1)SUMMARY

Project Brick Earth Quarry & Brick Kiln Project Name of Smt. Laxmi Chandra Company / Mine Location VillageKendudhar TalukaSaraipali DistrictMahasamund StateChhattisgarh 1 Mining Lease The brick earth quarry area is 4.882 ha. It is a private Area & Type of owned land. land 2 Geographical co- Corners Latitude Longitude ordinates A 21°22’13.86’’N 82°58’17.02”E B 21°22’13.54’’N 82°58’19.43”E C 21°22’11.15’’N 82°58’19.47”E D 21°22’11.09’’N 82°58’20.75”E E 21°22’09.87’’N 82°58’20.78”E

F 21°22’09.44’’N 82°58’23.98”E G 21°22’08.17’’N 82°58’23.78”E H 21°22’07.48’’N 82°58’23.69”E I 21°22’07.44’’N 82°58’22.28”E J 21°22’04.73’’N 82°58’21.94”E K 21°22’04.84’’N 82°58’21.03”E L 21°22’01.85’’N 82°58’20.77”E M 21°22’06.48’’N 82°58’15.24”E 3 Name of Mahanadi 40 km from the Lease area towards north Rivers/Nallahs/Tan direction. ks/ 4 Name of Reserve There is no wild life sanctuary/national parks exist within Forest(s), Wild life 10 km radius of area under study. 5 TopographySanctuary/ of The area is almost a horizontal plain with the maximum ML area elevation of about 286 m M.S.L while the minimum contour level is 284 m. The general ground slope is towards south of the area. 6 Project Proposal The proposal is for the production of 2509500 Bricks per year. 7 Name of Mineral Brick Earth 8 Ratemined of Production Based on 240 working days, average production per day is (in tons) 10456 Brick. Pre Feasibility Report of Laxmi Brick Earth Quarry, Area- 4.882 Hect.Village- Kendudhar, Tahhil-Saraipali, District – Mahasamund (C.G.) 9 Mineral Reserve The Geological reserve – 97640 M3. in Million Tons Minable reserve – 94210 M3.

10 Life of mine About 29 years

11 Drilling/ Blasting No Drilling and Blasting is required as the project is a brick earth quarry for manufacture of bricks.

12 Mining method Opencast manual mining.

13 Ground water table Ground water table is below at a depth of about 6 meter and intersection excavation of brick earth will be carried out only up to a depth of 2 meters from the surface during the first five year mining tenure. Hence there is no chance of intersection of water table during the mining activities. 14 Drainage pattern/ The general drainage pattern of the area is sub dendritic water courses type. Kunti nala 6 km from lease area.

15 Break-up of Land The total area is 4.882 Ha. Utilization Pattern This is private owned land.

Area under excavation – 0.81 Ha.

Area for soil dumping – 0.108 Ha.

Plantation – 0.108 Ha.

Untouched area - 3.963 Ha. 16 Water requirement As much as about 5KLPD Water will be required for brick & Source making and about 1 KLPD water will be required for sprinkling of water on the haulage road as and when required for the suppression of dust generated due to transport vehicles and for plantation purpose. The source of water is a nearby seasonal river. 17 Solid Small amount of Coal ash will be generated during brick waste/Tailings firing process, which will be stored safely within lease boundary in a pit, will be used for reclamation afterwards.

18 IBM approval : Not applicable Date 19 Cost of project Cost of the project:

(Rs. Lakhs] About 20,00,000 lakhs/- 20 Any Other Not required. (specify) Pre Feasibility Report of Laxmi Brick Earth Quarry, Area- 4.882 Hect.Village- Kendudhar, Tahhil-Saraipali, District – Mahasamund (C.G.) Name and address of the company M/s Laxmi Bricks, Smt. Laxmi Chandra

Village-Kendudhar

Thasil-Saraipali

Dstrict-Mahasamund

Chhattisgarh Registered Office M/s Laxmi Bricks, Smt. Laxmi Chandra

Mahapragya Nagar

Thasil-Saraipali

Dstrict-Mahasamund Mine office M/s Laxmi Bricks, Smt. Laxmi Chandra

Village-Kendudhar

Thasil-Saraipali

Dstrict-Mahasamund Email [email protected] Prospecting Agency Prospecting is not required at this state.

Type of Activity Opencast manual mining

Utilities (Power, water Requirement) No water and power required for mining purpose but about 5 KLPD water is required for brick making.

