LALISA WATTA SCHOOL

Donor: THE GOVERNMENT OF JAPAN

Partner: BUREAU OF EDUCATION

Program/Project Name: IMPROVEMENT SANITATION FACILITES AND RENOVATION OF SCHOOLS FOR IDP Design & Implemented By: UNOPS, OPERATIONAL HUB

(ARCHITECTURAL DRAWING PACKAGE)

1 REV -01 30 JULY 2020 UNOPS-ETOH UNOPS - ETOH.

DONOR Government of Japan PARTNER Z:\Desktop\Photo 2-PS.jpg Z:\Desktop\Photo 1- PS.jpg Education Bureau PROJECT Improvement of Sanitation Facilities and Renovation of School for IDP Lalisa Watta School LOCATION Oromia Regional State Woreda Wereda SCALE DRAWING TITLE 1:100 LIST OF DRAWINGS DATE July. 2020 REG. NO. SIGN. DR NO. Designed by A.G. AR FIN Drawn by A.S. Checked by B.M. 00/19 Approved by S.M. Legend 1. Proposed classroom block 2. Proposed classroom block 3. Informal shaded area 1377 m 4. Proposed Administration Block with Lavatories for Teachers and Staff (Septic Tank underneath) 5. Proposed Lavatories for students Separate buildings (Septic Tank underneath) 6.Existing New Classroom (relatively) 7. Existing old classroom 1376 m 8. Existing administration building 9. Proposed fenced ground water reservoir Perimeter Fence and water tank 25 Main Gate 10. Proposed Outdoor assembly area 3210 26 FFL.1376.50m 17 11. Proposed Playground 28 FFL.1375.25m 389 2960 12. Water Points 5382 635 FFL.1375.00m 24 3390 FFL.1376.25m FFL.1375.50m 13. Proposed library, laboratory and guidance counseling FFL.1375.00m 20 14. Multi purpose hall including feeding center and kitchen 637 276 22 23 FFL.1375.25m 15. Sports field 3097 892 FFL.1375.25m 16. Existing dry pit latrine - to be demolished 28 2501 FFL.1375.50m 24 18 FFL.1376.00m 8 24 678 FFL.1375.25m 17. Main Gate (Students' Access) 3022 FFL.1375.50m 947 941

876 18. Official Gate (pedestrian) FFL.1376.25m FFL.1375.50m 7 19 4 ±0.00 22 FFL.1375.25m 686 3022

19. Flag pole FFL.1375.25m +0.15 16 413.6m 941 20. Vehicular access 851 1051 297 1375.25m 568 21. Bore hole 297 10 1375.25m 1758 3506 13 6 FFL.1375.25m 22. Paved walkway 10227 96.1m 1010 FFL.1375.50m ±0.00 22 1375.25m 1051 23. Proposed parking (vehicle and/or carts and horses FFL.1376.50m ±0.00 22 24. Proposed Green area maintaining existing trees 2165 27 1375.25m FFL.1377.00m

Steel Pergola 2 25. Minor road 1748 FFL.1375.50m 4967 Steel Pergola ±0.00 26. Prospective Highway 3

Steel Pergola

4967 27. Outdoor Education Area 1 A FFL.1376.00m FFL.1375.25m 1 28. Proposed Security guard house FFL.1375.50m FFL.1377.50m ±0.00 24 29. Future Expansion area 240 FFL.1377.00m FFL.1375.25m FFL.1378.00m 30. Horticulture and education center 9 11 A 930 1051 22 1 0 28 N 31. Service Gate FFL.1375.50m 1962 767 4878 FFL.1375.25m 4045 22 5b

FFL.1376.50m 11 300 1782

14 5a 8000 FFL.1375.50m 22 782

23 12 FFL.1375.50m FFL.1377.50m 3964 300 323 1378 m Loading/ 1018 Unloading 31 15 26 22 FFL.1375.50m

10000 29 22 1375m 1376 m 22

FFL.1377.00m

14725 22 22 21

11270 300 FFL.1375.50m 112.9m 806

1379 m

22 30

126.8m 1 REV -01 30 JULY 2020 UNOPS-ETOH UNOPS - ETOH.

DONOR Government of Japan 1376 m PARTNER 123.3m Oromia Education Bureau PROJECT Improvement of Sanitation Facilities and Renovation 1375 m of School for IDP Lalisa Watta School LOCATION Oromia Regional State East Welega Zone Woreda Sasiga Wereda SCALE DRAWING TITLE 1:1000 MASTER PLAN MASTER PLAN DATE July. 2020 SC 1:1000 REG. NO. SIGN. DR NO. Designed by A.G. AR FIN Drawn by A.S. Checked by B.M. 01/19 Approved by S.M. 1377 m

NEW CONSTRUCTION 1. Proposed classroom block - 1 1376 m 2. Proposed classroom block - 2 4. Proposed Administration Block with Lavatories for Teachers and Staff Perimeter Fence 5a. Proposed Lavatories for Boy students 5b. Proposed Lavatories for Girl students 25 Main Gate 9. Proposed fenced ground water reservoir 3210 26 FFL.1376.50m 17 12. Proposed Water Points 28 FFL.1375.25m 2960 389 5382 635 17. Main Gate (Students' Access) FFL.1375.00m 24 3390 FFL.1376.25m FFL.1375.50m 20. Vehicular access FFL.1375.00m

