1 DESCRIPTION AND LOCATION
Application for permission in principle for a 352 Ha settlement expansion, including residential, commercial, industrial, recreation and retail uses, community facilities, landscaping and open space. Road and rail infrastructure, including M9 junction, train station and park and ride, and primary and secondary school provision at: Land around Winchburgh, West Lothian
2 DETAILS
Reference no. 1012/P/05 Owner of site Primary land owners: Winchburgh Trust John Cadzow (Auldcathie) Ltd John Cadzow (Glendeveon) Ltd Earl of Hopetoun Marquess of Linlithgow Network Rail British Waterways West Lothian Council Transport Scotland The full list of owners is contained in the file Applicant Cala Land Investments Ward & local Broxburn, Uphall & Ltd members Winchburgh J Campbell A Davidson E Glass G Morrice Case officer Wendy McCorriston Contact 01506 775218 details [email protected]
Reason for referral to Development Management Committee: Major application with more than 5 objections and council interest.
3 RECOMMENDATION
3.1 Grant planning permission in principle, subject to conditions and legal agreement(s).
3.2 Refer the master plan to the Development and Transport PDSP and the Council Executive with a recommendation that it be adopted as Supplementary Planning Guidance (SPG).
4 DESCRIPTION OF THE SITE AND PROPOSAL AND BACKGROUND
4.1 This application is for permission in principle for a major urban expansion of the existing settlement of Winchburgh. The application boundaries extend to the M9 corridor in the northeast and east; to the boundary with the former Auldcathie landfill site in the northwest; beyond Glendevon farm to the west and to Old Glendevon Farm Cottages to the southwest (see attached location plan).
4.2 The application boundary largely follows the boundary of the allocated Core Development Area (CDA) for Winchburgh (see attached plan), as identified in the adopted West Lothian Local Plan. There are two areas where the application boundary is extended beyond the CDA boundary to allow for additional landscaping to be implemented, and three areas to allow for road works and associated landscaping. There are also two areas at Faucheldean and adjacent to the M9 motorway that are within the allocated CDA boundary but not part of this planning application.
4.3 The planning application shows the settlement expansion (and proposals for improvements which extend into the existing urban area) comprising 7 different “Character Areas” (see attached plan), ranging from the new Town Centre area to the west of the canal, to the Duntarvie employment areas in the north and several primarily residential areas. In each of these Character Areas a strategic landscape framework is to be established within which “Development Blocks” are identified (see attached land- use mix plan). These are the areas proposed for future development.
4.4 The strategic landscape framework is to be used to provide new woodland/open space corridors, landscaped SUDS facilities, district and neighbourhood parks and sports and play facilities. Normal landscape and SUDS requirements will, where appropriate, also be incorporated within the Development Blocks.
4.5 The main components of the proposed settlement expansion are:
3,450 residential units, including affordable housing Two employment areas A new town centre with retail, commercial, leisure and other compatible uses Land for a partnership centre A canal basin A railway station Two park and ride facilities A motorway junction and road connections A distributor road connection to Broxburn A network of paths, including connections into the existing path network in the area Three neighbourhood retail/commercial centres Two secondary schools (one denominational and one non-denominational) on a joint campus on the west side of the development, with school and community sports pitches and facilities Two or three new primary schools (as required) and extension/improvements to the existing Holy Family/Winchburgh Primary Schools building A town park around the former claypit, a district park and three neighbourhood parks with play and sports facilities
4.6 The planning application is accompanied with the following supporting documents, some of which were included at the time of the initial submission and some which have been submitted, or updated, in response to issues raised during the processing of the application:
Final Master Plan, updated September 2009 Environmental Statement Environmental Statement: technical appendices Environmental Statement: non-technical summary Supplementary wildlife/habitat surveys (badgers, bats, amphibians, great crested newts and watercourses and water bodies) Public Consultation Report Transport Assessment Development Appraisal Report Local Roads Assessment Flood Risk Assessment Water Management Plan Glendevon Pond Water Balance Report Beatlie Drainage Channel Report Pitch and Play Park Proposals Summary Document Noise Report Niddry Castle Bing: redevelopment strategy and options.
Where appropriate, additional consultations/notifications have been carried out in respect of any additional information and the comments from consultees/representees contained in this report reflect the most up to date position of these bodies and individuals.
4.7 The master plan sets out an overall vision for the settlement expansion: as an integrated living and working environment with a wide variety of local services and community facilities to serve the existing and new populations. It then goes on to establish the design approach for the development: as a sustainable community, which aims to integrate with and improve the existing village, whilst respecting the local landscape’s intrinsic qualities.
4.8 In setting out the basic approach to the design of the settlement expansion the master plan identifies all the issues that have been taken into account in developing the proposed urban structure. These range from the policies outlined in the development plan to a detailed assessment of the site’s characteristics, including existing landscape character, cultural heritage, archaeology, ecological and wildlife habitats, watercourses and bodies, and ground conditions and contamination.
4.9 Following an assessment of the above characteristics, an overall development concept has been arrived at and then taken forward as a set of development principles for the master plan area. These cover issues like housing mix, height and density of development, the approach to vehicular and pedestrian/cycle integration, the development of a landscaped framework and the approach to energy and waste minimisation.
4.10 Detailed design parameters are given for the seven character areas in the master plan (as referred to in para 4.3 above) including guidance on what will be expected from future developers in locations such as the town centre, the district and town parks, the employment areas and some of the key approaches into the expanded settlement such as Glendevon from the south and Hawkhill from the east.
4.11 An indicative phasing plan has been submitted as part of the master plan, which indicates the proposed order in which the development blocks and associated infrastructure will be built. This shows that the first area proposed for development is block K to the immediate west of Winchburgh, followed by several of the blocks in the Glendevon area. These blocks will include up to 550 houses, including affordable housing, the first part of the distributor road, a new primary school, a neighbourhood play area and associated areas of open space, SUDS and landscaping.
4.12 The environmental statement (ES) sets out the anticipated impacts of the development, ranging from the visual and environmental/wildlife impacts on the surrounding area to the health and socio-economic impacts on the existing community. The relevant consultative bodies have assessed the findings of the ES and their comments are set out in section 7 of this report.
4.13 The other technical supporting documents have also been assessed by the relevant consultees in the same manner and again their comments are incorporated below.
5 PLANNING POLICY ASSESSMENT
Plan Policy Assessment Conform? Edinburgh HOU3 This policy requires West Lothian Council to allocate and the Strategic land for a minimum of 3,000 residential units in the YES Lothians Housing Winchburgh/East Broxburn/Uphall area. The West Structure Plan Allocations Lothian Local Plan allocates land for 3,450 new units in (ELSP) Winchburgh and 2,050 in East Broxburn (including 500 from previous local plan allocations). The application accords with this structure plan requirement. HOU4 Requires local plans to identify steps to make housing ELSP Meeting the sites effective and ensure that development can be YES Housing integrated into effective walking; cycling and public Allocations transport networks and provide for a range of housing. These requirements are reflected in the policies of the WLLP and in turn are incorporated into the master plan for Winchburgh, which shows different tiers of paths, linked throughout the settlement and into the surrounding areas. Full details of bus corridors, proposed bus stops and planned park and ride facilities are also shown, together with proposals for a railway station. Whilst the station is still dependant on national rail timetabling changes before it can become effective, the master plan presents this as an important part of ensuring the settlement is a sustainable and accessible place to live. A broad range of housing types and sizes, ranging from small town centre flats to town houses and family houses are proposed in the expanded settlement in accordance with structure and local plan policies. Plan Policy Assessment Conform? ELSP HOU5 Advises that development should not proceed beyond Infrastructure the existing infrastructure capacity of each area until the YES infrastructure improvements are provided or funding committed. The key elements of infrastructure required for this settlement expansion are water/drainage and gas/electricity connections, road infrastructure, including a junction onto the M9 and school provision at primary and secondary levels. The applicant is at advanced stages in negotiations to ensure the required service connections into the settlement; Transport Scotland has confirmed its acceptance in principle to a motorway junction and a package of financial contributions is being drawn up to ensure appropriate extensions and/or new schools are in place as the population expands. Subject to finalising the terms of the necessary legal agreements (section 69 and section 75 agreements) the proposals accord with the terms of this policy. ELSP HOU6 This policy requires financial contributions to remedy any Community deficiencies in local facilities and amenities. The YES Facilities and applicant has agreed to enter into legal agreements to Amenities finance town centre improvements (including possibly leasing and using the former Beatlie School) and provide or fund public art, together with the providing new play areas and upgrading the existing play facilities/pitches in the village. ELSP HOU7 Requires local plans to include policies to secure Affordable affordable housing. Policies are included in the WLLP YES Housing and the applicant has committed to the provision of a combination of land, finance and units to meet these policy requirements. Subject to finalising the appropriate legal agreements the terms of this policy are met. ELSP ECON2 Requires local plans to ensure that new economic land New Land for allocations are located within CDAs and are integrated YES Economic with path and public transport networks and are highly Development accessible. New employment allocations are identified in the north of the Winchburgh CDA and these are reflected in the master plan, close to park and ride and station facilities and readily accessible from the proposed M9 junction. ELSP TRAN1 This requires local plans to safeguard land for identified Safeguarding transport proposals. For West Lothian, and Winchburgh YES Land for in particular, this requires land for a railway station, an Transportation M9 motorway junction and park-and-ride/interchange Schemes facilities. The master plan shows each of these elements. Transport Scotland has agreed to the principle of a motorway junction in the location shown in the master plan, however, whilst the station land is safeguarded there are still timetabling issues to be determined. Nevertheless, this structure plan requirement is complied with.
ELSP TRAN4 Requires local plans to encourage higher densities of Density of development in the most accessible locations. In line YES Development with this requirement the application envisages a higher density and accessible town centre with rail and bus Plan Policy Assessment Conform? interchanges and good cycle/walking connections. ELSP TRAN5 Local plans are required to include policies to ensure Transport travel-generating developments submit transport YES Implications oassessments and travel plans, including the setting of New appropriate mode share targets. This technical Development information has been submitted and assessed by West Lothian, Edinburgh and Transport Scotland and the developer has committed to appropriate network improvements and financial contributions. ELSP RET5 This requires planning authorities to make appropriate Retailing provision for new local shopping facilities, particularly in YES areas of planned housing growth. A new town centre and smaller local centres are planned for Winchburgh, which are commensurate with the size of the expanded community. ELSP ENV1C Resists development that would adversely affect listed Historic or buildings and scheduled ancient monuments. The YES Built impacts on listed buildings and ancient monuments, Environment including the Union Canal, have been quantified in the Designations submitted ES and assessed by Historic Scotland. The impacts, subject to appropriate mitigation, have been determined as acceptable. ELSP ENV1D Aims to protect areas of regional and local natural Natural and heritage value from inappropriate development. YES Built Agricultural land will be affected by this proposal, Environment however, the impacts on this have been assessed as Interests part of the public inquiry into the WLLP and the mixed- use CDA allocation has been confirmed through the adoption of the local plan in 2009. In terms of this policy the impacts of the development on the surrounding countryside, on core and local path networks, on areas of archaeological interest and areas of open space within the settlement have all been defined, assessed and determined as acceptable, subject to appropriate conditions and mitigation. ELSP ENV1G This policy promotes a high quality of design in new Design of New development. The principles of high quality design and YES Development place making are central to the objectives and vision in the master plan. Detailed design codes are to be prepared in advance or in parallel with the submission of individual planning applications. ELSP IMP4 Requires legal agreements between developers and Planning local authorities to provide key infrastructure to be in YES Agreements place prior to the approval of planning permissions. Any consent(s) for this site will not be issued until the appropriate legal agreement(s) have been signed. West Lothian CDA1 and This policy requires all infrastructure to be provided or Local Plan CDA2 committed before permission can be granted. The policy YES (WLLP) Infrastructure allows for planning conditions and legal agreements to and facilities be used to secure the funding and proper phasing of for CDAs development and refers to the CDA Action Plan (appendix 7.1), which lists the requirements for each CDA. The key infrastructure requirements listed for this Plan Policy Assessment Conform? application are school provision, comprising new secondary and primary schools and an extension to the existing primary schools; road connections, including a motorway junction and local facilities including a public town centre car park, canal related facilities and library provision. Strategies for the restoration of the former Auldcathie landfill site and for the depletion and remediation of Niddry Bing are also required. The intention is to enter into two (or more) legal agreements. The initial agreement would cover the delivery of 550 houses and commit the developers to financial contributions to: an extension to the existing primary school building funding for non-denominational and denominational secondary school infrastructure, which will allow house building to commence prior to the opening of the new secondary school complex the first phase of a new primary school at Glendevon affordable housing town centre improvements, including potential lease/use of the former Beatlie school public art bus subsidies cemetery provision In addition to these contributions a serviced site for affordable housing and a neighbourhood play area, adjacent to the Glendeveon school, are also to be included in the first legal agreement. Subsequent agreements will cover the same contributions, as required for the overall development area, in addition to bringing forward a site for the partnership centre, library provision, secondary school provision and park and ride and town centre car parks. Other facilities such as the canal basin, motorway junction, parks/landscaping and employment land can be required through the use of suspensive conditions. Subject to the developers signing the necessary legal agreements the proposals will meet the requirements of this policy. As detailed in section 4 above, a redevelopment strategy for Niddry Bing has been submitted and a separate planning application has been submitted (ref: 0033/ful/07) for the remediation of the former Auldcathie landfill. WLLP CDA3 States that planning permission for the development of Employment the CDA employment sites referred to in policy EM 3 will YES allocations not be granted until developers can demonstrate that infrastructure is to be delivered in phase with the development. The submitted details, and the phasing plan, show that the employment land will be serviced prior to or at the Plan Policy Assessment Conform? same time as works are being undertaken on the M9 junction. This requirement can be made a condition of consent. WLLP CDA4 Requires that a diversity of house types, tenures and Housing mix densities be provided within the new housing YES and density developments within the Core Development Areas. Also states that affordable housing shall be provided within the Core Development Areas in accordance with council policy. The master plan reflects these requirements and allows for a range of house types from flats, terraces and town houses to detached and semi-detached and a range of densities from 20 up to 50 units per ha. CDA5 and Indicative master plan boundaries for the major CDA CDA6 schemes are shown in Appendix 7.2. These policies YES Master plans require masterplans to be prepared for these areas (or other areas subsequently agreed with the council). The master plans need to address the strategic aims of the local plan, show the proposed land use pattern and the proposed transport/movement network and reflect the design principles listed in the local plan. It states that piecemeal development within the master plan boundaries which would prejudice the successful implementation of the wider CDA proposals will be resisted. The application and the master plan have been drawn up in full compliance with this policy requirement and has been updated/amended to reflect the requirements of consultees and concerns of objectors. The applicant seeks to have the master plan adopted as supplementary guidance. WLLP CDA8 This policy sets out the key requirements of the two Winchburgh master plan areas within the joint Winchburgh/East PART and East Broxburn CDA allocation. These are: Broxburn Funding of the non-denominational secondary school Funding of new distributor road linking Winchburgh to East Broxburn Funding of improvements to B8020 between Winchburgh & Broxburn Funding of works to rehabilitate non-scheduled parts of Greendykes Bing. These requirements were anticipated on the basis that applications for both the CDA areas would be submitted within the same timeframe. Unfortunately applications for East Broxburn have only been submitted within the last year and only cover part of the East Broxburn CDA allocation. Formal agreement on funding between developers has not therefore been possible at this stage. The Winchburgh developer has therefore agreed to self fund the initial elements of the joint school and road works. However, council officers will continue to facilitate joint discussions between all the parties concerned in an effort to ensure that the final solution will be delivered equitably. Plan Policy Assessment Conform? WLLP HOU5 Requires amenity and open space provision to accord Open space with the council’s Residential Development Guide. The YES provision master plan has taken this guide into account together with the council’s open space strategy, sports facilities strategy and the views of Sportscotland. An appropriate hierarchy of play provision, parks and open space is identified in the master plan. WLLP HOU7 Encourages high quality design of new development. High quality The principles of high quality design and place making YES design are central to the objectives and vision in the master plan. Detailed design codes are to be prepared in advance or in parallel with the submission of individual planning applications. WLLP HOU8 Requires layout to facilitate low speeds and to Access and incorporate direct footpath and cycle access routes. The YES parking` master plan shows a detailed network of paths and an indication of proposed traffic calming and road speeds. These matters will be finalised in subsequent detailed applications. WLLP HOU9 Requires the amenity of neighbouring occupants to be Residential protected. Whilst this is an application in principle the YES and visual master plan gives advice on how the interfaces where (Also amenity the existing and new developments interact. Objections see section have been raised by residents in Glendevon and 6 below) Fauceldean and at Station Road and the canal concerned about the impact on their amenity. This issue is therefore addressed in more detail in the representations section below. WLLP HOU10 Requires developers to make provision for “affordable Affordable housing” and identifies general principles. Negotiations YES housing are being finalised on the exact detail of the affordable housing contribution but the principles have been established for a package of land and contributions to accord with this policy. WLLP TRAN2 Requires the transport implications of new development Transport to be the subject of a transport assessment. Detailed TA YES impacts and Appropriate Appraisal reports and a local roads assessment have been undertaken and assessed by council Transportation and Transport Scotland officers. Subject to appropriate mitigation works, including junction improvements at Broxburn and Newton, the proposals are acceptable. WLLP TRAN3 Requires developers to provide, or contribute towards, Travel the provision of travel improvements including traffic and YES improvements environmental management measures, road network improvements and measures to promote trips by public transport. The developer will fund all necessary road works and associated landscaping and appropriate bus subsidies and bus facilities have also been agreed to.
WLLP TRAN7 Encourages walking and cycling and the provision of Pedestrians safe and attractive routes. The master plan shows a YES and cyclists detailed network of paths for the expanded community Plan Policy Assessment Conform? with links to existing routes and connections to the surrounding rural areas. Extensive detail has been included covering the width and type of routes and the suitability of routes for a range of users from pedestrians to cyclists and equestrians. WLLP TRAN8 Requires priority to be given to pedestrian and cycle Pedestrians access and requires traffic calming, controlled crossings, YES and cyclists new paths and secure cycle parking. Details of these facilities have been given in the master plan but will be worked up further through the submission of detailed applications. WLLP TRAN11 Promotes the introduction of Home Zones in proposed Home Zones new housing developments. Where appropriate, and in YES agreement with Transportation officers this can be facilitated at the detailed application stage. WLLP TRAN15 Advises that contributions may be sought from Safe routes to developers towards the capital costs of the infrastructure YES school necessary to protect, or provide, safer walking and cycling routes to schools and other local facilities. The developer is aware that safer routes to schools and neighbourhood/town centre facilities will be required and details of these will be brought forward in subsequent applications. WLLP TRAN16 Developers will, where appropriate, be required to Bus services incorporate measures aimed at improving bus facilities, YES including the provision of stops and shelters. Stops and shelters will be provided by the developer and enhanced bus services in agreement with the council and bus operators. WLLP TRAN31 and Parking levels for development shall conform to the TRAN33 current council adopted standards, although lower levels YES Parking of provision will be encouraged in line with sustainable objectives, where modal evidence supports a reduction. Shared parking facilities will be required in town centres. A shared town centre car park is shown. Full details of proposed parking for each element of the development will be examined in more detail at the subsequent application stage. WLLP HER16 Applicants will be required to provide an archaeological Archaeological assessment in advance of determination of a planning YES assessment application where the council considers this appropriate. Where preservation of archaeological remains proves unfeasible, archaeological investigation and recording to the highest professional standards will be required at the developer’s expense, prior to the implementation of the development. An appropriate assessment has been undertaken and WOSAS has agreed that further work can be undertaken as part of the detailed application process. WLLP EM3 Sites for employment uses have been allocated within Employment the CDA allocations. The exact areas of development YES allocations in must be shown in master plans including a phasing the CDAs strategy to release the employment allocations at the earliest possible time. The necessary land is identified in Plan Policy Assessment Conform? the master plan and it is intended that it will come forward as work on the motorway junction is undertaken, in line with the requirements of Transport Scotland. WLLP TC11 The CDA proposals for Winchburgh are required to Retail in incorporate provision for a new town centre within the YES Winchburgh vicinity of the existing village centre. The scale of any new retail development at Winchburgh shall be commensurate with serving its expanded population arising from the planned major housing developments identified in this local plan. The council has had a retail assessment undertaken and this indicates that the capacity of the net convenience retail floorspace should be in the region of 2,200sqm. No specific floor space has been shown in the master plan though a supermarket and a main retail street leading to it are shown on indicative plans. It is intended to place a restriction on application in principle of 2,000sqm net convenience floor space for a supermarket, though this matter can be examined again in more detail as firm proposals for the new centre are drawn up. WLLP COM11 Appropriate public art will be required as part of major Public art development proposals. A public artist has been YES employed to work on the proposals for Winchburgh and a set of detailed proposals, or appropriate finance will be required before work starts on site. This will be secured through the necessary legal agreements. WLLP IMP2 Requires developer contributions towards Secondary denominational secondary school provision. A package YES school of education contributions for the first 550 houses has been agreed in principle and a commitment given to further contributions. Both are in line with the emerging updated council policy for denominational secondary school provision. WLLP IMP3 Identifies a presumption against housing developments Education where education constraints cannot be overcome due to YES constraints a lack of funding but provides for the use of legal agreements to secure appropriate developer contributions for education purposes. The package of contributions, which is being negotiated, will allow for the building of the necessary new schools or extensions and remove the existing education constraints. Conditions on this application and any associated detailed permissions will ensure that the number of houses to be built will relate to the amount of school capacity available. WLLP IMP6 Requires development to comply with current best SUDS practice on sustainable urban drainage practices. More YES detail will be given in each detailed submission, however, SEPA is satisfied that the information submitted at this stage is acceptable and in line with current best practice. WLLP IMP7 Requires a Flood Risk Assessment to be submitted Flooding where there is a suspected risk. Initial flood risk YES information was submitted and then added to following consultation with West Lothian and Edinburgh council Plan Policy Assessment Conform? flood prevention officers. The final package of information is acceptable but will be supplemented by further data as detailed applications are submitted. Conditions can be used to secure such information at the detailed stage. WLLP IMP8 Identifies a presumption against the culverting of Culverting watercourses. There is one location on the Beatlie PART drainage channel where culverting and realignment will be required and this has been assessed and agreed as acceptable by SEPA and the council. Other watercourse improvements will adequately offset the negative impact of this section of new culvert, which is needed to enable the construction of one of the core roads to the town centre. WLLP IMP9 Where necessary, requires air quality data to be Air quality provided by developers. Overall baseline and anticipated YES data has been included as part of the ES and has been assessed and agreed as acceptable by council environmental health officers. Further detailed information will be required for those subsequent applications where air quality is identified as a potential issue. WLLP IMP11 Identifies a presumption against housing being located Noise close to existing noise sources. Noise information has YES been submitted with the ES that shows mitigation will be required for any residential properties that are proposed in areas close to the motorway and rail corridors. Council environmental health officers are satisfied with the information submitted, though again more data will be required at the detailed stage. WLLP IMP14 Requires proposals to comply with all relevant SPG supplementary policy guidance (SPG). The main SPG YES against which this application has been assessed are those requiring specific developer contributions and the SPGs on planning for education and affordable housing. As already detailed in this policy assessment, a package of contributions is being negotiated which will accord with the requirements of these SPG. Other technical SPG covering noise, flood risk and drainage and health impact assessments have also been complied with through the submission of the detailed information in the ES.
Also of relevance are the council's Residential Design Guide, Open Space Strategy and SPGs. The Scottish Planning Policy Guideline (SPP), ‘Designing Streets; A Policy Statement for Scotland’ and the following Planning Advice Note (PAN) documents are applicable:
PAN 33 Development of Contaminated Land PAN 42 Archaeology PAN 58 Environmental Impact Assessment PAN 61 Planning and Sustainable Urban Drainage Systems PAN 65 Planning and Open Space PAN 67 Housing Quality PAN 74 Affordable Housing PAN 75 Planning for Transport PAN 77 Designing Safer Places PAN 78 Inclusive Design PAN 79 Water and Drainage PAN 83 Masterplanning PAN 84 Reducing Carbon Emissions in New Development
6 REPRESENTATIONS
6.1 Material letters of representation have been received from 24 parties (plus one relating to an ownership issue which has been resolved). The representations are summarised below; the full letters are attached to this report.
