June 8, 2021 the Honorable Kimberly D. Bose Secretary Federal Energy

Total Page:16

File Type:pdf, Size:1020Kb

June 8, 2021 the Honorable Kimberly D. Bose Secretary Federal Energy June 8, 2021 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street NE Washington, DC 20426 RE: Southwest Power Pool, Inc., Docket No. ER21-___ Submission of Network Integration Transmission Service Agreement and Network Operating Agreement Dear Secretary Bose: Pursuant to section 205 of the Federal Power Act, 16 U.S.C. § 824d, and section 35.13 of the Federal Energy Regulatory Commission’s (“Commission”) regulations, 18 C.F.R. § 35.13, Southwest Power Pool, Inc. (“SPP”) submits: (1) an executed Service Agreement for Network Integration Transmission Service (“Service Agreement”) between SPP as Transmission Provider and Western Area Power Administration - UGP (“WAPA”) as Network Customer (“Sixth Revised WAPA Service Agreement”); and (2) an executed Network Operating Agreement (“NOA”) among SPP as Transmission Provider, WAPA as Network Customer and Basin Electric Power Cooperative (“Basin”), Central Power Electric Cooperative, Inc. (“Central Power”), Corn Belt Power Cooperative (“Corn Belt”), East River Electric Power Cooperative, Inc. (“East River”), Missouri River Energy Services (“MRES”), Northwest Iowa Power Cooperative (“NIPCO”), NorthWestern Corporation (“NorthWestern”) and WAPA as Host Transmission Owners (“Sixth Revised WAPA NOA”).1 The Sixth Revised WAPA Agreements modify and supersede the Service Agreement and NOA among the Parties accepted by the Commission in Docket No. ER20-896-000.2 SPP is submitting this filing because 1 The Sixth Revised WAPA Service Agreement and Sixth Revised WAPA NOA are referred to collectively as the “Sixth Revised WAPA Agreements”, and SPP, WAPA, Basin, Central Power, Corn Belt, East River, MRES, NIPCO and NorthWestern are referred to as the “Parties.” The Sixth Revised WAPA Agreements are designated as “Sixth Revised Service Agreement No. 3126.” 2 See Sw. Power Pool, Inc., Letter Order, Docket No. ER20-896-000 (March 12, 2020) (“March Order”). The Service Agreement and NOA referenced in the March Order are referred to collectively as the “Fifth Revised WAPA The Honorable Kimberly D. Bose June 8, 2021 Page 2 the Sixth Revised WAPA Agreements include terms and conditions that do not conform to the standard form of service agreements set forth in the SPP Open Access Transmission Tariff (“SPP Tariff”).3 I. Description of the Sixth Revised WAPA Agreements Since the March Order, the Parties revised the Fifth Revised WAPA Service Agreement in Section 3.0 of Attachment 1 to make a name correction, and revised Appendix 3 to update the delivery points as a result of the Delivery Point Addition study 2021-February-1284. In addition, the Fifth Revised WAPA Service Agreement was updated to include changes to the pro forma Service Agreement approved by the Commission in Docket Nos. ER20-1687,4 ER20-26995 and ER20- 418.6 These changes conform to the pro forma Service Agreement. To facilitate these changes, the Parties executed the Sixth Revised WAPA Service Agreement, which is submitted herein with the Sixth Revised WAPA NOA. II. Non-Conforming Terms and Conditions The Sixth Revised WAPA Service Agreement retains the non-conforming terms and conditions without modification in Section 7.0; and Sections 8.5, 8.10, and 11.0 of Attachment 1 from the Fifth Revised WAPA Service Agreement.7 These non-conforming terms and conditions were accepted by the Commission in Agreements” and individually as the “Fifth Revised WAPA Service Agreement” and “Fifth Revised WAPA NOA.” 3 See Southwest Power Pool, Inc., Open Access Transmission Tariff, Sixth Revised Volume No. 1 at Attachment F (“pro forma Service Agreement”) and Attachment G (“pro forma NOA”), collectively “the pro forma Agreements.” 4 Sw. Power Pool, Inc., 171 FERC ¶ 61,272 (2020). Section 8.13 was added to Attachment 1 to add language regarding candidate incremental Long-Term Congestion Rights. 