Whitsunday Scenic Amenity Study
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
National Parks Contents
Whitsunday National Parks Contents Parks at a glance ...................................................................... 2 Lindeman Islands National Park .............................................. 16 Welcome ................................................................................... 3 Conway National Park ............................................................. 18 Be inspired ............................................................................... 3 Other top spots ...................................................................... 22 Map of the Whitsundays ........................................................... 4 Boating in the Whitsundays .................................................... 24 Plan your getaway ..................................................................... 6 Journey wisely—Be careful. Be responsible ............................. 26 Choose your adventure ............................................................. 8 Know your limits—track and trail classifications ...................... 27 Whitsunday Islands National Park ............................................. 9 Connect with Queensland National Parks ................................ 28 Whitsunday Ngaro Sea Trail .....................................................12 Table of facilities and activities .........see pages 11, 13, 17 and 23 Molle Islands National Park .................................................... 13 Parks at a glance Wheelchair access Camping Toilets Day-use area Lookout Public mooring Anchorage Swimming -
Emergency Management of Sunwater's Dam Portfolio in The
Emergency management of SunWater’s dam portfolio in the 2010-11 Queensland floods Robert Keogh, Rob Ayre, Peter Richardson, Barry Jeppesen, Olga Kakourakis SunWater Limited SunWater owns 23 referable dams and operates a further two dams for other owners. The dams are located across Queensland from Texas and St George in the South to the Atherton Tablelands in the north to Mt Isa in the west. During the period December 2010 to February 2011 there were several significant rainfall events across Queensland. The first occurred in late December 2010, the second in mid January 2011 and third in early February 2011. Generally it was the most significant rainfall event in Queensland since the 1970’s. 22 Emergency Action Plans were activated simultaneously by SunWater. Eleven dams experienced a flood of record during the events. This paper will discuss what has been learnt from these events including the optimisation of management structures for a dam owner with a large portfolio of dams: review of O&M Manuals including the adequacy of backup systems: relationships with the State disaster management framework: the value of rigorous communication protocols: managing fear and a general lack of understanding in the community: and the value of being prepared. Keywords: Emergency Management, Floods, . In addition to the dams SunWater owns, the following 1 Background storages are managed under facility management SunWater and its subsidiary company Burnett Water Pty contracts: Ltd own 231 referable storages consisting of 18 Category 2 Glenlyon Dam – (Category 2 dam) for the Border 2 dams and 5 Category 1 dams under the Water Supply Rivers Commission (Safety and Reliability) Act 2008 and Water Act 2000. -
Strategic Framework December 2019 CS9570 12/19
Department of Natural Resources, Mines and Energy Queensland bulk water opportunities statement Part A – Strategic framework December 2019 CS9570 12/19 Front cover image: Chinaman Creek Dam Back cover image: Copperlode Falls Dam © State of Queensland, 2019 The Queensland Government supports and encourages the dissemination and exchange of its information. The copyright in this publication is licensed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. Under this licence you are free, without having to seek our permission, to use this publication in accordance with the licence terms. You must keep intact the copyright notice and attribute the State of Queensland as the source of the publication. For more information on this licence, visit https://creativecommons.org/licenses/by/4.0/. The