ECOLOGY and FISH YIELD POTENTIAL of SELECTED RESERVOIRS of KARNATAKA Ecology and Fish Yield Potential of Selected Reservoirs of Karnataka
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Situation Report Nature of Hazard: Floods Current Situation
India SITUATION REPORT NATURE OF HAZARD: FLOODS In Maharashtra Bhandara and Gondia were badly affected but situation has improved there. Andhra Pradesh situation is getting better in Khamam, East and West Godavary districts. Road connectivity getting restored and Communication is improving. People from the camps have started returning back. Flood Situation is under control as the Rivers in Andhra Pradesh are flowing at Low Flood Levels. In Surat situation is getting much better as Tapi at Ukai dam is flowing with falling trend In Maharashtra River Godavari is flowing below the danger level. In Maharashtra Konkan and Vidharbha regions have received heavy rainfall. Rainfall in Koyna is recorded at 24.9mm and Mahableshwar 18mm in Santa Cruz in Mumbai it is 11mm. The areas which received heavy rainfall in last 24 hours in Gujarat are Bhiloda, Himatnagar and Vadali in Sabarkantha district, Vav and Kankrej in Banskantha district and Visnagar in Mehsana. IMD Forecast; Yesterday’s (Aug16) depression over Orissa moved northwestwards and lay centred at 0830 hours IST of today, the 17th August, 2006 near Lat. 22.00 N and Long. 83.50 E, about 100 kms east of Champa. The system is likely to move in a northwesterly direction and weaken gradually. Under its influence, widespread rainfall with heavy to very heavy falls at few places are likely over Jharkhand and Chhattisgarh during next 24 hours. Widespread rainfall with heavy to very heavy falls at one or two places are also likely over Orissa, Vidarbha and east Madhya Pradesh during the same period -
Live Storage Capacities of Reservoirs As Per Data of : Large Dams/ Reservoirs/ Projects (Abstract)
LIVE STORAGE CAPACITIES OF RESERVOIRS AS PER DATA OF : LARGE DAMS/ RESERVOIRS/ PROJECTS (ABSTRACT) Completed Under Construction Total No. of No. of No. of Live No. of Live No. of Live No. of State/ U.T. Resv (Live Resv (Live Resv (Live Storage Resv (Live Total No. of Storage Resv (Live Total No. of Storage Resv (Live Total No. of cap data cap data cap data capacity cap data Reservoirs capacity cap data Reservoirs capacity cap data Reservoirs not not not (BCM) available) (BCM) available) (BCM) available) available) available) available) Andaman & Nicobar 0.019 20 2 0.000 00 0 0.019 20 2 Arunachal Pradesh 0.000 10 1 0.241 32 5 0.241 42 6 Andhra Pradesh 28.716 251 62 313 7.061 29 16 45 35.777 280 78 358 Assam 0.012 14 5 0.547 20 2 0.559 34 7 Bihar 2.613 28 2 30 0.436 50 5 3.049 33 2 35 Chhattisgarh 6.736 245 3 248 0.877 17 0 17 7.613 262 3 265 Goa 0.290 50 5 0.000 00 0 0.290 50 5 Gujarat 18.355 616 1 617 8.179 82 1 83 26.534 698 2 700 Himachal 13.792 11 2 13 0.100 62 8 13.891 17 4 21 J&K 0.028 63 9 0.001 21 3 0.029 84 12 Jharkhand 2.436 47 3 50 6.039 31 2 33 8.475 78 5 83 Karnatka 31.896 234 0 234 0.736 14 0 14 32.632 248 0 248 Kerala 9.768 48 8 56 1.264 50 5 11.032 53 8 61 Maharashtra 37.358 1584 111 1695 10.736 169 19 188 48.094 1753 130 1883 Madhya Pradesh 33.075 851 53 904 1.695 40 1 41 34.770 891 54 945 Manipur 0.407 30 3 8.509 31 4 8.916 61 7 Meghalaya 0.479 51 6 0.007 11 2 0.486 62 8 Mizoram 0.000 00 0 0.663 10 1 0.663 10 1 Nagaland 1.220 10 1 0.000 00 0 1.220 10 1 Orissa 23.934 167 2 169 0.896 70 7 24.830 174 2 176 Punjab 2.402 14 -
Integrated State Water Plan for Lower Bhima Sub Basin (K-6) of Krishna Basin
Maharashtra Krishna Valley Development Corporation Pune. Chief Engineer (S.P) W.R.D Pune. Integrated state water Plan for Lower Bhima Sub basin (K-6) of Krishna Basin Osmanabad Irrigation Circle, Osmanabad K6 Lower Bhima Index INDEX CHAPTER PAGE NO. NAME OF CHAPTER NO. 1.0 INTRODUCTION 0 1.1 Need and principles of integrated state water plan. 1 1.2 Objectives of a state water plan for a basin. 1 1.3 Objectives of the maharashtra state water policy. 1 1.4 State water plan. 1 1.5 Details of Catchment area of Krishna basin. 2 1.6 krishna basin in maharashtra 2 1.7 Location of lower Bhima sub basin (K-6). 2 1.8 Rainfall variation in lower Bhima sub basin. 