Strategic Community Partnership Plan setting priorities for potential enhancement sites

April 22, 2016

355 square mile service area Combined Sewer Area

ASLA 2015 Annual Meeting and EXPO 126 CSO Locations ThroughoutCombined Sewer Area Combined Sewer Area

ASLA 2015 Annual Meeting and EXPO

Historical CSO & Consent Decree Requirement

9 9 8 7 6 4.5 5

(BG) 4

Typical Year Typical 3

2 0.494 CSO Volume Remaining CSO Volume 1 0 Baseline (1970s) Current (2015) Target (2036) Project Clean Lake: THE GRAY 25 years of tunnel construction

7 tunnel systems – 21 miles – 17’ to 24’ diameter – 100’ to 200’ deep – Three deep tunnel pump stations – Drop structures – Near-surface sewers , structures Looking across combined sewer area for opportunities to manage stormwater before it enters combined system

ASLA 2015 Annual Meeting and EXPO Buckeye / Woodland Hills Neighborhood The Sewer District: COMBINED SEWER OVERFLOW CONTROL Project Clean Lake Community Enhancements

NEORSD Stated Goals for Project Clean Lake Community Enhancements: • Meet requirements of EPA Consent Decree • Leave behind investment following construction / disruption • Develop a coordinated, system-wide approach • Tell the story of NEORSD investment / impact • Explore potential to integrate public art and public space enhancements with construction projects • Create a Project Clean Lake identity • Environmental education beyond a project’s construction Phase I: Developing an Investment Framework Project Clean Lake: • Green Infrastructure Basin Sites • Gray Infrastructure Tunnel Routes • Pump Stations • Miscellaneous Structures • Neighborhood-Based Initiatives

Project Clean Lake – Analysis of Initiatives Planning Horizon: Pre-2026 Projects: • Buckeye Road GI Basins Relief Sewer & GI Basins • Regulator S-8 Upgrade • Center Street Storage Tank • East 37th Street Pump Station • Shoreline Storage Tunnel • Columbus Road Storage Tank Pipes • Shoreline Consolidation • CSO-045 Storage Tank • East 37th Street Pump Station • Slavic Village Demonstration GI Upgrade • CSO-063 Relief Consolidation Basins Sewer • Lakeshore Boulevard Relief • Southerly Pump Station Sewer • Doan Valley Regulators / Relief • Pump Station • Fairhill GI Basin • Doan Valley Relief and • UAIZ GI Basins • Fleet Avenue GI Basin Consolidation Sewer • Union Avenue GI Basin • Kingsbury Blvd Relief Sewer • Doan Valley Storage Tunnel • Wade Avenue Connector • London Road Relief Sewer • Dugway Regulators / Relief • Westerly Main CSO Storage Sewer • Low Level Interceptor Relief Tunnel System • Dugway South Relief and • Westerly Tunnel Dewatering Consolidation Sewer • Mary Street Pump Station Pump Station • Dugway Storage Tunnel • Morgana Run & Burke Brook • Woodland Central East / West • Dugway West Interceptor Relief Rehabilitation GI Basins • East 140th Consolidation and • Morgana Run Relief Sewer

Establishing a Community Investment Timeline Planning Horizon: Pre-2026 Projects: • Buckeye Road GI Basins Relief Sewer & GI Basins • Regulator S-8 Upgrade • Center Street Storage Tank • East 37th Street Pump Station • Shoreline Storage Tunnel • Columbus Road Storage Tank Pipes • Shoreline Consolidation • CSO-045 Storage Tank • East 37th Street Pump Station • Slavic Village Demonstration GI Upgrade • CSO-063 Relief Consolidation Basins Sewer • Lakeshore Boulevard Relief • Southerly Pump Station Sewer • Doan Valley Regulators / Relief • Superior Avenue Pump Station • Fairhill GI Basin • Doan Valley Relief and • UAIZ GI Basins • Fleet Avenue GI Basin Consolidation Sewer • Union Avenue GI Basin • Kingsbury Blvd Relief Sewer • Doan Valley Storage Tunnel • Wade Avenue Connector • London Road Relief Sewer • Dugway Regulators / Relief • Westerly Main CSO Storage Sewer • Low Level Interceptor Relief Tunnel System • Dugway South Relief and • Westerly Tunnel Dewatering Consolidation Sewer • Mary Street Pump Station Pump Station • Dugway Storage Tunnel • Morgana Run & Burke Brook • Woodland Central East / West • Dugway West Interceptor Relief Rehabilitation GI Basins • East 140th Consolidation and • Morgana Run Relief Sewer

