Rammam Hydro Power Project, Stage-III (3X40 MW) in District-Darjeeling & West Sikkim State-West Bengal & Sikkim

Total Page:16

File Type:pdf, Size:1020Kb

Rammam Hydro Power Project, Stage-III (3X40 MW) in District-Darjeeling & West Sikkim State-West Bengal & Sikkim ENVIRONMENTAL IMPACT ASSESSMENT/ ENVIRONMENTAL MANAGEMENT PLAN Rammam Hydro Power Project, Stage-III (3x40 MW) in District-Darjeeling & West Sikkim State-West Bengal & Sikkim NTPC Limited (A Government of India Enterprise) July’ 2021 PREPARED BY SV ENVIRO LABS & CONSULTANTS Visakhapatnam Phone: 0891-2755528, Fax: 0891-2755529 Email: [email protected] Recognized by MoEF&CC and QCI – Accredited, Certificate No. NABET/EIA/1821/SA 0118 UNDERTAKING BY CONSULTANT This is to certify that M/s. SV Enviro Labs & Consultants is a NABET & NABL Accredited, ISO 9001:2015 certified company and is recognised by Ministry of Environment, Forest and Climate Change under Environment (Protection) Act, 1986. Further, this Environmental Impact Assessment/ Environmental Management Plan for the Rammam Hydro Electric Project Stage-III (3 x 40 MW) in Darjeeling District of West Bengal and West Sikkim District of Sikkim has been carried out by M/s. SV Enviro Labs & Consultants and the prescribed ToR’s have been complied with and the data submitted in the Final EIA report is factually correct. Thanks and Regards, M. Murali Krishna Managing Partner July, 2021 DECLARATION BY EXPERTS CONTRIBUTING TO THE EIA “Environmental Impact Assessment/ Environmental Management Plan” for the proposed Rammam Hydro Electric Project Stage-III (3 x 40 MW) in Darjeeling District of West Bengal and West Sikkim District of Sikkim I hereby certify that I was a part of the EIA team in the following capacity that developed the above EIA. EIA Co-ordinator : Name : Dr. G.V.A Ramakrishna Signature : Period of Involvement : July’ 2020 to September’2020 Functional Area Experts: S.No Functional Name of the Expert Category Involvement Signature and Date as per (Period and Areas NABET task**) 1 AP * M. Murali Krishna A Air Pollution monitoring, prevention & control 2 WP * V. Hemalatha A Water Pollution monitoring, prevention & control 3 SHW * K. Anitha A Solid waste management 4 SE * Dr. B. Vijay A Socioeconomic Bhaskara Rao studies 5 EB * Dr. M. Tarakeswara A Ecology and Bio- Naidu diversity 6 HG * Dr. G.V.A A Hydrology Ramakrishna 7 GEO * Dr. G.V.A A Geology Ramakrishna 8 SC * D. Sunder Rao A Soil conservation 9 AQ * M. Murali Krishna A Air quality modelling 10 NV * M. Murali Krishna A Noise and vibration 11 LU * Dr. G.V.A A Land use studies Ramakrishna 12 RH * Shaik Kasim A Risk and hazard study Declaration by the Head of the accredited consultant organization/ authorized person I, M. Murali Krishna, hereby, confirm that the above mentioned experts prepared the EIA/EMP for proposed Rammam Hydro Electric Project Stage-III (3 x 40 MW) in Darjeeling District of West Bengal and West Sikkim District of Sikkim. Signature: Name: M. Murali Krishna Designation: Managing Partner Name of the EIA consultant organization: SV Enviro Labs & Consultants NABET Certificate No. & Issue Date: NABET/EIA/1821/SA0118 Dt: 28.09.2020 valid up to 21.07.2021 Certificate of Plagiarism check Environmental Impact Assessment/Environmental Impact Assessment Report for Rammam Hydro Electric Title of EIA Report Project Stage-III (3 x 40 MW) in Darjeeling District of West Bengal and West Sikkim District of Sikkim Name of