information contained herein is subject to change without notice. The Queensland Government shall not be liable for technical or other errors or omissions contained herein. The reader/user accepts all risks and responsibility for losses, damages, costs and other consequences resulting directly or indirectly from using this information. Hinze Dam Queensland bulk water opportunities statement Contents Figures, insets and tables .....................................................................iv 1. Introduction .............................................................................1 1.1 Purpose 1 1.2 Context 1 1.3 Current scope 2 1.4 Objectives and principles 3 1.5 Objectives 3 1.6 Principles guiding Queensland Government investment 5 1.7 Summary of initiatives 9 2. Background and current considerations ....................................................11 2.1 History of bulk water in Queensland 11 2.2 Current policy environment 12 2.3 Planning complexity 13 2.4 Drivers of bulk water use 13 3. -
Rural Irrigation Price Review 2020–24 Part A: Overview
Final report Rural irrigation price review 2020–24 Part A: Overview January 2020 © Queensland Competition Authority 2020 The Queensland Competition Authority supports and encourages the dissemination and exchange of information. However, copyright protects this document. The Queensland Competition Authority has no objection to this material being reproduced, made available online or electronically but only if it is recognised as the owner of the copyright2 and this material remains unaltered. Queensland Competition Authority Contents Contents EXECUTIVE SUMMARY III Scope of our review iii Approach iii Prices iii Revenue and cost risks v Approach to apportioning dam safety upgrade capex v Costs vi Recommendations vi 1 OVERVIEW OF OUR APPROACH 1 1.1 Background 1 1.2 Referral 1 1.3 Irrigation services 2 1.4 Key regulatory obligations 3 1.5 Our approach to the investigation and recommending prices 3 1.6 Review process 5 2 PRICING FRAMEWORK 6 2.1 Introduction 6 2.2 Scope of our investigation 6 2.3 Matters we are required to consider in undertaking our investigation 9 2.4 Approach 10 2.5 Stakeholders' submissions 10 2.6 Relevant matters for this investigation 11 2.7 Approach to bill moderation and the transition to lower bound prices 22 2.8 Summary of approach to relevant matters 23 3 RISK AND THE REGULATORY FRAMEWORK 24 3.1 Background 24 3.2 Revenue risk 27 3.3 Cost risk 33 4 APPORTIONING DAM SAFETY UPGRADE CAPITAL EXPENDITURE 44 4.1 Overview 44 4.2 Dam safety compliance obligations 46 4.3 Recent developments and drivers of dam safety upgrades -
Tourismwhitsundays.Com.Au Visitor Guide 2019/20
VISITOR GUIDE 2019/20 TOURISMWHITSUNDAYS.COM.AU HAMILTON ISLAND Remember Why hamiltonisland.com.au SAVE 10%* WHEN YOU BOOK TWO OR MORE TOURS HEART PONTOON, HARDY REEF, GREAT BARRIER REEF BARRIER GREAT REEF, HARDY PONTOON, HEART WHITEHAVEN BEACH ISLAND ESCAPE CAMIRA SAILING REEFSLEEP & HILL INLET DAY CRUISES ADVENTURE Iconic beaches, lush tropical islands, luxe resorts and the amazing Great Barrier Reef – the Whitsundays is holiday heaven. Dig your toes into the pure sand of Whitehaven Beach, snorkel amongst spectacular marine life and sleep under the stars on the Great Barrier Reef or soak up the scenery on an island-hopping day cruise – your adventure awaits with the region’s premier tour operator. TO BOOK PLEASE CONTACT CRUISE WHITSUNDAYS +61 7 4846 7000 [email protected] cruisewhitsundays.com *TERMS & CONDITIONS - ONLY ONE DISCOUNT IS ELIGIBLE PER BOOKING. DISCOUNT IS NOT AVAILABLE FOR RESORT CONNECTION SERVICES, HAMILTON ISLAND GOLF, HAMILTON ISLAND ADRENALIN, AIRLIE BEACH ATTRACTIONS OR WHITSUNDAYS CROCODILE SAFARI. THE WHITSUNDAYS, A PLACE TRULY ALIVE WITH WONDER… WHITSUNDAYS VISITOR INFORMATION CENTRE Opening late 2019 at Whitsunday Gold Coffee Plantation Bruce Hwy, Proserpine QLD 4800 +61 7 4945 3967 | [email protected] tourismwhitsundays.com.au Tourism Whitsundays acknowledge the traditional owners of this land. We pay our respects to their Elders, past and present, and Elders from other communities living in the Whitsundays today. Tourism Whitsundays would like to thank Brooke Miles - Above and Below Gallery -
Schedule of Speed Limits in Queensland