Manpower Requirement Unskilled labor- 18

2) INTRODUCTION OF THE PROJECT / BACKGROUND INFORMATION

(i) Identification of Project and Project Proponent.

Name of the Project:

Brick Earth Quarry & Brick Kiln Project, Village Kendudhar, Tehsil Saraipali, , - (493558).

Project Proponent

Collector, Mahasamund granted Brick earth quarry for mining of brick earth used for the manufacture of Bricks by using Kiln to M/sLaxmi Bricks resident of District Saraipali, as per collector’s order.

As per Environment Impact Assessment (EIA) Notification, 2006, as mended requires mining projects ( new projects, expansion or modernization of existing projects as also at the stage of renewal of mine lease) with lease area of 5 ha and above, irrespective of the mineral (major or minor ) to obtained prior environment clearance under the provisions thereof. Mining projects with lease area of 5 ha and above and less than 50 ha are categorized as category ‘B’. Pre Feasibility Report of Laxmi Brick Earth Quarry, Area- 4.882 Hect.Village- Kendudhar, Tahhil-Saraipali, District – Mahasamund (C.G.) Category ‘B’ projects are considered by the respective State Level Environment Impact Assessment Authority, notified by MoEF under the EIA Notification, 2006.

Supreme Court of in Special leave petition (C) dated 27th February 2012 directs that “ leases of minor mineral including their renewal for an area less than 25 ha be granted by the states/UTs only after getting environment clearance from the MoEF.

As per MoEF guidelines dated 24.6.2013 considering the guidelines in term of the provisions under '7.I Stage (1) Screening' of EIA Notification, 2006, the borrowing/excavation of 'brick earth' and 'ordinary earth' up to an area less than 5 ha, may be categorized under 'B2' Category.

Further Government of India, Ministry of Environment and Forest issued guidelines dated 24 th Dec 2013 and amendments are made regarding categorization of ‘B’ category projects also referred the guidelines dated 24.06.2013 for mining of minor minerals of mining projects of 'brick earth'.

(ii) Brief Description of Nature of the Project.

The area is covered by soil with scanty vegetation mainly grass. The method of excavation of brick earth will be near surface opencast manual by local labors. The brick earth so excavated will be used for manufacture of bricks.

(iii) Need for the Project and its importance to the country and or region,

Soil bricks are used in all type of construction activities like commercial, industrial and public buildings as well as other physical infrastructure.

(iv) Demand Supply Gap

The growth in India's economy and pollution, coupled with urbanization, has resulted in an increasing demand for residential, commercial, industrial and public buildings as well as other physical infrastructure. For this, bricks play an important role and the demand for bricks is always there.

(v)Demand Supply Analysis

In order to have the great demand for building material, the supply is limited. To fulfill the demand of market the bricks will be supplied in the market.

(vi) Employment Generation (Direct and Indirect) Due to the Project. Unskilled 18 labors will be required for excavation of brick earth, manufacturing of bricks, loading bricks on trucks etc.

3) PROJECT DESCRIPTION (i) Type of Project (including interlinked and interdependent project, if any)

This project is a small brick earth quarry project which is interlinked with brick kiln.

(ii) Location (map showing general location, specific location and project boundary & project site-specific layout) with coordinates.

The brick earth quarry is situated near village Kendudhar, in Tehsil Saraipali, District Mahasamund, of Chhattisgarh State. The area falls in survey of India Toposheet No.64K/15.

The details of the area are as under:

District : Mahasamund, Pre Feasibility Report of Laxmi Brick Earth Quarry, Area- 4.882 Hect.Village- Kendudhar, Tahhil-Saraipali, District – Mahasamund (C.G.) Tehsil : Saraipali,

Village : Kendudhar

Area (ha) : 4.882 Hectares

The coordinates of the area are: Corners Latitude Longitude

A 21°22’13.86’’N 82°58’17.02”E B 21°22’13.54’’N 82°58’19.43”E

C 21°22’11.15’’N 82°58’19.47”E

D 21°22’11.09’’N 82°58’20.75”E E 21°22’09.87’’N 82°58’20.78”E

F 21°22’09.44’’N 82°58’23.98”E G 21°22’08.17’’N 82°58’23.78”E H 21°22’07.48’’N 82°58’23.69”E I 21°22’07.44’’N 82°58’22.28”E J 21°22’04.73’’N 82°58’21.94”E K 21°22’04.84’’N 82°58’21.03”E L 21°22’01.85’’N 82°58’20.77”E M 21°22’06.48’’N 82°58’15.24”E Pre Feasibility Report of Laxmi Brick Earth Quarry, Area- 4.882 Hect.Village- Kendudhar, Tahhil-Saraipali, District – Mahasamund (C.G.) Location Map and Google Map showing coordinates of the lease area is attached with the project report.