Accredited Organization SV Enviro Labs & Consultants Unique Identification Number SVELC/EIA/NTPC/FINAL/2021 Name of EIA Co-ordinator (EC) Dr. G.V.A. Ramakrishna Name of the Software Plagiarism Checker X Date of Check 05.07.2021 Time of Check 5:00 PM Declaration by the Head of the accredited consultant organization/authorized person I hereby certify that this EIA/EMP Report has been evaluated using in-house software Plagiarism Checker X version 6.0.11. The report produced has been analyzed by the system and based on it, I certify that the EIA report produced in accordance with good scientific practice. Date and Sign of EIA Coordinator: 06.07.2021 Name: Dr. G.V.A. Ramakrishna Designation: EIA Coordinator Date and Sign of Head of Accredited Organization: 06.07.2021 (M. Murali Krishna) Name of the EIA consultant organization: SV ENVIRO LABS & CONSULTANTS NABET Certificate No. & Issue Date: NABET/EIA/1821/SA 0118 Dt. 28.09.2020 CONTENTS Table of Contents C0-1 List of Tables C0-9 List of Figures C0-12 List of Annexures C0-14 Index of Compliance with TOR for EIA Study – Additional TOR C0-15 Index of Compliance with TOR for EIA Study – Standard TOR C0-20 Chapter I Introduction C1-1 Chapter II Project Description C2-1 Chapter III Description of the Environment C3-1 Chapter IV Anticipated Environmental Impacts &Mitigation Measures C4-1 Chapter V Analysis of Alternatives C5-1 Chapter VI Environmental Monitoring Program C6-1 Chapter VII Additional Studies C7-1 Chapter VIII Project Benefits C8-1 Chapter IX Environment Cost Benefit Analysis C9-1 Chapter X Environmental Management Plan C10-1 Chapter XI Summary and Conclusions C11-1 Chapter XII Disclosure of Consultants C12-1 Doc. No.:9548/999/GEG/S/01 ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR Rev. No.: 1 RAMMAM HYDRO ELECTRIC PROJECT Date: 30/06/2021 STAGE - III (3 x 40 MW) Page No.: C0-1 of 49 TABLE OF CONTENTS S. No. TITLE Page No. Chapter I: Introduction 1.0 General C1-1 1.1 Brief Details of The Project C1-1 1.2 Identification of Project & Project Proponent C1-2 1.3 Hydro Potential C1-3 1.4 Purpose of The Study C1-4 1.5 Brief Description of Nature, Size, Location of The Project C1-5 1.5.1 Nature of The Project C1-5 1.5.2 Size of The Project C1-5 1.5.3 Locations of The Project C1-5 1.6 Background of The Project C1-6 1.6.1 Statutory Clearances C1-6 1.6.2 Current Status of Work C1-7 1.7 Location & Accessibility C1-9 1.8 Need for The Project & its Importance to The Country and Region C1-13 1.8.1 Demand Supply Gap C1-14 1.9 Policy, Legal and Administrative Framework C1-15 1.10 Scope of The Study C1-17 1.11 Environmental Parameters in The Study Area C1-18 1.12 Generic Structure of EIA Document C1-18 Chapter II: Project Description 2.0 General C2-1 2.1 Location of Project C2-1 2.2 Size or Magnitude of Operation C2-3 2.3 Salient Features of The Project C2-6 2.4 Project Description C2-10 2.4.1 Diversion Structure C2-10 2.4.2 Intake and Intake Tunnel C2-13 2.4.3 Desilting Chamber C2-13 2.4.4 Head Race Tunnel (HRT) C2-13 2.4.5 Surge Shaft C2-14 2.4.6 Pressure Shaft C2-14 2.4.7 Power House C2-14 2.4.8 Tail Race Channel C2-14 2.4.9 Hydro-Mechanical Works C2-14 2.4.10 Minimum Flow in The River Downstream of The Barrage C2-15 2.5 Land Requirement C2-16 2.6 Infrastructure Facilities C2-17 0 ‐ 1 Doc. No.:9548/999/GEG/S/01 ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR Rev. No.: 1 RAMMAM HYDRO ELECTRIC PROJECT Date: 30/06/2021 STAGE - III (3 x 40 MW) Page