Schedule of speed limits in Queensland Description of area Speed Ships affected Date gazetted 1. The waters of all canals (unless otherwise prescribed) 6 knots All 21 May 2004 2. The waters of all boat harbours and marinas 6 knots All 21 May 2004 3. Smooth water limits (unless otherwise prescribed) 40 knots All 21 May 2004 Hire and drive personal 4. All Queensland waters 30 knots 27 May 2011 watercraft 5. Areas exempted from speed limit Note: this only applies if item 3 is the only valid speed limit for an area (a) the waters of Perserverance Dam, via Toowoomba Unlimited All 21 May 2004 (b) the waters of the Bjelke Peterson Dam at Murgon Unlimited All 21 May 2004 (c) the waters locally known as Sandy Hook Reach approximately Unlimited All 17 August 2010 between Branyan and Tyson Crossing on the Burnett River (d) the waters upstream of the Barrage on the Fitzroy River Unlimited All 21 May 2004 (e) the waters of Peter Faust Dam at Proserpine Unlimited All 21 May 2004 (f) the waters of Ross Dam at Townsville Unlimited All 9 October 2013 (g) the waters of Tinaroo Dam in the Atherton Tableland (unless Unlimited All 21 May 2004 otherwise prescribed) (h) the waters of Trinity Inlet in front of the Esplanade at Cairns Unlimited All 21 May 2004 (i) the waters of Marian Weir Unlimited All 21 May 2004 (j) the waters of Plantation Creek known as Hutchings Lagoon Unlimited All 21 May 2004 (k) the waters in Kinchant Dam at Mackay Unlimited All 21 May 2004 (l) the waters of Lake Maraboon at Emerald Unlimited All 6 May 2005 (m) the waters of Bundoora Dam, Middlemount 6 knots All 20 May 2016 6. -
Executive Summary
Executive summary Project overview Adani Mining Pty Ltd (Adani) proposes the construction and operation of the North Galilee Basin Rail Project (NGBR Project), a multiuser, standard gauge, greenfield rail line that will transport coal from mines in the northern Galilee Basin to the Port of Abbot Point. The NGBR Project is approximately 300 km in length and connects the proposed Carmichael Coal Mine and Rail Project’s east-west rail corridor, approximately 70 km east of the proposed Carmichael Coal Mine in the vicinity of Mistake Creek, with supporting infrastructure at the Port of Abbot Point (Figure 1). The NGBR Project will have an operational capacity of up to 100 million tonnes per annum (mtpa) of coal product expected to be sourced from both Adani and third-party mines in the northern Galilee Basin. The NGBR Project is proposed in accordance with the Galilee Basin Coal Infrastructure Framework. For the purpose of this Environmental Impact Statement (EIS), the NGBR Project begins at chainage 3.49 km, in the vicinity of the Adani Terminal 0 balloon loop at the Port of Abbot Point in the north. The NGBR Project runs south from this point to its connection with the Carmichael Project (Rail) infrastructure at chainage 306.9 km, west of the Gregory Developmental Road towards Mistake Creek. Need for the Project The Queensland Government’s Queensland Infrastructure Plan guides the development of major infrastructure within the State. Supporting Queensland’s resource regions is a key initiative of the infrastructure plan, with improving rail access between the Galilee Basin and the Port of Abbot Point a specific focus. -
Sunwater Dams Sunwater Makes a Significant Contribution to the Rural, Industrial, Energy, Mining and Urban Development of Queensland by Providing Water Solutions
SunWater Dams SunWater makes a significant contribution to the rural, industrial, energy, mining and urban development of Queensland by providing water solutions. Over the past 80 years, SunWater has designed and managed the construction of 30 of Queensland’s dams, 82 weirs and barrages, 39 reservoirs and balancing storages and rural and bulk water infrastructure systems. Currently, SunWater owns and manages 19 dams in Queensland and each dam has been strategically built in existing river, stream or creek locations to serve the needs of the region. A dam is a critical component of a water supply scheme which can be made up of weirs and barrages, pumping stations, pipelines and channels, and drains. The overall scheme is designed to supply water for various purposes including town water supply, irrigation, electricity