(iii) Size or Magnitude of operation.

The mining lease area is 4.882 ha in which the working area is only 0.81 ha and the average production of brick is 2429325 Nos. per day. Hence the size or magnitude of operation is very small.

Drilling

Drilling is not required.

Blasting:

As the project is for brick earth quarry and brick kiln, therefore no blasting is required.

Type of explosives used / to be used.

Explosives are not required.

Storage of explosive (like capacity and type of explosive magazine)

As no blasting will be done hence magazine is not required in the mining area.

(vi) Raw Material/ Consumables Required along with estimated quantity, likely source, marketing area of final product, mode of transport of raw material and finished product.

Only earth (soil) and sand is required as raw material/ consumables. The bricks produced from the mine area will be transported through trucks, tractors etc.

(viii) Availability of water, its source, Energy/power requirement and source should be given.

As much as about 5 KLPD Water will be required for brick construction and about 1 KLPD water will be required for sprinkling of water on the haulage road as and when required for the suppression of dust generated due to transport vehicles and for plantation purpose. Energy/power is not required as the mining activities are carried out in day time only.

Quantity of wastes to be generated (liquid and solid) and scheme for their management/ disposal.

As the brick earth quarry project is interlinked with brick kiln, hence small amount of coal ash will be generated during brick firing process, which will be stored safely within lease boundary in a pit will be used for reclamation afterwards.

Selection of Dumping Site:

No sub grade material is generated hence no dumping site is required.

4) SITE ANALYSIS

(i) Connectivity

The mine area which is near to the Kendudhar village is well connected to Tehsil Saraipali,HQ Mahasamund by all weather good roads. Pre Feasibility Report of Laxmi Brick Earth Quarry, Area- 4.882 Hect.Village- Kendudhar, Tahhil-Saraipali, District – Mahasamund (C.G.) (ii) Land Form, and Land Ownership

The land on which this mining lease is sanctioned is the private owned land in khasra no. 25/1, 120/1, 121, 122, 123, 124, 125, 126, 127, 128, 129, 130, 131, 132/1, 132/2, 132/3, 134, 135/1covering an area of 4.882 ha.

(iii) Topography along with maps

The mining area under study falls in Survey of India Toposheet no. 64 K/15.

The area is almost a horizontal plain with the maximum elevation is about 286 m M.S.L and minimum is 284 m. The general ground slope is towards west direction.

(iv) Climatic data from Secondary Sources

April and May are the hottest months in the area. The temperature rises up to 48°C in the month of May. December and January are the coldest months with temperature falls down to as much as 20° C. The average rainfall in the area is 1200 mm.

(v) Social infrastructure Available

There is no social infrastructure existing at / or in the near vicinity of 1 Km radius of the mining area.

5) PLANNING BRIEF

(i) Planning Concept (type of industries, facilities, transportation etc) town and country Planning / Development authority classification:

The brick earth quarry activity has no other concept except excavation of brick earth for use in manufacturing of bricks.

(ii) Population Projection:

Since there will be hardly any influx of people from outside in the region, hence there will not by any impact on the population projection of the region accept the normal increase in population.

(iii) Land Use Planning

Area of brick earth mining is only 4.882 ha. It is non forest, private owned land situated near the village Kendudhar, a thinly populated village. Land use planning details area as under:

Area under excavation – 0.81ha.

Area under plantation – 0.108ha.

(iv) Assessment of Infrastructure Demand (Physical & Social):

Since there will not be any major influx of people from outside, in this region because of the project, no adverse effect on physical and social infrastructure like roads, electricity, water supplies etc are anticipated.

6) PROPOSED INFRASTRUCTURE

(i) Industrial Area (Processing Area): Pre Feasibility Report of Laxmi Brick Earth Quarry, Area- 4.882 Hect.Village- Kendudhar, Tahhil-Saraipali, District – Mahasamund (C.G.) There is no proposal for any infrastructure development.

(ii) Residential

There is no plan for development of residential area in the region.

(iii) Green Belt

Plantation will be carried preferably on the lease boundary and along the road used as haulage

(iv) Social Infrastructure