276 20 21. Bore hole 637 22 23 FFL.1375.25m 3097 892 28 2501 FFL.1375.50m FFL.1375.25m 24 18 FFL.1376.00m 8 FFL.1375.25m 24 678 3022 FFL.1375.50m 947 941

876 FFL.1376.25m FFL.1375.50m 7 19 4 ±0.00 22 FFL.1375.25m 686

FFL.1375.25m 3022 +0.15 16 413.6m 941 851 297 1051 1375.25m 568

297 10 1375.25m 1758 3506 13 6 FFL.1375.25m 10227 96.1m FFL.1375.50m 1010 ±0.00 22 1375.25m 1051 FFL.1376.50m ±0.00 22 2165 27 1375.25m FFL.1377.00m

Steel Pergola 2 1748 FFL.1375.50m 4967 Steel Pergola ±0.00 3

Steel Pergola

4967 1 A FFL.1376.00m FFL.1375.25m 1 FFL.1375.50m FFL.1377.50m ±0.00 24

240 FFL.1377.00m

FFL.1375.25m FFL.1378.00m 9 11 A 930 1051 22 1 0 28 N FFL.1375.50m 1962 767 4878 FFL.1375.25m 4045 22 5b

FFL.1376.50m 11 300 SITE PLAN 1782 SC 1:500 5a 14 FFL.1375.50m 8000 22 782

23 12 FFL.1375.50m FFL.1377.50m 3964 300 323

1378 m 1 REV -01 30 JULY 2020 UNOPS-ETOH Loading/ UNOPS - ETOH. DONOR 1018 Government of Japan Unloading PARTNER 31 15 Oromia Education Bureau PROJECT Improvement of Sanitation Facilities and Renovation 26 of School for IDP Lalisa Watta School LOCATION 22 FFL.1375.50m Oromia Regional State East Welega Zone Woreda Sasiga Wereda 10000 SCALE DRAWING TITLE 1:500 22 SITE PLAN DATE 29 July. 2020 1375m REG. NO. SIGN. DR NO. Designed by A.G. AR FIN Drawn by A.S. 1376 m Checked by B.M. 02/19

22 Approved by S.M. FFL.1377.00m

14725 A B C D E F G H I J J' K L M 4967 150 397 392 X 378 378 392 397 397 Y392 378 378 392 397 150 6% Ramp up 6% Ramp up Steel column supporting the roof 6% Ramp up Steel column supporting the roof Steel column supporting the roof ±0.00 ±0.00 ±0.00 F.F. Polished Cement Screed F.F. Polished Cement Screed F.F. Polished Cement Screed

1 21 21 F.F. Polished Cement Screed 161 F.F. Polished Cement Screed 161 161 161 22 154 66 154 22 128 154 88 22 154 48 154 22 154 48 154 22 88 154 128 22 154 66 154 22 154 66 154 22 128 154 88 22 154 48 154 22 154 48 154 22 88 154 128 22 154 66 154 22 150 +0.15 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 150 248 248 248 248 248 248

2 22 22 22 22 22

D1 88 D1 D1 88 D1 D1 88 D1 D1 88 D1 23 23 23 23 22 110 44 792 44 110 22 21 110 44 792 44 110 22 22 110 44 792 44 110 22 110 44 792 44 110 22 140 22 +0.15 1144 22 1144 +0.15 24 +0.15 1144 22 1144 +0.15 22 140

Classroom - 1 Classroom - 1 Classroom - 1 Classroom - 1 Area: 75m2 Area: 75m2 Area: 75m2 Area: 75m2 F.F. Polished Cement Screed F.F. Polished Cement Screed F.F. Polished Cement Screed F.F. Polished Cement Screed 710 686 686 686 686 686 710 1051 1051 598 598 598 598 Fire Escape Route Fire Escape Route Fire Escape Route Fire Escape Route White board - 90*152 cm White board - 90*152 cm White board - 90*152 cm White board - 90*152 cm

W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 Adjustable desk for PWD Adjustable desk for PWD Adjustable desk for PWD Adjustable desk for PWD

3 22 22 22 22 22 22 22 140 22 154 66 154 22 128 154 88 22 154 426 154 22 88 154 132 22 154 66 156 22 154 66 154 22 128 154 88 22 154 426 154 22 88 154 128 22 154 66 154 22 140

+0.15 150 F.F. Polished Cement Screed F.F. Polished Cement Screed F.F. Polished Cement Screed F.F. Polished Cement Screed 150 160 160 160 160 160 160 160 4 20 20 Steel column supporting the roof Steel column supporting the roof +0.15 F.F. Polished Cement Screed ±0.00 6% Ramp up 1375m 150 397 392 378 378 392 397 397 ±0.00 X 4967 Y

stone walkway on grass Informal teaching area ±0.00 ±0.00 A B 116 m2 C D E ±0.00 F G H I J J' K L M K K 4967 stone walkway on grass X Y 150 397 392 378 378 392 397 397 392 378 378 392 397 150 6% Ramp up 6% Ramp up 6% Ramp up F.F. Polished Cement Screed ±0.00 ±0.00 CLASS ROOM BLOCK FLOOR PLAN ±0.00 +0.15 +0.15 F.F. Polished Cement Screed F.F. Polished Cement Screed F.F. Polished Cement Screed