production, industrial i.e. power stations, mines, stock and groundwater supply. Water Supply Scheme Pipeline Industrial & Mining Dam Drain Pumping Station Channel Legend Balancing Storage SunWater Infrastructure Purpose of Water Supply Weir Irrigation Town Barrage Water Supply Dam Types The type of dam is defined by how the dam wall was constructed. Depending on the surrounding environment, SunWater dams can be described as one or more Scheme of the following: Pipeline Cania Dam Boondooma Dam Wuruma Dam Paradise Dam Julius Dam EMBANKMENT CONCRETE FACED MASS CONCRETE ROLLER COMPACTED MULTIPLE ARCH Industrial & Mining ROCKFILL GRAVITY CONCRETE GRAVITY CONCRETE Constructed as an Constructed as an BUTTRESS embankment of well Constructed using a Constructed in horizontal embankment of compacted Constructed as concrete compacted clay (earthfill) some large volume of layers of dryer than normal free-draining granular earth horizontal arches supported with rock on the faces (rockfill). -
Port Procedures and Information for Shipping – Whitsundays
Port Procedures and Information for Shipping – Whitsundays December 2018 Creative Commons information © State of Queensland (Department of Transport and Main Roads) 2017 http://creativecommons.org.licences/by/4.0/ This work is licensed under a Creative Commons Attribution 4.0 Licence. You are free to copy, communicate and adapt the work, as long as you attribute the authors. The Queensland Government supports and encourages the dissemination and exchange of information. However, copyright protects this publication. The State of Queensland has no objection to this material being reproduced, made available online or electronically but only if it’s recognised as the owner of the copyright and this material remains unaltered. The Queensland Government is committed to providing accessible services to Queenslanders of all cultural and linguistic backgrounds. If you have difficulty understanding this publication and need a translator, please call the Translating and Interpreting Service (TIS National) on 13 14 50 and ask them to telephone the Queensland Department of Transport and Main Roads on 13 74 68. Disclaimer: While every care has been taken in preparing this publication, the State of Queensland accepts no responsibility for decisions or actions taken as a result of any data, information, statement or advice, expressed or implied, contained within. To the best of our knowledge, the content was correct at the time of publishing. Hard copies of this document are considered uncontrolled. Please refer to the Maritime Safety Queensland website for the latest version. Port Procedures and Information for Shipping – Whitsundays – September 2018 Contents List of tables ................................................................................................................................ 6 List of figures ............................................................................................................................... 6 Table of Amendments ................................................................................................................ -
Why Invest in the Whitsundays
WHYWHY INVESTINVEST inin thethe WhitsundaysWhitsundays Whitsunday Region Profile Why invest in the Whitsundays Location Airlie Beach is just one square kilometre of ultimate real estate that is the most exclusive waterfront lifestyle precinct on the planet. With the township book ended by two world class marinas and appointed with a range of cosmopolitan dining and fashion options, the Airlie Beach lifestyle is the perfect foundation. The township is well connected to the 74 Whitsunday Islands, 8 of which are resort islands and the remaining islands are protected National Parks. More than half of the 2600km2 Shire is classified as National Park, ensuring the retention of the area’s natural beauty. Located just 25km inland is Proserpine, home to the region’s hospital, railway station, sugar mill and primary airport. Bowen,situated on the north-eastern coast of the region, is known for its award winning beaches and delicious mangoes. Finally Collinsville, found 87km south-west of Bowen, lies within the resource rich Bowen Basin and is home to several mines. Quality of Life The results of an extensive survey conducted by Tourism and Events Queensland in 2013 revealed that 92% of residents love living here and 58% of residents would not live anywhere else. More than 85% of residents were born elsewhere in Australia, and more than 60% of residents stay for 10 years or more after relocating to the area. Of the residents surveyed, a large majority identified that the tourism industry results in many positive impacts for the area, including more interesting things to do, employment opportunities, events and festivals, improved facilities, increased local pride and greater cultural diversity. -
