(iii) If repair works required inside running wards I cabins of hospitals are restricted by hospital authority in writingfor duration less than usual working hours an extra rate of 10% will be allowed (iv) Iffor unavoidable circumstances. works are to be done in emergency cases at night, extra rate @10% will be applicable to items of night work only strictly under certificate of Engineer- in• Charge. (v) For works at Bhutni under Manikchawk FS. in MaIda District Extra 15% (Fifteen per cent) over and above the rates provided in this schedule is allowed

D-3 Ratesfor rehabilitation works in heritage structure I monuments (except buildings in use for Govt. or similar offices) requiring careful expert quality conscious mistries under guidance of experts, may be 25% higher than the Schedule rate for corresponding items considering wastage of labour and lesser output, with specific permission from Superintending Engineer of Concerned Circle.

D-4 5% (Five percent) extra in respect of works within Couai-I, Contai-ll, Contai- Ill, Khejuri-l, Nandigram- 1, Nandigram- II.Sutahata-I, Sutahata-II panchayat samity under East Midnapore District will be allowed on the whole schedule excepting those under section-/ (A) Earth works etc. (B) Dismantling and cutting chase, holes etc. (N) Thatch, Mud and Bamboo works and whole of Section-II. Extra in respect of works within following Police station will be allowed on (the whole schedule except• ing those under section-l (A) Earth works etc. (B) Dismantling and cutting chase, holes etc (N) Thatch, Mud and Bamboo works and whole of Section-II. [Additional 5% (Five percent) for Durgachak, Haldia and Digha Police station area. 20% (twenty percent) extra for Nayachar Island (developed on the midst of Hooghly river under the Administrative control of D. M East Midnapore on the whole schedule.

D-5 Rates of the items under- Section - IExcluding (0 Sub-Section (A) & (B) and (ii) items involving labour only in Sub-Section (C) to (T) are to be enhanced by

(i) 20%for works in the following places (a) Hill area ofGarubathan Block (b) Kalimpong Municipal Area (c) Dow hill area of Sub-Division (d) Miric BIa:k (e) Section from Mane Bhanjan to Phalut of Simana Phalut Road (f) Section from Pes hoke Khola to Lopchu Tea Garden of S. H No. 12 (g) within 10 km. from Mongpu under Takda Block (h) Ghoom Tiger Hill Road (i) Section Pankhabari Bazar to the Starting of Kurseong Municipal Road ofGaridhura- Kurseong Road 0) Kalimpong Block 1111and Mongpo & Takda Block. k)B!janbari Block I) Sukia Pokhri Block.

(ii) 20% of works in thefollowing places= (a) Municipal area (b) Kurseong Municipal area (excluding Dow Hill area) (c) Rangit (d) Health Centers at Singritam, , Lodhama, Takling, Gitdabling, Samathahar. Saimolbong & Sittong.

The rates under sections stated above for Jalpaiguri district are to be enhanced by 15%for works in BoxaHills.

The rates for all types of concrete works. masonry works and sand cement plastering in the District of Uttar Dinajpur and Dakshin Dinajpur have been arrived at with the consideration that Bans/oi sand

B-46 , .

'\

PREFACE

In continuation of U 0. No. 332/SPW/2013 d at ed 31.11.2013 of the Principal Secretary of PWD and subsequent U. O. No. 1143-ENC/13 date 02.12.2013 & No. JJ67-ENC/13 dated 05.12.2013 of the Engineer-in- Chief & Ex-officio Secretary of PWD, the Combined Schedule of Rates in 3 (three) Volumes was published on 01.07.2014.

Again, it was felt that a PWD Combined Schedule of Rates need to be published after amalgamation of all addenda & corrigenda published till 30.10.2015 in order to avoid handling problem and reducing the probability of committing error during preparation of estimates, as well. So, the Combined Schedule of Rates was published on 01.12.2015.

Now, after promulgation of CST from 01.07.2017, it wasfelt to revise the rates of all items considering only the basic price (i. e. exclusive of CST). CST is to be added later on. Sample Abstract sheet for preparing DPR given herein after (Annexure 'X~.

For incorporation of CST Act, 2017, the Construction Labour Welfare Cess (/%) which was included within rate of itempreviously has been extractedfrom the entire items.

In addition to above, all items in Chapter (U)-ADDITIONAL ITEMS, addenda & corrigenda published beforepublication of PWDschedule 2015, has beenplaced in other relevant existing chapters tofacilitate users.

This will take effect on &from 01.1l.201 7.

All efforts have been takenfor keeping this publication errorfree. However, effective suggestion for any correction, addition & alteration is always welcomefor anyfurther betterment.

At last, we on behalf of the Schedule committee would like to convey our sincere thanks to those Engineer Officers who have co-operated with suggestions and also expect fruitful comments & suggestionsfrom all corners infuture, as ever.

RI BHATTACHARYA) Superintending Engineer Superintending Engineer Superintending Engineer Engineer-in-Chief Bridge Planning Circle Survey& Design Circle Planning & Monitoring Circle Public Works Department Member of the Combined Member of the Combined Convener of the Combined Chairman of the Combined ScheduleCommittee PW Ole. Schedule Committee PW Ole. Schedule Committee PW Ote. & Schedule Committee PW Ole. & &PW(Roads) Ole. & PW (Roads) Ote. PW (Roads) Dte. PW (Roads) Ole.