5 Sw. Power Pool, Inc., Letter Order, Docket No. ER20-2699-000 (Oct. 1, 2020). Appendix 1 was modified to list the service start date, service end date and firm transmission rights. 6 Sw. Power Pool, Inc., Letter Order, Docket No. ER20-418-000 (Feb. 6, 2020). Attachment 1, Section 8.4.1(b) was modified to change “Schedule 1-A” to “Schedule 1-A1”. 7 The non-conforming terms and conditions are highlighted in Exhibit No. SPP-1. The Sixth Revised WAPA NOA conforms to the pro forma NOA. The Honorable Kimberly D. Bose June 8, 2021 Page 3 the March Order.8 The Sixth Revised WAPA Service Agreement in Appendix 3 also adds the non-conforming reference “Notwithstanding Section 8.4.1 (d, f, g) of Attachment 1, Delivery Points in the Western Interconnect will be provided under Attachment AS of the SPP Tariff” for Delivery Points located in the Western Interconnect to clarify that the Ancillary Services required under the Sixth Revised WAPA Service Agreement are provided under Attachment AS of the SPP Tariff. III. Effective Date and Waiver SPP requests an effective date of June 1, 2021, for the Sixth Revised WAPA Agreements. To permit such an effective date, SPP requests a waiver of the Commission's 60-day notice requirement set forth at 18 C.F.R. § 35.3. Waiver is appropriate because the Sixth Revised WAPA Agreements are being filed within 30 days of the commencement of service.9 IV. Additional Information A. Information Required by Section 35.13 of the Commission’s Regulations, 18 C.F.R. § 35.13: (1) Documents submitted with this filing: In addition to this transmittal letter, SPP includes the following: (i) A clean copy of the Sixth Revised WAPA Agreements; (ii) A redlined copy of the Sixth Revised WAPA Agreements; and (iii) Exhibit No. SPP-1 – Highlighted pages of non-conforming terms and conditions in the Sixth Revised WAPA Agreements. (2) Effective Date: 8 See March Order. 9 See Prior Notice and Filing Requirements Under Part II of the Federal Power Act, 64 FERC ¶ 61,139, at 61,983-84, order on reh’g, 65 FERC ¶ 61,081 (1993) (the Commission will grant waiver of the 60-day prior notice requirement “if service agreements are filed within 30 days after service commences.”); see also 18 C.F.R. § 35.3(a)(2). The Honorable Kimberly D. Bose June 8, 2021 Page 4 As discussed herein, SPP respectfully requests that the Commission accept the Sixth Revised WAPA Agreements with an effective date of June 1, 2021. (3) Service: SPP is serving a copy of this filing on the Parties listed in the Sixth Revised WAPA Agreements. (4) Basis of Rate: All charges for the Sixth Revised WAPA Agreements will be determined in accordance with the SPP Tariff and the Sixth Revised WAPA Agreements. B. Communications: Any correspondence regarding this matter should be directed to: Justin A. Hinton Nicole Wagner Attorney Manager - Regulatory Policy Southwest Power Pool, Inc. Southwest Power Pool, Inc. 201 Worthen Drive 201 Worthen Drive Little Rock, AR 72223 Little Rock, AR 72223 Telephone: (501) 482-2468 Telephone: (501) 688-1642 [email protected] [email protected] Tessie Kentner Managing Attorney Southwest Power Pool, Inc. 201 Worthen Drive Little Rock, AR 72223 Telephone: (501) 688-1782 [email protected] V. Conclusion For all the foregoing reasons, SPP respectfully requests that the Commission accept the Sixth Revised WAPA Agreements with an effective date of June 1, 2021. Respectfully submitted, The Honorable Kimberly D. Bose June 8, 2021 Page 5 /s/ Justin A. Hinton Justin A. Hinton Attorney Southwest Power Pool, Inc. 201 Worthen Drive Little Rock, AR 72223 Telephone: (501) 482-2468 [email protected] Attorney for Southwest Power Pool, Inc. Exhibit No. SPP-1 Non-Conforming Language SERVICE AGREEMENT FOR NETWORK INTEGRATION TRANSMISSION SERVICE BETWEEN SOUTHWEST POWER POOL, INC. AND THE UNITED STATES OF AMERICA, ACTING BY AND THROUGH THE ADMINISTRATOR, WESTERN AREA POWER ADMINISTRATION, DEPARTMENT OF ENERGY, HEREINAFTER CALLED WESTERN-UGP, REPRESENTED BY THE OFFICER EXECUTING THIS CONTRACT, A DULY APPOINTED SUCCESSOR, OR A DULY AUTHORIZED REPRESENTATIVE 7.0 This Service Agreement