2 1.9 Catchment area of sub basin. 3 1.10 District wise area of lower Bhima sub basin. 3 1.11 Topographical descriptions. 5 1.11 Flora and Fauna in the sub basin. 6 2.0 RIVER SYSTEM 2.1 Introduction 11 2.2 Status of Rivers & Tributaries. 11 2.3 Topographical Description. 11 2.4 Status of Prominent Features. 12 2.5 Geomorphology. 12 2.6 A flow chart showing the major tributaries in the sub basin. 13 3.0 GEOLOGY AND SOILS 3.1 Geology. 16 3.1.1 Introduction. 16 3.1.2 Drainage. 16 3.1.3 Geology. 16 3.1.4 Details of geological formation. 17 K6 Lower Bhima Index 3.2 Soils 18 3.2.1 Introduction. 18 3.2.2 Land capability Classification of Lower Bhima Sub Basin (K6). -
Water Resources Department Performance Budget
GOVERNMENT OF KARNATAKA WATER RESOURCES DEPARTMENT (MAJOR, MEDIUM IRRIGATION AND CADA) PERFORMANCE BUDGET 2017-18 JUNE 2017 1 PREFACE The Administrative Reforms Commission set up by the Government of India, inter alia, recommended that Department/Organizations of both the Centre and the States, which are in charge of development programmes, should introduce performance budgeting. In accordance with this suggestion, the Water Resources Department has been publishing performance budget from the year 1977-78. The performance budget seeks to present the purpose and the objective for which funds are requested, the cost of the various programmes and activities and quantitative data, measuring the work performed or services rendered under each programme and activity. In other words, performance budget represents a work plan conceived in terms of functions, programmes, activities and projects with the financial and physical aspects closely interwoven in one document. It may be mentioned here that, in the performance budget compiled now, an attempt has been made to relate the traditional budget to the programmes and activities. Suggestions for improvements are welcome and these would be gratefully received and considered while publishing the performance budget in the coming years. Bangalore Principal Secretary to Government June 2017 Water Resources Department 2 INTRODUCTION Performance budgeting helps in focusing attention on programmes, activities and their costs as also the performance in both physical and financial terms. Having regard to the merits of the technique, the Government of Karnataka has decided to adopt the system. As is inherent in the technique of performance budgeting, programme has been presented giving brief particulars of the programme, irrigation potential activity, classification and source of finance. -
Assessment of Water Quality Changes in Krishna River of Andhrap Radesh Through Geoinformatics
International Journal of Recent Technology and Engineering (IJRTE) ISSN: 2277-3878, Volume-7, Issue-6C2, April 2019 Assessment of Water Quality Changes in Krishna River of Andhrap radesh Through Geoinformatics Lakshman Kumar.C.H, D. Satish Chandra, S.S.Asadi Abstract--- Pancha Boothas are Life and Death for the are permissible in river water but exceed their level its Environment. In that any one is Disrupted that can be Escort to causes several diseases for users and Toxic elements, excess the danger of environment. Water is the one of the Pancha nutrients create vadose zones in river courses [5]. Most of Boothas. Quality of the water is very crucial in the present and the assured irrigation in India is surface water of rivers. It is future users. Natural issues and manmade activities are depending on the water quality. The ratio of transportation of essential to monitor and assess the water quality in the fresh water in liquid form to covert useless form is 70%. The Krishna river course. ratio of sedimentation is also one of the parameter of the water quality, if changes are happen in sedimentation the quality of the Notations: water also changes. The causes of water pollution source are GDSQ: Gauge Discharge Sediment and Water Quality many, of which sewage discharge, industrial effluents, agricultural effluents and several man made activities are play a GDQ : Gauge Discharge Water Quality key role on water quality. The total percentage of water in the pH : Potential of Hydrogen world is 97% in Oceans and reaming 3% of water in form of EC : Electric Conductivity glaciers, in which the consumption of water quantity is in form of CO3 : Carbonate surface and subsurface water bodies. -