No.: C0-2 of 49 2.6.1 Access Roads C2.17 2.6.2 Construction Materials and Equipment C2-19 2.6.3 Project Township/Colonies C2-20 2.6.4 Water & Power Requirement C2-20 2.6.5 Muck Generation & Disposal C2-20 2.7 Manpower Requirement C2-21 2.8 Project Schedule & Cost Estimates C2-21 Chapter III: Description of the Environment 3.0 Introduction C3-1 3.1 Study area C3-2 3.2 Study period C3-2 3.3 Methodology of EIA study C3-2 3.4 Micro-meteorological data C3-3 3.4.1 Wind Speed and Direction C3-4 3.4.2 Temperature C3-4 3.4.3 Rainfall C3-4 3.4.4 Site Specific Met Data C3-4 3.5 Air Environment C3-7 3.5.1 Selection of Sampling Locations C3-7 3.5.2 Methodology of Sampling and Analysis C3-7 3.5.3 Summary of Existing Ambient Air quality C3-16 3.6 Water Environment C3-17 3.6.1 Surface Water and Ground Water Quality Assessment C3-18 3.6.2 Selection of sampling locations C3-18 3.6.3 Sampling techniques C3-18 3.6.4 Water Sampling Stations C3-21 3.6.5 Surface water Quality Results are Summarized Below C3-29 3.6.6 Groundwater Quality Results are summarized Below C3-29 3.7 Soil Environment C3-30 3.7.1 Selection of Sampling locations C3-30 3.7.2 Sampling and Analytical Techniques C3-30 3.7.3 Summary of Soil analysis Data C3-35 3.8 Noise Environment C3-37 3.8.1 Identification of Sampling Locations C3-37 3.8.2 Methodology C3-37 3.8.3 Description of Locations C3-38 3.8.3.1 Noise Levels in The Study Area C3-38 3.9 Traffic Study C3-42 3.10 Geology and Hydrogeology C3-43 3.10.1 Geological Setting C3-44 3.10.2 Minerals C3-48 3.10.3 Hydrogeological Setting C3-50 3.10.4 Land Slide in The Area C3-52 3.10.5 Seismicity C3-53 0 ‐ 2 Doc. No.:9548/999/GEG/S/01 ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR Rev. No.: 1 RAMMAM HYDRO ELECTRIC PROJECT Date: 30/06/2021 STAGE - III (3 x 40 MW) Page No.: C0-3 of 49 3.10.6 Soils C3-54 3.11 Hydrology C3-54 3.11.1 Objective of The Study C3-55 3.11.2 Rainfall Data C3-56 3.11.3 Water Availability Studies C3-58 3.11.4 Runoff-Runoff Correlation C3-59 3.11.5 Extending Singlabazar flow series based on Rangit Stage-IV data C3-60 3.11.6 Rainfall –Runoff Correlation C3-61 3.11.7 Design Flood Studies C3-62 3.11.8 Dimensionless Unit Hydrograph C3-62 3.11.9 Derivation of synthetic Unit Hydrograph C3-64 3.11.10 Flood Frequency analysis C3-67 3.11.12 Diversion Flood C3-68 3.11.13 Drainage Pattern C3-69 3.11.14 Catastrophic Events like Cloud Burst and Flash Floods C3-69 3.11.15 Sedimentation Data C3-70 3.11.16 Environmental Flow C3-70 3.12 Biological Environment C3-72 3.12.1 Introduction C3-72 3.12.2 Objectives C3-73 3.12.3 Study Area C3-73 3.12.4 Cropping Pattern C3-77 3.12.5 Agriculture production System C3-79 3.12.6 Vegetation Composition in The Study Area C3-81 3.12.7 Methodology C3-84 3.12.8 Secondary Data Collection C3-87 3.12.9 Floristic composition C3-89 3.12.10 Medicinal Plants C3-111 3.12.11 Economically Important Plant Species C3-112 3.12.12 Phytosociology Analysis for Community Structures C3-113 3.12.13 Biodiversity Indices C3-132 3.12.14 Fauna C3-148 3.12.15 Butterflies C3-156 3.12.16 Aquatic Ecology C3-157 3.12.17 Methodology C3-158 3.12.18 Sampling Locations C3-159 3.12.19 Phytoplankton C3-161 3.12.20 Zooplankton C3-163 3.12.21 Macro-Benthic Biota C3-163 3.12.22 Primary Productivity C3-164 3.12.23 Fisheries C3-165 3.12.24 National Parks & Wildlife Sanctuaries C3-168 3.13 Landuse Pattern C3-173 3.13.1 Land Use Pattern-remote sensing Data C3-173 3.13.2 Methodology C3-174 0 ‐ 3 Doc.