Comments Response 1. General A public local inquiry (PLI) into the West Lothian Inappropriate scale of development Local Plan was held in 2006/2007 and the Timing of application in advance of P.L.I. reporters’ recommendations from that PLI were Contrary to existing and emerging LP published in March 2008. The reporters endorsed policies the scale of the allocation at Winchburgh, and the Loss of open countryside/prime agricultural use of agricultural land, subject to the delivery of land the motorway junction and some individual Should use brown field land first (eg recommendations with regard to the setting of Auldcathie & Niddry Bing) Glendevon pond and the delivery of the Why is this landtake necessary when new distributor road between Winchburgh and brownfield sites are coming forward at Leith Broxburn. The planning application was not Docks progressed until the WLLP was adopted. The application has been assessed against current Council should produce master plan not WLLP policies and as detailed in section 5 above developers is generally compliant. 2. Bings and open space The master plan proposals show over 600m Too close to Faucheldean bing (a Scheduled between the bing and the nearest proposed Ancient Monument and wildlife site): need a development. Historic Scotland is satisfied that 600m exclusion zone the proposals will not be detrimental to the Bings should be preserved and made an setting of the scheduled bing. There is an attraction extensive network of landscaping and open Improve open spaces and landscape space, which meets and exceeds council policy provision requirements. There are appropriate buffers Provide buffers between new and old between new and old development, but it is also development important to have integration between new and old, so there are areas where development will have an interface with existing housing, mainly to the southwest of Winchburgh and at Glendevon. Exact separation distances and how these interfaces work will be looked at in more detail in subsequent planning applications. 3. Wildlife and landscaping Detailed survey work has been undertaken as Impact on birds, bats, newts/fish (notably part of the submitted ES, including from the new canal basin) supplementary surveys. This information has Impact on wildlife and landscape quality been assessed by SNH and the proposed Spoil natural look of canal/can’t cope with mitigation agreed as acceptable, subject to increase in boating undertaking further updated surveys at the time Need to clarify proposals for existing of submission of detailed applications. The individual trees and groups master plan layout, including the road corridors, has been developed taking into account existing wildlife habitats and to avoid particular sensitive locations such as individual badger setts. There will be inevitable impacts on some habitats, including foraging areas, but the landscape network has been developed to ensure there are linkages with new and old habitat corridors and where possible appropriate mitigation is undertaken. Existing watercourses are to be enhanced to improve biodiversity. The landscape proposals show that existing trees and groups of trees will be retained where possible but where felling is necessary, in particular along new road corridors replacement planting will be undertaken. 4. Transportation The transport impacts have been fully assessed Without rail link only 300 houses would be and Transportation is satisfied that, subject to acceptable appropriate improvements to existing roads and Road congestion & traffic impact (5,000 extra junctions, the proposals are acceptable. The cars) improvements will include those to the road north Impacts on junctions at Kirkliston, A89 & A8 of the M9 and the Beatlie bridge and at existing The roads north of the M9 are narrow and junctions at Newton, Threemiletown, Broxburn will lead to road safety issues and Uphall, which will be required as conditions The M9 junction should be at Muriehall of consent. With these improvements the existing The junction will impact on the setting of road network can accommodate up to 1000 Duntarvie Castle residential units and beyond this the new Need new combined bus & rail links motorway junction will need to be in place. Bus services and facilities will be supplemented as the settlement expands and the council will continue to discuss the need for a new rail station with Transport Scotland. The reporters at the PLI concluded that because of constraints with the delivery of a rail station, an enhanced bus service would be acceptable to deliver the necessary improvements in public transport. Historic Scotland has not objected to the location of the junction in relation to Duntarvie Castle. 5. Phasing A package of town centre improvements or a Should include improvements to village and financial contribution will be required in line with provision of low cost housing first council policy. The first phase of finance has Start in centre and work out to allow been agreed and the developer is also monitoring by existing community (and later discussing the potential of leasing and using the provision of infrastructure) former Beatlie school as part of the improvement Avoid long term significant impacts on package. existing populations The phasing has been amended to take into account the current economic climate and the need to deliver key items of infrastructure, such as water and drainage and reach agreements with third parties such as crossings over the canal and railway. As the start will now be focussed to the west and move eastwards this will avoid extended impacts on the wider community, which would have occurred under the initial phasing plan where works were to start in both the east and west.
Monitoring of the impacts and liaison with the community will be important and where appropriate liaison groups/meetings will be set up. 6. Provision of services As part of the proposals land will be available for What provision will be made for doctors, post the council to develop a partnership centre. The office, police, fire, water & electric NHS health trust, police and other partners will Level of social housing/tenure mix needs be involved in developing the centre and clarifying ensuring that the appropriate level of services are available as the community expands. Affordable housing, in the form of land and/or commuted sums and units has been agreed at 25% and will include a range of housing. 7. Health and safety issues The appropriate technical safeguards will need to Land stability be undertaken by the developer to meet Scottish Gas pipeline Coal/building warrant requirements with regard to land stability and HSE / gas supplier requirements with regard to work in the vicinity of the pipeline. 8. Existing pitch As part of the initial master plan the proposals Loss of playing field showed the use of the playing field at Tippet Knowes for housing and community facilities such as a church hall and kick pitch. This proposal has now been deleted from the master plan, though it is shown as being potentially used for future community use, which could include use for the partnership centre. This, however, is not fixed and will require to be the subject of a future detailed planning application. The playing field is to be retained as part of the current proposals. 9. Town centre buildings The town centre is shown as being primarily two Impact of buildings, (particularly 5 storey and three storey buildings, however, illustrative building) on existing canal side houses (both layouts show that there could be one or two sides) higher focal buildings. The exact impact of these on existing properties will need to be examined through detailed applications though the design and siting of higher buildings will need to ensure there is no overshadowing or loss of privacy for existing residents. 10. Extension to existing school A meeting was recently held with education and The Winchburgh Parent Council (WPC) planning officers and the head teachers and objects to the delay in the provision of new parent council’s of both schools. schools, which will then require the existing At this meeting education set out that the Winchburgh Primary to be extended. WPC strategy for the existing building is to extend it in consider that the school is not capable of phases so that ultimately it will become a two being extended without detriment to the stream school for Winchburgh PS only. At that quality of teaching and learning stage Holy Family PS will be moved to a new opportunities. site, which is identified in the master plan behind The building and site were designed as a the former Beatlie school buildings. single campus but now accommodate both There is currently sufficient capacity at Winchburgh and Holy Family schools and Winchburgh PS to accommodate approximately facilities other than class rooms are required 350 new houses, but no capacity at Holy Family. which the developer should pay for. A 3 classroom extension is therefore planned for Holy Family, but this is to be located in such a manner that it will allow for the long term use of the school for WPS without prejudicing the short term use of the site for the two schools. The extension proposals, which will be paid for by the developer, also include improvements to circulation /garden and entrance spaces in the school and the provision of outdoor play facilities. Both parent councils have been given the opportunity to comment on options for the extensions and improvements directly to education/construction services. A detailed application will be required for the extension when there will be further opportunity to comment. At this stage none of the proposals will prejudice the operation of either of the schools. 11. Glendevon There are three small groups of houses at Impact on character of Glendevon area, Glendevon that are affected by the proposals: particularly existing cottages (privacy/ those adjacent to the pond, 5 properties at overshadowing) and the existing pond Glendevon Farm Cottages and 3 at Old The proposed path network will disturb Glendevon Farm Cottages. existing wildlife including swans The reporters at the PLI confirmed that the Crossing glendevon farm road with a new mixed-use allocation at Glendevon was road in close proximity of existing houses appropriate. The principle of housing in the area The road is in private ownership has therefore been established through the PLI, The Swannery agricultural holding is not where a number of residents from Glendevon recognised presented evidence. The reporters did require an The development will impact on the water appropriate wildlife corridor to be provided supply to Glendevon pond around the pond, to protect this valuable natural resource. This requirement has been carried through in the local plan and is reflected in the master plan. A condition can also be imposed to ensure that this is incorporated in any subsequent detailed application and that path routes respect identified wildlife habitats. Additional information has been submitted to confirm that the proposals will not impact on the water supply for the pond. The amenity of the individual residents will be fully assessed with the submission of detailed applications. The master plan currently shows adequate landscape buffers around the properties adjacent to the pond and those at Old Glendevon Farm. A landscaped area is shown opposite the 5 Glendevon Farm properties, but there could potentially be rear gardens of new properties adjoining the gardens of the existing houses. It will therefore be necessary to carefully assess the details of boundaries and privacy/overshadowing implications at the detailed application stage to ensure that they accord with and, where possible, exceed council standards. There are specific objections to the new road being located to the north of the 5 houses. This is required to complete the strategic road network for the settlement, though will not be required until about year 2 or 3 of the development. The road corridor is approximately 15m wide, to take the road, a cycle path, verges and roadside planting. However, the exact location of the road is constrained by the presence of a high-pressure gas main in this corridor. If moved too far north the road would be on top of the pipeline, which is not acceptable and if moved further north still it would affect the planned primary school site. The developer has agreed to ensure that the road is moved as far north as possible with enhanced planting areas to the south to create a buffer between the houses and the road. The exact detail of the crossing of the track will need to be the subject of a detailed application. Ownership issues will need to be resolved between the developer and the relevant parties. 12. North Greendykes Cottages The new link road from Winchburgh to Broxburn Impact from new road in terms of: will run to the west of these cottages, though will Noise not require to be completed until year 3 or 4. The Air pollution current main road goes in front of the cottages. Congestion Therefore the new route, which will be fully Would ring road avoiding new & old built up landscaped, will take the majority of the traffic areas be better? away from the front of the cottages to the side, potentially improving the overall amenity for the cottages. If appropriate, noise and air quality assessments will be required as part of the detailed submission for the road and appropriate mitigation, such as bunding/planting can then be undertaken. The reporters at the PLI agreed that the line of the proposed link road was acceptable, subject to the normal mitigation measures to protect residential amenity. This can be achieved at the detailed application stage. 13. Faucheldean The proposed link road to Broxburn will pass the The possibility of closing Faucheldean Rd west end of Faucheldean. The line of the link should be explored (note: this is not road was debated at the local plan PLI and the supported by Winchburgh residents) reporters were satisfied that the exact route of the main road and the connection between the two roads can be considered at the detailed application stage. Some Faucheldean residents support complete closure of the road, however, Transportation would prefer a connection together with appropriate traffic calming to ensure this does not become a “rat run”. Again this can be considered in more depth at the time of the detailed submission. 14. Impact on individual properties There is one property adjacent to the canal and Loss of Canal Cottage small pockets of land that remain in private Loss of field used and maintained for sheep ownership that may be required for the (north of West End House) development. The entire application site (other Station Rd dwellings are being incorporated than some landscaped areas) is allocated for into the site development in the local plan and supported by Uncertainty for affected owners the structure plan. It will therefore be for the developer to negotiate with the appropriate landowners to secure any necessary outstanding land. The Station Road properties, which are adjacent to the railway line are modern properties which will be retained and appropriate measures undertaken to protect the amenity of existing occupiers. 15. Remediation proposals A redevelopment strategy has been produced for No plans for re-instatement of Niddry Bing which allows for the gradual Auldcathie/Niddry Bing depletion of the bing, in line with the current permitted consent, and then gives options for the long term re-use of the site. Given that the current consent allows for extraction up to 2051, even with a speed up in the current rate when development begins in the area, any future use is very much a long-term proposal and is not relevant in terms of this current application. A separate planning application has been submitted for the remediation of Auldcathie including woodland planting and potential energy generation from gas extraction. Some of the detail has recently been updated and is being assessed but is generally supported by the council/SEPA/SNH and the Forestry Commission. Suspensive conditions will be used on this master plan application to ensure that the areas closest to Auldcathie are not developed until the strategy has been approved and appropriate agreed mitigation is in place. In particular the secondary school campus cannot be occupied until the agreed restoration has taken place. 16. Consultation The developers undertook the main consultation Report does not accurately reflect the exercise over 5 years ago. Since that time consultation exercise and responses updates have been provided for the public received. through the community council and existing school parent councils and where appropriate the plans have been amended to address concerns of residents and community groups. 17. Airport BAA has raised no objections to the application, Implications of Edinburgh Airport Expansion subject to appropriate planting and working plans methods being employed on site. 18. Other The documents have been updated and, where Errors/inconsistencies in documents necessary, corrected and re-notification Illustrative only undertaken. Comments on the updated master plan and supporting information is included and addressed in this section. As this is an application in principle much of the work is illustrative, but there is also a significant amount of detail that will be used to guide the determination of subsequent detailed planning applications.
7 CONSULTATIONS
This is a summary of the consultations; the full documents are contained in the application file.
Consultee Objection? Comments Planning Response Scottish NO There shall be no impact on the Noted. The developer has Government water environment during or after confirmed that best Environment Group construction as a result of the practice principles will be development. SUDS measures shall employed for protecting the be incorporated where applicable for water environment. Overall road drainage. SEPA should be fully SUDS proposals have involved in the discussions on the been submitted with the proposals. application and endorsed by SEPA who have been consulted on the application. Historic Scotland NO Historic Scotland is content that the Noted. Agreed mitigation in ES has made a comprehensive and the form of good design / fair assessment of the impacts on the appropriate protection and historic environment, in particular on integration of scheduled the Union Canal and Duntarvie monuments and listed Castle, and is content that the buildings / structures into mitigation strategy proposed is an the development can be appropriate and practical approach ensured through the use of that accords with the advise offered appropriate conditions. by HS. Transport Scotland NO There has been a significant degree Transport Scotland’s of ongoing consultation between support of the proposed M9 Transport Scotland (TS), the junction, subject to applicant and their consultants and mitigation on the strategic West Lothian Council. This has been and local network, is due to a number of reasons not least welcomed. This will include the applicant’s preferred access mitigation at the Newbridge strategy which included the provision junction and the developer of both a new motorway junction on and WLC Transportation the M9 motorway to the north of the officers are in discussion development and a new rail halt on with Edinburgh Council to the Edinburgh – Glasgow rail line. determine the mechanism Appraisal work and policy decisions for achieving this. have been required to establish the Whilst it is disappointing principle of such a strategy and to that TS are unable to determine its operational impact on support a new railway the strategic transport network. station at this time, this is a Based on the consultation and key component in ensuring discussions I would advise that Winchburgh develops as a Transport Scotland does not propose sustainable community and to object to the application, subject to officers remain committed appropriate conditions being to an ongoing dialogue with attached to any consent granted. In TS. However, at this stage, particular no more than 1000 houses in line with the TS request, shall be occupied before the junction no formal approval of the is opened. station can be given. The The recommended conditions reflect local plan, following the the need to deliver both the reporters recommendations Consultee Objection? Comments Planning Response employment and residential zones in at the PLI allows for tandem. The provision of a new enhanced bus services motorway junction is predicated on until such time that the the delivery of a functioning mixed station is delivered. The use development. legal agreements will The appraisal work has require the developer to demonstrated that a suitable public contribute to providing transport mode share could be these services until such achieved through either enhancing time that a station is bus services or providing a new rail delivered. If this does not station. However a rail halt at happen by the time that Winchburgh would impact on the 1000 residential units have Edinburgh – Glasgow Improvements been built then the overall Programme (EGIP). The primary public transport provision objective of EGIP is to increase will need to be reassessed. service levels via all Edinburgh to Glasgow routes from today’s 5 or 6 services per hour, with a fastest journey of 50 minutes, to 13 services per hour with a fastest journey time of around 35 minutes. Based on a scenario with a potential call at Winchburgh, timetable analysis has indicated that the journey time between Edinburgh and Glasgow would increase by approximately 3 minutes. Transport Scotland therefore cannot support the proposal for a rail halt primarily due to the detrimental effect this will have on the national objectives associated with the Edinburgh Glasgow Improvement Programme. TS therefore, request that the provision of a new rail halt does not form any part of any consent granted although it was referred to in the outline planning application. Sportscotland NO As amended, to show an increase in Noted. Conditions can be the provision of sports pitches in the imposed to require the expanded settlement and particularly appropriate provision as at the school sites, Sportscotland is the settlement expands. content that the development, as Management proposals will proposed in the master plan and need to be worked up in Pitch and Play Proposals document, conjunction with the council makes adequate provision for playing to ensure appropriate fields for school and community use. school and community Conditions and/or legal agreements access. shall be used to secure the phased provision of the pitches, which shall be constructed to an appropriate standard. Provision shall also be made for appropriate management and maintenance of the pitches. Consultee Objection? Comments Planning Response SEPA NO SEPA would commend the approach Noted. Further technical taken in identifying many of the detail will be required as environmental constraints and part of subsequent welcomes the master plan’s applications and can be emphasis on sustainable required as a condition of development and welcomes the consent. commitment to employ sustainable construction methods and the use of energy saving measures. SEPA commends the consideration given to the siting of the SUDS features across the site and the diversity of regional control structures. There remain matters of detail which will require to be resolved as detailed design codes and applications are brought forward, however, overall the proposals are to be commended as an example of best practice in environmental design. Following the submission of an additional report SEPA is satisfied that it offers adequate justification for the part culverting of the Beatlie drainage channel. SNH NO Following the submission of Noted. Appropriate supplementary survey work and conditions, which ensure meetings held between the that updated survey work developer, SNH and the council, and mitigation proposals SNH is content that its requirements are submitted, where for detailed survey work, and necessary, with detailed appropriate mitigation to ensure that applications, can be the proposed development would not imposed. impact adversely on wildlife and habitats, can be taken forward through appropriate conditions/legal agreements. Particular attention must be paid to otters, bats and water voles where more work is required before detailed development proposals are drawn up. The developer will require appropriate licences where work is to take place in the vicinity of protected species. Edinburgh Council NO The council raises no objections to Noted. Edinburgh Council the application but requests that at will be notified of the the detailed stage it is given the submission of detailed opportunity to comment on the applications. transport and water management aspects of the proposals. Scottish Water NO Subject to appropriate cost Noted. The developer is in contributions for water and discussion with Scottish wastewater connections being Water to ensure that the agreed with the developer, Scottish appropriate upgrades can Water will upgrade its facilities to take place to ensure the Consultee Objection? Comments Planning Response accommodate the Winchburgh necessary service development. A separate drainage connections are available system will be required and Scottish as the settlement expands. Water supports the principle of Best practice SUDS SUDS. techniques are to be used across the development and the submitted detail has been agreed in principle with Scotland Gas NO There is a high-pressure gas The master plan layout has Networks transmission pipeline in the vicinity of been drawn up in the development. No buildings consultation with Scotland should be constructed within 16m of Gas Networks and the the pipeline and no works or developer is aware of the crossings of the pipeline shall be restrictions. The position of carried out until detailed consultation the road network and the has taken place. formation of a linear park through the new settlement area has been drawn up in recognition of the location of the pipeline corridor. HSE NO The applicant has consulted with Noted. HSE consultation HSE with a view to drawing up will be undertaken for those proposals that are compatible with detailed applications within the gas pipeline. The master plan the vicinity of the pipeline. proposals appear to meet the recommendations of HSE, though HSE can only give final advice when the detailed applications are submitted. On the basis of the information supplied HSE does not advise against the granting of planning permission in this case. Network Rail NO On the basis of the information Noted. Transport Scotland provided Network Rail has no is unable to support a new objection in principle. However, this station at this time because is based on the key caveat that the of national rail network proposed railway station can only be objectives and the lack of bought forward within the context of capacity within the national additional rail infrastructure timetable to allow. elsewhere on the network over which However, the council the applicant has no control. The continues to support this indicative station site can be element of the proposals supported, in so far as it will be and is in discussion with capable of implementation. However, Transport Scotland. the current timetable and level of service precludes an allowance for an additional stop without detriment to either the service overall or to a particular station. The support of a train operating company is also essential in order to enable a station scheme to be developed. British Waterways NO British Waterways Scotland Noted. The indicative town welcomes the approach in the WLLP centre plans show a marina Consultee Objection? Comments Planning Response that requires canal related facilities of approximately 40 berths. for the two major expansion areas at The council will ensure that Winchburgh and East Broxburn. The the advice of BWS is benefits of scale suggest that a sought in the design and single basin at each town centre assessment of the detailed would be most commercially viable application for the town and create a critical mass of interest. centre and its facilities. Marina design should be targeted at 50 berths in each centre. BWS would be keen to be involved in the detailed design stage and assist in this process. BAA NO BAA does not have an aerodrome Noted. The landscape safeguarding objection to the strategy for the master plan proposal, provided that appropriate has been developed in conditions are imposed requiring the consultation with BAA and need for landscaping and SUDS to in line with their advice. comply with BAA advice on bird The necessary hazards from amenity landscaping conditions/agreements will and building design, and that a bird be part of any consent for hazard management plan is the site. submitted prior to development starting on site. Forestry NO The proposals offer excellent scope The applicant is currently Commission for the integration of existing and new engaged in detailed woodlands. There is real scope to discussions with the link into ancient and long established Forestry Commission and woodland areas. Some changes to the Central Scotland Forest the layout and linkages could also Trust to take forward the mean that grant funding may be woodland planting available. In particular species choice proposals in more detail. and planting specifications should be The final requirements can drawn up to suit individual site types be examined further at the and ground conditions. It would be detailed application stage. useful to discuss these matters in more detail with the applicant at the appropriate stage in the planning process. RSPB NO Development proposals of this scale Noted. Much of the will inevitably lead to some birds suggested mitigation is being affected, however, RSPB included in the ES and can consider that the studies carried out be developed as the and the approach to considering landscape/open space and implications generally satisfactory. SUDS proposals are Where losses of birds are likely it is brought forward at the appropriate to consider ways in detail stage. which any proposed losses can be mitigated on site or compensated for elsewhere. This can include provision of nest boxes, development and management of ditch margins and other wet areas. Scottish Rights of NO Scotways has been involved with the Noted. The path network Way and Access developer in drawing up their access plan has been updated to Society framework and welcomes the incorporate the additional Consultee Objection? Comments Planning Response developer’s willingness to consult ROW. A condition can be and take into account views of imposed to ensure paths interested parties. Most of the remain open or diversions existing ROW and paths are shown, are in place during except LW187. We would ask that construction. access be preserved along these rights of way during the works, with diversions if necessary. WOSAS NO The desk based archaeological Noted. A condition assessment identifies a number of requiring work to be archaeological sites both within the undertaken in each application boundary and character area before work surrounding it where there is a commences in any part of moderate to high potential for that area can be imposed. unrecorded archaeological remains. The work required to assess these sites can in this case be provided for4 by the attachment of a suspensive condition that requires the submission of a programme of archaeological works. Architecture & NO A&DS commends the work of the Noted. Further work on the Design Scotland master plan team, particularly in town centre and its layout understanding and working with the and linkages will be grain of the landscape to create a submitted at the detailed place rooted in its locality. There is planning application stage. an opportunity to capitalise on the assets of the canal, railway and park to create a unique town centre that integrates the new and existing communities. Further analysis of the public realm at the detailed stage when design coding is produced would be beneficial. A&DS looks forward to reviewing the project at a more developed stage. Garden History NO The Society is satisfied that the Noted. Society proposals are unlikely to have any detrimental impact on the designed landscapes in the area (Hopetoun and Newliston) and Niddry Castle and adjacent walled garden. It is noted that the rehabilitation of Niddry bing is not included as part of the current application. The Society would request that it is notified when this element comes forward as this is likely to have greater impacts on Newliston and Niddry Castle. Scottish Civic Trust PART The Trust does not consider it Noted. The master plan necessary to adopt the master plan has been updated to take as SPG. The design codes should be some of these comments worked up in conjunction with the on board. In particular a local authority. The overall aim of the more detailed assessment codes should be to encourage of the existing village has Consultee Objection? Comments Planning Response interesting layouts and architecture. been undertaken. Improvements to the existing centre The boundaries of the should be a priority. The Trust would development have been have expected a more detailed established through the PLI appraisal of the existing character process. It is considered and appearance of Winchburgh. The that the town centre is the Trust questions whether the most appropriate location supermarket should be located in the for a supermarket to heart of the town centre as large ensure it is fully accessible structures can be detrimental to the to all the population. The intimate sense of space. It is master plan fully endorses important that all boundaries remain high quality development as shown and mark a clear change and also includes potential from countryside to built improvements for the town environment. The retention of the centre. The exact design of green corridor to the south is housing and the full details supported. There is concern about of town centre the employment allocation along the improvements will only be M9, which will add to the urban available at the detailed sprawl. The Trust is disappointed stage. For an application in with the level of information, principle there is more that improvement and integration of the sufficient information to existing village in the extension allow a full assessment of plans. The Trust would recommend the proposed expansion. that the local authority strive for good quality contemporary design. WLC NO The transportation and access Noted. The transportation Transportation principles contained in the master requirements and triggers plan are acceptable. Full have been agreed with the vehicular/pedestrian/cycle access developer and will be proposals will be required with each incorporated into conditions detailed application that is submitted. or legal agreements as Developers will also be required to required. undertake the appropriate improvement/mitigation measures on the existing network at certain points throughout the development. The number of houses that are occupied will trigger the requirement for the works. During the construction of the first 550 units the following works will need to be undertaken: Signal and direction change at Greendykes traffic lights, Broxburn, Installation of traffic signals at Threemiletown Other triggers will then need to be conditioned up to the 1000th unit, including changes to signals at Uphall and new signals at Newton. The motorway junction, the railway station (or an enhanced bus service) and appropriate park and ride facilities will need to be in place prior to the occupation of the 1001st unit. Consultee Objection? Comments Planning Response The developer will be required to pay for the promotion of traffic orders and all the associated transport works including new bus stops and shelters and the proposed path network. WLC Education NO Education has been fully consulted in Noted. The developer has the development of the master plan agreed to the required framework for the provision of new education costs for the schooling at Winchburgh, and the initial 550 houses and expansion of the existing primary negotiations are ongoing to school. There needs to be sufficient establish the exact school capacity built to provide a procurement routes for the quality education for the rising new schools and the population in the Winchburgh delivery of the required community. Education is satisfied education infrastructure that with the developer contributions which will be needed when negotiated, the first 550 houses can the development extends proceed before the initial phase of beyond the first 550 the secondary campus is opened. As houses. there is existing capacity at Winchburgh PS, the first 350 houses can also proceed before a new non- denominational school is opened. Education is satisfied that this school is capable of being developed in the location identified at Glendevon and has given accommodation schedules and briefs to the developer to assist in the design process. A catchment review will need to be carried out to establish a catchment for the new school. WLC Housing NO The proposals should comply with Noted. These requirements the adopted Affordable Housing are to be incorporated in policy, which requires land or a the initial 550 legal combination of land and finance agreement and a which equates to the delivery of 15% commitment to comply with of the total site capacity for use for the AH policy at the time socially rented housing and for the when future detailed CDA sites an additional affordable applications are submitted house contribution equating to a will be included in the minimum of 10% fully complete overall legal agreement. affordable houses. The current offer in respect of the first 550 units, which involves the transfer of land for 30 to 40 units (to be serviced within 3 years of the transfer) and a financial contribution for the remainder of the 15% requirement, plus a commitment to deliver an additional 10% completed units in the town centre, is acceptable. WLC Flood NO Initial concerns regarding flooding Noted. The requirements to Prevention downstream along the Niddry and integrate the individual Consultee Objection? Comments Planning Response Swine Burns), within the Edinburgh SUDS schemes and catchment areas have been assess them against the addressed. The submitted water overall water management management plan shows that the key plan for the site can be a requirements of: ensuring there is no condition of consent. The development within any 1:200 year developer is currently functional plain; no property is examining proposals for flooded from the 1:200 year flood the adoption and long term event and that there is sufficient maintenance of all the storage on site to attenuate the SUDS, open space, critical 1:100 year event can be met landscape and woodland, through the submitted layout. and public realm elements Further detail will be required from of the expanded the developers of individual areas settlement. Full details of about the routing of flood water and these and risk the routes from each area will require assessments, where to be integrated. There are extensive appropriate, can be above ground SUDS. The detailed required as conditions of design of these and the claypit pond consent. will have to minimise risk to the public. There will also need to be clarity about who will be responsible for the long term maintenance of these facilities. Soil sustainability will have to be carefully considered for a development of this scale. WLC NO The initial noise details in the ES Noted. The relevant noise Environmental indicated that there were a number of and air quality monitoring Health areas where closed-window noise information can be required assessments were undertaken. This as conditions of consent. is not acceptable for an assessment of noise impacts in this instance. There was also no indication, if any, of the maximum noise levels for nighttime train noise. No proposals were shown for mitigation measures to be employed to reduce noise levels at relevant residential facades. Following meetings with the applicant’s noise consultants further work has been undertaken and mitigation examined. This includes the use of flatted development adjacent to the higher noise sources, such as road and rail corridors, and the location of bedrooms away from the front facades in such locations. Subject to appropriate conditions and the submission of noise information at the detailed stage the proposals are acceptable. Real time air quality monitoring information for road traffic will be required for the submission of detailed applications, together with the incorporation of this technique in Consultee Objection? Comments Planning Response the code of construction practice. WLC Property NO No objections to the application. The Noted. Services council has a small land holding in Winchburgh, such as at Tippetknowes park and the former Beatlie School complex. Property Services is in discussion with the developer about potential refurbishment/re-use of the school buildings. WLC Contaminated NO The ES has identified all the possible Noted. These requirements Land Officer contamination sources within the can be imposed as application area, such as the bings, conditions of consent. mineral railway lines, former brickworks etc. All of these sources will require further investigation and assessment as the development proceeds. A condition should be attached at this stage requiring site investigations to be carried out for each sub-section of the development and that these be submitted with each detailed application. WLC Access NO The network of paths looks sufficient The access proposals have Officer but will need to be examined further been updated to show a as the more detailed designs for new path alongside the each area come through. Linkages to distributor road linking with Broxburn, access for horse riding Broxburn. Routes are to be groups, and connections into the extended where possible, surrounding area, are issues that subject to ownership need to be considered in more detail. constraints, to connect into Appropriate routes need to be in existing routes and place as the housing areas are built amendments have been out. undertaken to ensure there Cycle groups have suggested that are appropriate paths for there should not be through vehicular use by equestrians. access into the town centre. Through access to the town centre will be required to ensure there is adequate permeability and access for servicing/buses etc. There will be large pedestrian/ cycle areas and off road routes along the canal which will allow safe access for cyclists. WLC Sport & NO Extensive discussions have been Noted. The developer is Outdoor Education held with the master plan team with currently examining and Land Services regard to the proposed open space, proposals for the adoption play provision and sports facilities. and long term maintenance Following amendments and of all the play areas, open confirmation of acceptability from space, landscape and Sportscotland the basic layout and woodland, and public realm provision is considered acceptable. elements of the expanded Details of the maintenance and settlement. Full details of Consultee Objection? Comments Planning Response management of the facilities and the these and can be required open space will require to be as conditions of consent. submitted and the final Details of access and design/provision within each play management of the area will need to be agreed. Details community elements of the of public access and management of school sites are being the indoor facilities will also require to discussed between the be agreed with Education and sports developer and Education. management colleagues. West Lothian NO Many of the proposals in the master Noted. The health authority Community Health plan should contribute to good public and other community & Care Partnership health, such as good quality, energy partners such as the police, efficient housing, a transport network local colleges and designed to facilitate walking cycling voluntary bodies are and public transport and the working with the council to provision of recreational facilities. deliver a partnership Mixed tenure housing and good centre. If this application is quality rented accommodation and approved this will allow job opportunities are also important. further detailed discussions WLCHCP will need to work with to take place and a number partners to plan new health care and of the issues raised here to related social care provision for the be addressed. expanding community. Increased Other matters can be pollution and road traffic accidents covered by appropriate are two of the main concerns as the conditions. settlement expands. A number of specific suggestions and recommendations are made which it is hoped can be incorporated into the conditions of consent. Winchburgh NO WCC accepts the intended boundary There have been several Community Council of the development. Points for further meetings between the (WCC) consideration have been drawn up developer, council and through meetings of the WCC and community during the taking into account the views of processing of the residents and businesses. The main application. Many of the issues are: issues raised have been The footpath network should be taken into account, expanded. including improvements to High quality development should be the path network and the provided throughout and not just in requirement for a single Glendevon. partnership centre, which There should be no secluded unlit will include a health centre, areas. CIS, library and other The developer should support new community facilities and local businesses. rooms. A package of There should be one main improvements for the community centre and CIS. existing centre will be There should be improvements in the required and finance existing Main Street to attract new toward this has been businesses. agreed. How this Water quality and air quality should should/can be spent will be be monitored. something that can be Renewable energy techniques taken forward with full should be used. community involvement. Consultee Objection? Comments Planning Response A new health centre and other Detailed issues such as community facilities should be traffic calming, exact road provided at an early stage in the routing and tree protection development. can be considered at the The road from Broxburn should avoid detailed stage, though the the ROW and the woodland strips. most sensitive locations The Faucheldean Road should have been avoided as far remain a through road. as practicable. Philpstoun CC NO It is disappointing that the structure Noted. The development (PCC) plan process has not directed new strategy in the structure development to the vast tracts of plan has been driven by a dereliction around Glasgow. need to respond to However, if development pressures development pressures in are directed away from Phlipstoun the eastern side of the with this scheme then PCC will not central belt. The allocation argue against it. The master plan is has been the subject of a an impressive piece of work and detailed assessment at the reflects a desire to create a local plan PLI. settlement that will allow a rounded The current proposal does community to form and indeed not detail any expansion flourish. It is important that plans for land further to the Philpstoun does not become a west. suburb of either Linlithgow or Winchburgh. The western edge of this proposal should therefore be designed to preclude further expansion. Newton CC NO In principle NCC has no objection to Noted. The land allocation (NCC) the development. The main issue for has been assessed Newton is additional traffic. This through a PLI and could be reduced if the Scottish confirmed through the Government agrees to make the adoption of the local plan. junction 4 ways at Kirkliston. It is also The Kirkliston junction will disappointing to see land shown for be improved to 4 ways as business development right up to the part of the Forth M9 boundary. The quality of the Replacement Crossing development shown in the master proposals. The required plan must be enforced. It will be standards of design can be important to ensure contractors imposed through the operate responsibly to limit the production of design codes impact on residents. and the careful consideration of detailed proposals. A code of construction practice will be required as a condition of consent. Linlithgow CC NO The updated proposals appear to Noted. (LCC) address our initial concerns regarding traffic impacts. However, if there are any future changes which could impact on traffic movement around Linlithgow or education capacity at the Academy LCC would wish to make representation on these matters.