Sc. 1:100 1 21 21

F.F. Polished Cement Screed 161 161 F.F. Polished Cement Screed 161 22 154 66 154 22 128 154 88 22 154 48 154 22 154 48 154 22 88 154 128 22 154 66 154 22 154 66 154 22 128 154 88 22 154 48 154 22 153 48 154 22 88 154 128 22 154 66 154 22 150 +0.15 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 150 248 248 248 248 248 248

2 22 22 22 22 22 22

D1 88 D1 D1 88 D1 D1 88 D1 D1 88 D1 23 23 23 23 22 110 4438 44 110 22 21 110 44 38 44 110 22 22 110 4438 44 110 22 110 44 3844 110 22 140 22 +0.15 1144 22 1144 +0.15 24 +0.15 1144 20 1144 +0.15 22 140

Classroom - 1 Classroom - 1 Classroom - 1 Classroom - 1 Area: 75m2 Area: 75m2 Area: 75m2 Area: 75m2 F.F. Polished Cement Screed F.F. Polished Cement Screed F.F. Polished Cement Screed F.F. Polished Cement Screed 710 686 686 686 686 686 686 710 1051 1081 598 598 598 598 Fire Escape Route Fire Escape Route Fire Escape Route Fire Escape Route White board - 90*152 cm White board - 90*152 cm White board - 90*152 cm White board - 90*152 cm

W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 Adjustable desk for PWD Adjustable desk for PWD Adjustable desk for PWD Adjustable desk for PWD 22 22 3 22 22 22 22 140 22 154 66 154 22 132 154 88 22 154 426 154 22 88 154 132 22 154 66 154 24 154 66 154 22 128 154 88 22 154 426 154 22 88 154 128 22 154 66 154 22 140

+0.15 150 F.F. Polished Cement Screed F.F. Polished Cement Screed F.F. Polished Cement Screed F.F. Polished Cement Screed 150 160 160 160 160 160 160 160 4 20 50 Steel column supporting the roof Steel column supporting the roof Steel column supporting the roof ±0.00 150 397 392 378 378 392 397 397 392 378 378 392 397 150 ±0.00 X 4967 Y

CLASS ROOM BLOCK FLOOR PLAN Sc. 1:100

1 REV -01 30 JULY 2020 UNOPS-ETOH UNOPS - ETOH.

DONOR Government of Japan PARTNER Oromia Education Bureau PROJECT Improvement of Sanitation Facilities and Renovation of School for IDP Lalisa Watta School LOCATION Oromia Regional State East Welega Zone Woreda Sasiga Wereda SCALE DRAWING TITLE 1:100 CLASS ROOM BLOCK - FLOOR PLAN DATE July. 2020 REG. NO. SIGN. DR NO. Designed by A.G. AR FIN Drawn by A.S. Checked by B.M. 03/19 Approved by S.M. A B C D E F G H I J J' K L M 4967 X Y 150 397 392 378 378 392 397 397 392 378 378 392 397 150

±0.00

1 21 21 150 150 2

EGA Sheet Roofing 710 710 1051 1051 EGA Sheet Roofing

3 134 150 150 4 20 20 30

150 397 392 378 378 392 397 397 392 378 20 358 392 397 150 X 4967 Y Steel Pergola Steel Pergola Steel Pergola A B C D E F G H I J J' K L M 4967 X Y CLASS ROOM BLOCK ROOF PLAN 150 397 392 378 378 392 397 397 392 378 378 392 397 150 Sc. 1:100 ±0.00

1 21 21 150 150 2

EGA Sheet Roofing 710 710 1051 1051 EGA Sheet Roofing

3 134 150 150 4 20 20 30

150 397 392 378 378 392 397 397 392 378 20 358 392 397 150 X 4967 Y

CLASS ROOM BLOCK ROOF PLAN Sc. 1:100

A B C D E F G H I J J' K L M 4967 150 397 392 378 378 392 397 397 392 378 378 392 397 150 +3.40 1375m 1375m 1375m ±0.00 ±0.00 ±0.00 D-01 ROOF LEVEL 21 21 1 1

150 +0.15 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 W1 150

2 2

60 D1 D1 D1 D1 D1 D1 D1 D1

60 60 60 60 60 60 60 60 60 60 60 60 60 60 +0.15 +0.15 1 REV -01 30 JULY 2020 UNOPS-ETOH

60 +5.20 Classroom - 1 Classroom - 1 Classroom - 1 Classroom - 1 60 Area: 75m2 Area: 75m2 Area: 75m2 Area: 75m2 UNOPS - ETOH. 57 F.F. Polished Cement Screed F.F. Polished Cement Screed F.F. Polished Cement Screed F.F. Polished Cement Screed DONOR 710 710

1051 60 60 60 60 60 60 60 60 60 60 60 60 1051

57 Government of Japan 60 PARTNER

60 60 60 60 60 60 60 60 60 60 60 60 60 Oromia Education Bureau

60 60 60 60 60 60 60 60 60 60 60 60 60

PROJECT 60 Plastered metal lathe suspended to steel truss Improvement of Sanitation Facilities and Renovation