Recommended publications
  • Original Research Article DOI - 10.26479/2017.0206.01 BIOLOGY of FEW BUTTERFLY SPECIES of AGRICULTURE ECOSYSTEMS of ARID REGIONS of KARNATAKA, INDIA Santhosh S
    Santhosh & Basavarajappa RJLBPCS 2017 www.rjlbpcs.com Life Science Informatics Publications Original Research Article DOI - 10.26479/2017.0206.01 BIOLOGY OF FEW BUTTERFLY SPECIES OF AGRICULTURE ECOSYSTEMS OF ARID REGIONS OF KARNATAKA, INDIA Santhosh S. & S. Basavarajappa* Entomology Laboratory, DOS in Zoology, University of Mysore, Manasagangotri, Mysore-570 006, India ABSTRACT: Agriculture ecosystems have provided congenial habitat for various butterfly species. The Papilionidae and Nymphalidae family member’s most of their life cycle is depended on natural plant communities amidst agriculture ecosystems. To record few butterflies viz., Papilio polytes, Graphium agamemnon, Ariadne merione and Junonia hierta, agriculture ecosystems were selected randomly and visited frequently by adapting five-hundred-meter length line transects during 2014 to 2016. Study sites were visited during 0800 to 1700 hours and recorded the ovipositing behaviour of gravid female of these butterfly species by following standard methods. Eggs along with the host plant leaves / shoot / twigs were collected in a sterilized Petri dish and brought to the laboratory for further studies. Eggs were maintained under sterilized laboratory conditions till hatching. Newly hatched larvae were fed with their preferred host plants foliage and reared by following standard methods. P. polytes and G. agamemnon and A. merione and J. hierta developmental stages included egg, larva, pupa and adult and these stages have showed significant variation (F=21.35; P>0.01). Further, all the four species had four moults and five instars in their larval stage. However, including larval period, pupal duration was also varied considerably among these species. Further, overall life cycle completed in 43, 32.5 to 40, 21 to 30 and 21 to 29 days by P.
    [Show full text]
  • Indian Minerals Yearbook 2018
    STATE REVIEWS Indian Minerals Yearbook 2018 (Part- I) 57th Edition STATE REVIEWS (Sikkim) (FINAL RELEASE) GOVERNMENT OF INDIA MINISTRY OF MINES INDIAN BUREAU OF MINES Indira Bhavan, Civil Lines, NAGPUR – 440 001 PHONE/FAX NO. (0712) 2565471 PBX : (0712) 2562649, 2560544, 2560648 E-MAIL : [email protected] Website: www.ibm.gov.in November, 2019 11-1 STATE REVIEWS SIKKIM Production No mineral production (except minor minerals) Mineral Resources was reported in 2017-18. The value of minor miner- als production was estimated at ` 188 lakh for the The important mineral resources of the year 2017-18. State are copper-lead-zinc and silver, reported Mineral-based Industry in Bhotang, Rangpo and Dikchu in East Sikkim districts. Occurrences of other minerals SMC, a joint venture of Government of reported in the State include dolomite, quartzite and Sikkim and Government of India was established for the purpose of development of Bhotang polymetallic talc/steatite/soapstone in West Sikkim district; ore deposit at Rangpo. Sikkim's Mines & Geology limestone in North Sikkim district and marble in East Department had set up a pilot dimension rock cutting Sikkim and North Sikkim districts Table -1. The unit and pilot lime making unit to ascertain the reserves/resources of coal and the coalfield located feasibility of setting up of commercial lime plant and in Sikkim are reflected in Table-2. dimension rock cutting plant in the State. A ferro Exploration & Development alloys plant, namely, Akshay Ispat & Ferro Alloys Ltd with an installed capacity of 6,000 tpy is located Details of exploration activities conducted by at Mamring, South Sikkim district.
    [Show full text]
  • Village & Town Directory ,Darjiling , Part XIII-A, Series-23, West Bengal
    CENSUS OF INDIA 1981 SERmS 23 'WEST BENGAL DISTRICT CENSUS HANDBOOK PART XIll-A VILLAGE & TO"WN DIRECTORY DARJILING DISTRICT S.N. GHOSH o-f the Indian Administrative Service._ DIRECTOR OF CENSUS OPERATIONS WEST BENGAL · Price: (Inland) Rs. 15.00 Paise: (Foreign) £ 1.75 or 5 $ 40 Cents. PuBLISHED BY THB CONTROLLER. GOVERNMENT PRINTING, WEST BENGAL AND PRINTED BY MILl ART PRESS, 36. IMDAD ALI LANE, CALCUTTA-700 016 1988 CONTENTS Page Foreword V Preface vn Acknowledgement IX Important Statistics Xl Analytical Note 1-27 (i) Census ,Concepts: Rural and urban areas, Census House/Household, Scheduled Castes/Scheduled Tribes, Literates, Main Workers, Marginal Workers, N on-Workers (ii) Brief history of the District Census Handbook (iii) Scope of Village Directory and Town Directory (iv) Brief history of the District (v) Physical Aspects (vi) Major Characteristics (vii) Place of Religious, Historical or Archaeological importance in the villages and place of Tourist interest (viii) Brief analysis of the Village and Town Directory data. SECTION I-VILLAGE DIRECTORY 1. Sukhiapokri Police Station (a) Alphabetical list of villages 31 (b) Village Directory Statement 32 2. Pulbazar Police Station (a) Alphabetical list of villages 37 (b) Village Directory Statement 38 3. Darjiling Police Station (a) Alphabetical list of villages 43 (b) Village Directory Statement 44 4. Rangli Rangliot Police Station (a) Alphabetical list of villages 49- (b) Village Directory Statement 50. 5. Jore Bungalow Police Station (a) Alphabetical list of villages 57 (b), Village Directory Statement 58. 6. Kalimpong Poliee Station (a) Alphabetical list of viI1ages 62 (b)' Village Directory Statement 64 7. Garubatban Police Station (a) Alphabetical list of villages 77 (b) Village Directory Statement 78 [ IV ] Page 8.