8 ASSESSMENT
8.1 Section 25 of the Town and Country Planning (Scotland) Act 1997 requires planning applications to be determined in accordance with the development plan, unless material considerations indicate otherwise.
Development Plan:
Edinburgh and the Lothians Structure Plan
8.2 The development of this CDA is a key component in meeting the strategic housing land supply targets for both West Lothian and the Lothians as a whole. As detailed in the policy assessment above, the proposal has been developed in full recognition of the structure plan requirements for bringing forward the allocated development sites in order to create sustainable and robust communities.
8.3 Whilst Transport Scotland (TS) has agreed that a new motorway junction is justified as part of the proposals, unfortunately it is unable to support a railway station at this time because of national timetabling requirements. Nevertheless, the station is an important element in the overall WLLP development strategy for Winchburgh, and is identified as an infrastructure requirement in the structure plan. Therefore, dialogue remains ongoing between the council and developers and TS in an effort to obtain the necessary permissions for the station. Until such time that a station is provided the developers will meet their public transport commitments through the provision of enhanced bus services, which, where necessary, will be subsidised by the developers.
8.4 Subject to signing the necessary legal requirements and ensuring that the negotiations in respect of the station continue, the proposal is in accordance with the provisions of the structure plan.
West Lothian Local Plan
CDA Allocation
8.5 As detailed in the policy section above, the proposal is for the development of one of the allocated CDA’s and has been assessed against a full spectrum of local plan policies and for the majority is in full compliance. The local plan envisaged that there would be an element of integration between the Winchburgh and East Broxburn CDA’s, however, because of the different timescales for developers submitting planning applications, this has not allowed for the production of joint reports or the commitment to joint infrastructure. The local plan does allow for the master plan proposals to be submitted and processed separately though encourages developers to produce a strategic integration plan detailing how the joint requirements can be taken forward.
8.6 Initial discussions have taken place between the Winchburgh and East Broxburn developers and council officers will continue to facilitate further discussions to ensure that as soon as practical those elements of joint infrastructure can be delivered equitably. In the current circumstances, however, where the Winchburgh developer has agreed to fund all the necessary Winchburgh requirements, and take on board the initial burden of the joint elements, it would be unreasonable to delay the processing of this application. There is nothing in the Winchburgh proposal that would prejudice the full development of the East Broxburn CDA, therefore, subject to there being ongoing dialogue between developers, there is sufficient justification to allow this application to proceed to determination without the submission of the strategic integration plan.
Education
8.7 A key component of implementing the council’s CDA strategy is ensuring that the development of new housing land does not proceed beyond the existing infrastructure capacity of each area. One of the greatest infrastructure costs within the CDAs relates to school provision. The CDA strategy has therefore been developed in conjunction with Education to ensure the appropriate capacity comes on line at the correct time.
8.8 As a result of the scale of the planned housing development within the CDAs, two non- denominational secondary schools and one denominational secondary school are required, together with appropriate primary provision. A large proportion of that capacity is required at Winchburgh and, as a result of constraints on public sector spending, the majority of that has to be developer funded.
8.9 Accommodation schedules and briefs for the schools have been produced by Education. Agreement has subsequently been reached with the developer for contributions for educational infrastructure to allow house building to commence whilst the design, phasing and procurement of 2 new secondary schools and 2 (or 3) primary schools is progressed. This will allow for new catchments to be developed and the numbers of pupils to reach an appropriate level before the new schools are opened. The school sites and buildings will be phased and the facilities associated with each of them, such as pitches and community accommodation will also be built in phases. Conditions and legal agreements will ensure that the appropriate facilities are delivered at the appropriate times and that management systems and plans are put in place, in consultation with sports and education development officers to allow for community access to these facilities. The planned extensions at Linlithgow Academy and St Margaret’s Academy will be able to accommodate the expected number of secondary school pupils from the first phase of 550 houses.
Transportation
8.10 In the same way that the school capacity will be developed incrementally, the road, path and public transport infrastructure will need to be expanded and improved as the settlement grows. The Transportation and Transport Scotland (TS) consultations detail the network improvements and interventions that will be required as the development is built out. Conditions will ensure that housing and other built development does not proceed beyond the capacity of the existing road and public transport network.
8.11 Whilst it is disappointing that TS are unable to support a new railway station at this time, this is a key component in ensuring Winchburgh develops as a sustainable community and officers remain committed to an ongoing dialogue with TS. The local plan, following the reporter’s recommendations at the PLI allows for enhanced bus services until such time that the station is constructed. The legal agreements will require the developer to contribute to providing these services until such time that a station is operational. If this does not happen by the time that a 1000 residential units have been built then the overall public transport provision will need to be reassessed and further commitment given to improving and expanding bus services, including park and ride facilities.
Quality of Development
8.12 The master plan has been developed taking into account all the constraints and assets of the site, including topography, watercourses, road and rail locations, mining history, archaeology and wildlife. The layout has been developed as far as possible to limit development on the most sensitive locations in terms of wildlife/archaeology/geology; to avoid skyline development and keep sensitive development back from road, rail and gas pipeline corridors.
8.13 At the same time, the proposals have taken into account the best practices in terms of place making and the layout maximises the use of positive assets, such as the canal and claypit pond and the linkages into the surrounding countryside, together with the transport connections onto the road, rail and canal. There is an extensive landscaped setting to be created and a detailed network of paths, both which will be essential to delivering a quality development. The planning process will ensure that these elements are brought forward as the settlement expands.
8.14 The master plan places emphasises the importance of quality design and sustainable design in bringing forward this settlement expansion. With the recent publication of the Climate Change (Scotland) Act and the forthcoming changes to the building standards regulations, the development of this settlement gives an ideal opportunity to incorporate the most recent best practice in sustainable design and carbon reduction techniques. The developer is committed to this approach and will be required to submit design and carbon reduction statements as part of any detailed application.
8.15 A soil management plan has been submitted as part of the ES to identify the best sustainable use of soil resources across the development and give guidelines for handling, storage and replacement. A construction and environmental management plan (CEMP), incorporating a code of construction practice, will be developed for the site. This will ensure that best practice techniques for management of construction waste and soil handling are implemented. Other management plans such as a landscape/open space and habitat management plan will also be required as conditions of consent.
Community Facilities
8.16 The proposals take full account of all the requirements in the local plan for community facilities, as detailed in the policy section above. Commitment has been given by the developer to make the appropriate level of serviced land available for schools, affordable housing, a partnership centre, a canal basin, railway station, parks, open space, play and sports facilities and parking. Appropriate developer contributions have also been agreed in line with policy requirements. The main focus and challenge for the council will therefore be to ensure the delivery of the facilities at the appropriate time as the settlement and population grows. As far as possible these requirements will be incorporated into the terms of the conditions and legal agreements for the development.
Ecological Impacts
8.17 On a site of this scale there will be inevitable impacts on wildlife and habitats. However, this scale of allocation has been examined and supported by the reporters at the PLI and is now reflected in the boundaries in the local plan. Nevertheless, as detailed elsewhere the master plan team has designed the layout to avoid areas of particular sensitivity and ensure that the impacts are kept within acceptable limits. The baseline data submitted with the ES is extensive and details for example that only 12 mature trees and approximately 40 semi-mature trees will be lost as a result of the overall development. The watercourses and SUDS/open space areas, which will be incorporated within the new development, are to be maximised to improve biodiversity value and the concept of creating a “green network”, which allows wildlife to move through the corridors, has also been developed. The reporters from the PLI have also required a wildlife corridor to be provided adjacent to Glendevon pond.
8.18 The developer’s environmental consultants and the council have undertaken extensive consultation with SNH, the Forestry Commission and the Central Scotland Forest Trust to ensure that best practice in terms of biodiversity and habitat creation and linkages are built into the final landscape proposals. There will be inevitable effects on some species, such as badgers, from the new road layout. In such cases existing habitats and foraging routes have been identified and mitigation measures, which include appropriate provision for crossing roads (via tunnels) and in one case the possible re-location of a sett, are proposed. Much of the initial survey work was undertaken several years ago therefore new surveys will be required before work starts on site and where necessary licences will need to be obtained. SNH has requested that further work is also undertaken in respect of otter and water vole habitat identification. Such requirements can be imposed as conditions of a planning permission in principle, to be submitted concurrently with any subsequent detailed application.
Auldcathie
8.19 Although not a specific policy, the local plan requires the developer at Winchburgh to produce a strategy for restoring the former Auldcathie landfill site. The strategy needs to include a timescale for implementation and is to be completed and approved before development can take place on adjoining sites. The applicant group (under Cala Management Ltd) has submitted the required strategy as a separate planning application (ref:0033/FUL/07).
8.20 Relevant consultees including SEPA, the Forestry Commission, the WLC contaminated land officer and WLC Transportation officers, have assessed this application. The strategy has recently been updated to reflect current best practice for remediation and landscaping of landfill sites and, subject to final clarification on issues relating to leachate and gas treatment, it is anticipated that this strategy can be approved in the next two months. The former landfill lies to the west of the proposed secondary school campus and several proposed housing areas. No development could be approved for these sites until the final strategy has been signed off and appropriate contaminated land reports have been submitted and agreed for them. No occupation of the school site or housing could take place until the agreed remediation measures have been implemented. These requirements will be made conditions of this and any relevant detailed consent.
Representations
8.21 Given the scale of the development, a relatively modest number of representations have been submitted. These are all detailed in section 6 above and include comments on both the initial and updated master plan proposals. The objections have been assessed and responded to in detail in section 6. Council officers, and in most cases the developer, have met or spoken to the majority of objectors, either individually or in small groups. Account has been taken of objections in the amended master plan and where possible appropriate changes have been made.
8.22 There are a number of cases where the issues are mainly ownership/legal ones where the matter will need to be resolved between the developer and the interested parties. There are others regarding the scale and several transportation issues that were already raised and addressed at the PLI into the local plan.
8.23 Where issues of individual amenity have been raised these will be addressed primarily by ensuring there will be adequate separation or buffers between existing and proposed development, particularly with regard to the proposed distributor road and properties at Faucheldean and Greendykes. The full detail will, however, only be available at the subsequent application stage, though this will allow relevant parties the opportunity to comment further.
8.24 The group of properties likely to be most affected by the development are the five cottages at Glendevon Farm. Discussions have, however, been held with the developer and master plan team and a commitment given that open space and appropriate landscaping will be provided around these cottages. Again this requirement can be fully assessed and quantified at the detailed application stage.
8.25 The link road travelling northeast from Glendevon toward the new town centre will be located close to the boundary of the northern most cottage. This is required to complete the strategic road network for the settlement. The road corridor is approximately 15m wide, to take the road, a cycle path, verges and roadside planting. The exact location of the road is constrained by the presence of a high-pressure gas main in this corridor. If moved too far north the road would be on top of the pipeline, which is not acceptable, and if moved further north still it would affect the planned primary school site.
8.26 The corridor could be kept as a cycle/pedestrian route only if the connection down to Greendykes Road in Broxburn were completed at an earlier stage in the development (to ensure there is a secondary access to the new housing areas). However, the developer is unable to deliver that connection any sooner, because of ownership constraints. The developer has therefore agreed to ensure that the road is moved as far north as possible, with enhanced planting areas to the south to create a buffer between the houses and the road. This and the exact detail of the crossing of the track will need to be the subject of a detailed application, at which stage there will be more certainty in the design and residents will be able to comment further. At this stage, subject to appropriate conditions, the proposals are acceptable.
9 CONCLUSION AND RECOMMENDATION
9.1 The proposed CDA development at Winchburgh has a major role to play in facilitating economic and physical regeneration in the area, as well as contributing to the housing land supply to address the continuing growth in population in West Lothian.
9.2 The aim of the CDA allocation in the local plan, and what has been reflected in the submitted application, is to create a robust and unique, sustainable urban structure that will fit into and become an identifiable part of the overall settlement pattern in West Lothian. The location and scale of the development has been carefully established to ensure that the appropriate transport, education and community facilities can be delivered by the developers as the settlement expands.
9.3 The vision for the development is that it provides a living and working environment that encompasses a sense of community, a high level of environmental quality and promotes economic success. The information and assessments submitted show that the expansion is capable of achieving these goals, but the challenge for the council is to ensure that the high quality design and environmental standards are adhered to as development commences. The adoption of the master plan as SPG is therefore an important element in achieving this.
9.4 Subject to completing negotiations on the required legal agreements, it is recommended that conditional permission in principle be granted.
10 ATTACHMENTS
Location plan Extract from WLLP showing CDA boundary Proposed Character Areas Proposed Land-Use Mix Plan Letters of representation
CHRIS NORMAN Development Management Manager Date: 2 June 2010 L.
t.
DM COMMITTEE LOCATION PLAN Date: 2 1) 10 Appik dtlofl No. : 1 () 12 P 0 West Lothian Sca’e I 20000 Council
X,-t
‘
o-,_
c---
)
--—
te,X.
----
>-
c--L
-
-
‘3-
c
A
,-
c,
(
c
-
4
I
—
QL
I
4t-I
-
—
—
‘
—
4
f
‘P
-t
L
c
V+
bc2
-_-
c
PJ’—t
xL
_
1/
I
,
4
,
2
1-
‘---.
SLP
/005
E
nfl
I
I
I
I
I — 4& SOld Glendevon Farm Cottages Winchburgh EH52 6PX
28 September 2005
The Development and Building Control Manager Development Control Unit County Buildings Linlithgow EH49 7EZ
Dear Sir! Madam Planning application for Winchburgh West Lothian
I am writing to register my serious concerns regarding the plans for developments in and around Winchburgh. We reside in a very beautiful area called Glendevon which on the plan is shown that our cottages (which date back to 1700’s> will be totally surrounded by housing estates. Our concerns are as listed below
1. The area of which is an area of beauty and enjoyed by residents and visitors, will be ruine. Regularly there are horse riders, walkers and runners who currently enjoy this area which also is home to some amazing wijfjncIudin a Hawk. The planning for Winchburgh could continue and leave the areaflendevon as an area of beauty for all the residents of Winchburgh to enjoy.
2. The new development will fl.Qtbeij keep iththQcqgesof 1,2,3,4 & 5 Old Glendevon Cottages, which date back to the 1700’s.
3. The new development will overshadow the cottagesaffecting privacy, light and disturb the peaceful country environment, which the area currently enj
(fully understand that there is a need to provide more housing, however this should be done in conjunction with consideration for what is already existing locally. It would also make sense 3 that instead of ruining an area of beauty that this would be enhanced as a focal point for the new planned development.
I look forward to hearing from you.
Yours Faithfully ,@fj, ‘t
Grainne Kelly & Paul Mc Vegh
4 & 5 O:d Gndeion arm Cctas I.
\. ____
Canal Cottage West End Winchburgh, West Lothian EH 52 6011 26/9/2005
Dear Sir Ref outline planning permission for a 352HA development in Winchburgh. Cala Land Investment Ltd.
We are in receipt of neighbour notificationof the above planning application and are lodging an officialobjection
We appreciate that these plans are in outline, however the supplementary material containing artists impressions of various features of the development include a new town centre and canal side residential area. P117 of the final draft master plan makes no mention of our property, which has been completely obliterated by the proposal.
If indeed the developers intention is to work around our property and outbuildings, which includes extant approved plans for a new dwelling, rio reference is made. Such building as a five story block as is shown, would have a dramatic impact on our amenity and would completely overshadow it These drawings also assume th 11vehiculrtss to our properties would be taken away.
We further understand that the Lothian Structure Plan does provide for an expansion in Winchburgh, however these proposals appear to be excessive and are not currently in accord with the existing adopted local plan.
Until such time as there is a new approved local plan decisions on such a major development proposal must be deferred.
It is also worth saying that the time scale involved in this proposal is so lengthy that it is already causing great unceijajty for us as householders. As a result we now find we are inhibited from pursuing our proposed and approved new housing development
ln general we now find our whole property is blighted with no immediate means of mitigating or resolving the problem..
In conclusion, it is for the above reasons that we must object to thi&proposal
Yours faithfully
Derek and Valerie Gorman
kJW I tI1/ 3
2SP -k
L4r.J Gorman J Glendevon Park TJ\CHBURGF{ 1 / / IEH 52 6UE 121.09.2005
The Development and Building Control Manager Development Control Unit County Buildings LINLITFIGOW — EH49 7EZ
Dear Sir or Madam,
PROPOSED DEVELOPMENT AT WINCHBURGH.
I write regarding the above subject, My home is to the south east of Glendevon Park, backing on to an area of natural landscaping, as well as the field I presume houses will be built on.
My concerns are that not only should the 4Lyith trees and shrubs etc be protected, they should also be to [which include deer] from any harm or loss of area due to the building of the new houses. Will an independent study be carried out to establish what the impact will be on the animal population and natural landscaping in this area?
Whilst nearly everyone I have spoken to agree that the development will be good for the future of ) Winchburgh, all have expressed concern about the ]g fQfl_cuntrsjcJe. I would hope that the council will ensure that the new houses will be built at a respectable distance from the current developments in Glendevon Park and Tippetknowes and possibly shielded by improving tree lines etc. Could the council also advise me what they would perceive to be a respectable distance between developments?
Finally I would urge council planners to remember that this development will have an iinpacn many of the current resident’s lives. Any descions taken should be considered with all seriousness’, as we all have the right to live in a clean and pleasant environment, which includes the open space Winchburgh residents currently enjoy. I understand that my comments may be viewed, but would ask that you respect my privacy and retrain from publishing my home address. Yourly,
John (pin 79 Mr
Yours
in cope into above I
I hich commuter A boatinjiarbour an spoil Winchburgh of
which
Winchburgh This unique now. development
facilities. school We acceptable The and here,
We can Providing which can’t around commute cope An residents
I Country Dear Linlithgow Development
2!
The also don’t
don’t
final Broburn,
Tippet
the
increasing
Dai
September2005
Winchburgh, have increase
have
go there
services
new with
the
Development
just
I
and find
ever
development Sir
faithfully location, should
are
alone see would
teachers. id
point. to
under
think Winchburgh
natural
noJ(
a Buildings
or development Knowes Fitzcharles
extra Winchburgh of Scotland. where now.
is to
monitored
village
it
any a
see
time, below
very
a
Madam: park
sets
work, Winchburgh.
area
will in Kirkliston.
goes in
bepyed the number
Winchburgh
Edinburgh.
like
big
Winchburgh Control
positive
the
with
A
weight
o Winchurgh
is
cc lodks
are Provide
due
the
proposed sad
have
and
and has
for
shortage average
large
to
put
Park.
ahead
population i.e.
and
facil’
goes
such
the
its
see historical
can’t
because
to to
Edinburgh,
the
of ride,
what
in, of
a
because and has
Unit
does
points, huge
number
Building
lack
lose
buses
Winchburgh. South
wildlife big more
ahead,
as
a the in
s. largest
plus
I
cope
was
new
and frequent although of
also what
development
are
black
are Ospreys,_Kites getting
impact so not
of
canal population
fire
they
drivers,
to
the guarantees
in
Queensferry. background
other
there
made a
doctors much of
awful service,
school,
know of plus
with
work
about population
supply such
jjgijjaae. you Control
Winchburgh
facilities,
and
canal
the
the are
that
this
on
power
many
than
views?
