E

3 -3 Purpose for the Term 6 6 E-363 ! 3 3 /030 - /0 /

E 0 1 9 MDS23 /0 /0 8 1 /0 3 6 MDS1 -3 ! ! E MDS2

MDS4 ! E

- 3 DOCUMENT:

E 6 E MDS21 3 - ACCOMPANIED SITE INSPECTIONS ITINERARY - ! 3 / 3

0 6

6

2 3

3

1 /

/ 0 / 0 0 ! 2 0

1

5

/

/ 0 0 MDS3

0

/ E- 0

4 3 63 / DRAWING TITLE: 0 / 01 1

0 7 2

/ /0 ACCOMPANIED SITE INSPECTION DAY 1: 0

3 /

6

3 MAIN DEVELOPMENT SITE

3

E 6 - -363/016/A

E 3 -

E 3 - 3/009/0 6 E E-36 3 / 0 0 / E 2 8 8 E -

0 1 / - DRAWING NO: 0 0 0 0 / 6/0 1 0 / E-363/01 0 /03 6 6 / 0 0 3 8 E-1 FIGURE 2 6 / 6 2 SANDLINGS 0 B / 0 / 3 / 6 0 3 DATE: - 6 DRAWN: SCALE : REV: E 0 2 1 1 E - 1 3 - 6 / 0 /0 6 E 0 APR 2021 A.M. 1:15,000 @A3 01 E / 27 3 / /0 E / E 0 - 3 3 0 -1 3 E-3 -36 -3 2 /0 06/ 6 6 E 6 0 3 63/0 6 /0 26 27/ SCALE BAR / 12/ 3 3/ 0 0 © Copyright 2021 NNB Generation Com0 pany (SZC0) Limited. No part of- this drawing 0 / 1 2 63 0 100 200 300 400 500 1/ E 4/ 3 is to be reproduced without prior permissi0on of NNB Generation Company (SZC) Limited. 0 E- M E - NAME ID 5 1 5 KEY /0 E 2 - 0 / 1 E-363/020/0 5 SIZEWELL C AND ASSOCIATED 0 / LEEIE MDS27 1 0 1 5 0 DEVELOPMENT SITE BOUNDARIES / / 0 5 0 1 8 8 5 DEMARCATION LINE / - Crown Lodge MDS2 0 E TO BE VISITED IN DAY 2 E-515/015/0 Aldhurst/0 Farm HabitatE SUFFOLK COAST PATH 4 - 0 5 /0 1 5 5 REPTILE MITIGATION AREA 1 / 0 9 -5 E Creation Scheme0 MDS2 - E 5 7 1 MARSH HARRIER MITIGATION AREA /

0 5 / 30 0 E 0 SUFFOLK SHINGLE BEACHES Kenton Hills Car Park MDS - 9 5 / 0 1 5 DRAIN

/ E 0 Aldhurst Farm GRR1 1 - 5 0 ALDHURST FARM HABITAT CREATION

1 / 5 0 Buckle's/0 Wood GRR2 MINSMERE- SCHEME 0 3 WALBERSWICK /0 SPECIAL AREA OF CONSERVATION (SAC) 3/0 /01 SITE OF SPECIAL SCIENTIFIC 15 E-5 INTEREST (SSSI) SPECIAL PROTECTION AREA (SPA) PUBLIC RIGHT OF WAY FOOTPATH

0 BRIDLEWAY / E 1 -515/012/0 1

0 / BYWAY

5

1

5

- 0

/ RESTRICTED BYWAY

E

1

2

0

/

3

6

3

-

E

0

/

6

0 0 /

0

/ 0 1 3 0 6 /

3 3 NOT PROTECTIVELY MARKED - 6

E 3 -

E COPYRIGHT Reproduced from Ordnance Survey map with the permission of Ordnance Survey on behalf of the controller of Her Majesty's Stationery Office © Crown Copyright (2021). All Rights reserved. NNB GenCo 0100060408. GRR1 © Natural England material is reproduced with the permission MDS30 of Natural England 2019. PROW data sourced from Suffolk CC on 27/02/2019 under 3/013/0 OGL v3.0 are an interpretation of the Definitive Map and E-36 Statement, not the Definitive Map itself, and should not be relied on for determining the position or alignment of any public