    [Show full text]
  • Trek Itinerary
    SINGALILA RIDGE, INDIA On the Singalila Ridge India © Ann Foulkes, trekMountains Land-only duration: 13 days Grade: Gentle / Moderate Trekking days: 6 days Max altitude: 3636m Price: contact us We can run this on dates to suit you for a minimum group size of 1. Dates: The 2 main trekking seasons are Spring and Autumn. Contact us at [email protected] with your preferred dates UK tel: +44 (0) 7713 628763 tel (outside UK): +39 338 500 9540 email: [email protected] web: www.trekmountains.com skype ID: trekMountains Before Nepal was opened up to the rest of the world, all Everest expeditions started from Darjeeling. There is a rich mix of Indian, Nepalese, Tibetan and Bhutanese cultures. You are likely to meet the Gurkhas of East Nepal, Gurungs from Western Nepal, fair-skinned Sikkimese, Bhutanese as well as Tibetan lamas in yellow robes and Tibetan women in striped aprons and brocades. This trek follows the famous Singalila Ridge, a prominent spur of high ground that lies at the southern end of a long crest, which runs down from the Kangchenjunga massif and forms the border between West Bengal and Nepal. It is a very scenic trek and as you pass through small settlements you will enjoy breathtaking panoramic views of Kangchenjunga, Makalu, Everest and Lhotse to name but a view of the spectacular peaks in this border region. On the Singalila Ridge India © Ann Foulkes, trekMountains OUTLINE ITINERARY Walking and journey times are approximate Day 1 Arrive in Delhi, fly to Bagdogra and drive to We stop for a break and refreshments half way Darjeeling up at Kurseong, before climbing to Ghoom at Arrive Delhi and connect with the 1-hour flight 2438 metres and then descending 300 metres to Bagdogra at the foot of the Darjeeling hills.
    [Show full text]
  • Darjeeling Himalayan Railway
    ISSUE ONE Darjeeling Himalayan Railway - a brief description Locomotive availability News from the line Chunbhati loop 1943 Birth of the Darjeeling Railway Agony Point, sometime around the 1930's Chunbhati loop - an early view Above the clouds Darjeeling Himalayan Railway Society ISSUE TWO News from the line Darjeeling, past and present Darjeeling station Streamliner Himalayan Mysteries The Causeway Incident Tour to the DHR A Way Forward ISSUE THREE News from the line To Darjeeling - February 98 Locomotive numbers Timetable Vacuum Brakes To Darjeeling in 1966 Darjeeling or Bust Covered Wagons ISSUE FOUR Report: Visit to India in September 1998 Going Loopy (part 1) Loop No1 Loop No2 Chunbhati loop Streamliner (part 2) Jervis Bay Darjeeling's history To School in Darjeeling ISSUE FIVE News from the line Going Loopy (part 2) Batasia loop Gradient profile Riyang station Zigzag No1 In Search of the Darjeeling Tanks Gillanders Arbuthnot & Co Tank Wagon ISSUE SIX News from the line Repairing the breach Going Loopy (part 3) Loop No2 Zigzag No1 to No 6 Tour - the DHRS Measuring a railway curve David Barrie Bullhead rail ISSUE SEVEN News from the line First impressions Bogies Bogie drawing New Jalpaiguri Locomotive and carriage sheds New Jalpaiguri Depot Going Loopy (part 4) Witch of Ghoom Colliery Engines Buffing gear ISSUE EIGHT May 2000 celebrations News from the line Best Kept Station Competition Impressions of Darjeeling - Mary Stickland Tindharia (part1) Tindharia Works Garratt at Chunbhati Going Loopy – Postscript In And Around Darjeeling
    [Show full text]
  • South District of Forest Environment & Wildlife Management Department in Their Respective GPU/Ward with Immediate Effect