60 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2 W2

3 3 of School for IDP Lalisa Watta School LOCATION +0.15 150 150 Oromia Regional State

4 4 20 20 East Welega Zone Woreda Sasiga Wereda +0.15 1375m D-01 SCALE 150 397 392 378 378 392 397 397 DRAWING TITLE ±0.00 1:100 4967 CLASS ROOM BLOCK - ROOF PLAN & DATE +3.40 CEILING PLAN & SECTION July. 2020 ROOF LEVEL REG. NO. SIGN. DR NO. Designed by Ceiling Section A.G. AR FIN Sc. 1:100 CLASS ROOM BLOCK CEILING PLAN Drawn by A.S. Sc. 1:100 Checked by B.M. 04/19 Approved by S.M. A B C D E F G H I J J' K L M A B C D E F G H

+5.20 +5.20

EGA Sheet Roofing EGA Sheet Roofing

+3.40 +3.40 ROOF LEVEL ROOF LEVEL Roof vent (40cm x 40 cm) Roof vent (40cm x 40 cm) Roof vent (40cm x 40 cm) compressed earth block compressed earth block +2.33 +2.33 +2.33 +2.33

+1.13 +1.13 +1.13 +1.13 G. FLOOR LEVEL G. FLOOR LEVEL 1375m compressed earth block compressed earth block 1375m ±0.00 +0.15 +0.15 ±0.00

South - East Side Elevation Sc. 1:100

M L K J' J I H G M L K J' J I H G F E D C B A

+5.20 +5.20

EGA Sheet Roofing EGA Sheet Roofing

+3.40 +3.40 ROOF LEVEL ROOF LEVEL Roof vent Roof vent compressed earth block compressed earth block +2.33 +2.33 +2.33 +2.33 +2.33

+1.65 +1.65 +1.65 +1.65

G. FLOOR LEVEL G. FLOOR LEVEL 1375m compressed earth block compressed earth block 1375m ±0.00 +0.15 +0.15 ±0.00

North - West Side Elevation Sc. 1:100

EGA sheet roof (0.4mm thick) EGA sheet roof (0.4mm thick) Purlins Purlins Steel TRUSS Steel TRUSS Plastered metal lathe suspended 4 4 Plastered metal lathe suspended 1 2 to steel truss 3 3 to steel truss 2 1

+5.20 +5.20

Roof vent Roof vent

D-01 60 57 57 60 D-01 D-01 60 57 57 60 D-01 18° 60 60 18° 60 60 +3.40 60 +3.40 +3.40 60 +3.40 60 18° 60 60 60 18° ROOF LEVEL 60 ROOF LEVEL 60 ROOF LEVEL 60 60 60 60 Roof vent Roof vent (40cm x 40cm) (40cm x 40cm) +2.33 +2.33 +2.33 +2.33 425 425 Class Room Class Room +1.65 +1.65 1 REV -01 30 JULY 2020 UNOPS-ETOH 325 325 +1.13 +1.13 UNOPS - ETOH. DONOR Government of Japan G. FLOOR LEVEL G. FLOOR LEVEL 1375m +0.15 1375m 1375m +0.15 1375m PARTNER ±0.00 ±0.00 ±0.00 ±0.00 Oromia Education Bureau PROJECT Improvement of Sanitation Facilities and Renovation of School for IDP Lalisa Watta School LOCATION Dressed stone pavement (Basola) Dressed stone pavement (Basola) Oromia Regional State Red ash 5 cm Polished Cement Screed 5 cm Polished Cement Screed Red ash compacted selected material compacted selected material East Welega Zone Woreda Sasiga Wereda 10 cm RC slab 10 cm RC slab SCALE DRAWING TITLE 25cm hard core 25cm hard core 1:100 & 1:50 CLASS ROOM BLOCK - ELEVATIONS & compacted selected material compacted selected material DATE SECTION X-X & Y-Y July. 2020 REG. NO. SIGN. DR NO. Designed by Section X-X Section Y-Y A.G. AR FIN Sc. 1:50 Sc. 1:50 Drawn by A.S. Checked by B.M. 05/19 Approved by S.M. A B C D Steel column supporting the roof 1328 150 397 392 X 378 1375m ±0.00 1 21 161 22 154 66 154 22 128 154 88 22 154 48 154 22 150 +0.15 W1 W1 W1 248

2 22 22

D1 88 D1 23 22 110 44 792 44 110 22 21 140 22 +0.15 1144 22

Classroom - 1 Area: 75m2 F.F. Polished Cement Screed A SINGLE CLASS ROOM LAYOUT 710 686 1051 Sc. 1:50 598 Fire Escape Route White board - 90*152 cm

W2 W2 W2 W2 Adjustable desk for PWD

3 22 140 22 154 66 154 22 128 154 88 22 154

+0.15 150 F.F. Polished Cement Screed 160 X 4 20

4 3 2 1 4 3 2 1 +5.20 +5.20

Leaf guard Leaf guard Leaf guard +3.55 +3.40 Roof vent +3.40 Roof vent +3.40 ROOF LEVEL ROOF LEVEL Steel Pergola

compressed earth block compressed earth block North - East Side Elevation Sc. 1:50 Informal shaded Education area

G. FLOOR LEVEL 1375m +0.15 1375m +0.15 +0.15 G. FLOOR LEVEL ±0.00 ±0.00 ±0.00 Masonry Masonry

1 2 3 4 1 2 3 4

+5.20 +5.20 1 REV -01 30 JULY 2020 UNOPS-ETOH UNOPS - ETOH.

