Status As on 31.10.2020 NHDP NH No. Sanctioned Awarded Target date of SL. Length Date of Cumulative Physical Cumulative Financial Phase/ Name of Project (Old/ Cost/TPC Cost Date of Award completion as per Name of the Contractor No. (Km) Start/Appointed Date progress % progress % Scheme New) Rs. in crore Rs. in crore contract Bridge Work

Construction of 48m Bridge over Chuba Khola at 1 NH (O) 10 0.48 8.93 7.45 16.09.2019 21.05.2019 5.10% 0.00% 15.09.2021 M/s Mohan Bajaj Km 75+300 to Km 75+800 on NH-10

(a) Total 0.48 8.93 7.45 Widening to 2-lane /4-lane SARDP- Construction of -Viaduct at Rangpo town M/s Dinesh ChandraAgarwal Infracon Pvt.Ltd. Jagdish 2 10 (New) 1.80 133.49 55.79 20.02.2017 16-12-2016 42.53% 36.84% 31.12.2020 NE Km 51.100 to 53.800 NH-10 Agarwal Construction / Upgrade existing road to 2 lane SARDP- 3 with paved shoulder from Km 0.000 to 16.000 510 16.00 375.8 163 05.10.2019 26.02.2019 16.43% 11.58% 05.05.2022 M/s. VKJ-NSPR (JV) . NE - Tarku NH-510 Construction / Upgrade existing road to 2 lane SARDP- 4 with paved shoulder from Km 16.000 to 32.500 510 16.50 290.05 171.53 01.11.2017 31-03-2017 48.85% 44.04% 31.03.2021 M/s S&P Infrastructures Developers Pvt.ltd Ramesh Bdr NE Tarku - Ravongla NH-510 SARDP- Construction of Alternate Highway from - M/s Dinesh ChandraAgarwal Infracon Pvt.Ltd.Jagdish 5 717A 26.70 447.37 318.42 01.11.2017 31-03-2017 73.93% 69.61% 31.10.2020 NE NH-717A Agarwal Constuction/Upgradation of existing highway to 2 SARDP- lane with paved shoulder from Km 00.00 to Km 6 717A 16.17 275.26 184 10.10.2018 28-03-2018 9.76% 6.00% 30.12.2022 M/s NPCC NE 16.1670 NH -717A. (Ranipool-Pakyong) Airport Road Construction & Upgradation of existing road to 2- SARDP- lane with paved shoulder from km27.200 (End of 7 717 B 10.40 230.45 100.95 15.10.2020 31.08.2020 0.00% 0.00% 15.04.2023 J.K. Associates - A.K. Builders (JV) NE bypass) to km37.600(New Rolep Bridge) of Rhenok-Menla spur ( II B) Construction & Upgradation of existing road to 2- SARDP- lane with paved shoulder from New Rolep Bridge 8 717 B 14.40 493.42 182.23 To be given 28.10.2020 0.00% 0.00% - Shivam Condev Pvt. Ltd. NE at km 37.600 to Chochenpheri at km 52.00 of Rongli to Chochenpheri (Pkg-II C) Construction of 2-lane with paved shoulder of new SARDP- green field alignment from Chochenpheri at km 9 717 B 30.00 816.79 532.52 To be given 28.10.2020 0.00% 0.00% - U.P. State Bridge Corporation Ltd. NE 52.000 to Helipad near Menla at km82.00 of Rhenok-Menla spur (Pkg-III A) Construction of 2-lane specification road with paved shoulder including Tunnel (300m) at SARDP- 10 Rabangla (Singtam-Tarku-Rabangla-Legship- 510 1.10 79.21 50.60 15.10.2020 22.09.2020 0.00% 0.00% 15.10.2022 Nagyan Construction Pvt. Ltd. NE Gyalshing) Pkg-III (Design Ch.: 32.500 km to 33.600 km) under SARDP-NE (Pkg- III) Rehabilitation & Upgradation of existing road to 2- SARDP- lane with paved shoulder including geometric 11 510 25.24 292.8 144.9 31.10.2020 31.08.2020 0.00% 0.00% 30.04.2022 Shivam Condev Pvt. Ltd. NE improvement of section from start of Rabangla km33.600 to km58.540 (Pkg- IV) Construction of 2-lane specification road with SARDP- paved shoulder as realignment (Greenfield 12 510 16.16 262.84 132.30 To be given 14.09.2020 0.00% 0.00% - JRA Infrastructure Ltd. (JRAIPL) NE alignment) of existing stretch between Legship - Gyalshing from km58.840-km75.00 (Pkg- V) Construction of 2-lane road with paved shoulder SARDP- (Greenfield alignment) of existing stretch between 13 510 15.21 183.31 89.57 To be given 14.09.2020 0.00% 0.00% - JRA Infrastructure Ltd. (JRAIPL) NE Legship - Gyalshing from km75.00 to km 90.210 (Pkg- VI) Construction & upgradation ofexistingroad to 2- SARDP- lane with paved shoulder including geometric Rani Constructions Pvt. Ltd. - Sri Satya Sai Infrastructrue 14 717 A 21 311 189.26 05.10.2020 21.08.2020 0.00% 0.00% 06.04.2023 NE improvement of Kafer- Lava More section from Pvt. Ltd. (JV) km 40.00 to km 61.100 (Pkg-VA) Construction & upgradation ofexistingroad to 2- lane with paved shoulder including geometric SARDP- improvement of sect. from bypass to TTC Infra - M/s Suryodaya Infra Projects (I) Pvt. Ltd. 15 717 A 16.6 345.38 240.3 20.10.2020 24.07.2020 0.00% 0.00% 21.04.2023 NE Reshi Border km 79.700 to km96.254 (Lava More- (JV) Rishi Border )Pkg-VB as part of Alternate connectivity to . (b) Total 227.23 4537.17 2555.36 Tunnel Work