    GOVERNMENT OF SIKKIM DEPARTMENT OF FOREST ENVIRONMENT & WILDLIFE MANAGEMENT FOREST SECRETARIAT, DEORALI, GANGTOK SIKKIM-737102 No: 606/ADM/FEWMD Dated: 30/01/2019 OFFICE ORDER With the approval of the competent authority, the following employees appointed on temporary ad-hoc basis under “One Family One Job Scheme” are hereby posted under various Divisions South District of Forest Environment & Wildlife Management Department in their respective GPU/Ward with immediate effect:- Sl. POST APPOINTED Reporting NAME CONSTITUENCY GPU/ WARD No. No. FOR Officer Environmental Rangang Lower Togday Ms. Shanti Maya Rai Assistant Yangang Ward DFO (T) 1 South Environmental Nambung Ward DFO (T) 2 Ms. Rekha Subba Temi Namphing Assistant Temi Namphing South Lower Sripatam Environmental Yangyang Mr. Rajesh Dahal Ward, Yangang DFO (T) 3 Assistant Rangang Rangrang South Environmental Rolak Kabey Ward, DFO (T) 4 Mr. Nutan Subba Temi Namphing Assistant Temi Namphing South Ms. Elizabeth Environmental Namchi DFO (T) 5 Rong Ward Gurung Assistant Singhithang South 12 Bermiok Tokal 6 Mr. Bishal Tamang Multi-task Office Staff Temi Namphing GPU Upper Tokal DFO (T) No. 5 South Environmental DFO(WL) 7 Ms. Namrata Nepal Temi Namphing Lower Tarku Assistant South Environmental Salghari Zoom DFO(WL) 8 Mr. Suman Rai Khaling Gaon Ward Assistant (SC) South Lingee Shokpay Environmental Tumin Lingee Mr. Sagar Rai GPU, Maidam DFO(WL) 9 Assistant (BL) Ward South Mr. Devi Charan Environmental Rangang Upper Kolthang DFO(WL) 10 Chettri Assistant Yangang Ward South Environmental Namthang DFO(WL) 11 Mr. Santa Tamang Kolbung Assistant Rateypani South Environmental DFO(WL) 12 Ms. Chabi Maya rai Barfung (BL) Lamten Tingmoo Assistant South Environmental Rangang DFO (E & 13 Ms.
    [Show full text]
  • Facilities of White Water Rafting in West Bengal IJPESH 2020; 7(6): 01-03 © 2020 IJPESH Kousik Biswas and Dr
    International Journal of Physical Education, Sports and Health 2020; 7(6): 01-03 P-ISSN: 2394-1685 E-ISSN: 2394-1693 Impact Factor (ISRA): 5.38 Facilities of white water rafting in West Bengal IJPESH 2020; 7(6): 01-03 © 2020 IJPESH www.kheljournal.com Kousik Biswas and Dr. Susanta Sarkar Received: 01-09-2020 Accepted: 02-10-2020 Abstract Kousik Biswas The objective of the study was to focus on the existing facilities and scope for White Water Rafting, and Research Scholar, Department of the level of facilities available of standard equipment and training in West Bengal. Checklist interview Physical Education, University and valid official data was analysed during the survey study. Result was found that few Non-Government of Kalyani, Kalyani, Nadia, agencies conducted white water rafting for commercial purpose only. They used both Indian and West Bengal, India international rafting gears but amount of equipment was insufficient, no such Government or Non- Government Institution for White water Rafting training. West Bengal Government do not have any Dr. Susanta Sarkar equipment for White Water Rafting. This study may raise the relevant points which are to be addressed Associate Professor, Department by the appropriate authority to elevate the prospect of White Water Rafting in the state of West Bengal. of Physical Education, University of Kalyani, Kalyani, Keywords: White water rafting, equipment, facilities, West Bengal. Nadia, West Bengal, India Introduction Adventure is an exciting experience that is typically a bold, sometimes risky, undertaking. Adventures may be activities with some potential for physical danger. Engaging ourselves in an unusual and exciting, typically hazardous, experience or activity.