shall not be assigned by either Party without the prior written consent of the other Party, which consent shall not be unreasonably withheld. However, except in the case of a Federal power marketing agency, either Party may, without the need for consent from the other, transfer or assign this Service Agreement to any person succeeding to all or substantially all of the assets of such Party. However, the assignee shall be bound by the terms and conditions of this Service Agreement. ATTACHMENT 1 TO THE NETWORK INTEGRATION TRANSMISSION SERVICE AGREEMENT BETWEEN SOUTHWEST POWER POOL AND WESTERN AREA POWER ADMINISTRATION, UPPER GREAT PLAINS REGION SPECIFICATIONS FOR NETWORK INTEGRATION TRANSMISSION SERVICE 8.5 Real Power Losses - Transmission The Network Customer shall be responsible for losses in accordance with Attachment M and Section 39.3 (e), Western-UGP Federal Service Exemption, of the Tariff. 8.10 Network Upgrade Charges Network upgrade charges shall be in accordance with Section 39.3 (e), Western-UGP Federal Service Exemption, of the Tariff. 11.0 Other Terms and Conditions Pursuant to Section 39.3(e) of the Tariff, Western-UGP retains the Available Transfer Capability from its Federal Power-Western-UGP in the Upper Missouri Zone (UMZ) to deliver to Statutory Load Obligations, which are not Network Loads of Western-UGP, located outside of the UMZ but within the Transmission Provider’s Transmission System in other Zone(s). These Statutory Load Obligations include various Public Power Districts (e.g. Nebraska Public Power District), Municipalities, and irrigation loads located in Nebraska. APPENDIX 3 WESTERN AREA POWER ADMINISTRATION DELIVERY POINTS Eastern Interconnection (On-System) Western Interconnection (Off-System) Delivery Point Name Ownership Voltage Co- (kV) Supplier Delivery Points on Big Horn County Electric Cooperative (Big Horn) Facilities 1/ Big Horn County Electric Cooperative - Big Horn via Big Horn 230 BPA Big Horn facilities Crow via Big Horn facilities Big Horn 230 Big Horn 1/ Notwithstanding Section 8.4.1 (d, f, and g) of Attachment 1, Delivery Points in the Western Interconnect will be provided under Attachment AS of the SPP Tariff.
Recommended publications
  • Closing Time: a Twenty-Five-Year Retrospective on the Life and Death
    Copyright © 2009 by the South Dakota State Historical Society. All Rights Reserved. MARSHALL DAMGAARD Closing Time A Twenty-five-Year Retrospective on the Life and Death of the University of South Dakota at Springfield Twenty-five years ago, South Dakota Governor William J. Janklow and the state legislature closed the University of South Dakota at Spring- field and converted it into a minimum-security prison. The closing— contested bitterly in the capitol, the courts, and public meeting halls— climaxed almost a century of continuing debates over the existence of the school.1 The community of Springfield had built much of its identity and economy around the school, and residents mourned the loss. Today, the former campus is the site of Mike Durfee State Prison, but memories of the University of South Dakota at Springfield and the fight to keep it alive remain vivid. To visitors, Springfield seems an unlikely place for controversy. The little town is tucked between the softly undulating tallgrass prairie and the slowly rolling Missouri River. Until the mid-nineteenth cen- tury, the area was the domain of the Yankton Sioux Indians, who, un- der their legendary leader Strike-the-Ree, ceded about 14 million acres between the Missouri and Big Sioux rivers with the Treaty of 1858. That treaty, followed closely by the Homestead Act of 1862, triggered a tor- rent of European immigrants—Czechs, Dutch, English, Germans, Ger- mans from Russia (including Hutterites and Mennonites), Russians, Swedes, Norwegians, Poles, Irish, and Austrians—who settled in what became Bon Homme County, Dakota Territory. The newcomers also included many cold-hardy settlers from Canada, plus empire-building Yankees from New England, who leapfrogged through Ohio, Indiana, 1.
