Updates on

JSC GEORGIAN RAILWAY Lianyungang- 11-14 days

Urumqi-Poti 6-8 days

Kobe-Poti 17-20 days Georgian Railway

Passenger Freight Infrastructure SBU SBU SBU

GR Logistics GR Transit Subsidiaries & Terminals Terminal yard area: 5,000 m2 Close to City Center 第比利斯 2 Gantry cranes with lifting capacity of 50t Max per time keeping capacity of 700 containers Poti Terminal yard area: 5,000 m2 Containers owned: 460 20’ 波季 Gantry Crane with lifting capacity 40t Max per time keeping capacity of 700 containers GR Logistics & Terminals office in Batumi Port container turnover capacity 100,000 TEU 巴统 Ferry turnover capacity 70,000t Bulk good turnover capacity 200,000,000t -Tbilisi- (BTK)

Completion Date: 2017 BTK railway length: 826 km Freight capacity: 6.5M tons Kartsakhi- Passengers capacity: 1M 29km New Line

Kars-Kanbaz 79km New Line

Historical step of deepening economic relations as and connect via railway BTK is beneficial not only for the region but also for Asia-Europe logistic networks Railway track modernization project

• Increasing capacity from 27.5M Bottleneck tons to 100M tons • Speed increase from 60 to Mitigation 80km/h for freight

• Construction carried out by China Project Railway 23RD construction Bureau details • Full automatic blocking system

• 46% completed Status • Completion year: 2019 Deep Sea Port project Completion Year 2020 Throughput capacity: 100M tons 阿纳克利亚 Berth can accommodate Panamax sized container ships Pre-construction work is already underway Georgian government already invested ₾100M Anaklia and Railway Network

18 km new railway track Georgia Anaklia Deep Tsatskhvi Sea Port

Black Sea Poti Port

Batumi Port Georgian government took responsibility for linking Anaklia Port to the region’ infrastructure. Completion Year: 2020 Connection between newly built port and railway network of Georgia will be constructed Projects across TITR countries

Georgia • Vale terminal construction

Kazakhstan • Modernization of Aktau port • Kuryk ferry port adding 4M tonnes to the TITR • Alyat port construction • Modernization of Azerbaijan railway - infrastructure and rolling stock Trade stats of 2016

$187B*

$2B

$169M

Agreement to initiate China- Georgia free trade

$547M

$25B

Export $429B* Import

*2015 Year Corridors Volume China-Europe Railway capacity 100M ton TITR 60 Block-trains expected in 2017 BTK Trade Flow: 600B Planned projects Ongoing projects Anaklia-railway network Modernization

Alyat/Kuryk Anaklia Port Rati Devadze

Head of Marketing & Business Development Freight SBU Georgian Railway [email protected]