Construction of Chisopani Traffic Tunnel of 16 NH(O) length 250 m from design Chainage Km 67.150 to NH-10 0.42 35.69 29.00 10.09.2019 05.03.2019 10.60% 5.00% 09.09.2021 M/s Nagyan Constrcution Pvt. Ltd Km 67.400 on NH-10 in East Dist.

(c) Total 0.42 35.69 29.00 Rehabilitation

Improvement & Rehabilitation of existing Indira 17 NH(O) Bye Pass road form Km 0.000 to km 10.117 on NH-10 10.117 33.24 17.57 04.05.2018 28.03.2018 100.00% 100.00% 03.05.2019 M/s Pasang Lama & Sons NH-10 in the State of Sikkim on Item Rate Basis

Special Protection work on Rehabilitation and 18 NH(O) Restoration of sinking/sliding zone on NH10 NH-10 1.25 33.84 33.84 11.06.2020 28.02.2020 0.00% 0.00% 10.06.2022 KCC Buildcon Pvt. Ltd. (Rangpo- Ranipool section)

(d) Total 11.37 67.08 51.41 Status Of Pre-Construction Activity Inception Report Feasibility Report Draft DPR Final DPR LA FC NHDP NH No. Alignment 3D Utility SL. Length Date of 3a 3A 3G Stage I Stage II Estimated Phase/ Name of Project Name of Consultant (Old/ Approval Notificati Shifting No. (Km) Award Target Actual Actual Notification Notificatio Notificatio Approval Approval Target Actual Cost Scheme New) Target Date Actual Date Status Target Date on date/ Estimate Date Date Date date/ Area n date/ n date/ date/ Area date/ Area Date Date Area in (in Cr) in Ha Area in Ha Area in Ha in Ha in Ha Ha DPR

28.09.2017 Estimates PKG II : Rishi Border - M/s SA Infrastructure Alignment 08.06.201 work is not in 1 SARDP 717 B 26.788 (Submitted) work is not in scope 12.05.2016 03.12.2018 has been 437.45 Rolep (NH-717B) Pvt.Ltd Approved 5 scope and revised received

Estimates PKG III : Rolep-Menla M/s SA Infrastructure Alignment 08.06.201 work is not in 2 SARDP 717 B 43.84 22.04.2019 work is not in scope 09.05.2018 07.08.2018 has been 635.68 (NH-717B) Pvt.Ltd Approved 5 scope received

3 SARDP Rabongla-Gyalshing M/s CM Solutions 510 47 Project has been forwarded by State PWD, Sikkim . No tripartite agreement is signed with NHIDCL. 495

Special repair works at narrow zone and 4 NH(O) landslide area between BO Sikkim, NHIDCL NH-10 1.17 Tender Annulled, DPR under progress, the same has been identified as pilot project under technical assistance from JICA. 166.3 Rangpo to Ranipool (Stand alone Project) A Total 118.80 1734.43 Bharatmala B Total 0.00 0.00 NH-In Principle (i) 2 laning with paved (i) Process shoulder of Namchi- for Joint (i) Electrical Ravangla-Tashiding- inspection Department Yusksum-Geyzing road 3(A) for Counting of section (length-122Km) (i) 3(a) completed identifying/fi utilities - in the State of Sikkim Submitted to for South nalizing completed (ii) 2 laning with paved M/s L.N Malviya Infra H.Q for Sikkim & forest land (ii) b) PHE shoulder of Geyzing- Projects Pvt.Ltd in publication West is in Department 22.12.201 16.03.201 5 NHIP Dentam-Uttarey- Association with 327 Approved 31.1.2018 18.02.2018 in Gazatte Sikkim progress. (Public under process 4578 7 8 Chiwabhanjang road Agnitio Infrastructure Notification. District, (ii) Forest Health section (length-55 Km) in Project Pvt.Ltd. Work Under official’s Engineering the State of Sikkim progress for demands Department) (iii) 2 laning with paved North village Counting of shoulder of Ravong- Sikkim maps for utilities - Phamtum-Dzongu-Upper year 1952, completed Dzongu-Chungthang road which is not section (length-150 Km) available. in the State of Sikkim. C Total 327.00 4578.00 Grand Total (DPR) 445.80 6312.43 (A+B+C)