    [Show full text]
  • Planning & Development District
    Planning & Development District III Yankton, South Dakota District III Contact Information Planning & Development District III 1808 Summit Street PO Box 687 Yankton, SD 57078 (605) 665-4408 [email protected] Donald Reinesch, Chairman Greg Henderson, Executive Director Table of Contents Introduction ............................................................................................................ 1 Purpose ............................................................................................................................... 1 Strategy Committee ............................................................................................................ 4 Public Review and Comment .............................................................................................. 7 Process ................................................................................................................................ 8 Performance ....................................................................................................................... 8 Section I: Background Information ........................................................................ 11 Economy ........................................................................................................................................ 11 Population ...................................................................................................................................... 19 Geography .....................................................................................................................................
    [Show full text]
  • City of Yankton Commission Meeting
    CITY OF YANKTON 2015_07_13 COMMISSION MEETING YANKTON BOARD OF CITY COMMISSIONERS Regular City Commission Meeting beginning at 7:00 P.M. Monday, July 13, 2015 City of Yankton Community Meeting Room Located at the Technical Education Center • 1200 W. 21st Street • Room 114 I. ROUTINE BUSINESS 1. Roll Call 2. Approve Minutes of regular meeting of June 22, 2015 and Special Meeting Minutes of June 15, 2015 Attachment I-2 3. Schedule of Bills Attachment I-3 4. Proclamation: NFAA Attachment I-4 5. City Manager’s Report Attachment I-5 6. Public Appearances - Special Presentation by Police Chief Paulsen & Lieutenant Brandt II. CONSENT ITEMS 1. Budget Workshop Meeting Dates Consideration of Memorandum #15-169 regarding setting Budget workshop meeting dates on August 11, 12 & 13 Attachment II-1 2. Approving Current Volunteer Firefighter List Consideration of Memorandum #15-160 regarding Approving Additional Members to Volunteer Fire Department Roster per Workers’ Compensation and SDCL requirements Attachment II-2 3. Establish public hearing for sale of alcoholic beverages Establish July 27, 2015, as the date for the public hearing on the request for a Special Events (on-sale) Liquor License for 1 day, August 1, 2015, from Drotzmann & Portillo, LLC (Steve Drotzmann, Partner), d/b/a Rounding 3rd Bar and Casino, 4-H Grounds, Yankton, S.D Attachment II-3 4. Establish public hearing for sale of alcoholic beverages Establish July 27, 2015, as the date for the public hearing on the request for a Special Events (on-sale) Liquor License for 1 day, September 5, 2015, from Drotzmann & Portillo, LLC (Steve Drotzmann, Partner), d/b/a Rounding 3rd Bar and Casino, 302 W 3rd Street to 313 Cedar Street, Yankton, S.D Attachment II-4 5.