Karnataka Commissioned Projects S.No. Name of Project District Type Capacity(MW) Commissioned Date
Karnataka Commissioned Projects S.No. Name of Project District Type Capacity(MW) Commissioned Date 1 T B Dam DB NCL 3x2750 7.950 2 Bhadra LBC CB 2.000 3 Devraya CB 0.500 4 Gokak Fall ROR 2.500 5 Gokak Mills CB 1.500 6 Himpi CB CB 7.200 7 Iruppu fall ROR 5.000 8 Kattepura CB 5.000 9 Kattepura RBC CB 0.500 10 Narayanpur CB 1.200 11 Shri Ramadevaral CB 0.750 12 Subramanya CB 0.500 13 Bhadragiri Shimoga CB M/S Bhadragiri Power 4.500 14 Hemagiri MHS Mandya CB Trishul Power 1x4000 4.000 19.08.2005 15 Kalmala-Koppal Belagavi CB KPCL 1x400 0.400 1990 16 Sirwar Belagavi CB KPCL 1x1000 1.000 24.01.1990 17 Ganekal Belagavi CB KPCL 1x350 0.350 19.11.1993 18 Mallapur Belagavi DB KPCL 2x4500 9.000 29.11.1992 19 Mani dam Raichur DB KPCL 2x4500 9.000 24.12.1993 20 Bhadra RBC Shivamogga CB KPCL 1x6000 6.000 13.10.1997 21 Shivapur Koppal DB BPCL 2x9000 18.000 29.11.1992 22 Shahapur I Yadgir CB BPCL 1x1300 1.300 18.03.1997 23 Shahapur II Yadgir CB BPCL 1x1301 1.300 18.03.1997 24 Shahapur III Yadgir CB BPCL 1x1302 1.300 18.03.1997 25 Shahapur IV Yadgir CB BPCL 1x1303 1.300 18.03.1997 26 Dhupdal Belagavi CB Gokak 2x1400 2.800 04.05.1997 AHEC-IITR/SHP Data Base/July 2016 141 S.No. Name of Project District Type Capacity(MW) Commissioned Date 27 Anwari Shivamogga CB Dandeli Steel 2x750 1.500 04.05.1997 28 Chunchankatte Mysore ROR Graphite India 2x9000 18.000 13.10.1997 Karnataka State 29 Elaneer ROR Council for Science and 1x200 0.200 01.01.2005 Technology 30 Attihalla Mandya CB Yuken 1x350 0.350 03.07.1998 31 Shiva Mandya CB Cauvery 1x3000 3.000 10.09.1998 -
FM Holds Inter-Ministerial Meeting on Banning Sugar Futures Sugarcane
NEWS FLASH –24th August, 2016 SUGAR FM holds inter-ministerial meeting on banning sugar futures Finance Minister Arun Jaitley on Monday held an inter-ministerial consultation on imposing ban on sugar futures trading in an effort to curb speculation and check price rise of the sweetener during festival season. MoS for Food C L Chaudhary, secretaries from Food, Consumer Affairs, Agriculture and finance ministries were present in the meeting. The meeting comes in the backdrop of the Food and Consumer Affairs Ministry recommending the regulator Sebi to ban sugar futures trade to check prices. Sugar prices in the retail markets have risen in last few weeks and are ruling at Rs 42 per kg in the national capital. “We discussed about banning sugar futures trading in the meeting called by the FM. It was an initial discussion and nothing was decided,” Chaudhary told Press Trust of India after the meeting. Food Secretary Vrinda Sarup echoed the same and said: “Nothing has been finalised on banning sugar futures.” Sugar is largely traded on leading agri-commodity bourse National Commodity and Derivatives Exchange (NCDEX). The exchange has already raised the margin amount to be deposited by both sellers and buyers on its platform. To check prices, the government recently imposed an export duty of 20 per cent on sugar as part of its efforts to curb outbound shipments and boost domestic supply. India’s sugar production is estimated to decline to 25 million tonnes in the 2015-16 season (October-September) from 28.3 million tonnes in the previous year. The outlook for the next year is not encouraging as sugar production is pegged lower at 23.26 million tonnes. -
KPCL POWER PROJECTS in KARNATAKA Installed Capacity Sl.No Power Stations Units X MW