Establishing a Community Investment Timeline Partner Outreach: • City Planning Commission • Northeast Shores • Cuyahoga Soil and Water • Famicos Foundation • NOAH: East Cleveland • Inc. • Buckeye Shaker Square • Campus District • St Clair Superior • Flats Forward • Detroit Shoreway • City Inc. • Tremont West

Neighborhood Outreach Opportunity Areas: - Target redevelopment areas within neighborhoods with uniquely identifiable characteristics, changes in land-use patterns, strongly defined physical edges, or topographic boundaries.

Opportunity Areas - Community Reinvestment Zones Opportunity Areas – Criteria for Assessing Impact

Opportunity Areas are evaluated on a scale of 1-5 for each of the following criteria to assess it’s viability for NEORSD sponsored public space enhancements: • Current Visibility: Automobile • Current Visibility & Accessibility: Pedestrian / Bicycle / RTA station • Increased Ped/Bike Visibility: Greenspace & Trails Initiative • Development Potential • Population Growth • Partnership / Funding Opportunities • Equity / Environmental Justice • Proximity to Schools M Opportunity Area Impact Ranking: L - High Impact - Medium Impact - Low Impact M L

L

H M L M H H

Opportunity Areas – Criteria for Assessing NEORSD Impact Catalytic Neighborhood Investment Opportunities Enhancement Sites: A - Potential locations at which Project Clean Lake community investments can be integrated C within neighborhoods have been

identified. Investment A opportunities build from planned / ongoing redevelopments, offer

NEORSD education prospects, B and occupy high-visibility locations throughout the City. A

B

C

A B A

A C

Catalytic Neighborhood Investment Opportunities Green Infrastructure Fleet Avenue Streetscape Infiltration Basin Green Ambassador Project

H

L

M

H Fairhill / Ambler Park Basin Green Ambassador Project

H

L

M

H UAIZ Basin Outdoor Classroom Green Ambassador Project

H

L

M

H Gray Infrastructure Dugway / Doan M Initiatives

Opportunity Areas: L H Forest Hills

Glenville/ East Glenville Neighborhood Famicos Foundation Cleveland H M East Cleveland

M M Garrett Square

University L Heritage Lane Circle H

Little Italy / Red Line Route H

Stokes / Ambler Park

Woodhill Road L Buckeye Glenville: Forest Hills Park

M

Forest Hills

Park

Street Street

th East 110 East

Glenville Town Center / East Side Market Shaft Site / Easement Locations Glenville: Garrett Square

M

Glenville Town

Center / East Street Street

Side Market Garrett Square th

Redevelopment East 110 East

Superior Avenue A

A Planned Development Initiatives East Cleveland: Pattison Park

Forest Hills Park / Cleveland 2nd Ave GI Basin

Programming partnerships

& community engagement

H Glenville Town

Center / East Street Street

Side Market

th East 110 East

Pattison Park

A

Phillips Avenue

Active / Engaged Communities University Circle: Ambler Park

Cleveland Museum H of Art

UC 3

UC 3 Case Western Reserve Master Plan / Stearns UCI Road Proposal 0 Gateway Glenville Town

Center / East Street Street

Side Market CMSD John Hay / th School of the Arts Complex

Carnegie Avenue 110 East

A

Ambler High Visibility Civic Destinations Park

DVT

ISOMETRIC VIEW

infrastructure MLKCT

Doan Brook

- Culvert

SHAFT CSO-073 DVT-2 Giddings Brook Culvert

WCT Below Below Grade SHAFT Ventilation Gate Control Giddings Ground Surface Vault Vault Brook Reference Line Culvert WCT

SHAFT DVT-2 CSO-073

Overflow Flow Structure Control/Gate MLKCT Structure Doan Brook Culvert

Diversion Structure

DVT ISOMETRIC VIEW

Project Clean Lake Identity