    [Show full text]
  • Engaging in a World of Change
    Engaging in a World of Change STATISTICAL APPENDIX UNAUDITED ANNUAL REPORT 2020 WESTERN AREA POWER ADMINISTRATION CONTENTS System data Project data System data . 2 Boulder Canyon Project . 42 Facilities . 3 Central Valley Project . 51 Transmission lines . 4 Loveland Area Projects . 63 Resources . 5 Parker-Davis Project . 80 Power marketing system . 6 Pick-Sloan Missouri Basin Program—Eastern Division . 90 Powerplants . 8 Salt Lake City Area/Integrated Projects . 115 Historical flows . 11 Other projects . 140 Peak firm loads . 12 Central Arizona Project . 142 Power sales . 13 Electrical District 5-to-Palo Verde Hub Project . 145 Purchased power . 19 Falcon-Amistad Project . 146 Purchased transmission services . .. 20 Pacific Northwest-Southwest Intertie . 148 Power customers . 21 Olmsted . 151 Top 25 customers in power sales . .. 24 Provo River Project . 153 Repayment . 26 Washoe Project . 155 Marketing plans and rates . 28 Term definitions . 157 Financial statements Combining statements (by agency) . 32 Combining statements (by power system) . 35 Operating expenses . 39 Summary of power system completed plant . 40 Construction work-in-progress . 41 1 SYSTEM DATA System Profile as of Sept. 30, 2020 ED5-to-Palo Pacific NW-SW Pick-Sloan Salt Lake Boulder Central Central Verde Hub Falcon-Amistad Loveland Area Intertie— Olmsted Parker-Davis Missouri Basin Provo River City Area/ Washoe Eliminations3 Asset Canyon Arizona¹ Valley Projects2 Southern Program— Integrated WAPA total Project portion Eastern Division Projects Powerplants 1 1 11 0 2 20 0 1 2 8 1 11 1 (1) 58 Transmission lines Circuit miles4 52 0 1,356 44 0 3,378 591 0 1,710 7,825 0 2,316 0 0 17,272 Circuit 84 0 2,182 70 0 5,436 950 0 2,751 12,590 0 3,727 0 0 27,790 kilometers4 Land5 Acres 1,168 0 19,536 0 0 35,388 16,818 0 22,011 94,123 0 35,913 0 0 224,957 Hectares 473 0 7,910 0 0 14,327 6,809 0 8,911 38,106 0 14,540 0 0 91,076 Substations 2 10 25 0 0 84 7 0 48 130 0 36 0 (17) 325 1 Coal fired plant ceased operating in November 2019.
    [Show full text]
  • 25654-A-SLZ 2010 S.D. 102 in the SUPREME COURT of THE
    #25654-a-SLZ 2010 S.D. 102 IN THE SUPREME COURT OF THE STATE OF SOUTH DAKOTA * * * * STEVEN WEST #34271, Petitioner and Appellant, v. ROBERT DOOLEY, Warden, Mike Durfee State Prison, Respondent and Appellee. * * * * APPEAL FROM THE CIRCUIT COURT OF THE THIRD JUDICIAL CIRCUIT DEUEL COUNTY, SOUTH DAKOTA * * * * HONORABLE TIM D. TUCKER Judge * * * * CHRIS S. GILES of Ericsson & Giles, LLP Madison, South Dakota Attorneys for petitioner and appellant. MARTY J. JACKLEY Attorney General MAX A. GORS Special Assistant Attorney General Department of Corrections Pierre, South Dakota Attorneys for respondent and appellee. * * * * CONSIDERED ON BRIEFS ON NOVEMBER 16, 2010 OPINION FILED 12/29/10 #25654 ZINTER, Justice [¶1.] Steven West petitioned for a writ of habeas corpus challenging the Department of Correction’s calculation of the time he must serve on two consecutive sentences. The dispute involves the manner of calculating good-conduct credit under SDCL 24-5-1. The habeas court affirmed the Department’s calculation, which applied the statutory formula to each sentence separately. West appeals, arguing that the total time to be served under both sentences should be aggregated before applying the statute. We affirm the Department’s calculation. Facts and Procedural History [¶2.] On July 1, 1998, Steven West was sentenced to 7½ years in the state penitentiary for sexual contact with a child (his “first sentence”). On the same day, he was sentenced to 7½ years for sexual contact with another child (his “second sentence”). The second sentence was to run consecutively to the first. [¶3.] West is an “old-system” inmate because his offenses were committed before July 1, 1996.