DONOR Government of Japan PARTNER Leaf guard Leaf guard Leaf guard Oromia Education Bureau +3.55 PROJECT +3.40 Roof vent +3.40 Roof vent +3.40 Improvement of Sanitation Facilities and Renovation ROOF LEVEL ROOF LEVEL of School for IDP Lalisa Watta School Steel Pergola LOCATION Oromia Regional State East Welega Zone Woreda Sasiga Wereda compressed earth block compressed earth block SCALE DRAWING TITLE South - West Side Elevation 1:50 CLASS ROOM BLOCK -PLAN, ELEVATIONS DATE Sc. 1:50 July. 2020 Informal shaded Education area REG. NO. SIGN. DR NO. Designed by A.G. G. FLOOR LEVEL AR FIN G. FLOOR LEVEL 1375m +0.15 1375m +0.15 +0.15 Drawn by ±0.00 ±0.00 ±0.00 A.S. Masonry Masonry Checked by B.M. 06/19 Approved by S.M. Door Schedule Window Schedule Steel column supporting the roof Element ID D1 Element ID W1 W2 Quantity 16 Quantity 24 32 Down pipe Orientation L & R Orientation up Steel column supporting the roof L & R 300mm*300mm*300mm pit Frame material 5 cm Polished Cement Screed Frame material 38mm LTZ Profile covered with 50mm thick 38mm LTZ Profile 38mm LTZ Profile 10 cm RC slab precast concrete 25cm hard core Sill 25mm thick reinforced 25mm thick reinforced compacted selected material Panel Ribbed sheet ferrocement panel ferrocement panel seal joints with 5 cm Polished Cement Screed Point joint pavement cement- sand mortar 10 cm RC slab +0.15 Sill height variable variable 25cm hard core ±0.00 sand bedding Point joint pavement View from Side Glazing & Louvers 4mm clear glass 4mm clear glass 50mm concrete compacted selected material Opposite to Opening Topping +0.15 Side ±0.00 110 22 22 depth varies from Slope 300 154 300mm to 800mm 154 View from Side Vary. +2.335 +2.335 Opposite to Opening

cyclopean 66 350 40cm Selected fill compacted concrete Side with hand vibrator +1.645 70

sand bedding 120

50mm lean concrete 63 cyclopean 154 50mm concrete topping +1.13 +1.13 concrete DETAIL L-L open masonry storm water drain DETAIL M-M 15cm r.c slab MASONRY WALL 40cm Selected fill compacted open masonry storm water drain

50mm lean concrete 149 Sc:- 1:25 Sc:- 1:25 90 154 20cm Selected fill compacted with hand vibrator 50mm lean concrete 98 +0.15 +0.15 with hand compactor 20cm Selected fill compacted 110 with hand compactor

Ironmongry stainless steel pull-push bar handle

Interlock 22 1 5 11 5 1 +0.15 +0.15 1375m ±0.00 1 H=115mm Stone walkway on grass

Pavement 9 11 Natural compacted soil Ramp detail Sc. 1:50 1 1375m +0.15 +0.15 1375m ±0.00 ±0.00 W=220mm L=220mm TO 250mm 1 4 12 4 1 Stone walkway on grass Stone walkway on grass Pavement Section K-K Pavement Natural compacted soil Natural compacted soil Compressed earth block Sc. 1:50 SC. 1:10

Stone Slab Copping Course Stone Slab Copping Course Stone Slab Copping Course 29 29 29 28 28 28 27 27 27 26 26 26 EGA sheet roof (0.4mm thick) 25 25 25 compressed earth block compressed earth block compressed earth block Purlins 24 24 24 23 Lintel 23 Lintel 23 Steel TRUSS 22 22 22 Plastered metal lathe suspended 21 +2.335 21 +2.335 21 to steel truss 20 20 20 19 19 19 18 18 18 17 17 17 1 REV -01 30 JULY 2020 UNOPS-ETOH 16 16 16 UNOPS - ETOH. 15 15 +1.645 15 14 14 14 DONOR 13 13 13 Government of Japan Gutter 12 12 12 PARTNER 11 11 11 Oromia Education Bureau compressed earth block 10 +1.13 10 compressed earth block 10 PROJECT +3.40 9 9 9 Improvement of Sanitation Facilities and Renovation 8 8 8 of School for IDP Lalisa Watta School 7 7 7 LOCATION 6 6 6 Oromia Regional State 5 5 5 East Welega Zone Woreda Sasiga Wereda 4 4 4 SCALE DRAWING TITLE 3 3 3 1:100,1:50,1:20 down pipe CLASS ROOM BLOCK - SECTION,WINDOW & 2 2 2 DATE ROOF DETAIL: D-01 +0.15 +0.15 +0.15 DOOR SCHEDULE & ROOF DETAILS July. 2020 1 1 1 Sc. 1:20 ±0.00 ±0.00 ±0.00 REG. NO. SIGN. DR NO. Designed by A.G. AR FIN Bond Pattern Elevation Bond Pattern Elevation Bond Pattern Elevation Drawn by A.S. Checked by B.M. 07/19 Approved by S.M. A B C D E F G H I 3022