I
any
into
are just
countr
hours
white, bigger as West
in don’t soiE local —
the
the
has ‘
(Winchburgh but
new
no
douT&i’t
these
of
with
newts, should
goinu
mo
Manager
an
of
an
now.
major others
rail
cuts,
post
to
taken insects and which
whis
residents Lothian.
of they
want
what Railway how
increase
attraction,
plans
side.
the
this
park
will hTTj
lines,
Pipistrelle ______
to European
You
birdlike office,
go which
then
cope work, oil
decades
have
local ins,thainTy
to
does
facilities we
village. destroy
that from
have
than
and
ahead
pipes
live
can’t
which
EH52
Station work
Health should in
after
with
been
our we environment.
below
Edinburgh it,
rides
working
ft,r
my afZ5iiiia Winchburgh.
a
andflsi
in
be
Bats
Owls and if to greater
The rare
get that
have
the local
a Winchburgh in 6LR eventually
increase
property you
successful,
seen
develop.
have
Centre
building to
we
because
avera Edinburgh
a
wouldcause
go first underground-disused Scottish
in
I
come
the that doctor’s
alreath
don’t
MP
from
are
where
Central
which impact
under
for
Airport
new canal
nest
was
promised, in
is
West value,
from?
the
being more
site
of
school ffliand have
run
boating
working
history,
but
lost
the development
the
would would
appointment
voted and the
and on
and
Scotland, population
for
new
under
Lothian I
ftirth&
not
but the
than
new
fields
due planned
road
I
limited
feed
JTEviJ1ose
service
the fields.
work
just 4th
because
expansion
get
be staff
really
may
such
on,
to
houses
Winchburgh. I
congestion, next
you
in worst
spoilt
base, problems
the new
if hasarebirds7
now, thanks
in
poor
number to
well The
I mines,
our
in
;f
the as
the
became when
within
due
public
number
plan
old
run
Central 1?
the the
developments
I
are
and
in
if size local
new
and
canal water
move,
L
plans
to
3
part
a to 4;
these Scotland),
bings, rail to
to you /‘I’ couldn’t
new
of so
to an
lack
transport
would the it
that
a
build area,
go.
of J - has
of
pressure.
is Scotland,
the lines lines
on.
work
live if
hew
nature
just
years.
of
can’t
The
the
seen
local
I
on?
that ‘
O5
to V — -__ -
- ___L/ V
- ZZJ&ZZEZZEZ — ___ -
__ _V4___WINCHBI.JRGH — V - ______VV _V
—
__Jt Z$c
___
04/C a _
_ ——-——--———EH526QA ____ -
______- L4p±d
__ 4J ______
$VV4&_VV
TEL:
Q’1’k, THE
V
&a4
trL
PI-IILPSTOUN
FIRM WEST _V
_VV__r DUNTARVIE
J&4i
cc4ó
OF
LOTHIAN day
V4c&i
0. 01506
— G.
VV•
NIMMO 834331
V i:
-—
fl/
a
22 JSLLtJ
-
cn/
d t t/4aa V
VF
Vc&4d c14sc. _
V /,
—
‘a ac/
--
atç/ f V___
VV 00 -- __ V V - V V
1J’i
Copies
Stuart
Yours
4
3
2
1
Please The
representations. that
Investments
Please arasedf&
our
3i
This
above
I
Findlay
16
352
Dear
West
EH49
Linlithgow
County
West
Development
The
refer 20Septemter200__J
Station
site
our
area
Findlay
Sincerely
Ha
house
The
Traffic
Impact
over Development
LLameoiLy,
Sirs
to
Lothian
development
note
Lothian
7EZ
note
would
neighbours
Developments Settlement
Buildings
in
the
site
development
Road
PPCA
question
CpnsukinCMLandStrucura1
along
iI
that
therefore
will
and
neighbour
on
is
appear
Council
Control
we
invariably
natural
not
should
Winchburgh
with
henrexpon.
Ltd
at
and
object
Expansion
and
Stuart
under
is
that
to
two
12
highlighted
the
Unit
notification
environment,
Building
not
and
have
delivered
and
this
increase to
others
current
the
be
essentially
the
14
been
Findlay
site
control
of
included
proposed
Station Control
Winchburgh
alongside
in
rural
to
is
dated
included
the
not
our
i.e.
of
environment
become
in
CALA
enclosed
Road
under
Manager
house
Associates 15
•
the
development
has
September
in
development
will
the
the
at
recently
urban.
part
be
16
control
greyed
will
Station
making
copy
2005
on
be
been
Engineers
Ltd
of
in
1
the
destroyed
area.
plan.
CALA
development
Road.
JA
similar
in
completed
grounds
respect
I
am
Land
2
by
sure
1
k.)
of
of
and
the
it
LbLJS J?Q7 proposal. Yours We Ground Mr Dear Country Development Linlithgow West TEL o ROYAL enclose and 01324 Sirs, Lothian faithfully, JKiSG BANK Mrs at Buildings This Hope a 471121 PT Dickson copy Cl Contact Council is 14 RIBERS. really Cottage, of a Unit letter for 4 your Winchburgh
TAIT 4 we L SOUCITORS records have PORTE FAX 2SE?2 sent
& t:an (Q(Lfr/( PREC1N, 01324 tthe at to
MACKENZIE & P.P.C.A. request ESTATE 484275 41 GRNOEMOLH of Ltd AGENTS L fli’tIflrt our regarding clients. eini1: Nj,;re their 27 tb FK3 awkairandrnackenzieco.uk September outline I SAT i planning , C 2005 DX 560722 _-( ( ))( Li ) CC
(‘N Mr A. Moncrieff, ) I 102 1Ippet knowes Road 1 Winchhurgh West Lothian EI-152 6UL
West Lothian Council. Development Control Unit, County Buildings. Linlithgow.
Dear Sir! Madam.
) Ref: Outline Planning permission : 352 HA Developmentq Winchburgh.
Having received the recent notice for Cala’s application for planning permission regarding the above development, I would like the Development Control Unit to record my disapproval of the application’s proposals.
The main reason for this development causing much concern is due to the enormous increase in traffic which will cause severe detriment to all of Winchburgh’s existing residents. An increase of 3500 houses could likely cause anflajQQrs to use the existing road network in and around Winchburgh and Kirkliston. Having attended the developer’s public meeting in February this year, it appears that very little thought has been given to this problem — even though there are 4 or 5 new planned distributor roads” and a new motorway junction. The new roads will serve only to distribute” the extra 4,000 odd cars across the newly developed area, which will result in queues and possibly tailbacks at all new and existing junctions. Currently, the road network suffers from tailbacks throughout the morning and evening rush-hours at the main junctions in ?1i!tirand at the A89. The motorway also suffers from tailbacks at the Newbridge roundabout. The A8 at Ingleston, although not severely congested, is very busy and causes tailbacks at times at the Gogar roundabout.
To introduce another possible 2,000 odd (figure reduced as not all residents will be orking in Edinburgh) cars ill result in absolute congestion and significantly increase journey times, not to mention pollution. The obvious alternative is to use public transport -- hut at this moment in time we have only been promiseL1 a new motorway junction (not really helpful!> and a new railway station7k and ride.
If Winchhurgb residents could look forward to a new bus and rail station offering a more comprehensive public transport netork thiFvoiikfErtaini ease our concern over pollution and road congestion.
\nother main concern is the type and mix or housing that is being proposed Wirn three ne neighbourhood centres being built, one ould expect a large proportion of social housing. No committed figure has been made available and therefore this gives cause for concern. As there is no commitment to build a new Police station or a fire station, (the current service in Broxburn is clearly not adequate for the number of houses being built) law and order along with public safety is another major concern.
Winchburgh, currently, is aesthetically pleasing with the lovely views and open spaces and is one of the main reasons why I moved here. This development will destroy what most residents have enjoyed whilst living in Winchburgh. Additionally, there are a number of mature trees, some solitary, others in clusters, that are a landmark in the area and noone has yet commented upon whether they will be preserved or felled to make way for a road or new houses. Already some forest areas have been removed at an obvious detriment to the wildlife that lived there.
Howeer more importantly perhaps Winchburg will lose its identit as a quiet country village to become yet another faceless’ modern town which will eventually experience all the problems associated with neighbouring towns such as Broxbum and Livingston Le. vandalism and inadequate public safety.
To summarise, I object to the development on the following grounds: • Increased car pollution • Increased risk of accidents (mainly concerning pedestrians) • Increased commuting time (No commitment yet to building the train station) • Increased risk of crime (No commitment to building a police station) • Increased noise and disturbance (construction time span over 10years) • Lack of detailed housing plans information. • Lack of proposals to retain existing trees / landmarks / footpaths etc. • General reduction of views and enjoyment of existing rural spaces. Yours/1/faithftilly, Andrew Moncrieff
Copy to: Caa Homes Malcolm M.cVittie, Winchburgh (.omm.unity Council
ii
__/• ‘
.
1
i
,
<
‘‘V{/
£:>
I
1?
/
L 11
i?
p
ç ?
- ,i’j
_
(.yf 2
.
43/-I-
/
j .11 ,
•‘ ?,
--
/
/..
?,
t
yj
U
?
//
/
6wppn9
r
i•
Z2
13 )V
.‘ —4
/
OZ
(Jl/ 7 /.J;/
J C
-
A
/
r-
1
2
)7_
(-2r
,
9
/
//(C/
///‘
‘2’
/ — 4jv42
6
Oit
Li 77-’ ‘?-7 )r?’) i; c—’?/ c/ )/; / 7))7r (‘i; L( /--.v - ?), 77r’7Y?/-7Q C? /- C’ ‘-4/t’r74 /‘ ., 7;1’:’ r ‘?:2’’’ /, I / ,i
(1 C ) )
the per
corridor. proposed
The important
2
and this details be
land use is The
With
I proposals With ltd.
Dear
EH49 Linhithgow West County Development
Cohn
Faucheldean
Size
such
required
proposed part
area
proposals
possibly could
proposals
required
regard
reference
Sir
7EZ
and
Lothian
Butter a
and
of
Building
This
for
development large wildlife
be
policy
based
or
from
to
housing
location.
using
Broxburn should
made
for
proposals
control
are
will the
scale
to
council
ENV
the around site
on
Bing
Winchburgh
too
increase above
land
of
the
also
development
development in
unit
22.
brownfield close
1thsato
link
should
the
closer
following
should
the
include
application,
road.
long
the
in
Glendevon
not proximity to
planning
size be
term,
ñoféd
This
this sites,
possibly
points.
be
is
required.
put
of
made
site
within
please area
and
forward
current as
such
application
south to
for
a
moving
would
FaucheldeaiiBing.
should
up
a
scheduled
It as
development.
be
600m
of would
or
Winchburgh
for
depIéfii
advised
good
to possibly
or
restoringthe be
the
1012/P/05,
to
looking
appear
considered
arable
8Oam
ancient
North
that
the
mean
by
at
that
exclusion
farmland, I Niddri5ing
of
wish The 2-3
monument.
alternative
Cala Aldcathie
Faucheldean. less
j)’I
approx
countryside
times
Bing
to
farmland
land
object
zone
r)
surely
is
60% in
and
landfill
investments
y
routes
a
Any
size,
locally
or
to
belt
of
using
would
more
More
green
the
Why
the
site
for
as 3 New Rail Station
It would appear that in the short term, from discussions at developers open day. that it willbe very unlikely that a rail station will be opened or be able to be included as a stop on current timetables and may not be possible until the new airport link is being
developed. Without a station, being opened I would suggest that the amount of new housing being proposed or constructed would be limited to approx 300no as a maximum without this new transport link. —
Please confirm receipt of my letter, and also note that I would be willing to speak at any meeting in the future, should it be required.
Yours sincerely
Cohn Buffer
to
I)ragon’
hae
area
until
6.
Lothian.
its
Council
on
have
who
and
5.
c1iim
the
landscape
the
4.
and
the
made,
junction,
3.
Edinburgh,
A89
the another
future
2.
considered,
Plan.
submitted
made
I. We
1)ear
11-149
County
Linlithgo
dependence
The
Development
the
proposed
Claypits
need
the
although
prospect
used
acquiesces
Newbridge
potential
to
wish
cheap
south
The
Deelopment
Much
as
Sir
problems
by
live During
need?iTiis
from
Also.
7FZ
The
to
Many
As
soullç
for
the
they
Buildings
- people
(‘ALA
open
to
that
to
there
Madam
or
despite
and
area,
of
regeneration
we
of
scale it
for
its
it
age-old
of
danger
it
submit
on
Planning
require
to
is
the
Broxburn.
another
of
area
may
to
is
Control
is
sore
duty
the
the
de
have
are
necessary
dormitory
a
non-brown-field
in
but
1.and
not will
not
its
of
our
consultation
lesser
willingness
the
elopment. the
of
&
land
on ‘remediated’. not
that
area
the
not
to destruction
the
convention
within
one
the
just
not
l3uilding
concerns
the
lnestment
few
their
[)epartrnent
future.
consider i
many
he
llowing
T nit
for
extent,
project
in
is
itself
approval
many
of
map
been
sleep Whether for
housing
thousand
the
Winchburgh
protected
over
CALA’s
dnnrctep
West
colourful
us
proposed
abandonejlandfijsj
of
period
Fhere
The
in
commuters
Control
Livingston.
about
is
seriously in
informed
there;
to
3000
for
sites,
hatexer
local
order
Lothian.
of
Ltd
coments
excessive
this
estate,
repeat
in
promise
or
cars
such
other
is
gift
as
our
there
do
new
/
the
on
not
landowners
a
way.
while
Aanager
pictures
to
and
such
for
/
that
requirement
converging
PPCA
ohjectioiIS
some
the
unharted the
on
1
aicrt
interested
if,
would
proposed’
houses
there
that
was
c
We
for
of
development
and
cannot
/
the ott
an
under
effects
working,
future
and
)
jff
/
educational
means.
future
additional
of
/
fear
0
even
drawn an
the
I.td
necessary
is out
relish!
/
covering
them
how,
to
almost
a
current
expect
WD1buj1ine
viability
territory
that
on
bodies.
to
dvelopnVhave
of
of
that
sell
greater
railway
residents
lies
by
West
Perhaps
shopping
the
the
proportion
brief
these
it
out
1
no
is
housing
conveniently
the
unanimous
rail
facilities
the
will
bottle
such
scale
legislation.
prime
development
scale
If
of
Lothian
/
should
by
station
‘
local
thanks and here.
these
objections
and
this
C-\L\ result,
a
of
plng
idding necks
—
large
to
than
agricultural to
road
schoolchildren
even
corner
the
being
not
primary
are
be
Council’s
or
the
of
agreement
once
should
that
any
outside
area
project
at
built
distract
links
already
not
I1ere a
those
present
living
can Kirkliston
provided
have
application
motorway
of
along
pTanne
again,
granted,
of
around
school
will
West
take
also
who
rural
land
and
the
Re
Local the
-
been
been
and
on
the
be
in in 7. The cjngof the project seems a hit strange at first sight. One would assume that the regeneration of the village and the provision of lower-cost housing would have a high priority and that development would start in the centre and work outwards. In this wa the Council and local residents could monitor the development and its effects and be in a better position then to decide if or by how much, future work should proceed. By starting on the western boundary with more expensive properties and on open land, CALA’s phasing proposal would prevent such an option and we would be left with rather a ‘fait accompli’. The cynical might think that this is in fact the reason for their decision.
8. There are a number of discrepancies between the substantial Environmental Report and the shorter Draft Master Plan. As the latter is more likely to be read by ordinary residents, the spin adopted tends to disguise some serious concerns for us.
9. The environmental statement goes into some detail about the effects on existing communities during all phases of the development and afterwards, These are rated as 4j,mtohihsensztzviry of long duration’ ‘szgnflcant1y) adverse , and for the magnitude of the cliii to rthFo jjetm the master plan this is not made clear; instead promises are only made to provide ‘buffers’ and for low-level units to be built back-to-back with abutting existing properties. We feel that these measures will have little effect in reducing the adversity particularly during the development phases.
10. We understand the need not to build over the gas pipeline which crosses Glendevon track but CALA is attempting to claim virtue out of necessity The proposed road over the pipe line will cut off the houses which maintain and access the track and will certainly do nothing to ‘preserve its private frel’
11. Our final concern is that the above comments and those of other concerned residents will not be taken seriously; that the Council is set to rubber stamp the proposals; that we are simply going through a pointless bureaucratic exercise, and the development will be driven through regardless on a mixture of short-term expediency, commercial exploitation and greed. It will be scant comfort for us to survive long enough to say “We told you so!”
Yours faithfully Th (_z -
HUGH MACRAE FRANCES MACRAE
3 OLD GLENDEVON COTTAGE WINCHBURGH FF1526PX 1
with cottages.
occasionS discussing crossinofglendevon proposal Linlithgow is opinion Cala the County plans urgently development Dear Wendy
Planning
the
surrounding
tarmac
homes.
Ms
job
are
Mccorriston,
buildings,
by
needed
is
Mecorriston, This
dept.
finalised of
that
it
far
going
and
government
with
at
road
this too
Winchburgh.
area
is Cala
to
the
great
this
no
road
was
be
which
people
homes
excuse Yours I
farm
road
Moving
enormous.
paid would
is
a
and
development
included
does road
may
Stewart
for are involved, Sincerely
local
for
The
like
on
by proposing
1)e the
by
not
proposal
The
to council
to
my in
the
a
excessive
have MacFarlane
a
lodge
major
our
more fact despite
neighbours
for
subject
title
the
to
a
to that
to
an
road
village detailed
provide remove
infrastructure build
deeds being
development
objection
of
a
to new
future
and
3,400
the
of
to told
proposal,
educational
it
secondary
4.
this
myself our
north
without
litigation.
to
G
on
houses
Stewart
lendevon
size.
the 6 houses.
to
of
two
\Ve%t
\Vincliburgh.
of
11152
October
absorb
to
proposed this
the
I
the
as
The
different
school
be
is
facilities
I
Mac
proposed
much
village
When
in
otliian. farm
surfaced
6PX
Farm
impact
such
my .
2V05
Farlane.
is
as
the
(ottaes.
not
a
It
on :1) 6.
4.j 5.
2.
Dear’ L UEIT[. Pc F Development Most Development fount 5.
1.
:osL
H9
nlithgus
“the
objent -
- neignbiurhood
MR
to Roads and not
areas Phasing aewt to are beg,anted the these which [he proved which far
should Local
[he Plan Too eventually i.e.
can been
in
the
I\[ [he
ii
WI\[HB[JRCFI Lot Luthian
Sir
7LZ
k existing
mainE
junnt
b
Biji
sod around
use initial made, rail case advanced application
much
application this application
hi
if’ and
many F
and
held
dl,
— be
are
category discourages
tradiction
Plan
to
Idiriqo
n
essential.
be
l\\
2° lfr
ion sin
of
fontrol
dod
arid south of
at invoLed.
good
application
therefore
the
tounci
making riot tot
discouraged
of
follow
[\0
oh
are
hrownfield town
until
he
2005
residents
comrnurii huLçij proposals
present.
I
Building
rotrway ing
before
Lnk
the
Ut
ahove
rest
given
quality built rj
APPL
onE
greatly
of
the
LL0PNENl
1
contreuninrradFruchjre
contravenes
which
is includes
Unit
i nomnunit
road
all --
the ol proposals
rig
res.
Olendevon
loss
bA
jr in
ty
adjacent
the
prematur&jUh
app
such the
ENV.9
may
the
‘ion
Rasical
shouil
resulting infrastructure
comply
fontro
I
junctions
from sites does integration
agricultural in
may
1
[O\ l concerned including
of
Environmental
[he
icafion
go—ahead.
vary leo
decisions ipart
areas
too
J
prime policy
thereafter
l\lt
Broburn
not
risk
are
r ‘i
B
be I
when
ly, first. part the
with of
many greatly
Manager
e
i
from comply
traffic
of
too
t4tA
6’
TTvr
have building
l Local
is
agricultural
npo F
shout
no
of which
the
aucheldean,
r Tirieii
until
Special
‘reserved
‘LTic on a1s5EhETirlding
vague h
land
passing
mlvrr tne
rail
ed
is West
Why approval
Local
Statement,
L\D
require from
with
motorway
Plan
the
implications romrnitted”
states
Tiowing
on
visual
Eu it
is
should or start
Lothian
to
unjUst
Agricultural
what
upth flit
it major
the
is
as
proposed
Plan
[\[ME\TS
is motorwa>
warrant
matters’ -
land
I
to
who
— established in
planning
that
impact
a Local
building 0
links
is
be onl
I
meaning
be
?
c
schools. known
of
list falls
reasons:
Inquiry c’:!
.4ould
1
for currently
in restricted
large SCANNED
altered
tH52 Faucheldean B>
Blende
1
arid
existing.
unimaginable
present
for
tted
out
7th
nibutor
Plan then
and
links
in a
nd
would
development
ri di
quantity.
permission
arid
Importance
uso
sonlose
on
development
I that
the
Lothian
Urtober
oP5 nehburgh
rail
scale
has
to -
noise
ED. °onsinq
whther should
which
on
are
farm[and
ENV.7 —
such d
be
consideration. proposed, Master
vlest
and
trn
iul
yjJTag.e
what
so
not
I
to
halts
odge
guaranteed?
too
development
d poilut
requires
how
201b
a
supposed to
other schools
if
policy
Lothian
>et
oIl
and
or
cannot
unless
into
could
ime ion
(
1
Robert
Yours
to
Our
10.
9.
8.
Contd.
.
enable
overwhelming
swans
of
comments
the
Our
proposed
development Why
is
comment
the developers,
Enclosed
Some
households.
ire
aspects
of
bodi°D
F
The
path
life
fine .tldliIe
ot’
toral
the
faithfully
M.
iuchnldean
the
now
kk
Auldcathie
current
views
is
community
road
expected
proposals
Dalgleish
2
proper effected
that
there
behind
;ijarltv
1 qricultuxil
Glendevon
planning
wildlife
it
on
letters
from
and
for
closure
find
on necessary
—
live
a
proposals
uhose
so
lhr
in
consideration
feeling
many
Leith
the
reqular
nd
the
to
both
on
of
copy
households
Could I.andfill
do
close
particular
and
even
would
disruption
on
Pond,
live
Environmental
Clendpvon
tic’
the
or
reqiderits;
not
others
boxpg
these
Docks
lind.
the
of
breed
and
to
c’ui—de—’aa’
there
is
bash.
rqurheldean
more
to
scale
beside
still
include
be
our
obstructing
have
Master
that
Site
are
Fdinhurgh
areas
have
?
irnr’rasurable
were
there
huge
the
views
of
be
strIp
What
of
;,ho
F’,
plan
sil
such
jfiU44
such
there
and
Ilinor
such
any
any
largely
present
proposals.
Plan
apparent
not
are
Impact
development,
status.
hn.’
and
monitored
atout
on
%iddr>
the
Rend
of
large
potential
Human
plans
in
notified
are
larqe
of
the
and
the
have
S.
toiced
:‘,odland
building
this
been Assessment
importance
would
bwdiversity
with
ruraL
presently
take—off
Dalrileish
scale
disregard
Consultation
lack
Rights
Winchburqh
for
scale
done
by
area
ignored.
the
a
of
health
reclamation
disturb
i.e.
mironment
of
the
and in
pref.renro
for
of
development.
this
issues
when
prposed
inclusion
and
the
too
houses
to
are
relevant
the
potentially
of
many
hazards
dinq.
?
application
present
flight
Fdinburgh the
overall field
process
many
that
18,000
if
ror
decades.
The
directly
or
hat
use
and
more tor
of
unknown
our
instance,
consenation
north
path
in
reinstatement
The
propoied
and
houses
and
af
many aoundant
views
by
was
dormitory
people
the
previous
itself
pollution
so
by
the
of
future
bird
of
west
previous
sort
factors
future?
fauct)
of post.
impact
aspects
comments,
source.
reliance
on
unsupervised,
in
149
fhe relating
Report
It
of
planning
is
small
the
previously
Again
opinion.
the
have
which
The
properly
any
in
suggested
the
the
with
feeling proposals.
The
is
It
consultation,
the
comments
that
welcomed
Consultation t11
their
input
of
and
content
The AS
I
loss
reflecting
of return
Consultation
issue,
noted
spaces is
ncit character
of
scale
consulting survey Consultation
the
local
Consul1ation
WOULD
have
the
on
Appendix
Report
FOLLOWS:—
it
the
advice
From
to
considered
application
the
of
teenage
to
beeciiricorpQrated
articulated
the
have bullet
was
wording
the been
made
that
that
is
written that development:
and
been
development
green
the
giving
allowed
provided.
community.
plan
the
data
COMMENT
integrity
comprises
too
included
or
An
use
been
the
of
supported
Report
primary
led
B the
up
the
all will
years.
returned
comments
young
point
and
constructive
Report
example
fields
compiled
—
low
the
—
of
Report
the
community
of
that
on
Report
to
recorded Primary
developer
Consultation
for
relevant
and
“There
result
34
has
the
Anoendices
to
yellow
settlement,
advises
ON
people,
believe
opportunity
—
to
of
age
of
multiple
this
228
It
the
advises
‘23%)
and
“The
represent
Hardly
by
to been
The Faucheldean
received,
is
in
convey
a
THE
the
by the
is
in
were
group
School
pages Local
in
the highly
date.
landscape under
places
as
response
is
comments
stickers
high
local
scale
has
contended
raised
the
that
comments,
village
relegated
respondents and
the
change
CONSULTATION
“The
not
a
community
a
that
responses A
Report
the
with
not
with
Plan
resnunding
in report
number
cont
2.2
as input
to
“Feel
and
a
at unbalanced
86
residents
seeks
of
the
It
scale
sufficiently
particular concerns impression
the
Road.
a
distort
incorporated
to
had
were
from
the
to
no
— (58%) features.”
development
B
pages
proposals
is
result
case.
that in
29
to
At
contained
the
the
(Appendix
but
of provide
contribution report
to
been
Draft and
considered
makes
of
to
this
a
placed
(19%)positively
the
the
comments
provided
distort
Space’ proposals.
this
50 village
endorsement
not
REPORT
on
developmept the
be
and
the
report
rlaryciooI
there
included
heading
Meetings
regard
—
that Master
the
incorporates
aspects this
made
do
withstanding
additional
information.
process
228.
strong
on
questions scale
within
in
is
A
It
forms’.
not
size pubiic
are
—
Eà
the
following and
DATED
that regarding
either
database
bigger
by
the
is
from
Primary
is
ie.
