Strategic Community Partnership Plan setting priorities for potential enhancement sites
April 22, 2016
355 square mile service area Combined Sewer Area
ASLA 2015 Annual Meeting and EXPO 126 CSO Locations ThroughoutCombined Sewer Area Combined Sewer Area
ASLA 2015 Annual Meeting and EXPO
Historical CSO & Consent Decree Requirement
9 9 8 7 6 4.5 5
(BG) 4
Typical Year Typical 3
2 0.494 CSO Volume Remaining CSO Volume 1 0 Baseline (1970s) Current (2015) Target (2036) Project Clean Lake: THE GRAY 25 years of tunnel construction
7 tunnel systems – 21 miles – 17’ to 24’ diameter – 100’ to 200’ deep – Three deep tunnel pump stations – Drop structures – Near-surface sewers , structures Looking across combined sewer area for opportunities to manage stormwater before it enters combined system
ASLA 2015 Annual Meeting and EXPO Buckeye / Woodland Hills Neighborhood The Sewer District: COMBINED SEWER OVERFLOW CONTROL Project Clean Lake Community Enhancements
NEORSD Stated Goals for Project Clean Lake Community Enhancements: • Meet requirements of EPA Consent Decree • Leave behind investment following construction / disruption • Develop a coordinated, system-wide approach • Tell the story of NEORSD investment / impact • Explore potential to integrate public art and public space enhancements with construction projects • Create a Project Clean Lake identity • Environmental education beyond a project’s construction Phase I: Developing an Investment Framework Project Clean Lake: • Green Infrastructure Basin Sites • Gray Infrastructure Tunnel Routes • Pump Stations • Miscellaneous Structures • Neighborhood-Based Initiatives
Project Clean Lake – Analysis of Initiatives Planning Horizon: Pre-2026 Projects: • Buckeye Road GI Basins Relief Sewer & GI Basins • Regulator S-8 Upgrade • Center Street Storage Tank • East 37th Street Pump Station • Shoreline Storage Tunnel • Columbus Road Storage Tank Pipes • Shoreline Consolidation • CSO-045 Storage Tank • East 37th Street Pump Station • Slavic Village Demonstration GI Upgrade • CSO-063 Relief Consolidation Basins Sewer • Lakeshore Boulevard Relief • Southerly Pump Station Sewer • Doan Valley Regulators / Relief • Superior Avenue Pump Station • Fairhill GI Basin • Doan Valley Relief and • UAIZ GI Basins • Fleet Avenue GI Basin Consolidation Sewer • Union Avenue GI Basin • Kingsbury Blvd Relief Sewer • Doan Valley Storage Tunnel • Wade Avenue Connector • London Road Relief Sewer • Dugway Regulators / Relief • Westerly Main CSO Storage Sewer • Low Level Interceptor Relief Tunnel System • Dugway South Relief and • Westerly Tunnel Dewatering Consolidation Sewer • Mary Street Pump Station Pump Station • Dugway Storage Tunnel • Morgana Run & Burke Brook • Woodland Central East / West • Dugway West Interceptor Relief Rehabilitation GI Basins • East 140th Consolidation and • Morgana Run Relief Sewer
Establishing a Community Investment Timeline Planning Horizon: Pre-2026 Projects: • Buckeye Road GI Basins Relief Sewer & GI Basins • Regulator S-8 Upgrade • Center Street Storage Tank • East 37th Street Pump Station • Shoreline Storage Tunnel • Columbus Road Storage Tank Pipes • Shoreline Consolidation • CSO-045 Storage Tank • East 37th Street Pump Station • Slavic Village Demonstration GI Upgrade • CSO-063 Relief Consolidation Basins Sewer • Lakeshore Boulevard Relief • Southerly Pump Station Sewer • Doan Valley Regulators / Relief • Superior Avenue Pump Station • Fairhill GI Basin • Doan Valley Relief and • UAIZ GI Basins • Fleet Avenue GI Basin Consolidation Sewer • Union Avenue GI Basin • Kingsbury Blvd Relief Sewer • Doan Valley Storage Tunnel • Wade Avenue Connector • London Road Relief Sewer • Dugway Regulators / Relief • Westerly Main CSO Storage Sewer • Low Level Interceptor Relief Tunnel System • Dugway South Relief and • Westerly Tunnel Dewatering Consolidation Sewer • Mary Street Pump Station Pump Station • Dugway Storage Tunnel • Morgana Run & Burke Brook • Woodland Central East / West • Dugway West Interceptor Relief Rehabilitation GI Basins • East 140th Consolidation and • Morgana Run Relief Sewer
Establishing a Community Investment Timeline Partner Outreach: • Cleveland City Planning Commission • Northeast Shores • Cuyahoga Soil and Water • Famicos Foundation • NOAH: East Cleveland • University Circle Inc. • Buckeye Shaker Square • Campus District • St Clair Superior • Flats Forward • Detroit Shoreway • Ohio City Inc. • Tremont West
Neighborhood Outreach Opportunity Areas: - Target redevelopment areas within neighborhoods with uniquely identifiable characteristics, changes in land-use patterns, strongly defined physical edges, or topographic boundaries.