0 0

/ / 3 right of way. The data contains Ordnance Survey data © Crown 0 0 1 copyright and database right 2019. 0 / 0 / 3 6 3

6 CWS: The Licensor grants to the End User a non-exclusive, 3 0 SIZEWELL / - 3 9

- non-transferable licence (revocable pursuant to the terms of 6 MDS2 E 0 E MARSHES this End User Licence) to use Supplied Data for the End User

0 / E Purpose for the Term 3 - 6 3 6 E-36 3 3/03 - 3 0/0 / E 0 1 GRR2 9 /0 /0 8 1 /0 3 6 3 0 - / E 3 0 0 / 3 6 3 - E

E DOCUMENT: -

3 E

E 6 ACCOMPANIED SITE INSPECTIONS ITINERARY - 3 - 3

3

/ 6 0 MDS27 6

3

2 3

/ 1 0 /

0

/ 0

0 2

5

1

/

0 /

0

0

/ E 0 4 -3 DRAWING TITLE: 6 8 / 0 3 /01 MDS2 1 0 ACCOMPANIED SITE INSPECTION DAY 2:

7 2

/ /0 0

3

/ MAIN DEVELOPMENT SITE AND

6 3

3

6 GREEN RAIL ROUTE - /016/A E E-363 3 - E 3 - /009/0 6 E E-363 3 0 / / 0 E

8 2 -

0 8 1 DRAWING NO:

0 / 0 / B 0 0 0/0 / / /03 6 FIGURE 2 3 8 E 06 6 E -1 / 6 2 E SANDLINGS - 0 1 - 0 1 3 0 / DATE: E 3 DRAWN: SCALE : REV: 0 3 / - / 6 0 6 - 3 0 1 3 E 6 E 3 1 - / 6 3 2 3 - APR 2021 A.M. 1:15,000 @A3 01 6 6 E / 0 3 / /0 3 0 3 0 - 0 27 / / /0 / 0 0 E 2 E 1 63 0 3 2 / -1 SCALE BAR -3 6 6 06 6 6 E 2 6 / /0 0 2 27 / / 0 / 0 0 2 3 / 0 0 200 400 / - 3 © Copyright 2021 NNB Generation Company (SZC) Limited. No part of this drawing 0 6 E -3 M is to be reproduced without prior permission of NNB Generation Company (SZC) Limited. E 0 E 0 / - / 2 0 1 0 1 / 6 1 NAME ID / 3 KEY 0 0 0 0 / 0 / 1 8 E 6 0 0 / 0 - / 1 Moat Road SLR1 5 5 SIZEWELL LINK ROAD DEVELOPMENT 4 2 5 5 -

- 8 0 SITE BOUNDARY

E 5 / E Theberton Village SLR2 - 0 2 E ! TO BE VISITED IN DAY 2 9

/ Theberton Hall SLR3 0 0 013/ OS_Rivers_pl 584/ /0 Pretty Road / Proposed Pretty Road E- 028 50/ PUBLIC RIGHT OF WAY (SUFFOLK COUNTY Bridge E-5 SLR4 E COUNCIL) E -550/034/ -58 0 4 0 Hawthorn Road /0 / SLR5 FOOTPATH