2012-17 Volume 2 Proserpine River Water Supply Scheme
Final Report SunWater Irrigation Price Review: 2012-17 Volume 2 Proserpine River Water Supply Scheme April 2012 Level 19, 12 Creek Street Brisbane Queensland 4000 GPO Box 2257 Brisbane Qld 4001 Telephone (07) 3222 0555 Facsimile (07) 3222 0599 [email protected] www.qca.org.au © Queensland Competition Authority 2012 The Queensland Competition Authority supports and encourages the dissemination and exchange of information. However, copyright protects this document. The Queensland Competition Authority has no objection to this material being reproduced, made available online or electronically but only if it is recognised as the owner of the copyright and this material remains unaltered. Queensland Competition Authority Table of Contents TABLE OF CONTENTS PAGE GLOSSARY III EXECUTIVE SUMMARY IV 1. PROSERPINE RIVER WATER SUPPLY SCHEME 1 1.1 Scheme Description 1 1.2 Bulk Water Infrastructure 1 1.3 Network Service Plan 2 1.4 Consultation 3 2. REGULATORY FRAMEWORK 4 2.1 Introduction 4 2.2 Draft Report 4 2.3 Submissions Received from Stakeholders on the Draft Report 6 2.4 Authority’s Response to Submissions Received on the Draft Report 6 3. PRICING FRAMEWORK 7 3.1 Tariff Structure 7 3.2 Water Use Forecasts 8 3.3 Tariff Groups 9 3.4 Kelsey Creek Water Board 10 3.5 Storage Rental Fees 10 4. RENEWALS ANNUITY 11 4.1 Background 11 4.2 SunWater’s Opening ARR Balance (1 July 2006) 12 4.3 Past Renewals Expenditure 13 4.4 Opening ARR Balance (at 1 July 2012) 16 4.5 Forecast Renewals Expenditure 17 4.6 SunWater’s Consultation with Customers 24 4.7 Allocation of Headworks Renewals Costs According to WAE Priority 25 4.8 Calculating the Renewals Annuity 29 5. -
The Whitsunday Volcanic Province, Central Queensland, Australia: Lithological and Stratigraphic Investigations of a Silicic-Dominated Large Igneous Province
Journal of Volcanology and Geothermal Research 99 (2000) 55–78 www.elsevier.nl/locate/jvolgeores The Whitsunday Volcanic Province, Central Queensland, Australia: lithological and stratigraphic investigations of a silicic-dominated large igneous province S.E. Bryana,*, A. Ewart1,a, C.J. Stephens2,b, J. Parianos3,c, P.J. Downes4,d aDepartment of Earth Sciences, University of Queensland, St Lucia, Queensland 4072, Australia bCentral Norseman Gold Corporation Limited, P.O. Box 56, Norseman, Western Australia 6443, Australia cQNI Limited, PO Box 7879 Waterfront Place, Brisbane, Queensland 4001, Australia dDepartment of Earth and Planetary Sciences, Western Australian Museum of Natural Science, Francis St, Perth, Western Australia 6000, Australia Received 16 June 1999; accepted 21 December 1999 Abstract Contrary to general belief, not all large igneous provinces (LIPs) are characterised by rocks of basaltic composition. Silicic- dominated LIPs, such as the Whitsunday Volcanic Province of NE Australia, are being increasingly recognised in the rock record. These silicic LIPs are consistent in being: (1) volumetrically dominated by ignimbrite; (2) active over prolonged periods (40–50 m.y.), based on available age data; and (3) spatially and temporally associated with plate break-up. This silicic- dominated LIP, related to the break-up of eastern continental Gondwana, is also significant for being the source of Ͼ 1:4 × 106 km3 of coeval volcanogenic sediment preserved in adjacent sedimentary basins of eastern Australia. The Whitsunday Volcanic Province is volumetrically dominated by medium- to high-grade, dacitic to rhyolitic lithic ignimbrites. Individual ignimbrite units are commonly between 10 and 100 m thick, and the ignimbrite-dominated sequences exceed 1 km in thickness.