KPCL POWER PROJECTS IN KARNATAKA Installed capacity Sl.No Power Stations Units x MW A. HYDRO PROJECTS Cauvery River Basin Sir Sheshadri Iyer Hydro Electric Station 4x6 1 42.00 ( Shivanasamudram) 6x3 2 Shimsha Hydro Electric Station 2x8.6 17.20 Total 59.20 Sharavathy valley Project 3 Linganamakki Dam Power House 2 x 27.5 55.00 4 4x21.6 Mahathma Gandhi Hydro Electric Station 139.20 4x13.2 5 Sharavathi Generating Station 10 x 103.5 1035.00 Total 1229.20 Gerusoppa Hydro Electric Project 6 Gerusoppa Dam Powerhouse 4 x 60 240.00 Kali Hydro Electric Project 7 Supa Dam Powerhouse 2x50 100.00 8 Nagjari Powerhouse 5x150+1x135 885.00 9 Kadra Dam Powerhouse : 3 x 50 =150 3 x 50 150.00 10 Kodasalli Dam Powerhouse : 3 x 40=120 3 x 40 120.00 Total 1255.00 Varahi Hydro Electric Project 11 Mani Dam Powerhouse 2x4.5 9.00 12 Varahi UGPH :4 x 115 =460 4 x 115 460.00 Total 469.00 Krishna Basin Project 13 1X15 Almatti Dam Power House 290.00 5x55 Mini Hydro Electric Project Bhadra Project 14 1x7.2 Bhadra Right Bank Canal Powerhouse 13.20 1x6 15 2 x12 Bhadra Left Bank Canal Powerhouse 26.00 1x2 16 2x9 Munirabad Power House(Thunga Bhadra Basin) 28.00 1x10 17 Ghataprabha Dam Powerhouse 2 x 16 32.00 18 Mallapur Mini Hydel Scheme 2x4.5 9.00 19 Sirwar Mini Hydel Scheme 1x1 1.00 20 Kalmala Mini Hydel Scheme 1 x 0.40 0.40 21 Ganekal Mini Hydel Scheme 1 x 0.35 0.35 Total 109.95 Total Hydro 3652.35 B. -
6. Water Quality ------61 6.1 Surface Water Quality Observations ------61 6.2 Ground Water Quality Observations ------62 7
Version 2.0 Krishna Basin Preface Optimal management of water resources is the necessity of time in the wake of development and growing need of population of India. The National Water Policy of India (2002) recognizes that development and management of water resources need to be governed by national perspectives in order to develop and conserve the scarce water resources in an integrated and environmentally sound basis. The policy emphasizes the need for effective management of water resources by intensifying research efforts in use of remote sensing technology and developing an information system. In this reference a Memorandum of Understanding (MoU) was signed on December 3, 2008 between the Central Water Commission (CWC) and National Remote Sensing Centre (NRSC), Indian Space Research Organisation (ISRO) to execute the project “Generation of Database and Implementation of Web enabled Water resources Information System in the Country” short named as India-WRIS WebGIS. India-WRIS WebGIS has been developed and is in public domain since December 2010 (www.india- wris.nrsc.gov.in). It provides a ‘Single Window solution’ for all water resources data and information in a standardized national GIS framework and allow users to search, access, visualize, understand and analyze comprehensive and contextual water resources data and information for planning, development and Integrated Water Resources Management (IWRM). Basin is recognized as the ideal and practical unit of water resources management because it allows the holistic understanding of upstream-downstream hydrological interactions and solutions for management for all competing sectors of water demand. The practice of basin planning has developed due to the changing demands on river systems and the changing conditions of rivers by human interventions. -
Why Do Interstate Water Disputes Emerge and Recur? an Anatomy of Ambiguities, Antagonisms and Asymmetries
Pre-publication Draft Why do interstate water disputes emerge and recur? an anatomy of ambiguities, antagonisms and asymmetries Srinivas Chokkakula Centre for Policy Research, New Delhi [email protected] (To be published under RULNR monograph series, CESS, Hyderabad) Srinivas Chokkakula Pre-publication Draft Acknowledgements This monograph has taken much longer than initially planned. The research presented here is part of my dissertation work, and I have planned to publish this soon after submitting the dissertation (for my Ph D from the University of Washington, Seattle, USA) in 2015. The earlier draft received some useful and critical inputs, which set me on revising it substantially and also increasing its scope. It is now considerably improved and I hope that it will be received with interest. I express my deep gratitude to two individuals on this account: Dr Radha D’Souza for her critical review and discussion of the draft, and Dr Gopinath Reddy at CESS for his extraordinary patience and undeserving belief in me and my work. I am also thank Prof Gopal Kadekodi for his comments on an earlier version of the draft. I thank my colleagues at the Centre for Policy Research (CPR), New Delhi, for conversations, inputs and support at different stages of producing this research. I am grateful to Dr Pratap Bhanu Mehta and Dr Partha Mukhopadhyay for their unstinting support. I have been fortunate to benefit from generous conversations with late Prof Ramaswamy Iyer on the subject. I have also benefitted from interactions with several professional colleagues engaged directly with interstate water disputes resolution. I want to particularly acknowledge the enthusiastic the generous support of Mr Mohan Katarki. -