0 2 1/ 0 0

0

Trust Farm / SLR6 BRIDLEWAY

4 0

8 / 0 Middleton Moor 5 SLR7 0 BYWAY - 2 / 0 E / 7 4 2 Fordley Road SLR8 0 RESTRICTED BYWAY 8 / 5 - 0 E 5 Oakfield House, Fordley Road SLR8A 5 E - 0 E / - 3 /0 E 2 9 Littlemoor Road SLR9 6 6 - 1 2 5 /0 0 0 0 / 5 Proposed Middleton Link and / 8/ 0 0 6 0 0 5 / / 5 0 9 - 7 2 roundabout SLR10 3 E SLR10 - 2 4 0 E E / / -5 ! 0 84 0 A12 SLR11 /0 5 1 5 0 8 - / /0 View of the East Suffolk line road 9 E 1 0 crossing SLR OPT / SLR7 4 ! 8 E-396/010/0 5 - E SLR OPT !E 0 - / 5 E 8 9 -3 4 0 / 0 44 0 / E-39 E-5 / 1 6 6/00 5 0 6 5/0 0/ 1 9 0 3 / 25 0 / 0 3 /0 / 0 E - 4 E - E - 1 5 0 39 E / 6/ /0 8 - 00 3 ! 3 4 4 4 9 /0 6 0 / E 0 4 0 / / 0 0

3 / - 1 1 - 1 SLR11 4 SLR9 3 E 6 / 6 0 0 9 0 / 9 A / 6 ! ! 3 6 - E-3 SLR8 / 9 44/01 ! 0 2/0 E 3 1 - 0

/ 7 E

4 SLR8A / E

0 2 E - 0 /0 /0 3 / - 3 16 3 2 /0 9 4 9 /0 96 6 8 6 6 -3 / 9 E / 5 0 -3 0 - 2 E 0

E A 2 6 0 / / / 0 /

2 0 7 2 ! 1

0

0 / /

6 SLR6 SLR5 4 9 ! 4 E

3 3 - - 3 E - 9 E 0 - E E 8/ 6 5 - 1 /0 1 NOT PROTECTIVELY MARKED 3 /0 1 5 9 6 7 / 6 9 /0 / 0 0 / -3 9 0 /0 0 / 0 /01 6 COPYRIGHT E 96 01 6 5 2 E-3 / 2 15 / Reproduced from Ordnance Survey map with the permission of 1 / /0 -5 0 0 0 1 E / 02 Ordnance Survey on behalf of the controller of Her Majesty's 4 6/ E-3 Stationery Office © Crown Copyright (2021). All Rights 4 9 96/0 3 E 3 15 - - /0 reserved. NNB GenCo 0100060408. -3 E ! E 4 4 E PROW data sourced from Suffolk CC on 27/02/2019 under /0 - SLR3 E 0 5 / 2 1 - OGL v3.0 are an interpretation of the Definitive Map and 8 5 3 5 / 1 Statement, not the Definitive Map itself, and should not be 4 E-344/018/0 0 /0 5 0 0 relied on for determining the position or alignment of any public / / /0 5 0 4 9 / right of way. The data contains Ordnance Survey data © Crown 02 0 0 4 4/ 4 8 copyright and database right 2019. 3 -3 - E ! / 0 E ! /0 SLR2

E 4 0 E- 0 / - 3 SLR4 0 7 44 5 / 5 0 /0 1 1 E 2 0 5 0 5 / - /0 - 5 / E /0 0 E 5 1 - 1 3 27 0 5

4 0 5 / 0 3 / 4 44 / - 0 /0 -3 0 / 0 0 2 E 3 E 1 /0 9 / E-344/026/0 4 / 0 4 2/0 SLR1 ! 0 -3 E-515/00 E E - E 34 4 - /0 3 2 4 5 4 0 /0 3/ DOCUMENT: / 1 0 5/0 3 -51 ACCOMPANIED SITE INSPECTIONS ITINERARY 2 E / 0 0 0 1/ 44/03 / E-3 1 0

0 /

5

1 5 /0 - 012 E 5/ 51 0 DRAWING TITLE: - /

E E 1 DAY 2 - SIZEWELL LINK ROAD - 1

3 0

4 /

4 5

/ 1

0 5

3 -

3 E

/

0

0 / DRAWING NO: 0 1 FIGURE 3

0 0

/ /

6 3 DATE: DRAWN: SCALE : REV:

0 6

3 0 MAY 2021 A.M. 1:20,000 @A3 01 / - 3 E SCALE BAR 6

3 © Copyright 2021 NNB Generation Company (SZC) Limited. No part of this drawing - 0 200 400 600 800 1,000 is to be reproduced without prior permission of NNB Generation Company (SZC) Limited. E M KEY ASSOCIATED DEVELOPMENT SITE NORTHERN PARK AND RIDE BOUNDAR IES DEVELOPMENT

YOXFORD ROUNDABOUT

TWO VILLAGE BYPASS (Refer to Figure 5 for detailed map)

NOT PR OTECTIVELY MAR KED COPYR IGHT R e produ ce d from Ordna nce Su rve y m a p with the pe rm ission of Ordna nce Su rve y on b e ha lf of the controlle r of He r Ma je sty's Sta tione ry Office © Crown Copyrig ht (2021). All R ig hts SOUTHERN PARK AND RIDE re se rve d. NNB Ge nCo 0100060408.

DOCUMENT: ACCOMPANIED SITE INSPECTIONS ITINER AR Y

DR AWING TITLE: DAY 3 – OVER VIEW MAP

SEVEN HILLS DR AWING NO: FREIGHT MANAGEMENT FACILITY FIGUR E 4 DATE: DR AWN: SCALE : R EV: APR 2021 A.M. 1:125,000 @A3 01 SCALE BAR © Copyrig ht 2021 NNB Ge ne ra tion Com pa ny (SZ C) Lim ite d. No pa rt of this dra wing 0 2 4 6 is to b e re produ ce d withou t prior pe rm ission of NNB Ge ne ra tion Com pa ny (SZ C) Lim ite d. KM 0 / 3 NAME ID 0 0 KEY / 7 Riverside Centre Meeting Point TVBMP 3 1 TW O V ILLAGE BYPASS DEV ELOPM ENT

- 0

/ E SITE BOU NDARY 1

Friday Street Farm TVB1 0

0 / ! TO BE V ISITED IN DAY 3

7

Mollett's Farm TVB2 3 1 !( TREE OF INTEREST - ! ! ! ! !

E Foxburrow Wood and Palant's Grove TVB3 ! ! ! ! ! ANCIENT W OODLAND Farnham Hall, 1 & 2 Farnham Barn ! ! ! ! !

0 RIV ER ALDE / and 1 & 2 Hall Cottages TVB4 4 0 0 PU BLIC RIGHT OF W AY / The Old Vicarage TVB5 7 E-137/033 1/0 3 /0 FOOTPATH /00 1 502 - EN- uttery Belt TVB6 E BYW AY River Alde TVB7

RESTRICTED BYW AY 0 / E

Park Gate Farm 7 TVB8 -

0 1

0 3 / 7

Pond Wood 2 TVB9 / 0 0 0

5 / 3

- 5 Ancient lane TVB10 0 2 E / /0 0 2 0 -5

E

0 /

E 9 - 5 2

0 0 / 2 0 7 / E / -137

3 8 /0 0 /0 2 28/A 0 1 0 0 - / 6 3 7 / 0 E 0 / 3 7 -1 3 E -1 /031/0 E TVB1 E-137 ! 98 97 !(!( ! TVBMP ! TVB2 /0 5 0 /0 3 4 E 2 - - E 2 E-243/008/0 4

3 E E / - - 24 0 3/ 2 00 0 4/ /0 4 0 6 07 3/0 3 / 4 -2 / 0 E 0 0 9 / 0 FOXBURROW ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! W! OOD ! ! ! ! ! ! ! ! ! ! ! ! TVB4 ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! NOT PROTECTIV ELY M ARKED ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! COPYRIGHT ! 118! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !(! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! Repro d uc ed fro m Ord na nc e Survey m a p with the perm issio n o f TVB5 ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! TVB3 ! ! ! ! ! ! ! ! ! ! ! Ord na nc e Survey o n b eha lf o f the c o ntro ller o f Her M a jesty's 0 ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! / 119 0 Sta tio nery Offic e © Cro wn Co pyright (2021). All Rights ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! 1 0 reserved . NNB GenCo 0100060408. POND !( ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! / !( 3 ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! 4 WOOD 2 © Na tura l Engla nd m a teria l is repro d uc ed with the perm issio n ! ! ! ! ! ! ! ! 120 ! ! ! ! ! !TV! B! !10! ! ! ! ! ! ! ! - ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! E o f Na tura l Engla nd 2021.

! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! PROW d a ta so urc ed fro m Suffo lk CC o n 27/02/2019 und er ! ! ! ! !! T! V! B! 9 OGL v3.0 a re a n interpreta tio n o f the Definitive M a p a nd ! ! ! ! ! ! ! ! Sta tem ent, no t the Definitive M a p itself, a nd sho uld no t b e ! ! ! ! ! ! ! ! relied o n fo r d eterm ining the po sitio n o r a lignm ent o f a ny pub lic ! ! ! ! ! ! ! ! 0 ! 43/011/ TVB7 ! ! ! ! ! ! ! ! E-2 right o f wa y. The d a ta c o nta ins Ord na nc e Survey d a ta © Cro wn ! ! ! ! ! ! ! ! c o pyright a nd d a ta b a se right 2019.

TVB8 !

0

/

3

0 0 TVB6 / E ! 3 -

4 2 4 2 3 - /0

E 1 2 /0

DOCU M ENT: ACCOM PANIED SITE INSPECTIONS ITINERARY

E E -24 - 3 2 /0 4 13 3 /0 / 0 0 1 / 0 DRAW ING TITLE: DAY 3 - TW O V ILLAGE BYPASS – DETAILED M AP

0

/ DRAW ING NO:

6

1 FIGU RE 5

0 / DATE: DRAW N: SCALE : REV : 3

4

0 2 M AY 2021 A.M . 1:8,500 @A3 01 / - 2 0 E SCALE BAR /0 © Co pyright 2021 NNB Genera tio n Co m pa ny (SZC) Lim ited . No pa rt o f this d ra wing 3 4 7/0 0 100 200 300 400 -2 243/01 is to b e repro d uc ed witho ut prio r perm issio n o f NNB Genera tio n Co m pa ny (SZC) Lim ited . E E- M

SIZEWELL C PROJECT – ITINERARY FOR HPC ACCOMPANIED SITE VISIT

NOT PROTECTIVELY MARKED

ITINERARY FOR SITE VISIT TO HINKLEY POINT C

NNB Generation Company (SZC) Limited. Registered in England and Wales. Registered No. 6937084. Registered office: 90 Whitfield Street, London W1T 4EZ

NOT PROTECTIVELY MARKED

Itinerary for Hinkley Point C Accompanied Site Inspection |

SIZEWELL C PROJECT – ITINERARY FOR HPC ACCOMPANIED SITE VISIT

NOT PROTECTIVELY MARKED

CONTENTS

1 INTRODUCTION ...... 1

TABLES Table 1.1: Itinerary for the Examining Authorities Accompanied Site Inspection (ASI) to the Hinkley Point C Site ...... 2

PLATES None provided.

FIGURES None provided.

NNB Generation Company (SZC) Limited. Registered in England and Wales. Registered No. 6937084. Registered office: 90 Whitfield Street, London W1T 4EZ

NOT PROTECTIVELY MARKED

Itinerary for Hinkley Point C Accompanied Site Inspection |

SIZEWELL C PROJECT – ITINERARY FOR HPC ACCOMPANIED SITE INSPECTION

NOT PROTECTIVELY MARKED

1 INTRODUCTION

1.1.1 As requested by the Rule 8 letter [PD-011], this document sets out SZC Co.’s suggested itinerary for the Examining Authorities Accompanied Site Inspection (ASI) to the Hinkley Point C Site. Any views into the site from particular view points or visits to the surrounding area will be done unaccompanied. 1.1.2 The Examining Authority will determine who will attend the Accompanied Site Inspection. All those included will be required to provide personal information for security prior to the visit (details of their Full Name, Date of Birth, Nationality and Country of Birth). This information will be collected via a registration form (refer to Appendix A) and will need to be sent back to PINS by 23.59 on Tuesday 8th June. On the day, attendees need to bring either a current passport or photo driving licence as identification with them. This is a requirement of entering a Nuclear Licenced Site.