Plan
‘Other
and
meet a
of
—
concerns of
an
of
sample
exhibition
of
one
contended
ias
Consultation
the
which
It
gravely
town.”
all
the
78%
supported this
young
their
response
individual
nothing
the
change
Exhibition about
AUCUST
input
neutral
facilities
than
would
the
can
unacceptable.” 15
report
While
this
reTcard
Comments’
strongest an
School
of
extensive
concern
was
proposa1c
of
outline
reppards
The
aspirations
only
unreliable people proposals
about
we
misleading
the
the
has
more
local It
concern, and
that
supportive
omitted. panels
2005
had
restricts to
Postcards
document
is
conclude
made
number
over
the in
4.
5.
3.
2.
made
1.
the
Count
In
consultation
)impadommwi4ty
invited.
priorities
and
The
to
There
their
ten
the
It
population
should
what
employment
the
for the
phrases
response
are
in most
—
Session
60
At
A
conclusion
the
due
A
do
Consultation
‘that
Respect
A
5
ferns during
become
More
Improved
It
core
2,’
advance Draft
is
Winchburgh
by high
priorities
well
general
first
high
(24%)
people
quality
the
—
the most
not not
do
is
is
local
priorities
to
noted
about
makes
the
be
and
themes
appropriate
returned
you
noted
no
priority
better?
“Bringing
sum
phased convenient the show
Master
quality
One
a
the
important
—
A group
for negative.
built
community,
-
the
associated
transport better
town,rather opportunities.
attended.
indication
community’.
Winchburgh
having
and
38%
that Winchburgh
think
of
No
the
under
up
low
exhibition —
an
the
is
that
are
for
Report.
draft
What
local
1
the
session
growth
attendance
those
Plan
early
—
statement
number,
to
overwhelming
after
in
and asma11
for
response
local
should
facilities
the
No
(in
facilities
Winchburgh
9
taken
21
things
produce
consultation
kind
and
6.3 do
—
Master
Stakeholder
sustainable
connections
new
stakeholders
facilities
1
that
From
with
and
comment
Community
in
no
is
“Pulling
plan.
today?
the
you
a
It
response
could
when
Balancing
landscape
period
of an
place
The
rural
happen
desire
particular
these
and
a
must
is
you
that —
do
is
exhibition
the
the
like
small
place
the
inadequate
Plan
Changing
Early
individuals
returns
noted
early
and
support
do
exist
considered
—
forms
believe
to
wording,
development.
and
match
—
responses
it
tables’
‘While
No
most
first?
for
Together
including
—
The
over
with
had
place
Workshop
6
and
rural
you
then
date.
Priorities:
quality
and
The
delivery
all
peaceful
1
that (28%)
provision
are
were
improved
order)
group
submitted
around
response
the
safe
about
Winchburgh
the
would
a
period
for
need
the
need
the
Together”;
sample
in
No
and
top
of
facelift.
it
in
poor were
demand
neutral,
submitted
that
proposals
groups
and the
held
roads
1 meeting
primary
schools,
number
top
poor
can
Winchburgh
6.2
-
to
of
to peaceful
ten
like
25
village.
response
have
facilities.
of
to
proposals
asked
and
rural
—
the
widen
ten
happen
a
during
Group
atndees
on
be
Identify
—
quality
There
generated
will
schools.
wide
Winchburgh
around
satisfy
and
The
not
not
1st
assumed
10
community
on
school priorities
9.1
on
shops,
has
What
to
character
the
Session
-
(48%)
take
31st
range
range to
village.
individual
supportive
the been
are
June
today?
the
Making
identify
What
Facilities
taken
the
and
and
from
Priorities:
range
change
ticking
three
pupils
exhibition
a
by
that
Draft
a May
community
2005
positive
included
of
of
to
tables
again
rundown
lack
do
wish
long
over
Two
growth
—
—
Local
place
2005
and
comments
new
be?
words
you
any
No
No
Winchburgh
their
to
Master
is
What
top
of
the
—
of
the
time
represent,
65
and
1
improve
1 and
— to
debate following Dislike
comment
over
extensive,
Views
with adequate
—
in
in facilities
response
and
and
response
ten
Nol box
or
consultees
period
Group
village
are
combine
top
they schools
—
the Plan b
S
-ft
b
by case 3, of The at and It
West consultation arms is
Council not
the
contended
Lothian
length the
consultation
developer. are
by
Council and asked that
responding
establish
the
process
to
elected
consultation establish
to
should the
members developer
content
what
not
haa
and are
be
not proposals. and
officials the lead
been structure
core
by
extensive
the
themes
directly
developers of
any
arising
and
Master and
in
but not
any out
Plan Date:
Comments
Case
Comments
Outline
Officer:
lodged
Planning
on
Winchburgh by:
Jiei
the
Reference Permission
V Winchburgh
C The 15th Mr
Wendy
Investments
Planning
lendevon
Lothian
PA
October
Swannery
Core
and
McCarriston
No:
Mrs
EH52
for
Development
2005
Application
10121P1
the
SM
6PX
Ltd
Winchburgh
Rigby
5
SANED
Area
by
Extension
Cala
19
Lthian
OCT
Land
2005
Coincil
/
through
purpose
milam
hoiehole impact
I
5. 5.
4
main
reserved the
development En 4.
4.
view
Statement.
betxeen
impression documents. 3.
3.
n’ timeframe
\\ithin
thousand 2.! Timeframe. 2
proposals
Illo
of I
I.
L Comments: Risk I The
1
ironrnenial
Errors
scheme
ironmental The I
The
the iew
citr effects
is
The of
The
evaporation, to
‘1aster
of in the There
that EIA It
scale
is The
ibllo Application
matters,
the
documen
the the
is
pages) the
source
and Environmental
2X
a could of
Master is
the
Some of
not
Regulations.
Man
development
Public
development
might
ground
Water of
of the
are
priman Statement
day the
ini Statement
Plan inconsistencies planning
reasonable a
the
and
to be br
numerous West
document
of scheme
period
several
are
Plan
be
Enquiry.
particularly
be developed Application
is these
the
Supply the
is
typographical
‘iter developed,
aler commented too
Lothian premature.
is wore application
pond
environmental
md
is
Statement
hundred
on
cannot in
cannot
are
We
extraciio’i illustrative,
to based mistakes cuppl
many
that
related
of
Glendevon In
expect addressed
is
significant
request
in in
local
in
Glendevon this
from
has
be
is
a
on
he
with
the the
areas
objections,
upon ver for too
cannot
txt properly
respect
is
errors
judged
not this
a borehole
and summer
Plan
application.
field
inadequate
a
many planning
G
with
effects
large three
simply
different
inters
Pond.
in
been
by
ilJustrative errors
errors nJ
20n5
but
drains more
be the
Pond. the to
too
details assessed.
in
month
proofread. and
fully
is
months.
sev that
be
might
Chapter illustrative plannin
community an application in because relation
many
only
detail
way
from
in
and
era!
P6n’ the may a
assessed
left omissions
Master
keeping
,,round
extension
be
to
wrong
due planning
are
and
later the reserved
well to
.
help quite application this
to
The
more
There
reserved
to
Table showing
are
surrounding
and of
Plan. in be
the v
in
with
in
the compensate
Local
different. true
this
akr
in in
this for
its signitkantl
application
its
the serious.
Comment
are
large
breach the .
matters. There the
present assessment
magnitude
this
e’.tr’iction
I document.
l
id matters.
how wider
Plan
is
Environmental
inconsistencies
in
policies
number
comment premature
is
the
land
of
is
As the
is The
that for
state.
public
a
Schedule
under
such
risk re
The
loss overall (sex
the
and
oithe
TI Our
— of
ised
that the era!
Council
Public
rit
pathwa
the
this
Glendevon
6
foolpathIcvclewav
6.
h
the
5.3
2
1
will
Je’
area.
52
Threat
drological
pond
will
deelopment
of
eloped
Path
be
It
The
w
We
under
cause
This
on
to
would
ai
destro
We
to
Pon
Diersion
Glcndeon
Draft
have
the
is
this
includes
wildlife
sun
estimate
the
considerable
along
basis
appear
ed
written
land
on
Master ey
Countryside
*
ThisTs
aloiw
Minimum
and
the
There
Glende4
that
Order
from
part
i1l
that
Bum
that
pond
to
update
the
Plan
an
it
become
of
the
ENVIRON
disturbance.
is
proposed
No
is
this
estimated
area
and
former
deelopment
on
also
and
water
a
(Scot1nd)
pond
the
pubhc
1(1977)
the
Farm
former
that
Environmental
a
impermeable
HA
mineral
supply
risk
Faucheldean
drains
birds
footpath/cycleway
expressing
ater
roadls
right
accordingly
the
mineral
It
Glendevon
4ct
caichnient
blocks
is
an
and
and
c
railway
pond
ot
also
area
1967.
wa.
duck
have
and
raika
green Statement
our
the may
C
was
of
1iie
area
and
nest
asked
the
Farm ‘West
-
This
only
concern
land
he
established
belt.
to
of
K.
field
line
in.
contaminated
and
is wildlife
at
Winchburgh
the
Glende
them
as
Lothian
show
and
not
least
has
drains
regarding
immediate illustrated
housing
the
to
a
been
a
75
on
corridor
pathway
b
conduct
proposed
District
case.
feeding
Pond
times
West
11
selected
)tj
the
below
west
the
linking
impact
through
Council a it’s
Lothian
the
public
of
own
as
pond
If
a of 3 The Fin ironmentalStatementon page () states Proxirnit of new housing to the nest of the ponds inavpreudice flight paths to theponds”. which we strong1 agree with Yet the Drali Master Plan shows 1Pm high housing to the immediate west of GIendeon Pond. rhis pond is one of onl three rnestYothian on which mute swans breed Housing of this height ma pre4ent the swans from fl ing from the pond We request that this deelopment block C is limited to bungji1gs, which would also be more in keeping with the existing properties in the area
t 3 At present. Glende on Pond is isolated from urban de elopment. hence the wildlife is relatnel free from predation 1wdomestic cats. Cats are one of the most %ignilicarltthreats to wildlife in Britain. We request that new housing within a 5 ) i metre radius of Glende on pond is sold or rented subject to a legal obligation that preients owners or tenants from keeping domestic eats.
7. Motorway junction and railway station uncertainties
new 7 1 The traffic assessment in the Planning Apphcation assumes that the motorway junction on the M9 and new railwa station ill be builL Permission to build these infrastructures however is outside the control of the deelopers and West Lothian Council. These decisions rest with other bodies such as the Scottish Executi e the Stratç,gic Rail Authority and train operating compame& There is no exkfence to date that these parties will agree to these new infrastructures.
7,2 There is no risk assessment of the ffi.wpact without these infrastructures or an continençy pjans toa&1iesupceb4em& The Planning Application proposes that these key infrastructures are not built until well into the deeIopment phase. by which time any refusal by third parties will result in iraffic chaos.
7 3 The deelopers cannot meet the requirements of the Local Plan. CDA 1. that states that planning permission will not be granted for development of specific sites until all rele ant infrcture is rjdedifldsince they are not in a position to guarantee commitment.
S. No recognition of The Swannery agricultural holding
S. I The aricultura1 holding of The Swannerv. Glendeon. is surrounded b the proposed de elopment. This hold ingThiiienilv used for the gra/ang of sheep. There is no recognition or mention of this holding in the En ironmental Statement 6.7.3 or figure 6.3. Should the de elopment proceed this holding will become isolated and its tiabilit will be at risk This holding is situated between the B9()SOand Glendeon Pond
9. Poor community involvement
° I The Planning .\pplicalion Consultation Report does not accuratel reflect the meetings or ted back recea ed from local residents. The report states that in a poll the ast malontv of local residents ere in fin our of the deelopmenL hut the report failc to mention that this was seera1ears ao when the deelopment was to be around SOP houses The report distorts the true public opinion in seeral ways For example it relers to 15 response cards receixed fiuIloxing a public meeting, but it does not refer to the many more detailed xxrittenresponses that xere submitted instead oithe brief reply cards. The report appears as a xewht’ document. hut 750 of is de’oted to childrens’ paintings. hardl a data intensix e report. At the e\hihition. opinions xere collected h aHox ini people to rite comments on Post-its’ and stick them on the displa s This x as totally uncontrolled. a1lm ing people to “rite muiiiple comments and e en remoxe the comments of others that the did not agree with. As such this data is unreliable
9 2 A particular concern expressed b many residents at the second public meeting related to the inability of the deelopers to make an progress in the promised motonay jwction and railway station. ATitfiecxidence pointed to the fact that neither of these infrastructures would be built. The report makes no mention of this or the great Ie ci of concern The oxerall impression expressed by members ot’ the comrnunit that haxe spoken to is that much critical or negatixe feedback has been edited out by the developers.
9.3 The Stakeholders Workshop report also does not represent the facts. Mr Peter Rigbv, a member of the Scottish WildlifeTrust and part owner of Glendex on Pond was appointed to attend the Stakeholders Workshop, He was refused admission to the ) workshop by Rod Howett of Cala Ltd. No coherent reason was gien to Mr Rigb. As a result the Stakeholders Workshop report contains no comments by the SWT regarding wildlife sites or biodiersity.
10. Understatement of impact on exisling rural communities
Ii).1 In Chapter 1()of the Enxironmental Statement the impact of the development on existing rural communities has been underestimated. The impression is that the authors of the report do not underst r,p’ruaLJj,e. For example. in paragraph 10.9.8 the author writes “The field in fallow in the foreground of the view and the high number of dead and dying trees gives the impression of a slightly degraded landscape.” This is a typical urban view of the countryside, the writer does not appreciate that fallow fields are a normal feature ofthe countyj4ç and does not realise the alue of rjTies to wildlife. He clearly did not appreciate the birds and l’iifE NorRToe’he ‘i’ealisethat views such as this are in constant change ix ith new interests each dax Another example may be read on page 11() “... the relatixe lack of importance attached to the view reduces its sensitixitv as does the poor quality of the intensive agncultural character of the landscape”. We submit that the countryside of Britain. outside highland areas. is an agricultural landscape of considerable beauty.
01.2 We suggest that the authors speak directl to the rural communities and express the impact of’the development in the communities’ language and not their own.
11. Lack of safety around Claypit Pond
II 1 Page 97 of the Eni ironmental Statement states “The cla pit will be modified to improe its appearance and reduce the pcrcc.ptton oiin unsafe enxironment” The
considerable
and
of
limited 14,
13.
Plan Winchburgh
that
world.
central
West
Environmental
development
13.1 Yet
13.
increase
Glendevon
proper
is
12.3 Cadiow
tbrmerlv possibly
B.
de
does
problems.
of
12.2
by
oodlands
area
coal
Glendevon
needs
12.
o
clavpit
12.
1
the
Incorrect
rail
A
our
these
Use
as
erhanging
agricultural
another
elopment
1
Lothian
Ground
and
not
‘T’he
since
mining.
main
station
to
Areas
belt
Any The
hydrological
Page
future
to
of
Chapter
The
is
agricultural
to
much mines
piped
identitx
D
he
Draft
excessive
of
unsalè,
development
risk
earl
development
Pond
contributor
flow
is
typographical
to
in
Farm.
29
of
around
Environmental
phasing
should
drained,
are
Scotland
generations
particularly
block
of
conditions
rock
Statement
the
feed
higher,
that
Special
and
into
of
activities,
Master
through 8
the
medieval
to referred
the
of
deelopment
the
it
vet
edges.
a
these
the
be
Glendevon
survey
not
same
Glendevon
is
prime
uses.
the
spring
well
of
partially
Environmental
it
developed.
o
result and
Agricultural
in
text
Plan
be
occupies
is
the Environmental
his
on
is
er
transport
not
to the
may
vest
hut
error?
south
level
not
times.
underestimated.
Reducing
flows
on
could
agricultural
makes
30
this garden in
Assessment
in
shows
development
in
area
fully
occasionally
until Macaolv
the
well
our
mulled
of
metres
grain
of
Pond
Farm, area.
land
est
underground
miss
the
excessive There
to
importance
roundel
infditrictures
section
little
All
assessed
the
the
regret.
at
Importance.
Glendevon
crop
will
the
of
existing
but
Assessment
Glendevon
Traces
and
deep
identified
evidence
this
first
end
reference
Assessment.
Glendevon
is
underestimates
perception”
land
was
result
yi
6 to
recontoured
much
holes
feature,
of
We
phase
with
prime
s2lan
The
above.
the
of
dierted
ds..tharn.,amongsLUieThighstin
villae.
this
as
through
submit
in
to-d
such
and
climate
as
Burn, do
submerged
e
the south\Lst
House.
will
of
states
to
phase the
agricultural
or
QFc
idence
House.
appear.
ate
land
de
these
as
hydrology
mines
The
permanent
not
the
that
(‘oat
several
It
that
proposed
such
to
shows,
elopment
the
in
that
and
is
In
designated
There
get water
make
prime
potentially
of
Figure it
difficult
the
of
has
summer
potential
Some
in
Figure
development
the
cliffs
soil is
early
the
years
CilLndeon
land.
tields
Lhautcre
land unsafe
been
and
supply
will
it
motorway
agricultural
types
approi
loss
development
6.
taking
safe.
and
of
bottle
to
7.2
around
1
hvdrogeolog.
ago
this hae
be
In
in
this
mined
problems
of
serious
of
imagine is
submerged
of
particular
issue
the
identities
a
al
agriculture
sheer
the
water
b
is
place
water
the mines
significant
House
been
should
from
a
junction Local
Mr
in
of
land
eastern
folly,
source this
how
blocks
v
hidden
John
due
was
the the
in
est
in
none
the
be
of
the
to
a it
)
END
communt3
deelopment
and
phasing
necasai
the
01
itllage
chould
C’OMMEN
parties.
is
will
be
halted
changed.
IF
be
I’S
this
before
left
were
with
ctarting
final
to
pockets
happen
completion
around
of
further
isolated
the
we
eisting
deeIopment
are
communities
left
iillage
with
would
an
centre,
integrated We
hai
submit
such
e
to
that
be
that
hailed
if the
the
fact
The
studies
The
drain
field number
fed
A
underground
installed.
embankment
preventing
This
the
Section
Thank
Dear
Linlithgow
County
West
Development
Case
similar
Mrs
average
W
12 th
Winchburgh
Glendevon
The
the
report
via
developer
following
drains
an
states
Lothian
Mrs
by
engineers
Wendy
Febnian’
underground
Swannety
Officer
Lothian
you
Pt
area
21
argument
Buildings
dye
has
Re:
There
leakage
17800/GLA/600
McCorriston,
to
that
any
for
of
EF149
field
was
been
supply
tests EH52
cannot
comments
McCorriston
Calaffoines
surface
the
land
the
Council
and
2007
is
cursory
built
drains
no
or
rate
unable
copy
embankment
is
7EZ
Regulatoty 6PX
considerably
field
the
substantiate
oflèred
excavations
evidence
some
which
runoff
pond
observations of
from
by
drains
to
the
in
(East)
section
determine
regarding
100
I
the
into
from
land
above
have
to
Services
from
of
year
this
in
report
to
indicate
the
Glendevon
to
the
land
of
excess
reveal
determined
5.3ha land
report,
at
the
pond.
after
this
the
dismantled
the
the
clearly
to
west.
that
to
report:
road
true
the
the
of
the
figure
driest
the
The
I
the
presencrIrab!eneenffielddi,..
west
the
have
Pond
level
pond
shows
to
from’er
east
i3ha
report
time
without
the
pond
railway
and
considerable
of
was
Water
east
how
The
of
as
is
east.
fails
dug
the
rlbdfrom
no
undertaking
claimed
line
contour
the
The
Balance
to
yeaiu4dirqs
yst—E
longer
Clearly
and
acts
land
recognise
pond concerns
_____
field
in
map
as
height
fed
West
this continues
Report
the
a
experimental
the
drains
dam
via
drawing
Council
1
pond
section.
that
pondin
unciI allows
3FE92007
and
LothIan ______
Unlithgow
Services
this
can
to
offer
lnformaton
be
I
Council 3
drains that
November
problems, the
interruptions
its
the
borehole gross
Since
Section
the
the Section
area
The
pond
water
requirement
off
over
of
40cm
The
Section
current
clearly from
amiss flows
5.
The
The
the Section
many using
report
evaporation
extremes.
set The
Section
water
answer
the
3ha critical
include
error. and
This the
model
the
water pond
and catchment
figures CoupModel
field
over pond.
4.0
climate
2.1
from
reaches
from
pump
years an
it
model
but
totally supply? 3.1
that
year, catchment
to
error
2.5
would
is
will
2.3 established
The
primarily that
in
question
caichment
drains the
the
here
no
the
not.
of
the
the
this This
in
the Observations
prior
(groundwater).
and
rate
data always
noticeable leads
is year
second the
the
distorts
report
the
development
table
surrounding graph
results
expect
efficiency
catchment
electricity
being
Indeed
has and
by
methodology
has pond.
drainage
to pond.
is area
is
the
depends
to
2
limited never
the not
claims
be
area
method totally
surface not
week
in
indicate
the
used
a
in
any
report
question
the the
figure
very
installation
been If
drop This
significant
been
true
given
show is
supply.
more this professional area
area pump
with in
same,
land!
to that
areas?”
unrealistic.
even
upon
If significant
runoff
such
should
included.
seems
February
in
situation
that
a
3
declared,
assumption
of
this
includes is
that
by
3
the
and
unrealistic than showing
pond
larger
is calculating
a If 5.3ha. year “no”, as
less
Most
the
were
of
large
main would
switched errors.
the
this
is Given
unrealistically
answer
Grunsky 26cm
level the
sadly CoupModel
sample than
study
due pond
since than
understatement
This
were
Also development and
recently
I
the
water
that In
source
have
borehole
be were
The
the
assumptions
even
occurred.
to
this 5%
is:
case
lacking.
shown the exceeds
off surface level
to
it
the the
thy
for
ci
power
period.
way
“Does shown catchment
starts
assumed
of
respect
quote
corrected,
figures of
from a!.
with
the
how
3
case methodology
for
precipitation
varies
low,
to
the
water,
pump
the
in
pump
runoff
3
interruptions
with
the 6
the
the
land
time
did
Glendevon my
an
the
I
results
to
model
of
months
the are
the offered
variation
it
my
depth
by
pond borehole
6 on 67%,
one the model.
the
area
the
is
to
then
to
was
report
conclusions
months
considerably
into
a
water
less
very
the
pond
time
assumption would
is
true
maximum
in
of
fed
water
of
off each
for on a
with
run
the
one
than
west
30
calculating
Bum clear cannot
in water
and
water budget
pump
because
the
via
from
survive
the
each
pond
in
year
pond
year
the
show
hundred
catchment
one
and
field
surrounding
this
other
pond
which
something
are
over
very
mid year,
lower
of
switched
average
answer
is
no
in
third
study
level
ast
that
report
over
of
20cm
in
suspect.
is
water
low
much
year
is
which
the
the
than
of
of
fed
data is
Peter
Yours
Reporters,
I
concen1s
contamination
not
analysis
evaporation
I
would
am
Rigby
even
faithfully,
disappointed
ask
of
make
Cling,
that
Glendevon
that
rates
this
of
common
if
MII3T,
field
and
this
letter
with
Carl field
drainage
pond.
this
MSc,
is
sense.
also
Bro
drain
Carl
Of
BSc
placed
report
due
1
greatest
efficiency
Bro
uphold
to
report.
has
development.
before
my
concern
been
are
water
Basic
them.
underestimated
placed
to
budget
assumptions
me
This
before
is
report
the
study
the
potential
and
are
as
simply
Public
the
the
in
error,
conclusions
only
loss
increases
[nquity
or
realistic
leakage,
my do
proposed
residents?
inmtenance
which
which
Current
included catered
changes
development
We
current
walking,
completely
be
Secondly,
not
will
Firstly
There
must majority
employment
reaction
Having
Planning
Dear
Ff149
Linlithgow
County
Development Dee1opment
seen
fully
all
actually
runs
runs
be
Sir/Madam,
are
plans homes
for
proposals.
what
onto as
7EZ
road.
between
understand
cycling, attended
taken
It
is
Buildings
of
NorthSouth
without what
from
however
an
is
application
eigj1j’Glendevon.
of
of
the
and
guarantees
a
indicate
be
also
extension
What
to
will
this
genuine
long
seriously.
Control
and
Glendevon of
residents
built?
what
support
the
horse
community
our
the be
private destroying
7
established
are
some
building
the
new
that
built
is
understanding
outlying
Although
interest
through
riding
the 1012/P/05
and
requirement
Unit
are
in
this.
development
ofWinchburgh
serious
a
ro4
by danger
safety
Farm
new
in
improvement
Control
the
Cala
and meetings
place
This
We
and
hamlet
ii
Glendeon.
which
road
Cala
to
concerns
existing
implications
of
(Land
wildlife
do
and
hope
area
Winchburgh,
that
that for
endtcominunity.
becoming
will
however
Homes
Manager
of
is
and
that
and
extra
which
the
that
currently
a
Glendevon?
are
around
to
be
cominut
studies
which
high
existing
plots
having
What
quality
the
built
this
in
is
schools
of
feel
is
a
prçssure
favour
the
larger
run
of
development
this currently
crossinLthe
we
Winchburgh)
implications
parallel
would
a
that
seen
main
and
homes
land
joint
‘and
down
feel
and
village
Whilst
In
of
there
styf
the
as
will
developer
completely
responsibility
Surely we
fact.
this
to,
a facilities
used
area.
satisfactory
extensive
main
must
be
and
is
development,
of the
existingprivate
is
will
does
no
develqprnent
as
sold
any
an Winchburgh
just ft
development
runs
air.
need
a
within
rejuvenate
also
we
additional
this
development
recreation
disappear
to
South
plans
understand
tinder
of
other
to
buffer
seems
have
Glendevon
the
force
16
a
our
of
developers.
proposed
point
for this
it
Farm
access
road
and
October2005
zone
that
the
can
under
area
will
initial
these
the
can
bring that
burn
easily
the
which
Co
for
be be
Richard
Yours
We
the
that
Whilst path/footpath.
aspect
road
above
look
a
required
more
faithfully
of
we
and
forward
Glendevon
points
understand
Jill
sympathetic
at
Horsburgh
this
should
to
hearing
point,
would
the
be
approach
economic
addressed.
so
from
be
close
better
you.
should
to
and
preserved
the
social
be
existing
taken
arguments
if
this
to
settlement
existing
access
for
was
of
rural
the
Glendevon?
development,
limited
communities,
to
a
The
cycle
we
and
rural
feel that : Z:L’° One Acre \1F IJCHELDEAN West Lothian
24th October 2005
The Development and Building Control Manager Development Control Unit County Buildings LINLITHGOW 1EH497EZ
Dear Sir, / Re: Planning Application for Winchburgh by Cala Landen’ To West Lothian Council.