187 340 315 308 308 308 369 370 402 115 1375m ±0.00 Z 1

+0.15 F.F. Glassed159 cement screed159 159 159 F.F. Glassed cement screed 159 159 159

150 Gents 150 176 46 110 83 100 96 110 110 111 154 373 154 310 154 176 154 264 154 84

2 22 22 22 22 22 22

D2 D3 78 W1 W1 Shower D3 W1 W1 W1 PWD Changing 22 6 m2 Toilet 22 22 150 198 22 F.F. Glassed220 cement screed22 220 22 902 391 22 304 22 379 22

280 PWD Toilet

3 m2 276 PWD 4.5 m2

F.F. 198 Glassed cement screed 22 417 417 Store Deputy Director's Office Jan. Staff Room 16m2 12m2 22 22 133 941 941 578 578 622 600 F.F. Glassed cement screed 600 80 D4 50m2 F.F. Glassed cement screed

F.F. Glassed cement screed F.F. Glassed cement screed F.F. Glassed cement screed Toilet Principal's Office +0.15 22 PWD D2 D1 21m2

202 4.5 m2 F.F. Glassed cement screed Shower F.F. Glassed cement screed 22 PWD 22 176 22 150 22 6 m2 220 280 22 220 22 902 22 259 110 215 110 2222 379 22

261 Toilet 203 F.F. Glassed cement screed PWD Main entry Changing 22 D1 3 m2 D1 8m2 +0.15 D3 W1 W1 F.F. Glassed cement screed W1

D3 D3 78 320

3 22 22 22 22 176 56 100 83 100 96 110 110 110 154 372 154 156 321 347 20 350 185 154 84 104 F.F. Glassed cement screed

150 F.F. Glassed cement screed 150 160 160 Ladies 160 160 160 160 160 4 1375m ±0.00 187 340 315 308 308 Z 308 369 369 403 115 3022 ADMINISTRATION BLOCK FLOOR PLAN Sc. 1:50

EGA sheet roof (0.4mm thick) Purlins Steel TRUSS Plastered metal lathe suspended 1 2 to steel truss 3 4

+5.30

D-01 D-01 +3.40 Roof vent +3.40 ROOF LEVEL

+2.57 +2.57 +2.33

425 1 REV -01 30 JULY 2020 UNOPS-ETOH 325 Staff Room UNOPS - ETOH. +1.07 +1.07 DONOR Government of Japan PARTNER 1375m G. FLOOR LEVEL 1375m +0.15 Oromia Education Bureau ±0.00 ±0.00 PROJECT Improvement of Sanitation Facilities and Renovation of School for IDP Lalisa Watta School LOCATION Oromia Regional State East Welega Zone Woreda Sasiga Wereda Dressed stone pavement (Basola) SCALE DRAWING TITLE Red ash 5 cm Glassed cement screed 1:50 ADMINISTRATION BLOCK - FLOOR PLAN & compacted selected material 10 cm RC slab DATE 25cm hard core SECTION Z-Z July. 2020 compacted selected material REG. NO. SIGN. DR NO. Designed by Section Z-Z A.G. AR FIN Sc. 1:50 Drawn by A.S. Checked by B.M. 08/19 Approved by S.M. A B C D E F G H I 3022 +3.40 187 340 315 308 308 308 369 370 402 115 D-01

1 4

+0.15 F.F. Glassed cement screed F.F. Glassed cement screed

150 Gents

2 3 D2 D3 W1 W1 W1 W1 Shower D3 W1 60 PWD Changing 6 m2 Toilet 60 F.F. Glassed cement screed PWD Toilet 3 m2 PWD 4.5 m2 60 F.F. Glassed cement screed

+5.30 60 Store Deputy Director's Office Jan. Staff Room 16m2 12m2 60 941 600 D4 50m2 F.F. Glassed cement screed F.F. Glassed cement screed

F.F. Glassed cement screed F.F. Glassed cement screed F.F. Glassed cement screed 60 Toilet Principal's Office

+0.15 PWD D2 D1 21m2 60 4.5 m2 Ceiling button for plastered F.F. Glassed cement screed metal lathe

Shower F.F. Glassed cement screed 60 PWD

6 m2 Toilet 60 F.F. Glassed cement screed PWD Changing Main entry D1 3 m2 D1 8m2 +0.15 D3 D3 D3 W1 W1 F.F. Glassed cement screed W1 60

3 2

F.F. Glassed cement screed 150 Ladies

4 1 1375m ±0.00 D-01

ADMINISTRATION BLOCK CEILING PLAN +3.40 Sc. 1:50 ROOF LEVEL Ceiling Section Sc. 1:50 A B C D E F G H I 3022

187 340 315 308 308 308 369 369 403 115 Z 1 150 150 2

EGA Sheet Roofing 941 941 600 600

+0.15 EGA Sheet Roofing 1 REV -01 30 JULY 2020 UNOPS-ETOH UNOPS - ETOH.

