UP Booklet Shrawasti.Cdr
Total Page:16
File Type:pdf, Size:1020Kb
NORTH CENTRAL RAILWAY Shri Narendra Modi Hon'ble Prime Minister SHRAWASTI PARLIAMENTARY CONSTITUENCY Uttar Pradesh, the most populous state of Nation is served by North Central Railway along with Northern, North Eastern Rajiv Chaudhry and East Central Railways. Indian Railways (IR) plays a very General Manager important role in development of the state and provides North Central Railway connectivity for freight and passengers, including international tourists. IR has a history of more than 160 years in the state and has the highest route kilometers - 9100 route kilometers - within it, which is 14% of entire railway network. IR has made Uttar Pradesh proud by giving it Nation's first semi high speed train Gatimaan Express, which initially ran between Agra and Delhi. It has now been extended upto Jhansi - a move that will boost tourism in Bundelkhand region of Uttar Pradesh. After Gatiman the nation's first engineless semi high speed train set "Vande Bharat Express" is now serving Uttar Pradesh running from New Delhi to Varanasi. Efforts for further development of railway infrastructure in Uttar Pradesh have been intensified in last five years with 911% more investment in coparison to previous years. Results of such a massive investmentare becoming visible with enhanced infrastructure and modern passenger amenities. Soon the era of congestion and inconvenience will be matter of past and a new Railway equipped with state-of-the art facilities will be able to serve the citizens in a better manner and provide them enhanced value for their money. The longest stretch of the under construction Eastern Dedicated Freight Corridor i.e. almost 57% of the entire length lies in Uttar Pradesh from Pt. Deen Dayal Upadhyaya Jn. to Ghaziabad. In this brochure, we have compiled the important contributions and achievements of Indian Railways in the development of the SHRAWASTI constituency of Uttar Pradesh in the last five years. I hope that it will serve as a ready reckoner for those eager to know about the role of Railways in the development of this constituency. It may be noted that the budgets allocated to various projects are not apportioned constituency wise but reflect the cost of the project. INPUTS BY RAILWAY IN SHRAWASTI PARLIAMENTARY CONSTITUENCY SHRAWASTI PARLIAMENTARY CONSTITUENCY A. ASSEMBLY SEGMENTS: Gainsari, Balrampur, Bhinga, Shrawasti, Tulsipur B. WORKS COMPLETED IN LAST FIVE YEARS: 1. Infrastructural Developments: G Gauge conversion of Gonda-Barhni (107 km) at a cost of Rs. 44138 Lakh. Limited Height Subway in lieu of G LC No. 133C on Kauwapur-Ganjahwa section at a cost of Rs. 89 Lakh. G LC No. 134C on Kauwapur-Ganjahwa section at a cost of Rs. 67 Lakh. 2. Improvements in Passenger Amenities: G100% LED lights provided on Station at Pachperwa, Gainsari-Jn, Tulsipur, Kauwapur, Laiburwa, Balrampur & Gaijahwa at a cost of Rs. 49 Lakh. GLeveling & widening of circulating area, improvement of mela waiting hall with proper lighting arrangement etc. at a cost of Rs. 28.54 Lakh. GBalrampur- Pay and use toilet in Circulating area at a cost of Rs. 20 Lakh. GAt Tulsipur Station : Toilets in waiting room at a cost of Rs. 15 Lakh. GWaiting room at a cost of Rs. 15 Lakh. G03 Ticket Windows at a cost of Rs. 4 Lakh. GTrain Display Boards provided at Tulsipur & Balrampur at a cost of Rs. 7.20 Lakh. GGainsari- Work of pump house & boundary wall with connecting pipe line at a cost of Rs. 31.00 Lakh. GTulsipur & Balrampur: Provision of Auto Announcement System at a cost of Rs. 11.00 Lakh. GTulsipur:Stainless Steel Railling, parking sinages, SS benches, dustbin etc. at a cost of Rs. 10.00 Lakh. GProvision of shallow tubewell, storage tank and pipe line conection on 6 nos. D class stations & 14 No. E class station at a cost of Rs. 145.00 Lakh. GProvision of toilet, Railing and other facilities for Divyang Passengers on 30 stations at a cost of Rs. 229.00 Lakh. GProvision of SS dustbins at D and E category stations (400 nos.) at a cost of Rs. 20.00 Lakh. GProvision of addl. 200 nos. stainless steel benches with RCC Grouting at a cost of Rs. 50.00 Lakh. GGorakhpur-Anandnagar-Gonda & Anandnagar- Nautanwa Electrification. (261.61 RKM) at a cost of Rs. 23213.00 Lakh. C. OTHERS DEVELOPMENTS New trains having stoppages over Shrawasti constituency: GTrain No.11079/11080 Lokmanya Tilak T.-Gorakhpur Weekly Express. GTrain No.12571/12572 Gorakhpur- - Anandvihar (T) four days a week Humsafar Express. GTrain No. 15009/15010 Gorakhpur - Gomtinagar Express. GTrain No. 15069/15070 Gorakhpur-Badshahnagar Express has been introduced. GTrain No. 75007/75008 Gorakhpur-Gonda DEMU. GTrain No.15067/15068 Gorakhpur-Bandra (T) Weekly Express. GTrain No.15063/15064 Gorakhpur-Lokmanya Tilak (T) Weekly Express. GTrain No.15065/15066 Gorakpur-Panvel Express (Four days a week). GTrain No.15705/15706 Katihar Jn. Delhi Bi-Weekly Express. GTrain No.11111/11112 Gwaliar-Gonda Weekly Express. GTrain No. 55049/55050 Gorakhpur-Gonda Passenger. GTrain No. 75007/75008 Gorakhpur-Gonda Passenger. GTrain No. 75005/75006 Gorakhpur-Gonda Passenger. GTrain No. 55031/55032 Gorakhpur-Gonda Passenger. B1. ONGOING WORKS: GBahraich - Shravasti - Balrampur (Tulsipur) (80 km) New Line, at a cost of Rs. 1,60,000 Lakh. GBalrampur, Basti & Lucknow- Watering Hydrants at a cost of Rs. 197.6 Lakh. Limited Height Subway ROB in lieu of GBarhni-Trilokpur- Road over bridge in lieu of level crossing No. 87 at a cost of Rs. 3501.96 Lakh. GLC no. 89/C at km. 114/8-9 between Barhni-Pachperwa stations at a cost of Rs. 243.86 Lakh. GLC no. 90/C at km. 116/4-5 between Barhni-Pachperwa stations at a cost of Rs. 244.03 Lakh. GLC no. 139/C at km. 183/1-2 between Intyathok-Balrampur stations at a cost of Rs. 243.62 Lakh. GLC no. 93/C at km. 120/12-13 between Tulsipur -Pachperwa stations at a cost of Rs.243.58 Lakh. GLC no.124/C at km. 153/5-6 between Tulsipur-Kauwapur stations at a cost of Rs. 243.94 Lakh. GLC no.129/C at km. 160/9-10 between Tulsipur-Kauwapur stations at a cost of Rs. 243.47 Lakh. GLC no.135/C at km. 177/3-4 between Kauwapur-Gainjahwa stations at a cost of Rs. 243.49 Lakh. Gorakhpur-Gomtinagar Express Inaugural Train on Newly Gauge Converted Barhni -Gonda Section Humsafar Express Flagging off of Susashan Express at Balrampur Station.