As a resident of 45 years standing at the above address, we wish to make known our objections to the development application on the following points.
1. The proposed new road connecting Broxburn, Faucheldean, Glendevon and Main Street Winchburgh
It is stated in the report that “Overall sensitivity of the view is considered from medium to high” .this is reduced from high as it is unlikely that long duration views wifi be gained from rear upper floor windows”
Our main living area is on the upper floor of our two-storey house and we will therefore look down on the new road which crosses the field behind our house at ‘One Acre’ Faucheldean. This will adversely affect our view which we value highly. We would therefore place the overall sensitivity to this development affecting us as HIGH. Our ‘long duration view’ from our porch and living room will be affected and we will also be adversely affected by increased noise level and pollution level from road traffic.
2. The proposed road junction west of Faucheldean
Since it is “proposed on balance” by Cala that the FaucheldE?açLc connected to the maifl çgre road from Broxburn to Winchburgh, we wish to object to this on two acourits
4.
3.
there
to
permission
We Traffic
badgers
Conservation
it?
ground
local
Under
infrastructure
done
Cala
I
when
on
which
Cala
The
Edinburgh
acknowledge
Landscaping
would
local
is
badger
Development
(ii)
but
(i)
prior
Land
access future
law,
some
badgers
will
to
badg
further
object
forage.
for
to
to
to would cul-de-sac.
choose
The
Investment
already setts
mount
evasive
the
When
Traffic
footpath.
a
Such
suffer Faucheldean
population,
debate
is
detail
proble
go
and
Winchburgh.
narrow
the
the
is
afreadv
Ecciesmachan
a
rely
residents
population
in
schemes
up
to are
surveys
wildlife
development
a
M9
Biodiversity
have
two
and
between
the calming
place
would
the
junction
planning
action
as
through
on eaten
protected
country
motorway
to
verge
vehicles
large
their
The
stressed
Ltd
to
access
in
it
such
a
of
survey
for
should
find
into
adversely
requires
junction
is
losing
majority
acknowledge
calming
measures
Faucheldean
There
and
will
survival
development Faucheldean.
to
which
too
applications
junction
road
as to
-
food,
at
are com
enable
i.e.
to
food
that
junction
give
late has
a
include
the
present
their
accommodate
would
buzz
‘Badger
a
ha
to
being
the
may
measures,
voted
car/lorry
affect
land
taken
this
will
for
sources
rise
as
be
a
to
valuable
road
cing.Oricebuimg
words
pass
mitigation. suggested
taken,
details
will
due
have
is
be that the
were
be
acceptable.
via to
are
taking
len
the
for
place
Marking
definite.
an
impossible
no
is Winchburgh
to
the
are
need
considered”.
to
“the
a
surrounding
or
a
entirely
in given
leaving
increase
and
further
be
sand
cul-de-sac.
this
of
and
potential
by
the
new
place
not,
car/tractor
planning.
loss
made.
areas
to
would
Environ
a
Survey’
manoeuvre.
flew
essential
It
the
consequently
vehicle
be
The
road with
until
would
the
of
need
unsuitable,
to
in
available considered
opportunity
of
agricultural
significant
Grass
existing
guarantee. junction
be
traffic
road
no
from
area.
Farm
traffic. Do
planning
on
should
for
and
require
inadequate.
is
foraging
appear
pedestrian
required
behalf
we
as such
verges
Broxburn
through
vehicles
for
road
it
since
are
mean
the
T’he
be further
-
is,
to
effect
traffic
to
land,
of
or pass,
from
it
to
a is
)
BILLIE
3.
AL
Yours
We
Thank
to
held
possible
We
had
concurrently
Cala
WIN If
Broxburn agreed
size
be
are,
development
object
to time
I.
costed
faithfully,
state
of you
WYLIE
WYLIE
account.
be
the
upon.
to
to
for
“Landscape
implemented”. to
and
be development
there
with
Winchburgh the
established
If
covered
Such
would
opportunity
there
being
development
an
I
framework
is
adversely
a
prior
undertaking
no
should
loophole
within
is
Although
M9 even
to
to
junction,
to voice
the
be
the
affect
necessary.
will,
ensure
in
capped development
sotmding new
in
this
the
wherever
surrounding
Phase
it
above
statement.
community the
is
until
debatable
woodland
1
reasonable,
and
objections.
the
possible
commencing.
Phase
i.e.
new
area.
as
if
“whenever
and
it
road
the
be
2 evolves.”
Cala
must
trees
implemented
new
system must
have be
road,
seen
be is I
(‘!
f9/’
7Y)
1
i—f
-4$
rY
7T
71
/
4,,
(
-Thy’
3/2 ‘
/
—
Ji
/‘
T9
uir’ryY
/2
-——-—-—--
y7
i
—
pq
f
74
p2 1L —AL’(
(
-/J f’( I/c kcrQ & *_ I (;4J1
ii
-
L ‘-
(;
k/
-
p
-
i’J
/!
(L
3&k’C,
*U
c
d
i
a
A--(
/
/- -
/ /
-Q
A
( 1J
o/L,’X
Li
/
‘
-L/L AO
P
i7/
,A
/L
!
,
—
/
‘
C
/1I
/
L
Cc_L
/A
/,
I
} I
( //cc
RFT0 Rr Oah. /
I
/‘
- 2<
L<-
/c
,
5tc-
S/(
t
,,,&
JpJ
p
1,C//lL Stflards
,ftL
(
£
- c
c%i
-1
a
-
/
-
->\AJ
:
IA *
/
-
e
C’
/
4j)
c
(
‘LcJ
icu2
-“A --t’
*
<
/
V} L
7ztL(
1Jf
4L
‘Zt/’
cY
v
//j L/(
I
/
-II /:
t’(
,
F &
?I2
4iJ
U 2
, De’&Gpniefl1 County Development
EH497EZ LINLITHGOW
Dear
Assessment We The Regulations. to have more amended setts. that species Attached
details”.
Ron Mob.e est Ron Badgers
re!
be
wish
EIA these
13144,102 Sir,
Bagnall a BagnaHe!bg considered
important
Lotniar
Buildings
potentially
in
J7366 admits
to
and
and is
by
matters
the
object
a
(EIA)
the
Control
that sheet their
(‘no,nc West
Outline
Building
373
is that
Nature
further
the
to
significant a is,
are
setts —
646
of snet
Yours complete “..
Lothian the
Unit by
fact
,that
additional
built
ito. Planning
Comments
Control
Conservation its when above
are
o EDINBURGH
that Winchburgh
Sincerely,
own
loss
into
biodiversity UK
effect protected
EtA
the future
Cala
application
the
admission, of Manager
Reference
Permission
points
Ron
plan is
agricultural
on on
plans
Land
submitted
detail
BADGER Act
the the Bagnll
Midirth 404. EHI4 Curr;e Core
by implies
which
action
from
Investments
Scotland the local Planning
wwwelbg.fsnetco.uk
on
planning
No:
incomplete,
Lanark
for
Development
‘S
the Protection need
land an
the
with the
plan. the badger 10121P105
a
grounds
beginning, destruction
R which Winchburgh
the 2004 Application
to
AND
applications
It
ad
be
Ltd..
is
population plans
in
1_
a of GROUP
therefore \jJ and
considered.
badgers
breach
Area,
that
Badgers
‘.-,
at
are not
LOTHIANS of
its
by
this
Extension,
,
at
are
just
of
Environmental
included and
rely
particularly
least
stage. Schedule
Act
considered”.
left
that
on
(1992)
26-October-2005
two
as
to
this
as
future
find
main
4
a
important
will
as
of
key
food \/
Impact
Even
badger the
need
/1
may
EIA
/
Li Badgers
protected Environmental present, development. out each sufficient Phasing
Although
Badgers
. •
•
•
by
social
A existing between Proposals corridors the time i.e. to Developers wildlife These Within plan
a
minimum and
competent
before of allow
are compensatory
greenways. and badgers territories
of for
developments
group.
Development
need aggressively development
year(
sanctuaries The
retained
ditches,
badgers badgers Assessment
badger
should permission
should
of
shouldarr çatipnient
can
be
ie
person
of 30m
December
only
Where existing
form hedgerows clans adapt within
rather free
incorporate foraging
around
should
but
territorial
a sites
to
is
Plan
access an
few to
to
granted, the
establish
should than different
badger
integrated prevent
a
wild
ac49csu1evs,
to
squareetres setts
resources
be layout is
more
and
try
April
throughout prepared
enhanced
so,
designed
areas
not
to
should
clans fj1Lc developers water
urban
in-breeding.
it as how of
when fit
have
is
network
it them developments should
are
essential
and much is
courses
in
be
environment
to
not undergrowth wildlife
known their
available
advance open of
in minimise protected
upon
have
bushes be throughout. own
each
as
includingmarkin
foraging This
that
created and
that an corridors
this
adjoining
ace
socijwffl]e
.Sui
of
can and afterthought)
a in
also the
and more
it from information
any
bait is
can the
ti-a,elvel is
areas.
be
accessible
as
runingthrouh at impact
weeds
creating
essential
so planning
detailed all marking
than a-i-o’-
then a achieved
refuges
proposal
minimum)
as
development.
(Note
on one
adjusted
to to
layouts
which
new
maintain
act Badgers.
that study layout
to for permission
social
survey
by at sites
badgers
as wildlife.
lines
to
a the
retaining
to
must
them.
to designed is
complete
mini-
plans ascertain
these
group
the
optimum
carried
ensure
and
links
of
be
travel in
as
is Swiss Lodge, Faucheldean, Broxburn, West Lothian EHS2 6PS Tel. No..01506 89045!
Development and Building Control Manager Development Control Unit 15 Jf gØ5 County Buildings Linlithgo’w I EH49 7EZ 21 October2005
Dear Sir/Madam
OUTLINE PLANNING PERMISSION FOR A 352 HECTARE SETTLEMENT EXPANSION AT WINCFIBURGH
We object to the above planning application on the following grounds.
General Objections
Objection 1
This application is premature, and cannot be considered until a decision is reached on the Finalised West Lothian Local Plan 2005. It should therefore be refused. I L (JrI’’ Objection 2 1
Para4.3.4 on page 16 of the Transport Assessment states: “The two major landowners, Hopetoun and GlendevonEstates, decidedto pool theft resources and actively promote an initiative to bring about their vision for the future of the village. These proposals were endorsed at meetings of the Community Council. They were also the subject of a Jinpezi turey which showed that local people overwhelmingly supported the ideas”. The survey carried out did indeed support develo ment but not on the scale now proposed. It was for a development of some 500 to 800 houses and not the 3,450 units now proposed. The only reason for the size of this development is because have forced the develo r to for all the infr tructure and the educational facilities. [n view of the fact that the result o t e survey gave this eve ment such impetus, it is considered that the application should not be granted as it was based on erroneous facts.
Objection 3
Figure 5. on page 28 of the Draft Final Master Plan. ;hos the e’dsting landscape ha’ing a cnmpiete path betseen Fauuheldean and UIendem Pond. Pirtfthi does not now e\ist as it vas bulldozed some years ao by the farmer of(lcndeon Fstates paths correct. are Faucheldean In is the giving aguhural of Outline It The narrow soil is a development Policy unacceptable. irreplaceable land educational option permanent from so sector The This However, where liopetoun
do
(‘ore
considered
described has
the
Winchburgh.
are
not.
land
a. b.
and
new
best not
capable
project
development
are
been
Environmental
of vulnerable
the a
ENV of
Development
there there
range
planning
productive
believe south These
loss
developments the farmland also
choosing
these
landowners Estates
loss
said
land
facilities
as
has
7
district, of to of is is
natural on that
of
shown
and states
are
Mla
an a
of
West producing
land that
areas that
crops. been the
with This
proven
permission
to
the
prime and overwhelming
west only
in
and
this
agricultural
pressures
above
this
the
that of
resource,
running
Area
by West Ochiltree
application
Statement. It
are
led approximately development
it are
the
76%
land of
two
of is
above
the would
agricultural lack landji
development
also
Land from
only intensively
Glendevon
a
the
in
land loss
Lothian
developer
examples
moderate as
and
has
the
of
south
close
thr
Union
the
exemptions
the
one too appear Use of road.
Specific should
land.
development
Agricultural
been 57% para first
should
one locational
developments.
such
conservation
start
willing
of
lies
will towards
to Clas
land
200 They
Canal
instance? of farmed
2.3.6 and the Apart
respectively.
range sought of
that urban made will
be
a
in by
result
the
not
large many
hectares
Core
unless: Objections
the refused.
Tippet
the to are
are
West
not
(Walking ueensfey),,
is
need;
highest
East
of from
it be
settlements.
sell.
in
sites coastal by
Class
yers in
easier applicable amount supposedly
be
crops
Development errors
considered
Land of
large
CALA
Lothian the
Broxburn
The Knowes
one and
permitted
this
elsewhere.
Could
3.1
loss
for
rain with
lowland
units and
adverse
in
small
of
land
(Winton)
for the
Winchburgh
Council of
motorways
prime and
Cycling),
it
consistently will
shown
of
and
until and
and
merits a some
be relevant pocket,
which
ldthcwork1.
Glendevon Areas
352
would
etfect
fringe
be
that
which
is
west
agricultural
the
highly have
on and 267
built hectare
general
results
the
of
documents states
the
of
and
argue
documents Figure alongside
and
to
is
is hectares
West
taken high
such on provision
remainder
described
be prime productive.
the and
the
expansion
in that
land
protection
that
chosen
2.8 yields
land
Lothian
eastern
the
airport.
the
As
broad
quality
of
which the
are
hut
and
easy
of is
an
as
of of
as
it
a plant The effect badgers to
In the appear and Consultation conclusions. attended It part While number public The developments development to discouraged, also It areas Agricultural proposals To strategic within Policy Special loss
is is
the
conclusion,
that
provide proposed
the
loss considered
averred Consultation of
of
be
and
there
on 1mpat
it
meetings,
already the ENV
that the
top-quali1
designated
railway —
of Agricultural
is of
the
reasons.
local
animals
of
related
eastern
County. very forms
will
hedgerows
a
additional
that
two which
Importance. 9
iliat Report number development,
and unless
badger in it states
designated
unbelievable commendable be
station
is
the
public terms
in processed,
the to the
that Report
part
considered a
farmland as
there
It
that
overwhelmingly
agricultural
presumption
land is
Importance, that
development failure
may
an
is
populations.
rely protection
and of made
would
of
meetings, therefore, the
Area
are
does various
proposed
West
visual
These
as
have
on
changes
it
greatest
it
of Community
several
an md up
that
does
these
of be
that
that is
not
the
Lothian,
been
Area
of
and
considered
areas im’ct,
hiodrersit’ Special
built.
for
intensively
out
within
against
only
proposed
appear
not seem
postcards developers the
for
It li
to
habitats.
Biodiversity
concern
in
farm these
mislaid
proven
of of
would
small
are
much Primary
the the
twenty-one
more
Special
a
are
which
Importance se
to large-scale
diversification
shown
little
areas,
area development
Involvement
that that
accurately designated
watercourses
appear
expressed
weight
to and
farmed,
or
n
could
The
than
to —
over Schools
large-scale
be
otherwise.
entc
ildlile Agricultural
the
not
they
give
comments
find on
loss
in
one
returned
be
that
should
land
much the
the
with
development the
high-quality
are
assurances
food,
of
significant
reflect
hundred
was
as
were
top
in proposals
in little
public
agricultural around
would
designated
the
will
Areas
weight
this
Wincburgh developments
en.
be In
the
may
when
from comment
Importance
consulted attention
same
the
view
given
have
area
size
interest,
and
normally
have
of
Winchburgh
traffic
that
thosikfren.
responses
over
can
agricultural
map. unless
restrictions.
Special
of
of
an
fifty
to
as
land
the
a
be forms.
the
the
is
has
impact
75%
this
at
Areas
generation,
significant
Only
Within
no people
given
in justified
M9
will
be
small
length where
been
report.
the
different
from of
accepted.
junction
should It
minor
be of
areas,
on
the
to
eastern
would
paid
these
who
on
the
the
for area. Tramline at Evening and improved Pam Tramline space the benefit that Lothians far. of Light appeared hole. set Broxburn, there The junction, could been respectively. Winchburgh drastic relevant Scottish However, proposals “planning Great This roads south restrictions speed merely speed. front the Faucheldean
several
Chapter
to
benefits
the
the
development Approval proposed 5.2.2
placed
type It would
of Rapid shelve of
It
be of
where emphasis
will
to
consequences West will route
mean This
was
News under the Executive
infrastructure the Structure 2 built
key 1. in and
the indicating
(Transport
of
should at permission
and
8 will
be
had to the run will
Transit on schools be
part development suggested - the road, is the development.
Edinburgh
of
Winchburgh road.
high-speed locations that
restricted En
M9 for in the
Transport on two
that
not a
the have
Edinburgh
risen Tramline from
is time
undoubtedly the
speed
the saving
of
with either
this 27
junction
Winchburgh they
given
however,
Plan
completion years. conducive or no
It Edinburgh’s (Tramline
and that event
development
a
September Proposals)
Haymarket of from for
project the would will
alternative clear
feeder is
that limit use
including
of 2015 to
of60 writing, area”.
in vehicles to
and provided the
sustainable
Strategic 2
and Of of development. those 20mph not Evening an
the and the
the
if
will
It impact
will will
make development. one
Accessibility). roads and this the have has
to estimated has
partly be 2)
town existing
proposed of
and the million.
However,
of be indicating encouraging projects
neither either only planned
or Airport as in will granted the options not
Tramline sum, in been Traffic i.e. before
or
more considerable new Rail the
shortened
East on leading
News
Edinburgh
both proposed
centre. the
near
Gyle transport
committed”. yet
Glendevon
run be
the
Transport
only be suggested
minor
railway Authority/Train
Finalised of cost
Broxburn
sense
allowed Strategic
It not the been fail to
Any tram have for the
an
for 30 which
transport
and
Impact that these
is
2
from The
Newbridge
some These
need of473 article to being On development
or
considered motorists for M9 approximately
to
road in
such
granted
to network link Edinburgh been to
the
materialise.
station 40
pedestrian Local cut
Policy
projects Saturday the indicated it.
Assessment junction. have Neighbourhood to
that its
West
Link for £375
CDA
roads
network CALA cost completed mph,
between
curtailment
appeared costs travel network
examined.
terminus benefit
million
the
approximately
Plan, a and
are
Iran
to Lothian from section of
million to
ring Operating
with
hr are there that with
has construction
and
Airport. help
up have 1 this use of that
even both
traffic.
In
-
of October CDA Edinburgh
one
around 27 road Broxburn to especially specific the too
to in the states thereby
the at
then addition
this
scheme,
Winchburgh plug Transport
were
would has £714 no
Local of integral the 60
if
Newbridge,
mile,
approval
much
extension
20mph Centre,
or three
1, it
road thrther the
alternative
this Companies
mph
It
Edinburgh been
“the
a
were, the
states a shelved, a
million I
will sites diminishing funding
of Plan Edinburgh partly ,000 by-pass further further
to
to emphasis will
City including
areas the but
on Winchburh to
proposed
the secured
speed
leaders
the the
the reducing provide
of
could
that until the
this (Para
houses of will
have
and
Centre
above. to stopping the
road in urban
where M9
then
reduce article
the
black
round
the road.
the
all
East
it
were has so 8.59
&
an in
the
be Assessments Great no years. There require been
Yours
Wifliam
consideration
addressed
fI
play
is
/,.
faithfully It
to
also
J.
is
be
has
considered Wilson /
7)
made for no /
been
r
properly
mention
most
has /1
/fr\
to
made
been
deliver
of
that
and the
of
of
given
the
the
roads
the
that
sufficient
full
construction
to Trip
it
surrounding
potential the
will
Generation
additional
material
Yvonne be
much
of
traffic
the
the
to
P.
more 42,000 Rates
restore increased development. Wilson
which
than
and
HGV
will the
Junction
the
traffic
Auldcathie
last
journeys
amount
/
It
tbr
volume
would
Capacity
some
suggested.
that
Landfill
appear
has
twelve
will
not
site. that I from u do and ‘-‘arious support
area In make
Glass road Faucheldean Faucheldean one was
Winchburgh This I
Community Dear Ef149 October There Linlithgow
Planning Mrs
County
have
refer
over
not
the
that
of
distributed
Broxburn included
were
as
W
Swiss
a
Mrs
already were
O(ffLINE even
which
7EZ to
P(
jbr
definitive Mini
speed 50%
it
Buildings
IvfcCorriston
of
regarding
the
Tel
finalised
Department
is,
McCorriston,
ting
others,
Faucheldean
Lodge,
know
two
Council
SETTLEMENT who
of Market
make
No
meeting
mentioned
Road. Road.
limits
5
made
to
the
minor
replies
surveys
only
were 01506
PLANNING
decision
the
where
I
it
answers
Faucheldean,
objections
am
on
my
on
in
into to
The
M9 In
you
road
questioned
from
persons
that Glass
aware a
\
my
done objections
890451 I Faucheldean
the
replies
Road iDuntarvie,,1
a
questionnaire
held
until
&
‘
cul-de-sac R’
net#
survey
road
the
road.
EXPANSION
:c
Glendevon
6u
Road
concerning
PERMISSION
to
that
at
to
preferred
plans
with
from
i 1) ‘-
irk
the
my
stay Broxburn,
Winchburgh
outside rnaiLrHThiefauta
The there
known quite
4
and
apparently
project
properties view -
for
Junction.
some
is!!
open.
or
other
residents comprising
were
espec
a
the
choice
this AT
make
is ards
Scotmid
on
lot
random
that
and
West
FOR one
From roads
the WJNCHBURGH
road three
ofpeople
ia/tv
Community
and gave
various
on,
motorists was in proposed
was
Lothian, who
A
in
particular - the my
in
choices or
because
350
12
one 352
for
an
Main
done
their
were leading
fau own
questions,
in
improvements.
overwhelming persons
19
a
by HECTARE
aol
Winchburgh cul-de-sac. Centre will
Strategic EH52
particular February
by
Street
knowledge -
reluctant the
he/dean
qf
leave corn
mys to
on
merely
the
the
in
6PS
and
to
only on
etf
the
the
Link
24th
and
2008
to jump
preserve population,
As As Farm No. against. allowed In withdraw made already Road. terms that village were the that Yours
This Winchburgh
Winchburgh,
far addition
I
we
Community
1
meeting no
road
that
Wilson
on
which a
sincerely and of
were
as
I
round
access
cul-de-sac.
being
on
have
cost, to
I -
the
any it
is
large a
will
the
to to
leaving
was
not
quiet related currently
use
Faucheldean how
no by
this
objections it What hearing
required
grass is
now
just
from
Council.
numbers
used
this
the
allowed wish
a
country
would
subway
take the these
If
to those
Glendevon
road
verges for
the
this used to
our the
from
meeting,
this
proposed restrict
be
after cycling
of members on
The
premature who as
road
is
Road objections,
by
would
a
cyclists. when
part opportunity not the to
drop recollections
horse having
live
it
which
duck
you possible
developer
the is
from
and
of
traffic
deal
Strategic concerned,
in are in
existing
their
riders
asked
pond.
in application
walking
Faucheldean,
the
heard
you
can
the
stating
with
addition,
passes.
of
ocean
then
circular
Strategic
be
heard
from
f
of
withdrawing
arguments
Link most
traffic
anyone
used
some by
access
I
is
compared would
the from
what
lots
by
road. many
of
route
by
but
of
Link.
without
livery
Cala.
the
would
ofpeople
should
the
some
we those
still
families
only both
objections.
to
my
local
want
at
You to
and
prefer
like
members for
having
members
to
Objection
not
Kirkiands
what
heard
from
from
ensure
to
from
and to
be
it
is
to
to
In
the
at
of
be 4v(i
!‘I )(i \ Catbells 1-aucheldean \ Vet Lothian E11526PS
l’elephone 01506 890707
West Lothian Council Development Control Unit County Buildings Linlithgow th25 October 2005
Outline Planning Permission Application at Winchburgh, West Lothian, made by CALA LAND INVESTMENTS Ltd
My wife and I live at Catbells the most westerly house in Faucheldean facing onto the small field that will be bisected by a proposed link road as marked on Drawings I 120/ppca!pa/0I Sheet I of 2 and I l2Oppca/paIO2sheet 5 of 6 associated with the above application
On the issue of this proposed road (north I3roxburn and Glendevon on the west side of Winchburgh) we take exception. What is the justification for this road? It would appear that this road is a feeder from Broxbum to theew WTJ wncerifre chools and the new motorway ‘al1 ways”junction on the M9. If this road is built it will in effect be a Winchburgh and Ecciesmachen bypass and will also be a commujrniduit between Broxhurn. Linlithgow and the M9 to Falkirk and Stirling at Philpstoun. This particular flow of traffic to the West and North is not considered as an impact of the proposed road link. It would also raise the traffic on the Fjiucheldean ro1 from areas south and east of Winchburgh and from Ltphalland the south west to an intolerable level. This type of road should be a part of the strategic linking roads plan at a much higher level than this outline planning application, probably the Scottish Office. [believe that this proposed road will create more problems than it will solve in terms of this application. Existing roads provide this link, This particular part of the application should be linked to likely work that will take place at Threemiletown to improve the motorway links between the M9 and M8 that, with existing roads, will provide the same function.
You know of the recent Scottish Executive’s decision with regard to the ‘all points’ junction at Burhmuir near Linlithgow and the Executives position of a” hJaiket esumption” aginst new motorwgJunctions. In view of this what is the likel outcome of the application for a new All Ways junction that is key to the success of the proposed development encompassed by this application? It is my view that without a motorway junction the need for this linking road would not he justified just to take additional School traftic. The size of any development will necessarily have to be significantly reduced without proper lmks to the motorway.
