Group Housing Project
Total Page:16
File Type:pdf, Size:1020Kb
Project: Commercial Multiplex Building at Sy No.296.297,298, Hayathnagar (V)& (M), Ranga Reddy(Dist), Telangana ENVIRONMENT MANAGEMENT PLAN Or Conceptual Plan ENVIRONMENT MANAGEMENT PLAN Page 1 Project: Commercial Multiplex Building at Sy No.296.297,298, Hayathnagar (V)& (M), Ranga Reddy(Dist), Telangana A. BRIEF DESCRIPTION OF PROJECT IN TERMS OF LOCATION AND SURROUNDINGS 1.1 PROPOSAL OF PROJECT DETAILS We, Sri. ASVM ANJANEYA PRASAD and others are proposing to construct a New Commercial Multiplex Building project at Survey No. 296.297,298, Hayathnagar (Village), Hayathnagar (Mandal), Ranga Reddy (District), Telangana state-501505. Total Land Area : 6230Sq.mts Proposed Built up area : 27315.71 sq.mt. Proposed Height of Buildig : 24meters Estimated Project cost : 50 crores EMP Capital Budget : 1.6 crores EMP Recurring Cost : 30 lakhs Table 1 : Proposed Activities hereunder S.no Type Area Particulars in Square meters 1 Ground Floor Hypermart & Retail Space 3031.53 2 First Floor Hypermart & Retail Space 3123.53 3 Second Floor Hypermart & Retail Space 3123.53 4 Third Floor Movie Theaters 3123.53 5 Fourth Floor Movie Theaters 2260.37 6 Basement -1 Parking area 4217.74 7 Basement -2 Parking area 4217.74 8 Basement-3 Parking area 4217.74 Total Built up Area 27315.71 sq.mt 1.2 PROJECT PROPONENT Sri ASVM Anjaneya Prasad & Others Address: H.no 4-9-666 to 4-9-679, Sy.no.296,297,298, Hayath nagar (Bagh Hayath Nagar), Rangareddy Dist, Telangana- 501505 Email.id. : [email protected] Phone. No. 9052911122 1.3 SITE LOCATION: Survey No. 296.297,298, Hayathnagar (Village), Hayathnagar (Mandal), Ranga Reddy (District), Telangana state-501505. ENVIRONMENT MANAGEMENT PLAN Page 2 Project: Commercial Multiplex Building at Sy No.296.297,298, Hayathnagar (V)& (M), Ranga Reddy(Dist), Telangana Fig. 1. Contour Survey Map of Project Site ENVIRONMENT MANAGEMENT PLAN Page 3 Project: Commercial Multiplex Building at Sy No.296.297,298, Hayathnagar (V)& (M), Ranga Reddy(Dist), Telangana Figure-2 :Google Imagery of project site Fig. 3.Topomap of 5Km Radius Proposed Project Site Features of the Project Site: The project site is plain and covered by sparse vegetation of shrubs and few trees. There are some old Shed like structures already present in the site. They will be removed during the site leveling process. The terrain of the project site and its surrounding area is plain. The site is devoid of any rocky outcrops and is not covered by any notified forests. ENVIRONMENT MANAGEMENT PLAN Page 4 Project: Commercial Multiplex Building at Sy No.296.297,298, Hayathnagar (V)& (M), Ranga Reddy(Dist), Telangana FIG 4: TOPOGRAPHICAL MAP- 10 KM RADIUS OF PROJECT LOCATION Project Site ENVIRONMENT MANAGEMENT PLAN Page 5 Project: Commercial Multiplex Building at Sy No.296.297,298, Hayathnagar (V)& (M), Ranga Reddy(Dist), Telangana Fig 5: PHOTOGRAPHS OF PROJECT SITE ENVIRONMENT MANAGEMENT PLAN Page 6 Project: Commercial Multiplex Building at Sy No.296.297,298, Hayathnagar (V)& (M), Ranga Reddy(Dist), Telangana FIG 6 : MASTER LAYOUT PLAN Project Site ENVIRONMENT MANAGEMENT PLAN Page 7 Project: Commercial Multiplex Building at Sy No.296.297,298, Hayathnagar (V)& (M), Ranga Reddy(Dist), Telangana FIG 7 : ELEVATION PLAN Table 2: Landuse Breakup S.no Type Area( in Square meters) Percentage 1 Plinth Area 3151.5 51.0 2 Green belt area 618.00 9.7 3 Open Area 608.00 9.5 4 Road Areas 1852.50 29.8 Total Area 6230 Sq.mt 100% ENVIRONMENT MANAGEMENT PLAN Page 8 Project: Commercial Multiplex Building at Sy No.296.297,298, Hayathnagar (V)& (M), Ranga Reddy(Dist), Telangana Fig.8: Floor Plans of Building Ground Floor Plan 1st & 2nd Floor Plan ENVIRONMENT MANAGEMENT PLAN Page 9 Project: Commercial Multiplex Building at Sy No.296.297,298, Hayathnagar (V)& (M), Ranga Reddy(Dist), Telangana Theatre Lower Floor Plan Theatre Lower Floor Plan ENVIRONMENT MANAGEMENT PLAN Page 10 Project: Commercial Multiplex Building at Sy No.296.297,298, Hayathnagar (V)& (M), Ranga Reddy(Dist), Telangana B.ENVIRONMENTAL IMPACTS ON PROJECT LAND AND IT’s SURROUNDING DEVLOPMENTS 2.1 Environment Settings of project site are as follows. Table 3: Environment Settings Particulars Details Location of Project Survey No. 296.297,298, Hayathnagar (Village), Hayathnagar (Mandal), Ranga Reddy (District), Telangana state-501505. Land Area Total Land Area : 6230Sq.mts Proposed Built up area : 27315.71 sq.mt. Proposed Height of Buildig : 24meters Estimated Project cost 50 crores Temperature(0C) 450C (max), 180C (min) Nearest Railway station Secunderabad Railwaystation -15km on NW Nearest Airport Rajiv Gandhi International Airport: 20km(South West) Other Historical / Religious places None Defence installations No Ecologically sensitive areas (National Parks / None Wild life