Opportunity Areas - Community Reinvestment Zones Opportunity Areas – Criteria for Assessing Impact
Opportunity Areas are evaluated on a scale of 1-5 for each of the following criteria to assess it’s viability for NEORSD sponsored public space enhancements: • Current Visibility: Automobile • Current Visibility & Accessibility: Pedestrian / Bicycle / RTA station • Increased Ped/Bike Visibility: Greenspace & Trails Initiative • Development Potential • Population Growth • Partnership / Funding Opportunities • Equity / Environmental Justice • Proximity to Schools M Opportunity Area Impact Ranking: L - High Impact - Medium Impact - Low Impact M L
L
H M L M H H
Opportunity Areas – Criteria for Assessing NEORSD Impact Catalytic Neighborhood Investment Opportunities Enhancement Sites: A - Potential locations at which Project Clean Lake community investments can be integrated C within neighborhoods have been
identified. Investment A opportunities build from planned / ongoing redevelopments, offer
NEORSD education prospects, B and occupy high-visibility locations throughout the City. A
B
C
A B A
A C
Catalytic Neighborhood Investment Opportunities Green Infrastructure Fleet Avenue Streetscape Infiltration Basin Green Ambassador Project
H
L
M
H Fairhill / Ambler Park Basin Green Ambassador Project
H
L
M
H UAIZ Basin Outdoor Classroom Green Ambassador Project
H
L
M
H Gray Infrastructure Dugway / Doan M Initiatives
Opportunity Areas: L H Forest Hills
Glenville/ East Glenville Neighborhood Famicos Foundation Cleveland H M East Cleveland
M M Garrett Square
University L Heritage Lane Circle H
Little Italy / Red Line Route H
Stokes / Ambler Park
Woodhill Road L Buckeye Glenville: Forest Hills Park
M
Forest Hills
Park
Street Street
th East 110 East
Glenville Town Center / East Side Market Shaft Site / Easement Locations Glenville: Garrett Square
M
Glenville Town
Center / East Street Street
Side Market Garrett Square th
Redevelopment East 110 East
Superior Avenue A
A Planned Development Initiatives East Cleveland: Pattison Park
Forest Hills Park / Cleveland 2nd Ave GI Basin
Programming partnerships
& community engagement
H Glenville Town
Center / East Street Street
Side Market
th East 110 East
Pattison Park
A
Phillips Avenue
Active / Engaged Communities University Circle: Ambler Park
Cleveland Museum H of Art
UC 3
UC 3 Case Western Reserve Master Plan / Stearns UCI Road Proposal 0 Gateway Glenville Town
Center / East Street Street
Side Market CMSD John Hay / th School of the Arts Complex
Carnegie Avenue 110 East
A
Ambler High Visibility Civic Destinations Park
DVT
ISOMETRIC VIEW
infrastructure MLKCT
Doan Brook
- Culvert
SHAFT CSO-073 DVT-2 Giddings Brook Culvert
WCT Below Below Grade SHAFT Ventilation Gate Control Giddings Ground Surface Vault Vault Brook Reference Line Culvert WCT
SHAFT DVT-2 CSO-073
Overflow Flow Structure Control/Gate MLKCT Structure Doan Brook Culvert
Diversion Structure
DVT ISOMETRIC VIEW
Project Clean Lake Identity