COVID-19 mitigation measures

1.1.3 Lateral flow testing will be taking place in the morning at Cannington Court. 1.1.4 Minibuses will be used to transport attendees between sites. Whilst this vehicle will have capacity to enable social distancing measures (a seat between each attendee), a negative lateral flow test will still be required for the safety and comfort of attendees visiting the Nuclear Licenced Site, as well as the use of face masks on-board and the opening of windows to promote clean airflow.

Lunch provisions

1.1.5 Lunch will be provided at Cannington Court. Attendees that wish to bring their own lunch, or have special dietary requirements must note this on the registration form provided (Appendix A), which must be sent back to PINS by 23.59 on Tuesday 8 June 2021.

Clothing and Personal Protective Equipment (PPE) for the day

1.1.6 Attendees will not need PPE for the visit but should this change, it will be provided. 1.1.7 Whilst steel toe capped boots are not necessary, sturdy walking footwear is required and arms and legs must be covered at all times. Attendees should sensibly dress to weather conditions.

NNB Generation Company (SZC) Limited. Registered in England and Wales. Registered No. 6937084. Registered office: 90 Whitfield Street, London W1T 4EZ

NOT PROTECTIVELY MARKED

Itinerary for Hinkley Point C Accompanied Site Inspection | 1 SIZEWELL C PROJECT – ITINERARY FOR HPC ACCOMPANIED SITE INSPECTION

NOT PROTECTIVELY MARKED

Route of the site visit

1.1.8 Table 1.1 sets out the itinerary. 1.1.9 Please note that whilst the Applicant will endeavour to visit the points of interests in the order as listed in the table, the order may change to account for site conditions.

Table 1.1: Itinerary for the Examining Authorities Accompanied Site Inspection (ASI) to the Hinkley Point C Site 1 Date Time and Activity

22nd June 2021 09.00am As there is no parking available at Cannington Court, those travelling by car should park at Cannington Park and Ride Site and will be transported by minibus to Cannington Court. All visitors will undergo a lateral flow test, a security briefing and have the opportunity to use the restroom and facilities. Parties travelling by public transport, or from overnight stays locally, can arrive directly at Cannington Court.

10:00am Depart Cannington Court and travel to the Hinkley Point C Site via Bus/Coach. Route to include Cannington Bypass (AD Site)

10:25am Bus/Coach guided tour around the Hinkley Point C Site to include: • Temporary office and welfare facilities • Community Safety Centre and Hinkley Health • Permanent Buildings and Structures under construction • Batching Plants and other Temporary Construction facilities and structures • Temporary Aggregate Jetty and Sea Wall • Materials Stockpile and Compounds • External Car Park

11:55am Travel to Hinkley Campus (AD Site) for stop and visit. Use of restrooms and facilities if necessary.

1 As noted in the Rule 8 letter, the ASI is dependant on COVID-19 restrictions and Site Rules in place at the Hinkley Point C Site permitting the ASI to go ahead. Face masks will need to be worn for most of the day, with social distancing measures observed when not worn. NNB Generation Company (SZC) Limited. Registered in England and Wales. Registered No. 6937084. Registered office: 90 Whitfield Street, London W1T 4EZ

NOT PROTECTIVELY MARKED

Itinerary for Hinkley Point C Accompanied Site Inspection | 2

SIZEWELL C PROJECT – ITINERARY FOR HPC ACCOMPANIED SITE INSPECTION

NOT PROTECTIVELY MARKED

Date Time and Activity

12:30pm Travel to entrance of Emergency Access Road for stop and walking tour of southern landscape/ecology area.

1pm Travel to Cannington Court via Cannington Village.

1:30pm Lunch provided at Cannington Court for ExA and Interested Parties.

2:15pm Transport back to Cannington Park and Ride, or to Taunton station if requested in advance.