The suggested route of this road in front of our house is insensitive to the people who live in the rural environment. Roads should be planned in harmony with the local environment. The road and its construction would seriously disturb unspoiled countyside and wildlifc habitat. If constructed in this area as proposed it will introduce pollution hitherto not experienced here particularly fumes, noise and light. the amount of land reserved for this proposed road seems to U. mnre than could rcasonahk he requir:d and eacroaches on the right of sa trom (ilendevon and successful. realignment the ([have remainder consultative this The view information are views The seriously detailed If
Regards
Tom
at
feeding
not
on
application
route issue
the
of
I3ryce
of
the
records
prepared
the
end
design
the
by
of
of
tët
woodland
The
route
local
is
of
meetings of the countryside the
the
precariously
the
the from
of
proposed is
Authority.
management
proposed
to
thë1eld
residents of
successful.
this
proposed
day
accept
the
other
strip
organised
road
this
bats
and
route
in
tint this road
involved is
application close and
between route
front
to
the
Regardless of
impairment
i
of would
have
its
the
by
evening
a
to
the otu
and
Countride
route.
Winchburgh the
wildlife
road
the
Glendevon
road,
significantly
the
is
woodland
fthisapptiation
road
of through
granted skies,
area
and
as
what
groups
closed
outlined
that
oppose
Group and
Development
and
information
then Faucheldean
strip
affect is
to seriously
to
Faucheldean.
encompassed
confinn we
this
Man’gcd
in
that
through
the
the
is
would
application
has
successful?
supporting
amenity
lower
that
needs Initiative this).
established’bat
traffic.
area
want
has
by
the
The
to
of
come Vv
to
the vigorously.
This
value
be
There
hat drawings and
our
be
pt6
application
resolved
involved would
view to
property. others
of
needs
you anJbido1omes
I
our
dind1s
must
and
he
from
the
particularly
property.
to
in
th
if
unspoilt
be
majority
he
the
it
the
taken
alöii is
a
We
if
A* )
objections a West
Dear Development
352HA
Sirs,
Lothian
4)
5)
3) 2)
I
1)
settlement
as
have
Council
follows:
Control
the
application
Unit — I ______
ensure On the
suburb the will The development, mean that schools They the development will on This
development. would such rules
been
these
a
sun
village never
be
line statement
more
application
land. state
Winch
station
agreed
prohibit
like built
Winchburgh
of
for
are from
grounds.
dear through
that
reopen
particular
and The
in
to
heating
burgh
on
in
is
the
and
Cala
but
city?
Currently
make
is
vtew
isakey
is
speaking
application
fact
non—agriculturaFbuilding
“clearly
untrue.
assumes
agricultural and
Planning
it
the
Winchburgh
Land
and
at
the
is
is
note,
in
when
village
the
well
the
most
Edinburgh
Investments
to
following
supported”.
with
(j
my
sun
Statement the
should
site
EARL
known
28Th
element
become
land
of
other
will
house
at
local
is
was
Easter
October the
is
and
all
an
points/raise
Winchburgh
be
the
in
completed
chosen
does
residents,
/
regarding --
EHS2 Canalside
land
relies Living
times plan
that
area
another
rejected existing
fact
in
Cottage
station
2005
this
that
this
6PU
the
has
on
for
be
on of
to
in p
forward
Gudmund I
hope
you
to
Friis
your
will
the to towards the the the a the modelled aims. successfully heating
Jorgensen.
response.
3
consider
year.
year.
sun south.
deprive
winter.
storey
effect
is
being
Before
In
on
The
not
the building
these
As,
getting
a
on
a
more
in proposed will
building
the computer
in building
keeping
points
put
Britain,
design some proposed
environmentally
my
started
development
carefully
with
of
that
at to house
there
its
various
lmmediateiy
determine
the
environmental
is
energy
in
is
and
house
currently
shade
friendly, times
a
there
i
move
from
look
was
the
to of
in
Is time Thanks Hi something masterplan Things aspects previous and From Graeme hestate I Regards. Lastly,
hope McCorriston,
Sent: Subject: To: From:
Wendy,
• • • • •
integrate
of
my
cottages, are We there “nature which Given to then the over face said, I routed I property certainly The boundary previously boundaries. How be the
year, I that
for would
believe
of
did
to
objections
better
personal
moved
directly
above house. all the
early
get your
issues
22 Graeme
the has RE: McCorriston,
I be the do
think I
would
it think
Cala the would
need
should into
corridor” personally proposal
has December2009
in at we
prospect
years). “protect” however
there hem ‘Mnchburgh been
note
in my
and
scale
touch.
to our
are tt had
the
were above on all
“protect”
I point the
Wendy
not
potentially was to
will think some I
not
own
Couper
the
would the
below. of more the houses.
were the around
agree development.
an
new
been
of
as be I be
some a such going
of
property of
the this southern would has Wendy
open stem residents
that
the public favour
good
extent
I view aware
keen
at
going
a
year.
like the
expect
if
possible [graeme.coupersn.comJ
front
Settlement
will
I fence development, two
as and
risk
given
be the
help to
popped
The
from
aspect
idea therefore northern to 10:21
footpath
there
main
if removing
provide
be (similar
an
to children’s
in of of of about
road In
this consider
most
need in
rationale
this less
house be the significant via
the flying impact the this that
consideration for
appears
roads
over
were
in
a is
could
increased
location
road
than resubmission. and houses?
Expansion.
respect to without most to open however us variety
to
to
be
footballs
the
locations,
fields agree
the other
to is see *
all
to become
etc
for keen I
a be
bedrooms
become
got there
my cottages
Faucheldean
directly space
to to issue
dozen
nature
this the
therefore
of of removed?
the though,
(further get
options be
on a garage
the public to
options my
(certainly
of copy
scope Rigby’s
is
limited explore benefit a
for
and/or the Planning together
was
feet
latest
future join corridor) that
a cul house
from
directly all
dumping
path integration
and
of
limiting
but
and
we
proposed de
from to on
the
in the
the
scope
but
of are plans
end
plans with the
amend
in sac
in I relation as have
footfall to
greenhouses
like
Application
a have southern
northern
to
actual relevant my unfortunately the
on
of
my
front you of link
both
which the
ground
prevent we mention
to greatest
and
to this the
lounge
plot
aspect existing
opposite retrieved
road? how
mention,
influence and developers
to
carefully
garden
have
view
fact,
road
if footpath
which joining
most end
most
section.
there
for the
potential
being
Ref:
and
direct
and I
most previously impact
that
as
boundary is believe
grass
public
the and they properties
enough 3
those
means
consider
are best the
dining the new 1
cottages
light
therefore
would
so
directly whether 0121P/05 garden
northern As
additionally,
were
any more
gardens to
cuttings
end
directly
for
path
to
this that
to
you
me
that
of room
although
as existing
all queries, access.
my
of
how out.
as
them significant
is
to of impacts have
mentioned suggested, are:
I
the then
there
the
development
most
house). would
preferable
well. which garden impacted? etc.
windows
being
best
Fortunately
boundary
cul
from
already of
be boundaries
please may I
cottages.
In
That
will
those
on de potentially
to
very
directly I
this Page
live
the structural
In
above mitigate
my sac
be arrange given
that
being to
addition,
raised
close respect
don’t fields
in
could will scope
a
would
1
the
one
on
of6
the
is
to
a stay
be a Objection rear paths”) development
‘avoid
served of police authority.
our Objection
houses. Obviously master authority serious
application. comment Notice
I
Dear
County West
Development Linlithgow West
(ref
loss
write
without the
joint
of
in
1012/P)
Sir/Madam,
of
Lothian Lothian
guidelines.
my
road.
plan
by disruption
of
concerns a
Again
formally
Buildings
amenit
We
concerns.
has
rural
objection
only
house.
2 a
We
doubt
Winchburgh I
and —
safe
have
of —
now
Policy
I
our Management Council
have
that
area
Roads/access
the
and did
the
about
vehicular
the
to
a
of
had
severe In
I
there
is
large —
meeting a
local
write
would
not
enjoying
ENV you
public
particular
most
right another
outline
the
the
is
accepted amount
‘il1
plan
loss to
amended
back
planning
of
33
like
disturbing
seen
access”.
Manager
rights
arranged
ask
planning
he
access
issue —
strategy. -
must the
these new
Should
in
our
uhstantial
of as
you
countryside as
of
2005/06
that
houses
application.
master
a developments conform
and
road
recorded
Clearly
with responsible
formal
and
to
Core
application
the
is
My
are
note
is
first
upsetting
the
deeloprnent
proposed
plan
disniption.
house
Development
liable
private but
to objections.
that
with
developer
and my -
with
Karen.ne
re-notification,
the
now
access
is
should
for
is
for
objections
tbremost
the
and
design
change the
panoramic to
not
the
understand
application land
ourlooking
be
middle
proceed,
not
later
or
the
I
maintenance ...
built
3
Area.
tonscottish.par1ianient.uk
trust
and
around
Glendevon
to
to
in
“(k) maintained
case.
in
to
rights
our the
to
that
of
‘iews.
development
the
given
my the
he
the
Tel
that
I
a meantime.
arguments
way other
you
terraced
section have
Winchburgh month
capable
house
of above
front
-01506
and
the
that
Farm
Ihat
may
of
way
West
by
houses
Winchburgh
studied
and upgrading
FH52 letter
to
ide
will
(i)
the
the
of row planning
note
will Cottages
or
against
discuss control
Lothian
890961
to
states
being
have
local
core local
will
of
e
was
6PX
the
my
the
be
5 would These at ride explanation one and OLjcction disrupted note meeting being house Karen master issues.
Yours
Glendevon
detailed
of
our
considered
are Newton thithfully
will decrease
plan the
objections.
with
to
my
proposals 3
be
that
assessments
given
our —
Farm
LXB
main
impacted
Core
and
development
at
severe
‘
and
every Cottages
and
is objections
our
is
Development
to
protect
to
discuss
quality
disadvantage.
will
stage. by
improve
conjoin
Alan
and
a
reveal
control
residential
major
of
matters
Newton
not should
life
the
full marketability.
Area
to
process
road
would
N19
There
mention
traffic be
fully
amenity”
in
taken
with
network
suffer.
with general
proposals will
and
I
the
into
suspect
environmental
be
them.
maxirnise
M8
situated
account that
I
loss -
will
will
it
It
clearly
the
Please
seems
of
await
is
he
value when
very
potential
trees
clearly
rigorously
will
however
impact. the very
close
the of
and
outcome
afftct
worded
our
clear
application
for
landscaping
to
Given
properties meantime
examined
residents
that
park us.
of in
The
that
our
the the
&
is McCorriston, Wendy - CV’i 1
From: GillTreadwell [gilltreadwellblueyonder.co.ukJ Sent: 04 November 2009 22:13 To: McCorriston, Wendy Subject: Planning Application number 1012/P/05 f[ 227 CLJtci
I li3: ilrent nciL.
no I s fin ;nrnrn rrrun y i’m 1 L ret: in j, idv: i rrut mccc. ir : ‘3.jr . fly ncm f fib using ievb lmer The Parent mnil bect thIs n D2&L the nas: a tnat no hiatli. re moat in an in :reaaed number of piDils within no c.t. men fin thburgh Prir ary S L o I which wiil require he a hoel to be extended o crommodfle tne additional pupils (something ye r fivid fcKirtney appeared t be aware ot) The Parent Council onsider flat the schoil at present is not capable at being extended without detrimentally efretin the quality of teahinq and the ability fi the school ‘o cinflnue t iffer the level of active learning rnd physical exercise which is being promoted by the Scottish Government. The schoo was originalty built as a single stream single campus ilcility. The denominational primary school(Holy Family) occupied a site immediately adjacent to the current school building. However, the Council considered that it was surplus to requirements due to a falling school roll and decided that there was sufficient capacity within Winchburgh Primary School to accommodate both schools and demolished the Holy Family. The Council also granted planning permission for a residential development on the site of the former Holy Family and have recently allocated the former playing fields of the Holy Family as well as an area of omen space to the north of Winchburgh Primary School for residential development.
As you will be aware, the Council have recently received the sum of £550 000 for a 2 class extension to the Holy Family as a result of a development in Kirkliston. The developer at the Community Council meeting also advised that a turher S classroom extension would be required at Winchhurgh Primary School to accommodate the first phase of the residential development. Whilst in is only right that the developers are funding the infrastructure required for tneir development, they tall to realise that the current school site has a finite amount of land on which to extend. Furthermore, the legal agreement for the Kirkliston develupment does not provide the flexibility for tnis money to be used t’r ‘b prov:s in rf :ther facilinies at the scnools. increasing Cr crmodaflrn in trn.sof nrovidinj additional ciasarcoms is only one elem’nt of mn i ucreasec schrl ri 11. The tact that the school nLZ sing was iisi ;r.ei s a single mvnptis means that: — ra ras more bnr zma will ia.cit:r .unn:im-as aw,rd ma ir’ syrs en .n/c’ n As cmIn, ;ym :c: has
LneCe itit.
n m ‘r- r ed r b a r swn’’ n r — — t t - 0, zjM 3 ) ) r’ i it I inm Oiiti’ Rfr I. Vt Il0, r ‘o t ii titi its ii— to n,i. :3; 0.0)) 0, D0 ttt D 11 Ii’ *DDI’ t) 0 t i W D. I.- iJ :i 0’ t I • zi- ott a o:r tmo-t r • kt rrap.’ .20 Ii D)t P a 011Dm D ra oe 0*10 UD ‘c bit Ifl- 1 $..L’1D) tlqQ J0.e1l1 fr 1 0’ ti: b WOOD 0
O ci ig j. t’ttg. G0) ii It 0 00 0. tAD :n COD CD pm cce 1 ) 1$ CO hOt’ t ‘4 i Ua ti. )Q. 1 (Ii, Ca Rb D 3 10 lii D tn Cr10 3 ‘teD 0’ld.DR ‘1. ‘14 r D Pip, 40,0 3 at aDOO 4 i.i C) Dliii 1-. I I ciltj)fl a. U it • C—liCD I taIl’L. or 4DD1 I ttitato I )t 4W 4’t t 3 ‘3 p o tab ioI° I- 1’ t’0D3 %%Ø Ca II tflp’) t l’ It) ti -..e rx WI 1 ‘4) v•CO ) I El’ Z 0 Sm co x: 0.D’i • CO frfl WE P to MO iQ D) 111,0W 011 U US® aw t’ ii ) ‘3 Dli taD g P Dtt) ‘.0 Ci 1111 D D l-3 t 0() to cia Mti ‘‘0mb • a i t 1< D 4W a I’ — a ‘a o .3 Ct .4 J on 3cc 3 orovision 2. core Faucheldean town Main formation General 1 1. follows: discuss application. Members We and M9 Cala Outline Dear West ee EH49 County WEST LINLITHGOW Development Manager Development Mr. 24 Date
WINCHBURGLcQMMUNITY The making The THE WCC tha’ junction, 2. November, 3. t I refer
R.R, retail paths centre; Street °ndlrg Land Sir Glendevon Lothian 7EZ amount great The The Planning The the Buildings LOTHIAN VIEWS and would to Hartland of of uses, it should Investments to application your the a views views views Winchburgh ip train town eastwards distribution effort circular Hawkhill & Control 2005 ofootpaths like being community i’ost Regulatory letter for OF area station, radiate centre of of of COUNCIL bad to a business the community desirable COMMUNITY see & 352ha of eferred should Wood; and gone Ltd to Building of 27 people to Community out park
a the — facilities, to Auldcathie; is Services ‘Welcome September,
financial from development into Land put too rot to bottom owners & Hawkhill and of councillors as ride, Standards (01506) forward smalj,— be reating the Winchburgh Around Milhonaires posh COUNCILLORS landscaping allowed - package Council of primary centre with Packs’ Wood Auldcathie parts the together suggest to planning Telephone 890262 area including Winchburgh shops Niddry the to
to met of and to being to link in receive Council the new Niddry with 9 & along on Winchburgh a secondary Brae; northwards prospects No each open
w new iiu of minimum residential, set the residents. maps special the Mains; up From three and evening area. space, bottom to
i’/( Main and existing schools for enable the categories through attention, commercial, , Niddry 20km documents, road In ow Street of of
Draft
/
I other Wednesday, the
/ density its village, / and which Mains Glendevon Niddry in members words with of nal rail Winchburgh responses, vusirg industrial, Master relating eg. should emphasis to infrastructure, Brae we Myreside. 16 from COUNCIL to West Winchburgh EH52 BROXBURN Faucheldean ‘Bellemonte’ to do to November include Pan organise to Faucheldean; tre/ Main not Myreside
4 recreational the as being Lothian 6PS one wish above Other Please the Street; including the placed an to to to reply to -J WCC — Response to the Planning Application in respect of Proposed Development in Winchburgh 24.11.05 Page 2
1. THE VIEWS OF COMMUNITY COUNCILLORS (Continued) General (Continued>
3.(Continued) Itree planting, scenic routes, etc., etc., etc. but the plan lacks the same commitment to top quality living conditions at the town centre, Hawkhill and Myreside, for example. One must ask whether the priority on the part of the developers to produce a very desirable area in which to live will be replicated in the future when the landowner has moved to another area and the staff at CALA,etc. are employed elsewhere? Will the same very high standards and consideration still prevail when it is time for other areas to be developed? Small pockets of desirable, expensive housing in each area is acceptable but one area being given special preferential treatment will be resisted. 4. Allelectricity----- cables should be underground. 5. All BT/landline cables should be underground.
6. Alleypplief hould upgrade_the system of supply to existing parts of the village.
7. When power suppliers intend to carry out underground work, they should have to contact other suppliers, e.g. Scottish Water, Scottish Power, Scottish Gas, W.L.C., etc. to arrange for work to be carried out by everyone at the same time the roads/pavements, etc. are being opened up.
8. Insufficient attention has been paid to old mine_workings. We do not want any new houses to disappear down a hole.
9. WCC does not want to see the Royal Highland Showground being sited anywhere near Winchburgh village.
10. WCC does not want to see First Bu&s new garage being sited in Winchburgh.
11. The existing community centre ed and kept as a museum/community facility,
12. The autonomy of Winchburgh should be safeguarded.
13. WCC accepts the intended boundary of the development.
14. Alltelecommunication masts to be yedaprJteputside the development boundary. No future telecommunication masts to be sited in the village.
15. A special fund should be setup to ensure there is sufficient finance available to WCC for C members to arrange for works to be carried out to mitigate the affects of development (something c;. resembling the John Kennie Fund which paid for road works throughout_the village).
16. A video record should be made of life in Winchburgh at the start of development and continue on through’2eviopment to record the changes that have taken place to benefit future generations. The visual record should be kept in a public building in Winchburgh.
17. At the start of the developmentpthian & Borders Polichould have a strategy in place to deal with the likelihood of increases in crime and idalismZRäT’dents should not have to wait until crime reaches unacceptable levels before increased Police presence is put in place.
18. There should be no secluded, unlit areas where people are afraid to walk at night or during the day
I 9 WL .0. and neveiopers should coaperate to obtafn grants for busness stauOsIn oropesed new employment areas 9. 7. 6. 8 technology, 4.
education 5. local 3. 2.
Environment 31. 29 access 28. 1. 30. family 27. community 26. 25. 24. the provision 23. 22. 21. WCC for that 20.
in proposed
1.
Tippetknowes
a Water As
WCC
Would Grey All The
WCC
VIEWS
pharmacy
There universities,
An A An An A
There A A At secure
everyone It Outdoor
flora
rights —
museum is ttle central centres crematoria dedicated
an
vacant
area advice area
area
water
Response
important
does
should
quality
applies
and
like
needs
Development early
disturbance should
should
from
etc.
environment
OF
of
for
should
should
meeting
to community
to
should fauna, not is
throughout way
plot
and
workshop
date
a
be should to COMMUNITY see
relocate.
safe.
fragmenting.
should
computer
to Park/Craigton
be
should Registry wish
bejgflj
that
enable in
to
information to
kept
adults
be
be
the
charity
there
thus Main
be the
be
areas
as
to set public
set
be
all
of
informed
use
used
preserved,
and
be
equipment Planning
see
possible
the
should making
young
wishing
continually Street Office must Winchburgh aside
aside
be
suite
collection
throughout built
of
not
toilets
new
buildings/houses
enhanced
wherever
while
integrated communiceritreto
COUNCILLORS
Park/land
be
should
for
for
within people
cause
should should be
of
it
development.
of
Application
to
provision
a
whether
are respite a
the
set
depot
paying
the
gain
wildlife
momtored
Council
bins
West
offence be Winchburgh
possible built
results up
who
be and be
rural
sources
to
or
for
put should
in
care
used put
tléirC&iii1lTax,
the
adopted
retained upgrade in
for haven..... left
Lothian
the
countryside
clothes,
Information
in
in
a
in of
in
to
north
a
in
school
respect for
central
place,
as
existing
close
place.
monitoring
be new
of
residents ‘
local
(Continued)
toilets which a
should
renewable
to provided
or
for qualifications
of
car
toys,
health
proximity
with
early reduce
water
not.
location existing
of
community
community
park
shOuld
Service
all and
etc. be
access but
of
to
residents
centre,
etc.
courses
to
or
the
set
the
air
energy, return
where
at
schools at
to store
take
turned
24.11.05
office
quality watering aside a
amount
to the
the
to
central use
centre.
dental
return
place.
to
West
equipment
Police
start
are Clay
e.g.
at
into
where
education.
which
in
which
drawn
of
of
the
practice of location.
solar
to
Pit.
Lothian
an
can
land
gardens.
the
work.
is
village.
area
residents nagerscan
surplus
energy, dib
for
in
development.
needed
order
College
and
to
the The
encourage
various
area
to
same
hydrogen
to and
Page
for
can
or
keep
burials.
gather
check
one
3
the
4
of
f:&.. WCC — Response to the Planning Application in respect of the proposed Development of Winchburgh 24.11.05 Page 4
1. THE VIEWS OF COMMUNITY COUNCILLORS (Continued)
Building Standards
1 Schools and public buildings should be designed to ensure low cost maintenance. e.g. pitched, tiled/slated rooves and materials used from sustainable sources with anti-fire properties wherever possible.
2. Deliveries of materials, etc. in areas near habitations should be between agreed set times with no deliveries on Saturday and Sunday. It is important to cut down on noise pollution.
3. All vehicles carrying loose materials, e.g. shale, sand, etc. should be covered by a tarpaulin.
Transportation
1. Would like to see ‘Tuffgrip’ road surfacing system put in place to ensure the soft surface cuts down on the amount of traffic noise by 50% - especially in busy areas and quiet outlying streets.
2. A scheme should be set up to deal with speed and other violations by construction traffic. The scheme would see haulage contractors agreeing that repeated violations would see their contract terminated or suspended for a number of months. WCC to be involved in the scheme from the consultation stage.
3. All speed bumps should be phased out and replaced with more attractive methods of deaiing with the problem, e.g. pinch points and landscaped traffic calming, etc.
4. Wherever possible, there should be no cul-de-sacs so as not to impede the progress of emergency vehicles.
5. Streets should be of a width to allow access by bin collection vehicles, emergency vehicles and
furniture vans. -
6. Sustainable road repairs should be mandatory with the use of ‘Rhinopatch’, a heat welded system to existing surfaces which will also cut down on motor cycle accidents.
7. Would like to see thet !illentotit1nw road from North Greend Gndevon.J On the plan it is too close to the right of way which is desi6id in one of W.L.C.’s brochures as ‘The Gateway to the Countryside’. It is also too close to the woodland strip that has an abundance of wildlife, e.g. woodpeckers, owls and colony of tree sparrows. Where this road meets with the Faucheldean Road, ef orts must be madeto put safeguards in place to deal with deer which cross in this area on their way south and east. -
8.A multi-storey car park should be erected in the town centre.
9. The Faucheldean Road shoulcLLemj pp_wjthogj-de-sac, and upgraded as necessary This is the wish of the majority of residents.
10. Vehicles and pedestrians should be kept separate with ‘jay walking being forbidden.
2. THE VIEWS OF THE PEOPLE OF WINCHBURGH
This information was provided in July this year, during consultations on the Finalised West Lothian Local Plan, but feel it is worthy of being considered again at this stage of consultation on the proposed development:
Q. 1 Do you support the provision of a 4way motorway junction in the vicinity of Winchburgh? Yes — 55% No — 45% WCC — Response to the Planning Application in respect of the proposed Development in Winchburgh 24.11.05 Page 5
2THE VIEWS OF THE PEOPLE OF WINCHBURGH (Continued)
Peope who said No’ to this question were of the opinion that development would never happen in Winchburgh or that it would mean more traffic in the village. It is expected that the ‘yes’ vote will increase in the future when the benefits of a motorway junction are fully understood — especially when houses are built and the employment area starts to be developed.
0.2 Do you support a railway station, with park & ride, in the vicinity of Winchburgh? Yes—89% No—11% Again, people who voted No’ stated the belief that a railway station was something that would never happen or that the park & ride was in the wrong place at Myreside. For the ‘Yes’ vote, having a railway station was seen as a very desirable facility and something that would compensate for living in a building site for years.
Q.3 Do you think Winchburgh needs a new town centre? Yes—56% No—44% People did not want this most important of streets to be overlooked and down graded to the status of a side street. Since the survey was carried out, the Post Office has been burnt down and there is ) even greater emphasis on retaining the Main Street as a major area in the village.
Q.4 Do you support the development of the Union Canal through Winchburgh? Yes—93% No—7% This was the most positive answer in the survey and saw residents being excited at the prospect of the canal being given the status they believed it deserved. People expressed great love and affection for this stretch of water.
0.5 Do you support two new secondary schools in Winchburgh, paid for by the developers, as identified in the Local Plan? Yes—88% No—12% Parents were relieved that new schools would take away the worry of whether or not their children would be able to attend Linlithgow Academy but, white they recognised that developers had to pay to provide the facilities to serve the people who would live in the houses they built, there were strong objections to the Council putting itself in the position of being blackmailed into providing planning permission for houses in order to get the facilities which, it was felt, should be provided from taxation by either the Government or the local authority.
