Parramatta Light Rail Fact sheet Parramatta Light Rail is one of the State Government’s major public transport projects in Western , being delivered as part of a record $73 billion infrastructure program across NSW. Parramatta Light Rail Stage 1 will connect Westmead to Carlingford via Parramatta CBD and Camellia with a two-way track spanning 12 kilometres. Stage 2 will connect Parramatta CBD to Ermington, Melrose Park, Wentworth Point and along a 9 kilometre route.

Key features of Stage 1 Key features of Stage 2 • Stage 1 will link Parramatta’s CBD to the Westmead • The preferred route connects to Stage 1 north Health Precinct, Parramatta North Urban of and runs east along South Transformation Program, the new Western Sydney Street and Boronia Street to Melrose Park, south Stadium, a cultural hub including the Powerhouse to Wentworth Point via Wharf Road and a new Museum and Riverside Theatres, the private and Parramatta River crossing, and on to Sydney social housing redevelopment of Telopea, Rosehill Olympic Park to Carter Street. Gardens Racecourse, and three Western Sydney • Stage 2 will have a 9 kilometre two-way track and University campuses. approximately 10-12 stops, with travel times of • A 12 kilometre two-way track from Westmead to around 25 minutes from Olympic Park to Camellia, Carlingford, via Parramatta CBD. and a further 8 minutes to Parramatta CBD. • 16 accessible stops integrated into the urban • Stage 2 will connect to the future Sydney environment. Metro West underground stations, heavy rail in • The network will operate seven days a week from Parramatta and Olympic Park, and ferry services at 5am to 1am, with services approximately every Rydalmere and Olympic Park. 7.5 minutes from 7am to 7pm weekdays. • Stage 2 will be further developed and informed by • Modern, comfortable air-conditioned driver consultation with the community and stakeholders. operated vehicles, 45 metres long carrying up to • Consultation and further planning will inform a final 300 passengers. decision on the Stage 2 route through Rydalmere • Interchanges with existing rail, bus and ferry terminals or Camellia. at Westmead, Parramatta CBD and Carlingford. • A Final Business Case for Stage 2 is expected to • Integration with the electronic be completed in 2018, with an investment decision ticketing system. and details on the timing of construction to follow. • A new shared pedestrian and cycle path from • Find out more about Parramatta Light Rail Tramway Ave, Parramatta to Carlingford along the and watch the animation on Stage 2 at: light rail route. parramattalightrail.nsw.gov.au

parramattalightrail.nsw.gov.au [email protected] 1800 684 490 Parramatta Light Rail Preferred routes for Stages 1 and 2 Carlingford

STAGE 1 STAGE 2 16 stops 10–12 stops

Melrose Park

WHARF RD

Ermington Rydalmere PARRAMATTA RIVER SOUTH ST

BORONIA ST Wentworth Point

R TTA RIVE MA Westmead RA PAR

Camellia HILL RD Parramatta CBD

AUSTRALIA AVE

Sydney Olympic Park

Carter Street DAWN FRASER AVE

Stage 1 route Stage 2 preferred route

Stage 2 – alternative Camellia alignment under consideration