DONOR Government of Japan PARTNER 3 Oromia Education Bureau PROJECT Improvement of Sanitation Facilities and Renovation 150 150 of School for IDP Lalisa Watta School LOCATION 4 Oromia Regional State East Welega Zone Woreda Sasiga Wereda SCALE DRAWING TITLE 187 340 315 308 308 308 369 369 403 115 1:50 Z ADMINISTRATION BLOCK - ROOF PLAN & DATE 3022 CEILING PLAN & SECTION July. 2020 REG. NO. SIGN. DR NO. Designed by ADMINISTRATION BLOCK ROOF PLAN A.G. AR FIN Drawn by Sc. 1:50 A.S. Checked by B.M. 09/19 Approved by S.M. A B C D E F G H I

+5.30 +5.30

EGA Sheet Roofing EGA Sheet Roofing

+3.40 +3.40 ROOF LEVEL ROOF LEVEL

compressed earth block +2.57 compressed earth block +2.57 +2.33 +2.33

compressed earth block +1.07 +1.07 +1.07

compressed earth block 1375m G. FLOOR LEVEL G. FLOOR LEVEL1375m +0.15 +0.15 ±0.00 ±0.00

North - East Side Elevation Sc. 1:50

I H G F E D C B A

+5.30 +5.30

EGA Sheet Roofing EGA Sheet Roofing +3.85

+3.40 +3.40 ROOF LEVEL ROOF LEVEL

+2.57 compressed earth block +2.57 compressed earth block +2.33

compressed earth block +1.07 +1.07

compressed earth block 1375m G. FLOOR LEVEL G. FLOOR LEVEL 1375m +0.15 +0.15 ±0.00 ±0.00

South- West Side Elevation Sc. 1:50

1 2 3 4 4 3 2 1 +5.30 +5.30

1 REV -01 30 JULY 2020 UNOPS-ETOH Leaf guard Leaf guard Leaf guard Leaf guard UNOPS - ETOH. Roof vent Roof vent +3.40 +3.40 +3.40 +3.40 DONOR ROOF LEVEL ROOF LEVEL Government of Japan compressed earth block compressed earth block PARTNER Oromia Education Bureau PROJECT Improvement of Sanitation Facilities and Renovation of School for IDP Lalisa Watta School LOCATION Oromia Regional State East Welega Zone Woreda Sasiga Wereda SCALE 1375m G. FLOOR LEVEL 1375m 1375m G. FLOOR LEVEL 1375m DRAWING TITLE +0.15 +0.15 +0.15 +0.15 1:50 ±0.00 ±0.00 ±0.00 ±0.00 ADMINISTRATION BLOCK - ELEVATIONS Masonry DATE Masonry July. 2020 REG. NO. SIGN. DR NO. Designed by South - East Side Elevation North - West Side Elevation A.G. AR FIN Sc. 1:50 Sc. 1:50 Drawn by A.S. Checked by B.M. 10/19 Approved by S.M. Down pipe Steel column supporting the roof 300mm*300mm*300mm pit covered with 50mm thick Stone Slab Copping Course Stone Slab Copping Course precast concrete 29 29 28 28 seal joints with 5 cm Polished Cement Screed 27 27 cement- sand mortar 10 cm RC slab 26 26 25cm hard core Point joint pavement 50mm concrete compacted selected material 25 Lintel 25 Topping compressed earth block 24 compressed earth block 24 +0.15 EGA sheet roof (0.4mm thick) 23 +2.565 23 ±0.00 depth varies from Slope Purlins 22 22 300mm to 800mm Steel TRUSS 21 21 20 20 Vary. Ceiling button for suspended 19 19 350 metal lathe 18 18 17 17 sand bedding 16 16 50mm concrete topping cyclopean concrete 15 15 open masonry storm water drain DETAIL 40cm Selected fill compacted 14 14 50mm lean concrete Sc:- 1:25 13 13 20cm Selected fill compacted with hand vibrator with hand compactor 12 12 11 11 Gutter compressed earth block Steel column supporting the roof 10 +1.07 10 9 9 8 8 +3.40 7 7 6 6

5 cm Polished Cement Screed 5 5 10 cm RC slab 4 4 25cm hard core 3 3 compacted selected material +0.15 2 +0.15 2 Point joint pavement 1 1 +0.15 down pipe ±0.00 ±0.00 ±0.00 sand bedding ROOF DETAIL: D-01 Sc. 1:20 Bond Pattern Elevation Bond Pattern Elevation 300

cyclopean 40cm Selected fill compacted concrete with hand vibrator 50mm lean concrete Interlock DETAIL 22 15cm r.c slab MASONRY WALL open masonry storm water drain Sc:- 1:25 50mm lean concrete 1 5 11 5 1 20cm Selected fill compacted H=115mm with hand compactor 1 9 11 1 W=220mm L=220mm TO 250mm Compressed earth block 1 4 12 4 1 Door Schedule SC. 1:10 Element ID D1 D2 D3 D4 Quantity 3 2 5 1 Orientation L L L L Frame material 38mm LTZ Profile 38mm LTZ Profile 38mm LTZ Profile 38mm LTZ Profile

Glazing 6mm clear glass fixed 6mm clear glass fixed 6mm figured glass fixed 6mm figured glass fixed Window Schedule View from Side Element ID W1 Opposite to Opening Quantity 8 Side Orientation L & R 110 100 100 80 Frame material 38mm LTZ Profile

REV -01 30 JULY 2020 UNOPS-ETOH Sill 25mm thick reinforced 1 66 66 66 66 ferrocement panel UNOPS - ETOH.