    [Show full text]
  • District Election Plan for General Elections 2014
    District Election Plan for General Elections 2014 South District, Sikkim 2 Contents 1 DISTRICT PROFILE ........................................................................................................................................... 8 1.1 GEOGRAPHY ........................................................................................................................................................ 8 1.2 DEMOGRAPHY ...................................................................................................................................................... 8 1.3 ADMINISTRATIVE UNIT ............................................................................................................................................... 9 1.4 ASSEMBLY CONSTITUENCIES IN SOUTH SIKKIM .......................................................................................................... 10 1.4.1 9 – BERFUNG ........................................................................................................................................ 11 1.4.2 10-POKLOK-KAMRANG ........................................................................................................................ 11 1.4.3 11-NAMCHI-SINGHITHANG .................................................................................................................. 13 1.4.4 12-MELLI .............................................................................................................................................. 14 1.4.5 13-NAMTHANG-RATEYPANI ...............................................................................................................
    [Show full text]
  • Observations on Lycaenid Butterflies from Panbari Reserve Forest and Adjoining Areas, Kaziranga, Assam, Northeastern
    Journal of Threatened Taxa | www.threatenedtaxa.org | 26 December 2015 | 7(15): 8259–8271 Observations on lycaenid butterflies from Panbari Reserve Forest and adjoining areas, Kaziranga, Assam, northeastern India ISSN 0974-7907 (Online) ISSN 0974-7893 (Print) Communication Short Monsoon Jyoti Gogoi OPEN ACCESS Ph.D Student, Department of Ecology & Environmental Science, Assam University, Silchar, Assam 788011, India [email protected] Abstract: A checklist of 116 taxa of Lycaenidae (Blues) along with made to document the Lycaenidae notes on important species in low elevation forest of Panbari Reserve, of Kaziranga-Karbi Hills Kaziranga - West Karbi Hills, upper Assam is reported in this paper based on surveys conducted during 2007–2012 and some recent sightings till date. Important sightings include Blue Gem Poritia Methods erycinoides elsiei, Square-band Brownie Miletis nymphys porus, Plain Plushblue Flos apidanus ahamus, Blue Royal Ancema carmentalis, Study area Elwes Silverline Spindasis elwesi, Artipe skinneri, etc. The Panbari Reserve Forest (26036’N & 93030’E) is protected under the Kaziranga National Park (KNP) Keywords: Butterfly diversity, Kaziranga, Lycaenidae, northeastern India, Panbari Reserve. as its fourth addition (Images 1a,b & 2). The average elevation of the forest is around 90m. The altitude however ranges from 70–300 m. The reserve is very close to National Highway 37 (NH37) on the Guwahati- The Lycaenidae (Blues) butterfly diversity in low Jorhat route. The reserve falls between Golaghat and elevation forests of Panbari Reserve, Kaziranga - West Karb Anglong (KA) districts of Assam. To the north of Karbi Hills, upper Assam is reported in this paper. Karbi the reserve lies Dollamora proposed reserve in Karbi Hills constitue a chain of hill ranges lying in middle Assam Anglong District and on the southern boundary is a in the southern bank of the river Brahmaputra.
    [Show full text]
  • Status of USG Clinic of Darjeeling District Sl
    Status of USG Clinic of Darjeeling District Sl. Name of the USG Clinic Address Contact No. License No. License issued License valid Name of the Sonologist Status of the Remarks No. on upto Clinic 1. Mariam Nursing Home N.B. Singh Road, Darjeeling 0354-2254637 CE-17-2002 24-11-1986 31-12-2009 Dr. S. Siddique Functional 2. Anandalok Medical & Hill Cart Road, Siliguri 0353-2510010 CE-18-2002 29-03-2001 31-12-2009 Dr. Shusanta Roy Functional Research Centre Pvt. Ltd. 3. Mitra`s Clinic & Nursing Hakimpara, Siliguri 0353-2431999 CE-23-2002 24-12-2001 31-12-2008 Dr. P. Reddy Functional Home 4. Paramount Hospital Pvt. Ltd. Mangal Panday Road, Khalpara, 0353-2530320 CE-19-2002 28-12-2001 31-12-2009 Dr. J.P. Tayung Functional Siliguri 5. D.D.M.A. Nursing Home 7, Nehru Road, Darjeeling 0354-2254337 CE-16-2002 02-01-2002 31-12-2009 Dr. K. Saha Functional 6. B.B.S. Mediscanner Pvt. Ltd 3, Rashbehari Sarani, Siliguri 0353-2434230 CE-20-2002 09-01-2002 31-12-2009 Dr. Mintu Saha Functional 7. Sono Diagnostic Sagarmatha 7/2/2 Robertson Road, Darjeeling 9832063347 CE-2-2002 13-12-2002 31-12-2009 Dr. Chayanika Nandan Functional Health Enclave 8. Omkar Ultrasonography Anjuman-E-Islamia Building, 0354-2252490 CE-3-2002 05-03-2002 31-12-2009 Dr. K Saha Functional Centre Botanical Garden Road, Darjeeling 9. Suraksha Diagnostic & Eye Ashrampara, Sevoke Road, Siliguri 0353-2530640 PNDT/CE- 28-05-2002 31-12-2009 Dr. Mukti Sarkar Functional Clinic Pvt.