sanctuaries / bio-sphere reserves, migratory routes within). Reserved / Protected Forest 1.Mansurabad RF -- 3.0km [North] 2.Gurramguda PF --- 4.0km[SW] 3.Ambarpet RF --- 4.5km[East] 4. Mangalapalli RF --9.5km[South] Nearest Water Bodies Water Bodies The nearby waterbodies are listed below. Musi River ---5.0km [North] Jilavarkhan cheruvu ---3.5km [South] Masab cheruvu ---4.5km[SW] Sarurnagar cheruvu ---- 8.5km [West] ENVIRONMENT MANAGEMENT PLAN Page 11 Project: Commercial Multiplex Building at Sy No.296.297,298, Hayathnagar (V)& (M), Ranga Reddy(Dist), Telangana 2.2 Environmental Impacts of Proposed Project Activity The purpose of the impact assessment study is to provide information on the nature and extent of environmental impacts arising from the proposed project during construction and occupation. This information shall contribute decisions on the following; Overall acceptability of any adverse environmental consequences that are likely to arise as a result of the proposed project. Conditions and requirements for the detailed design, establishment and operation of the proposed project to mitigate against adverse environmental consequences wherever practicable and Acceptability of minimized impacts after the proposed mitigation measures is implemented. The environmental impact assessment of the proposed activity shall cover all developments within the proposed project site and any other works associated with these developments outside the project area. The impact prediction shall include specific impacts namely; air quality impact, water pollution impacts, noise impacts, ecological impact and socio-economic impacts. The impact assessment is carried out for the construction phase and operation phase. 2.3 Air Quality Impacts An assessment of air quality impacts associated with the construction and occupation of the proposed project has been carried out. Worst case impacts on the representative receivers have been assessed. Three major sources of air pollution have been identified namely construction dust emission, road traffic emissions and DG set emissions. a. Construction Phase: Construction works include site clearance, site formation, building works, infrastructure provision and any other infrastructure activities. The major air pollution source during this activity is dust generation as a result of the above activities. b. Occupational Phase: The major sources of air pollutants are the vehicle emissions from traffic on roads internal and neighboring roads, air pollutants emitted from operation of DG sets and other mechanical equipments used for day to day activities proposed at these project. The representative air sensitive receivers within the study area represent the future and existing sensitive receivers likely to be affected by the project. 2.3.1 Construction Phase Impacts The principal potential source of air quality impact arising during construction period is fugitive dust generation. The dust, measurable as PM 2.5 & PM 10 would be generated as a result of construction activities. The construction program of the project shall commence immediately after obtaining statutory clearances. ENVIRONMENT MANAGEMENT PLAN Page 12 Project: Commercial Multiplex Building at Sy No.296.297,298, Hayathnagar (V)& (M), Ranga Reddy(Dist), Telangana The potential dust sources associated with construction activities are loading and unloading of the materials, top soil removal, travel over unpaved roads and wind erosion etc. The construction works associated with the proposed development are broadly given below. 1. Site development and foundation works 2. Dust generation due to vehicles bringing raw materials 3. Un loading of raw materials, removal of un wanted waste material from site 4. Civil constructions and provision of infrastructure required for various activities proposed at each project. Among all the construction activities, site formation has the highest potential for causing dust nuisance to the nearby air sensitive locations. During the construction of the project, existing houses nearby may be subject to the potential dust impacts. 2.3.2 Mitigation Measures proposed For the proposed project, site leveling and grading will be carried out for construction apartments and club house, where ever possible natural elevations will not be disturbed, only leveling activity will be carried out for providing roads, sewage network, storm water system, and places required for providing buildings. According to the engineering assessment; most of the excavated material (for providing basements) shall be reused within the project boundary, if any excess will be disposed through local contractors for filling low lying areas or road laying purposes, etc. The movement of cut and fill material will be limited. Broad estimation shows that there would not be more