    [Show full text]
  • Pharmaciesverification.Pdf
    South Dakota Board of Pharmacy South Dakota Pharmacies; Active, in good standing as of October 5, 2018 This document may be used as a Primary Source Verification Certificate ZIP No PH Type Corporate Name DBA Name Address 1 Address 2 City State Code Phone PIC PIC# Issued Expiration 100-1616 R/I ABERDEEN MEDICAL CENTER PHARMACY dba STATE STREET PHARMACY 105 S STATE ST STE 111 ABERDEEN SD 57401 605-225-1945 ROBIN FISCHER 4513 08/10/1994 06/30/2019 100-1861 LTC ABERDEEN MEDICAL CENTER PHARMACY dba DT PHARMACY 815 1ST AVE SE STE 202 ABERDEEN SD 57401 605-725-4001 JENNIFER DAGGETT 5148 05/03/2004 06/30/2019 ABERDEEN MEDICAL CENTER PHARMACY 100-0517 R/I INC dba UNITED CLINIC PHARMACY 3015 3RD AVE SE ABERDEEN SD 57401 605-225-4001 JOANN WREN 4367 06/30/2019 ABERDEEN MEDICAL CENTER PHARMACY 100-0518 R/I INC dba PLAZA PHARMACY 2201 6TH AVE SE STE 23 ABERDEEN SD 57401 605-225-6344 JONATHAN FLIEHS 5693 06/30/2019 100-1992 T ALIXA RX LLC dba ALIXARX-SKYLINE MILBANK 1103 S 2ND ST MILBANK SD 57252 877- 322-4292 BRIAN DRESSING 4100 04/04/2014 06/30/2019 100-1998 TELEPHARMACY ALIXA RX LLC dba ALIXARX-SKYLINE ARLINGTON 120 CARE CENTER DRIVE PO BOX 280 ARLINGTON SD 57212 877- 322-4292 BRIAN DRESSING 4100 05/28/2014 06/30/2019 100-1999 TELEPHARMACY ALIXA RX LLC dba ALIXARX-SKYLINE MADISON 718 NE 8TH AVE MADISON SD 57042 877- 322-4292 BRIAN DRESSING 4100 05/28/2014 06/30/2019 100-2000 TELEPHARMACY ALIXA RX LLC dba ALIXARX-SKYLINE LAKE NORDEN 803 PARK ST LAKE NORDEN SD 57248 877- 322-4292 BRIAN DRESSING 4100 05/28/2014 06/30/2019 100-2001 TELEPHARMACY ALIXA
    [Show full text]
  • As Requested, Enclosed Are True and Correct Copies of Expert Reports from Three Experts Whom Plaintiff Has Identified and Expects to Call at Trial
    Case 4:18-cv-04056-LLP Document 27 Filed 10/11/18 Page 1 of 1 PageID #: 92 CADWELL SANFORD DEIBERT & GARRY llp LAWYERS Joe W. Cadwdl (Retired) Telephone Steven W. Sanford River Centre (605)33W)828 Douglas M. Deibert 200 East 10^ Street, Suite 200 William C. Garry Sioux Falls, South Dakota 57104 Telecopier Scott PerrenCKjd* (665)336-6036 Stephen 0. Landon Brett A. Lovrlen't Writer's E-Mail Address James S. SImko Shawn M. Nichols [email protected] KtlstI M. Laber Melissa R. Jelen Alex M. Hagen Michelle Stratton Joseph A. Meader * Also adottlea m Icwa t Also sdmitMd n Minnesota October 11,2018 The Honorable Lawrence L. Piersol United States District Judge United States Courthouse 400 S. Phillips Avenue, Room 202 Sioux Falls SD 57104 RE: Winston Brakeall v. Dennis Kaemingk, Bob Dooley, et al. Dear Judge Piersol: As requested, enclosed are true and correct copies of expert reports from three experts whom Plaintiff has identified and expects to call at trial: 1. Professor Christine Hutton, of the University of South Dakota Law School; 2. Professor David Shapiro of Northwestern Law School; and 3. Mr. Jeff Larson, Esq. Sincerely, CADWELL SANFORD DEIBERT & GARRY LLP Alex M. Hagen AMH/lb c: James Moore [via e-mail, with enclosures] Alexis Warner [via e-mail, with enclosures] Case 4:18-cv-04056-LLP Document 27-1 Filed 10/11/18 Page 1 of 4 PageID #: 93 September 14, 2018 TO: Alex Hagen FROM: Jeff Larson SUBJECT: Legal Resources for Penitentiary Inmates You have requested my opinion, based on my career experiences as a criminal defense lawyer, on how the termination of the inmate legal services contract would affect inmates' access to the courts.
