Additional Financing for the Green Urban and Economic Revitalization Project (RRP PRC 49021-004)

CONTRIBUTION TO THE ADB RESULTS FRAMEWORK

Level 2 Results Framework Indicators No. (Outputs and Outcomes) Targets Methods / Comments 1 Use of roads built or 717,315 New urban roads, rehabilitated roads, and industrial upgraded (average daily park roads operational in , , , and vehicle-kilometers in the ; and non-motorized transport will be first full year of operation) improved. 2 Roads built or upgraded 61.5 New urban roads (8.8 km), rehabilitated urban roads (kilometers) (34.3 km), and urban roads in industrial parks (18.4 km) will be constructed in Hegang, Jixi, Qitaihe, and Shuangyashan; and non-motorized transport will be improved. 3 Urban rail- and bus-based 29.1 Bus priority lanes and upgraded bus stops with mass transit systems built intelligent transport and information systems will be or upgraded (kilometers) implemented in Hegang; 209 electric buses will be purchased, three bus terminals with charging stations will be built, and smart-phone accessible bus route and scheduling will be implemented in Qitaihe. 4 Households with new or 303,000 Raw water intakes upgraded, and water treatment improved water supply plants rehabilitated and upgraded to meet quality (number) standards in Jixi and Qitaihe. Water supply pipes installed and rehabilitated in Jixi, Qitaihe, and Shuangyashan. 5 Households with new or 18,900 New connections to sewers and improved systems of improved sanitation wastewater management in Jixi and Shuangyashan. (number) 6 Wastewater treatment 26,000 Industrial wastewater treatment plants constructed and capacity added or improved operational in Hegang and Jixi. (cubic meters per day) 7 Water supply pipes installed 136.6 Water supply pipes new installation and rehabilitation or upgraded (length of in Jixi, Qitaihe, and Shuangyashan. network in kilometers) 8 Small and medium-sized 30 Number of small and medium-sized enterprise loan enterprise loan accounts accounts opened over the course of the project. opened or end borrowers reached (number) km = kilometer. Sources: Asian Development Bank estimates and feasibility study reports for Hegang, Jixi, Qitaihe, and Shuangyashan.