    [Show full text]
  • 7-Day Singalila Ridge / Sandakphu Trek Tour Code: IND-SRS 07
    7 7-Day Singalila Ridge / Sandakphu Trek Tour Code: IND-SRS_07 An easy but rewarding trek which offers spectacular views of the big mountains Grading including Everest and Kanchenjunga. This trek traverses along the Singalila ridge Easy Trek which forms the international border line between India and Nepal. It offers a At a glance good distant view of Mt. Everest (8850 m) accompanied by Lhotse (8501m) and • 05 days of trekking Makalu (8475m) and a close view of Kanchenjunga (8586m). Kanchenjunga • 04 nights in along with the surrounding ranges closely resembles a person sleeping and hence trekker's hut the view from Sandakphu is popularly called 'The Sleeping Buddha'. The Singalila • 02 hotels nights in ridge is actually an extension of one of the ridges that sweep down from the high Darjeeling snows of Kanchenjunga itself and the trek along this ridge is renowned as being Places Visited one of the most scenically rewarding in the entire Himalayas. This area is also • Darjeeling Departure culturally diverse, with Tibetan, Mongolian, and Indians intermixed with 22 Feb-28 Feb, 2015 immigrant Nepalese. Buddhism is the most popular religion and during the course 15 Mar-21 Mar, 2015 of our trip there's immense chance of interaction with the warm locals at 12 Nov-18 Nov, 2015 Trekker's Hut that dot this trail. Quick Itinerary: Day 01: Bagdogra to Darjeeling (2134m) Day 02: Drive Darjeeling to Dhotrey (2460m) and trek to Tonglu (3070m) 2.5 hr drive and 3 hrs trek Day 03: Trek to Kalapokhri (3108m) 6 hrs trek Day 04: Trek to Sandakphu (3636m) 3 hrs trek Day 05: Trek to Gurdum (2400m) 3-4 hrs Day 06: Trek to Sepi (2280m) 3 hrs and drive 4 hrs to Darjeeling Day 07: Drive to Bagdogra 3 hrs X-Trekkers Adventure Consultant Pte Ltd (TA License: 01261) Co.
    [Show full text]
  • Rivers of Peace: Restructuring India Bangladesh Relations
    C-306 Montana, Lokhandwala Complex, Andheri West Mumbai 400053, India E-mail: [email protected] Project Leaders: Sundeep Waslekar, Ilmas Futehally Project Coordinator: Anumita Raj Research Team: Sahiba Trivedi, Aneesha Kumar, Diana Philip, Esha Singh Creative Head: Preeti Rathi Motwani All rights are reserved. No part of this book may be reproduced or utilised in any form or by any means, electronic or mechanical, without prior permission from the publisher. Copyright © Strategic Foresight Group 2013 ISBN 978-81-88262-19-9 Design and production by MadderRed Printed at Mail Order Solutions India Pvt. Ltd., Mumbai, India PREFACE At the superficial level, relations between India and Bangladesh seem to be sailing through troubled waters. The failure to sign the Teesta River Agreement is apparently the most visible example of the failure of reason in the relations between the two countries. What is apparent is often not real. Behind the cacophony of critics, the Governments of the two countries have been working diligently to establish sound foundation for constructive relationship between the two countries. There is a positive momentum. There are also difficulties, but they are surmountable. The reason why the Teesta River Agreement has not been signed is that seasonal variations reduce the flow of the river to less than 1 BCM per month during the lean season. This creates difficulties for the mainly agrarian and poor population of the northern districts of West Bengal province in India and the north-western districts of Bangladesh. There is temptation to argue for maximum allocation of the water flow to secure access to water in the lean season.
    [Show full text]