MINUTES of 41St ESZ EXPERT COMMITTEE MEETING for THE
MINUTES OF 41st ESZ EXPERT COMMITTEE MEETING FOR THE DECLARATION OF ECO-SENSITIVE ZONE (ESZ) AROUND PROTECTED AREAS (WILDLIFE SANCTUARIES/NATIONAL PARKS/TIGER RESERVES) & ZONAL MASTER PLAN (ZMP) THROUGH VIDEO CONFERENCING (VC) HELD ON 23RD TO 24TH JUNE, 2020. The 41st Meeting of the Expert Committee on Eco-Sensitive Zone / Eco-sensitive Area was held under the Chairmanship of Shri Ravi Agrawal, Additional Secretary during 23rd to 24th June, 2020 through Video Conferencing. List of participants is Annexed. Day 1: (23 rd June 2020) 2. At the outset, the Chairman welcomed the Expert Committee Members & representatives from the States of Himachal Pradesh, Maharashtra, Haryana, and Punjab. After a brief introduction, Chairman invited States to present their proposals as per Agenda items ad seriatim. 3. Following 11 proposals for Eco-Sensitive Zone listed in the agenda were taken up for discussions. S. State/UT Protected Area Status N. Maharashtra Katepurna Wildlife Sanctuary Draft proposal Maharashtra Pranhita Wildlife Sanctuary Draft proposal Maharashtra Chaparala Wildlife Sanctuary Draft proposal Maharashtra Tamhini Wildlife Sanctuary Re-notified draft proposal Himachal Manali Bird Sanctuary Re-notified draft proposal Pradesh Himachal Kugti Sanctuary Wildlife Sanctuary Re-notified draft proposal Pradesh Himachal Kalatop-Khajjiar Wildlife Sanctuary Re-notified draft proposal Pradesh Himachal Kibber Wildlife Sanctuary Re-notified draft proposal Pradesh Proposal at pre-Draft Haryana Sukhna Wildlife Sanctuary stage Proposal at pre-Draft Punjab Sukhna Wildlife Sanctuary stage Mukundra Hills Tiger Reserve Rajasthan Draft proposal Sanctuary 4. The representatives of respective State Governments presented their ESZ proposal for consideration of the Expert Committee. State-wise discussions are summarized below; MAHARASHTRA 4.1 Katepurna Wildlife Sanctuary, Maharashtra Shri Vivek Khandekar, CCF, Forest Department, Govt. -
Ans: a 2. Which
Techofworld.In Techofworld.In 1. Which of the following hydroelectric project constructed on the river Krishna? A. Almatti Dam B. Baspa Hydro-Electric Project C. Bhadra Reservoir Project D. Chamera Hydro-Electric Project Ans: A Explanation: The Almatti Dam is a hydroelectric project on the Krishna River in North Karnataka, India which was completed in July 2005. Hence, A is the correct option. 2. Which of the following power project of Gujarat equipped with power generating sets manufactured by Bharat Heavy Electricals Limited? A. Subarnarekha Project B. Ukai Project C. Sardar Sarovar Project D. Ramganga River Project Ans: B Explanation: The Ukai Dam, constructed across the Tapti River, is the second largest reservoir in Gujarat after the Sardar Sarovar. It is also known as Vallabh Sagar. Constructed in 1972, the dam is meant for irrigation, power generation and flood control. It was manufactured by Bharat Heavy Electricals Limited was inaugurated on October 12, 1977.Hence, B is the correct option. Techofworld.In Techofworld.In 3. Match the following Set I a. Tungabhadra Project b. Tehri Dam Project c. Subarnarekha Project d. Sharavati Project Set II 1. Located near the Gersoppa falls 2. Jharkhand, Odisha, West Bengal 3. River Bhagirithi 4. Joint undertaking by the governments of Andhra Pradesh and Karnataka Code: a b c d A. 1 2 3 4 B. 4 3 1 2 C. 4 3 2 1 D. 4 1 3 2 Ans: C Explanation: The correct matching is given below: Tungabhadra Project: It is joint undertaking by the governments of Andhra Pradesh and Karnataka. Tehri Dam Project: The World’s fifth and Asia’s largest hydroelectric project has been constructed on river Bhagirithi, a tributary of Ganga in Tehri district of Uttaranchal.