0.6 Do you think the Faucheldean Road should be closed and a cul-de-sac created there? Yes—14% No—86% This was the only question that caused anger and brought forward a passionat.’ No’ vote. Villagers spoke with pride about this road, saying it went back to Roman times ancfhad been in existence long before Faucheldean was built or the existing 89080 constructed. Their wish was and still is that, instead of turning it into a private driveway for people living in Faucheldean, it should be upgraded and receive recognition as an ancient road down which Mary Queen of Scots rode on her way to Niddry Castle. They are proud of the roads historical links and the belief that Mary hunted in fields round about Winchburgh and Faucheldean. They feel that every road in and round about the village will be a potential ‘rat run during the next twelve years and Faucheldean should not be treated differently from anywhere else. It would be appropriate to heed public opinion and site a new pathway to run alongside the road and form part of the circular pathway around Winchburgh
Q.7 Do you support a number of new primary schools in Winchburgh, as identified in the Local Plan? Yes—87% No—13% Those against the provision of new primary schools did so because they believed the Council or Government should be paying to provide them. Most residents did not look upon this question as an noortant one as t seemed to them tc ne a -ecessar oart of the facht’es nrov ded envisaged to Traders With in account Street WINCHBURGH was wondered 3. developers option Had Q.12 Those lack terraTh associated Auldcathie community young people serious village Q. take Those Q.10 of WCC Those of old 2. Q.9 the Q.8 use road Some their
the
comment
The
11 the
the
THE
people
idea.
by
of able
there
part the
own
would
future, —
countryside.
proposed
would
people people.
VIEWS against
with against against Do with räquired Council
off-road
thought
about
Yes Yes—89%
were Do Response Yes—71% Do Do Yes—83%
Do Yes—87% becoming
loss
VIEWS
to
in
little
what
you
been
the
from
Landfill
with
to council you you low turnover youthink need you
the side
on —
when
have
of
asked
completely pay
their
area Main
73%
support
this
this the
expertise
what
OF it car survey
the support bikes?
support
the the a support It
the
Development
step
was
to
OF
caused
third
for
received
new
more on
development proposal Site
provision
sport meetings
ownership
Government
and
development?
Street Post be
BUSINESS young.
to Those
being
they
Winchburgh
vital
its
obvious
THE the
an and
comment option
provided
for
road
able an
the
duties
No No—11%
difficult West No—29% No—17% No—13%
and
Office,
in
misunderstood
thought
quite
Planning area
services.
in
club
slashed
extension to
in
managing
a —
concept
PEOPLE
thought
felt
thought Once
the to
to
it
favour
large fill in 27%
that and
in
Lothian
and is
specifically
a
organise activities.
organise
addition
there
there as
in
in has OWNERS and
future.
Winchburgh
on
likely ‘stir’
was
Community
an the
has
a it
and Application
vote
time
more
how
a
was of
of
form
begun the
It Council
to
extension
were is
its
OF
new
needed among future
Council’s
was
some
higher
a
the
the
the
as now goes
activities to
their
they
finances requests new this
understood or
and
The for WINCHBURGH
crematoria
new
Yes
people prospect
felt
enough
and cemetery?
less
WITH
to
a
were of
question
saw
road
by. own than
youngsters
the
Council
circle
to
crisis
in
that
uneven
deal
and
their
road
the was
expect view
revive
respect
elderly
of
in
to their
were amusements,
doing
average between
SHOPS
would
roads Main
No,
with
the ‘Yes’ the
of
of
number the necessary.
accepted
that
that
and should
should
confidence
being future ground
the
developers
future. suspicious such young
Council
with
extra
but
Street
when the
lead already developers
for
believed
future
bicycle/off
East
ALONG
where
will
able
their elderly
as
this
prospect be endeavour
(Continued)
traffic.
the
would to would
they
is
Maybe to eventually
built etc.
Broxburn the
of question. 24.1105
and
to being
taxes
fact
among
allow
of
children to
that
the
found
would
maintain
community
most
provide be
in THE
should
the
pay
road that
that
over
West
or
street
the
upgraded. when
noisy
them
to
way
traders for
Don’t
that people
it
and
be
it
agree
MAIN
bike have
intention
the
may
would
These
was
pay
the
everything.
a
Lothian
able in
and
but
it
to
they
Winch
coming healthy
had
ownership
which
having Know,
visit?
an
use necessary for
likely
to
along
Winchburgh were
STREET
how
to spoil
young
were
area
take They
everything
to
was
part
live
burgh? but
the
depend
that
they
profit
the
months
in
to
the
a
part
set
allowed
most in
to were
of
favour
nice
They
pay Page
people
Council
among
third
another
Main
peace
rough
separate
the
IN
aside
and
in
for
is
piece
on
asked
and
6
of
a
loss
to
are
the
in
its
for WCC for with Another trader of Your The was and office. for clients A as either while The WINCH8URGH Secretary (M.G. periodic roads situation headed should advertise Street. The back the problems do-it-yourself (Kirkliston, 3. however, In people’s sellotape, stamps, hairdressers Parking necessity. In hairdressers Post Everyone
trader,
our the the
well THE
children,
WINCHBURGH former
attractive
traders local another general butcher
Office,
faithfully
on
they —
MiNer).fri long
being view the proposed
remarked
to
and be
as
Response paper,
is
monitoring hairdresser to bubble
VIEWS and
attention who
do
keen footpaths pharmacist
than
vacant viewed
masking made are their seen
term, the PC.
Broxburn,
it
believed
and
carried Café, community
their
saw opinion desirable
as being might give
goods,
to has
out
Main
copies it
to
customers.
wrap,
there
as
Development
for
available potential solved Z5 traders that
It
building lack
OF shopping the A see
advice
of
been to Specialist
must
to
a (Continued)
be run tape,
of such
out CALA
Street:
said was that
the
COMMUNITY what major
newspapers, the
Planning and need
Bridgend
were
the of the BUSINESS envelopes, of
appropriate
provision
from
while
and
hall in
be
do parking village
which
the creation
as hammer on she that
site speed shoppers. one affects
and
was
to business
for
of already remembered problem
not
was to
the led
home.
shops Bakery,
add
construction
would
the
opposite
the
of
in a
better Application house
available
are
or
wish
they
to
problem.
post
of Winchburgh places the in
of to
loss
of needles aforementioned
Linlithgow) and
More
a
for stationery, OWNERS
construction attached.
place
and 3
construction funds for
like
COUNCIL as lay-by turndown are
As
the hair
facilities another
office
No.
part
It
Town
of
nails,
the
29-years,
lack was
the as a
seating to
doing Main
on
a
dressing that
in
legal
hairdresser,
of to
work
&
in
see P0
car areas, a
in
Pitlochry the street
Centre of
also
fancy thread,
the assist
major respect
butcher for shop
for snacks, Winchburgh,
Street
WITH in
their in
sales parking
a businesses
Main
is
traffic along
history
trade. at their
dental Winchburgh wheelchair thought
put
while
taking
itself
establishment in
good,
owners in drawback
regular
Management food
wool,
to area
Linlithgow
and
Street. forward
the
shop SHOPS
pensions,
the etc.
being
clients
spaces
be
needed
of looking practice
Shop
shopping, place. cutlery,
employment important Callendar.
(formerly
length
knickers, the turned
periods. in and etc. that
preferably
monitored
users
the
the
Another for ask
has shale
owners
is
ALONG
or
their neat a opens
on benefits,
of It mugs.
failing have people
village
following
into
to makeover
24.11.05 her
Livingston. seen
was
acted
attending
the that
the the
wallpaper
pay
industry,
and staff
It a
if
on
of point would
written
before
street
felt regularly Main Star was
she to quiet
there people
THE a and
intending
a tidy, on She
the
postal need
visit attract
proposals consultant
that
was can
as thought to &
Street 13
like
side Main the
laundrette
was
was
is
10 had out
MAIN
paste Garter)
to make
a going there to
often No.
supply requirements
and the
a.m.
to
priority hairdresser, passing discuss
their
have
street.
also created
advertising to
Street.
with
see
illegal
lack that and
shop
maintenance it
should STREET
to
elsewhere
asked to
but
or
views
more
favoured
a
brown
attract a
and
a
look
public at paint,
of
place
the
trade.
no car
as play They
A on
more
Page
the
signs
by taxi a be
appealing
more on a at
matter
the
park
buying to
paper, and post
area people
site to toilets her IN
the
are,
draw
7
rank
Main One to
park
of at
of 4.
Winchburgh Mary
Dear
village substantial The
have
presentation It other 845810
Yours
Mifler Steven
1 main Mrs may 2.
3.
4. recently
of
977 to residents areas residents. Miller cope 1353 Winchburgh. identify identified be squeezed good New sincerely. residents 1120 comments developers. Indeed, facilities Development encouraged maintained
expand changes Community
Ward
that homes
with homes taken
you Primary access CALA APPLICAnON homes
meant
these a
adequate and
specific to and this staffing would I
would
in are to would
the
I
allow are
As LAND as have
I recreational, iistc it are A by to Council ideas expansion planning Healthcare
would planned of
was time
few an
use planned you like road,
be
the planned
site expect levels \iem,her good The
on Steven healthcare afterthought.
INVESTMENTS difficult have designated easily to
me this are Branches
expect existing
the or FOR together
study
is in Oft:ce: passing 21 and to date. aware route, and Village the in
been application started Facilities years Winch of Recistered from facilitated retail comment
years for OUTLINE EHS2
both The cope the existing Main
would in Main Ward
provision With
me thereby 6 incorporated year with the ‘Disabled”
E/dinhureh, trade 1-4 and
National application
KrttiI’stoun early
ourselves 5-8
with
to
Street will application this burgh
be of a
in 9 community Pharmacy LTD on, if are: 6RU take Health Street
of
for convenient onwards PLANNING a the on Scotland this Limited be looking ensuring in
may the
new please
Pharmaceut the
should to mind provided it development
parking I.harinoak.6trr: within
all development and
by Court Centre. into avoid
be small healthcare
is in to Cala No and
feel a facilities the
the a feel for incorporate at re-locate. existing bus-stop good
a vibrant PERMISSION Lird spaces retailers,
t in
one the
existing eel 07402 free a new appIic3t:on and for
it Tel:
the
major
is rheo
N Tee selling influx the
sitting facility This to ourselves are facility important
Town facilities
community Ths
should no and
contact
The development 01506
and development Health
envisaged
short-term
E.H49 is of will
point
is was if adequate
an Centre, having these application
but vehicles
you an require be
additional 605 that me would
Centre
already for
the additional
encouraged
feel of
additional
at 890313 to the an parking
size local
but
of a car-parking. home should there struggle be and
17/1 area to site
mentions the
in
fails
of
2
shops be
place
3.200 105 300 with the are on is
able be to
to
any
is Winchburgh Winchburgh Mary I Dear village Simple difficulties Linlithgow have and letter. these steady dwindled Winchburgh to fact NHS In activities Yours outside expansion are continual Community retailers In
(Director
write
addition collect
order
planning
that low-income
Mrs prescription to
Miller
From locations with
sii as
downturn tasks
purchase
the
to
since
remaining,
normally to their
& Miller,
these drain
posting at
to regard of preserve
village Superintendent
such conversations
Council
since
are
lunch-time
investment such
Community
the these
Winchburgh
pensions BScMR
on
before
items
families
experiencing
in
area. a
income
a
to
parcels the
the
performed as
Re1istered and
level
counter
problems, book
for
campaign
the
the
posting
need
unfortunate
Pha surviving
getting
‘tenver
the we If
just
vibrant and
ongoing as that
to
residents
of
for
.ran:hes
or
rmS
Council in may
consumers
residents comply
to to
Pharmacist) sales stamps
to
benefits, the
Office letters they the
at a
The
the make the the be
Steven for post
o
Registered non-standard
character see
businesses, a
major
Pharmacy
challenges
weighed
of
same Post bus are lie a passing
closure
n are
with
21
from abroad. paperwork
a Post
toiletries,
many
6
Village
fidnburh, now
Winchburgh
\
reduction or unable
KeItil’stoun
home.
forced who
part EH52 Office,
the o
trend.
do Main
non
Office
n of Ward
vu have
of
shops trade at
of
are Disability
l
Scohanci I the routine
many the small
am a
I to have
Post letter
to
tissues our
I would
riri
to Post
to
unable fear
to Banni
in buy
village 6RU go on Pharmacy
Winchburgh
aware Street
vulnerable.
our Court,
turnover, travel
choice, be
Office
of businesses
also Limited
or
out-with
Main
banking
office more a
o
reckon
-ckhurn whom
Discrimination re-opened. Head
and
small
single
to
I
of
heard
Ln6thgrt’ to
believe
I
Street
retailers.
travel
h74h2
and
other both sundries. counter
Broxburn,
Office, but
package the have
&. that they
stamp
We
Post
complaints
more
such (owic,
of
since
community most
people Tel:
it
Without most are
are either
goods
is
Office EH$9 or
For
to
This
Act as of
essential
fortunate
cannot
Kirkliston July doing mornings to
post
businesses
them
01506
us, ours
experiencing
already send
and
6PS stocked
I
earlier
one
from
we
am
this
one
for
their
have
will
the be
have a
there attributing that
that
routine pensioners
means or
has
letter recorded
done
invested, this
use forthcoming
shopping
and
faced Linlithgow
890313
the
in
we
seen
will now
year
retailers
similar
as
16/11/05
of in
a
rely
be
the
in they
trip
to
or
a at
on
the
to
Streaks
Donna
Yours
would
I
have
4.
3.
2.
1.
sincerely
Witherspoon
Ahead
put
hope
one
trade
Lottery
the
with
and
Old
village
effectively
Re-location- and
our
Post
down
main
of
an
business
star
while
these
a
swell as
office
the café
eye
to
machine
&
street
a
move
other
points
down
few
garter
sore
or wont
—
especially
when
especially
the
library
points,
to
traders to
-
in
be
could loss
—
with
the
the
the
broxburn
the
the
or
of
village
new
which
Concerns
new
the
site
on
on
be
main
to
some
the
42
addressed
a
the the
lottery
STREAKS
development?
where
development
Saturday
post
have
concern
MAIN
I
street
sort
older
main
would
over
office
machine the
of
their
street.
clientele
will
STREET
by
meeting
01506
star
afternoon.
me
future
like
hair
to
the
there
to
regarding
&
Will
to
the
going
community
the
done.
garter
develqpments 891
see
who
place
main
be
WTNCHBURGH
there
village
this I
337
up
a
AHEAD
now
would
Will
used
chance
the
street
which
with
be
used
goes
new
the
any
council.
favor
to
like
the
has
as
would
sit
for
of
post
help
ahead
developments
a
post
osee to
has broxburn
had
Winch[gJ
existing
focal
office
with
get
became
a
office
and
this
noticeable
point
people
relocation
be
traders the
for
facility
this
re-built>
a
for
main
in
there
waste
back
has
the
the
in
effect
given
street
cost?
effected
shopping
the
village
village
ground
up
of
to
to I __
of
on proposed would the complex where proposed schools grade the traftic additional traffic addressed community, I inclusion in to Communit thunder responding 8020 County undertaken. Dear I)ev Winchhurgh; West Lini Richard
lopetoun
the to and
the
junction
north
ithgow
&huilding
a
Sir and
Lothian, A architecture
business wish A8020. coming
generated
rat from
We
We We Our
In I
to
The buildings.
the
agricultural
Hartland
am
rather
of junction
park of
the
run.
principle
as Estate. he load
hope note are
to
to village
main the
the
the
only we Council grateful I
the
provided A904
indeed
at the
avoid
and or
EH497EZ
concerned
arising than
and
railway. Manager.
West
land have
that
that Kirkliston scheme from
going
way concerns
Is
above Esq..
and
at
ride
day
through we
other
it
creating
land
the Newton
(‘ala
Duntarvie
between to
the the meeting
however
on
not
to
the
landscaping
within
from
have
and and
Mrs to
tacky
application,
you
reduce the proposals
is
between
commercial
possible Land over
new
the
are developed
train four
night.
the
McCrotsston
the
M9 no
are a could
the last East. the
house
a
cantered unsightly
Community
the
would In
village objection
the new
way
number
are
going halt
railway
new
and week.
Winchburgh
major for
esirnents
will
and
be
present
directed
designs
slips
instead so
could
enterprises
and
any smaller
community, included be
tii
of
seek
make
on that ive1OPrnC
armpit of
deviation
to
line jt1tIlt4Wton he to
Newton, tor
on
progressed improvement
the
concerns, be heading
loading
3u
persuade
the I Winchburgh
the
tough
of
and
at
the
granting 10
a could
and
area’s placed
traffic
significant two Phiipston and
within
to
proposed
highest
M9
layouts
could
the
the
with
this firstly
from
thiiiral and which confirm
to
to
at
on the likely which
and
M9.This North
me
and
the
could
be
Duntarvie.At
he
to
standards the
to
the the
that
Scottish
to
arising
development
a
various
catchment
found
prevent at
integrated impact
from Ref
the
de\elopers to (iin1mu111t\
few
the
we south
the
of 1994
countryside
present
mer2e
place
be
B8020
area
the l0l
A
hope,
points days
the
within
from
imposed
strategic Executive the
impact for
904;
side
increase 2
community.
additional
02
was
bridge
deals P1105
area present within grace
the
last a
can might
additional
November
raised as
on
HGV’s of
the
Winchhurgh
identified
around
good
studies
easily
thing
of he
the
on
solely
and
plan
in
new
from
the COUnCIl turn to
the
vehicles
from the
qualit\
traffic
of
make the
The
by as
new V
the
with this are
B
the
2005
e
as
on
the our Cc Midward. Newton. West Chairman community of consultation additional EH52 a developments incorporated
planning
the
Councillor Mary
Michael
Lothian,
6 progress
The
We
QH
By
Mulligan
Newton
loads
zaar
are
boundary
road
Broxburn,
process
Connarty in
around
aware
of
Torn
the
to
from
networks
the
ensure
Community
planning
M
Kerr.
to
application
that
is
construction
our
S
M Yours
monitor
the
P.
that
P.
communitties.
we
around
M9
consents
have sincerely
only
Council
this? We
particularly
the
no vehicles: the
appreciate
setting development direct
highest
R.
Is
3
C
there
locus
is
out
Jarnien with
standard
it being
Newton
possible
any
guidelines
in
regard
are
this
kept possibility
bound
s
are application
to
that
in
Community
the for
the
attained?
a
to
the
directive
points
of
loop
he
the
contractors
affected
as
and
appointment
we
our
be
made
have
Council
by
and
raised.
aware
a
of
)
pre.cure
However
generate
only
Community
document,
then
he
r
with
that
sprawl
significant
travelӈloiig
minor
from
land
planning
only
avble
future,
centre,
Glasgow.
development
Edinburgh
igment demand.
industrial
locals
has
This
Dear
Planning
FF149
West
Lmlithgow,
County
Case
Building
Wendy
Fo\hound
if
address
PhilpstouuCommunitv
ureat
experienced
to
be
Faucheldean
is
development
roads
Wendy
If
along
I
Officer,
Lothian,
have
the
It
This
barely
7EZ
on
developed
more
a
always
from
With
if
development
application
McCorriston,
Buildings,
is
As
resources
manifestation
that
Instead
Application
revolution
and
development
Winchburgh
reenbeit
south
Council
and
disappointing
these
external
thrpuE
been
scheme
the
‘ears
Kennels
well
deelopment
a
regard
pressures
McCorriston,
able
you
Development
Ui
find
Lothian’s
M8
west
over
put
roads
as
it
to
e
aim
if
need
to
into
feels
seeks
the
and
use
seeing
or
will
needs
to
demonstrate
Ecclesmachan
track
it
turning
at
cope
it (Glendevon
the
pressures
No.
is
areas
a
becomes
you
in
a
this
of
idea,
and
to
brown-field
Ihreemiletown
to
consume
scheme
\L\
proven
that
disadvantage
that
Structure
last
to
Scotland
nscp
the
housing
build
with
pressures rather
the 1012,05
what
Council
get
landscape
yet
over
Control,
ot
inexorably
outlined
any
few
extreme
tiomes
north,
just
attractne a
present
are
on
overwhelmingly
as
was
for
than
very
this?
develop
development
decades.
South)
land
scheme
that
towards
plan
desirable the
and
directed
over
will
the
and
land
developments
essentially
presented
in
current
at strong
Although
pressures
with
countryside
ofp
connect
demands
then
into extensioWtichburgh.
has
P
par
not
Glendevon
would
the
countr
forms
be
Edinburgh,
\u975
and
Development
the
fore
1.4.4
public
away
age not
a
horizon
into
a
sense
needs
a
suburban
place
of
bore
vast
the
not
part
a
taken
still
for
not
side’
0,
let
the
of
to
seherc
significance
from
again1
services
of
to
B8020
along
the be
within
development
tracks
alone
South
no
assist
of
given
to
BathiH1TETErevQ a
to
11w
a
being
-fie
enhance’
the
rural
in
a
live
the
Philpstoun
city
‘Winchburgh
county.
elation
wonderful
has
the
Id
opportunity
r’r
the
as
it.
what
in
the
to
is
of
Philpstoun
south
not
as
with
county
miles
si!s)
Presently,
allowed,
reducing
the
public run
the
dereliction
A
Forth.
nH
just
Linlithgow
same
for
keeping
to
is
Unfortunately
it,
B8046.
a
rede
is
at
that
proposed
from
Philpstoun
the
a
finely
with
rather
at
the
such
sweep
interest.
protection
being
It
misplacd
FUTURE’
the
rural to
West
that
development
community. is
eJu
suburban
Philpstoun
any
pace
this
direct
important
When in
a
scaled
bizarre.
end
then
\Vest
subverted.
it
of
pace
that
mimt
and
Lothian
for
scheme,
is
Does
31
Castlepark,
with
Philpstoun.
F11496RA
will
land
of
done
the
the
it
can
the
you
around
that
city
Lothian,
the
lO2OO5
will
the new )
Jonathan
Philpstoun built
adequate Yours to Winchburgh edge? appropriate Linlithgow more can that Glendevon Therefore or driven Westfield, buildings to go of document further Winchburgh. Winchburgh buildings housing documents which The the proposal surroundings. up
—At
Philpstoun
be lãiiped people)
into in
ethos
be
this
masterplan
on,
directed a
character
faithfully
struggled
ythe
resisted?
de expansion.
PhilpTThñä1fillage
the
The
is and
refined
M
schemes.
and
of
as to
present
we
is
for
to Communit}
is
County but South, you
that
Harris
master
track
create
if
includes a for
Masterplan.
a
that form
Community Planning
It
would tocreat
by
paik lower So
substantial
they
large-scale
the
zones.
is sent
also
the
There
many and
to
landscape?
there
was housing
important
Philpstoun
development
At
and
scale
a
achieve
plan on Buildings
were
edge
to
then density
expresses
cohesive like
low-density GlendJvon
very This
the
services
are
Philpstoun
indeed Process
was
Council
has
of
the
of
in
delivered Is
and
Council
landfill
many scheme,
that
this
any badly
lack
a
no
the the
recognised
housing. that4
Wc.tern
If
vacuum,
is to
very development mthaill’aroundedcommuni
may
great
a CALA
either
it
or
competince scheme settlement high
very
is
have of
reasons
desire
were,
North
reproduced
site,
detached theJyciope
Community
into
that
cohesiveness
that
impressive
flourish. jlpstoun
and
in
expectation
standard
much
through Can a
Edj
homes
has
makes the
the
the
would to
look
was
that the suggests
with
for
form
we
countryside countryside
follows
been
hi
within
need
housing with
for
developers recently the does
at
rWiric
Playing
and
this hope set
choice
is
this
piece
the
Council
connections
town
sindarçJsetuj!1the
position
the
inexorably
that between
of
a for
out
not
without
an
the
better
master well-deffned the
that
any
biggest
as the
of
granted
unlikely many planning
or become in
fields
sphere
urjtobedeigpd
field
between
belt,
well
work,
do
there community
aslowcreepofdevelopmçaL the
by
scheme
of
help
buildings,
plan
the
not
direction.
residents
field
and Winchburgh
fault boundary
linked
I
as and
planning
of
note was
a a
the area
key.
outlined
slip
tiatted
document.
suburb complete
a
influence
Linlithgow
publTc
at
relationships
boundaries,
with
possible formation
one
from
with. Winchburgh. for
back
I
to
took
a
may
So
or
accommodation.
modem
treatment
plan expansion.
permission,
have
of realm,
in
the lasterp!an
into
should
There
it Masterplan
the
brake
either.
of
go
the
golf
fhat to is
(a
of
master and
a
of
producing
important
to is çclude trouble
great
mix
the between summed
housing.
a
seems
course
it
from
it
of
Of
settled
At
be
of
is
plan
mix
the
to Jack these Academy movement Community The Linlithgow However regarding commercial,industrial,recreation Dear Yours Thank 22 County open Delopmnt Planning Linlithgow Manager ride, FAO- Ff149 West
T updated
MIs Dec.
primary matters.
Lothian Wendy
space,
7F7 sincerely
R
you
Buildings
Thompson,
McCorriston,
the
will
if
2009 Application
in Community
for
Council
there
MeCorriston
proposed road
proposals
Council Managm.nt
and
be &
your
secondary
compromised
around
are
&
in
c-mails Planning
rail
its
Winchburgh
Council future
appear 1012/P/05-
letter
Linlithgow
infrastructure,
schools
of
Secretary
changes
dated
to
Linlithgow 30th
take
and
development.
Outline
at-land Nov
24th
or
into to
retail
it
and
October
the
is
Community
including
C’c
account around
planning
considered
uses,
proposals
December
2005.
Winchurgh
I
community
the
M9
)
for
Council
S
educational concerns
that
junction,
a
and
352ha
may
will
meeting
facilities,
expressed
have
make
train
capacity dcv.
jackti1(;b1ueyonder.couk
I Ref.-pln9-04 1:-mail. El West
14
ci.
inhthgo
149
Clarendon
on
impact
representation mci. 01506
station,
Lothian
landscaping MN
by 15th
at
residential,
842817
Linlithgow Linlithgow
December
on
park Road
traffic
on
& &