    [Show full text]
  • South Dakota History
    VOL. 41, NO. 1 SPRING 2011 South Dakota History 1 Index to South Dakota History, Volumes 1–40 (1970–2010) COMPILED BY RODGER HARTLEY Copyright 2011 by the South Dakota State Historical Society, Pierre, S.Dak. 57501-2217 ISSN 0361-8676 USER’S GUIDE Over the past forty years, each volume (four issues) of South Dakota History has carried its own index. From 1970 to 1994, these indexes were printed separately upon comple- tion of the last issue for the year. If not bound with the volume, as in a library set, they were easily misplaced or lost. As the journal approached its twenty-fifth year of publica- tion, the editors decided to integrate future indexes into the back of every final issue for the volume, a practice that began with Volume 26. To mark the milestone anniversary in 1995, they combined the indexes produced up until that time to create a twenty-five-year cumulative index. As the journal’s fortieth anniversary year of 2010 approached, the need for another compilation became clear. The index presented here integrates the past fifteen volume indexes into the earlier twenty-five-year cumulative index. While indexers’ styles and skills have varied over the years, every effort has been made to create a product that is as complete and consistent as possible. Throughout the index, volume numbers appear in bold-face type, while page numbers are in book-face. Within the larger entries, references to brief or isolated pas- sages are listed at the beginning, while more extensive references are grouped under the subheadings that follow.
    [Show full text]
  • RFP# 193 Service PO#16SC180170
    STATE OF SOUTH DAKOTA AMENDMENT #1 FOR PROVIDER SERVICES BETWEEN Name: Global Tel'Link Corporation South Dakota Department of Corrections Address: 12021 Sunset Hills Road, Suite 100 3200 E. Hwy 34 c/o 500 E. Capitol Ave City/State: Reston, VA 20190 Pierre, SD 57501-5070 Referred to as GTLNendor Referred to as State/SDDOC/DOC THIS AMENDMENT #1 is effective as March 16, 2018 shall amend and revise services to include the Inmate Telephone Service, Mobility Service (Tablet and Pod Kiosks), Video Visitation and Management Solution, and Electronic Payment Solutions (for tablet and video visitation services) in the Agreement dated March 15, 2016, by and between Global Tel' Link Corporation (the Contractor) and the State of South Dakota Department of Corrections (the State). The State hereby enters into this Amendment to the Agreement for services with Vendor in consideration of and pursuant to the terms and conditions set forth herein. WHEREAS, the Parties desire to amend the Agreement to reflect the Terms and Conditions as follows: 1. Term - Unless terminated earlier either pursuant to Section 13 (Default), the Agreement will continue through this first contract renewal term of one year ending March 15, 2019. This agreement may be renewed up to two (2) additional one year terms upon the written agreement of the parties. The Agreement, with the expiration of all renewal terms, ends March 15, 2020. 2. Paragraph 4. Compensation. Conditions under this paragraph remain the same for inmate telephone service and video visitation. Other services are revised as follows: a. Email Messaging (Message Link) Rate is hereby changed from $1.00/email to $.25/email.
    [Show full text]
  • South Dakota Department of Corrections Annual Report FY 2008
    South Dakota Department of Corrections Annual Report FY 2008 2 Table of Contents Mission Statement 5 Message from the Secretary 6 Fiscal Year 2008 Significant Events 8 Organizational Structure 11 Contact Information 12 Budget and Expenditures 13 ADULT CORRECTIONS 15 Adult Facilities 16 South Dakota State Penitentiary and Jameson Annex 16 Mike Durfee State Prison 18 South Dakota Women's Prison 20 Minimum Security Units 22 Community Service 23 Emergency Response and Fire Suppression 24 Work Release 25 Pheasantland Industries 26 Parole Services 28 Board of Pardons and Paroles 29 Community Transition Program 30 JUVENILE CORRECTIONS 31 STAR Academy 32 STAR Academy Admissions 33 Patrick Henry Brady Academy 33 Youth Challenge Center 34 EXCEL 35 QUEST 35 DOC Foster Care 36 Juvenile Community Corrections 37 Grants Programs 39 Juvenile Justice and Delinquency Prevention Act Formula Grants Program 39 Title V 39 Juvenile Accountability Block Grant Program 39 Prison Rape Elimination Act Grant 39 Council of Juvenile Services 40 Corrections Commission 41 Legislative Summary 42 Statistical Information 43 3 4 South Dakota Department of Corrections Mission Statement To protect the citizens of South Dakota by providing safe and secure facilities for juvenile and adult offenders committed to our custody by the courts, to provide effective community supervision to offenders upon their release and to utilize evidence-based practices to maximize opportunities for rehabilitation. The South Dakota Department of Corrections is responsible for the management of the state adult prison system, the state adult parole system and the state juvenile corrections system. This includes juveniles committed to the Department of Corrections and placed in residential out-of-home placement, as well as youth that have completed their correctional placement and are on supervised release (aftercare).
    [Show full text]
  • 2021 Synod Assembly Preliminary Report Packet
    PRELIMINARY REPORT 2021 SOUTH DAKOTA SYNOD ASSEMBLY JUNE 4-5, 2021 Table of Contents PART I – General Information Proposed Assembly Agenda ................................................................................................... 1-2 Synod Assembly Committee and Contributors .......................................................................... 3 Synod Directory Synod staff ...................................................................................................................... 4 Synod Council ............................................................................................................... 4-5 Committees: Support to Ministries, Candidacy, Consultation, Discipline Evangelical Outreach, and Multicultural ............................................................ 5-8 Representatives on Region III & Churchwide Boards ..................................................... 8 Part II – Bishop and Staff Reports Report of Presiding Bishop Elizabeth Eaton .......................................................................... 9-10 Report of Bishop Constanze Hagmaier .................................................................................... 11 Anniversaries, Dedications, Roster Changes (Retirements, Necrology, Resignations, Removal, Ordinations, Transfers, Installations) ................................. 12-15 Report of Associate to the Bishop – Rev. Renee Splichal Larson ............................................ 16 Report of Director of Evangelical Mission – Rev. Jonathan Steiner .........................................
    [Show full text]
  • United States District Court District of South Dakota Southern Division
    Case 4:18-cv-04056-LLP Document 55 Filed 11/16/18 Page 1 of 19 PageID #: 382 UNITED STATES DISTRICT COURT DISTRICT OF SOUTH DAKOTA SOUTHERN DIVISION WINSTON BRAKEALL, Civ. 18 - 4056 Plaintiff, vs. DENNIS KAEMINGK, Secretary of S E C O N D A M E N D E D Corrections, individual and official C O M P L A I N T capacity; BRENT FLUKE, Director of Prison Operations, individual and official capacity; KRIS KARBERG, individual and official capacity; and REBECCA SCHIEFFER, individual and official capacity. Defendants. COMES NOW Plaintiff Winston Brakeall, by and through his attorney, and hereby states and alleges the following for his Complaint: 1) In October 2017, the South Dakota Department of Corrections cut all funding to hire and pay for lawyers who provided essential services to inmates and determined that previously accessible hardcover legal resources would no longer be available. As a substitute, the DOC offered inmates access to an electronic tablet with a pre-loaded electronic database. This decision unlawfully restricts inmates’ fundamental right to open access to the Courts and violates the U.S. Constitution, the Constitution of the State of South Dakota, and federal law. 2) Plaintiff Winston Brakeall (“Brakeall”) has suffered, and will continue to suffer, an actual, cognizable injury as a result of Defendants’ decision to deprive inmates of access to the Courts. 1 Case 4:18-cv-04056-LLP Document 55 Filed 11/16/18 Page 2 of 19 PageID #: 383 3) With this action, Brakeall states claims for declaratory and prospective injunctive relief, pursuant to 28 U.S.C.
    [Show full text]