Sill height variable DONOR 63 63 63 63 Glazing & Louvers 4mm clear glass Government of Japan PARTNER Oromia Education Bureau 90 90 90 90 154 22 PROJECT 110 100 100 80 View from Side +2.57 Improvement of Sanitation Facilities and Renovation of School for IDP Lalisa Watta School Opposite to Opening LOCATION Side Oromia Regional State stainless steel 150 Ironmongry stainless steel stainless steel gate East Welega Zone Woreda Sasiga Wereda stainless steel gate bolt +1.07 SCALE standard DRAWING TITLE pull-push bar latch reveted on the bolt latch reveted on 1:50 inside of toilet door locable door the inside of toilet 154 ADMINISTRATION BLOCK - SECTION,WINDOW & handle DATE door DOOR SCHEDULE & ROOF DETAILS July. 2020 handle 92 +0.15 REG. NO. SIGN. DR NO. Designed by A.G. AR FIN Drawn by A.S. Checked by B.M. 11/19 Approved by S.M. 1 2 3

+4.50

EGA Roof

A B C A B C +3.15 +3.15 530 530 125 385 125 385 +2.33 compressed earth block +2.33

1 22 1 F.F. polished cement screed +1.65 +0.15 EGA Roof 149 149 149 145 145 124 33 80 180 80 33

22 22 G. FLOOR LEVEL G. FLOOR LEVEL

44 1375m 1375m 2 45 D4 2 D4 +0.15 +0.15 W3 Toilet ±0.00 ±0.00 Toilet 2m2 W3 61

60 2m2

low wall N F.F. polished 121 121 F.F. polished N N N 124 22 170 22 170 22 EGA Roof North- West Side Elevation 93 22 22 606 606 558

22 155 22 185 22 636 636 Sc. 1:50 152 Toilet

80 D4 2m2 435 435 F.F. polished cement screed 124 low wall W3 60 33 21 PWD270 - Toilet 13 5m2 EGA Roof F.F. polished cement screed 3 2 1

+0.15 100 D3 140 +4.50 33 3 22 22 3 124 20 157 229 125 385 125 385 Roof Vent Roof Vent 530 530 +3.15 +3.15

compressed earth block STUDENTS' - GIRLS' LATRINE STUDENTS' - GIRLS' LATRINE +2.33 FLOOR PLAN ROOF PLAN +1.66 Sc. 1:50 Sc. 1:50

G. FLOOR LEVEL G. FLOOR LEVEL 1375m 1375m +0.15 +0.15 ±0.00 ±0.00

South - West Side Elevation Sc. 1:50

B C C B A C B A EGA sheet roof A Purlins Steel TRUSS +4.50 +4.50 +4.50 Ceiling button for fabric ceiling +4.00 +4.00 +4.00

+3.75 +3.40 Roof Vent D-01 +3.15 +3.15 +3.15 +3.00 +3.00 +3.00 ROOF LEVEL ROOF LEVEL compressed earth block ROOF LEVEL +2.33 +2.33 +2.33 compressed earth block Corridor Corridor +1.65

Toilet Toilet Corridor HWB

Steel Post Steel Post Steel Post 1 REV -01 30 JULY 2020 UNOPS-ETOH G. FLOOR LEVEL G. FLOOR LEVEL G. FLOOR LEVEL G. FLOOR LEVEL G. FLOOR LEVEL G. FLOOR LEVEL 1375m 1375m 1375m 1375m 1375m 1375m +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 UNOPS - ETOH. ±0.00 ±0.00 ±0.00 ±0.00 ±0.00 ±0.00 DONOR Government of Japan PARTNER South - West Side Elevation North - East Side Elevation Oromia Education Bureau PROJECT Sc. 1:50 Sc. 1:50 Improvement of Sanitation Facilities and Renovation 3 cm thick polished cement screed Dressed stone pavement (Basola) of School for IDP Lalisa Watta School 5 cm cement screed Red ash LOCATION 10 cm RC slab compacted selected material Oromia Regional State 25cm hard core compacted selected material East Welega Zone Woreda Sasiga Wereda SCALE DRAWING TITLE 1:50 GIRL'S LATRINE FLOOR PLAN, DATE Section N-N ROOF PLAN,SECTION & ELEVATIONS July. 2020 Sc. 1:50 REG. NO. SIGN. DR NO. Designed by A.G. AR FIN Drawn by A.S. Checked by B.M. 12/19 Approved by S.M. compressed earth block compressed earth block

compressed earth block compressed earth block

compressed earth block

tb gb flashing waterproofed colored pull handle waterproofed colored cement plaster cement plaster gb gb gb low wall 01 04 02 tp 03 gb 140 140 140 140 tp waterproofed colored waterproofed colored cement plaster cement plaster

D3 hwb

PWD WC Cubicle PWD WC Cubicle PWD WC Cubicle PWD WC Cubicle View 01 View 02 View 03 View 04 PWD WC Cubicle Floor Plan

Stone Slab Copping Course Stone Slab Copping Course EGA sheet roof Window Schedule 26 26 Purlins Element ID D3 D4 Element ID W3 25 25 Steel TRUSS Quantity 1 3 Quantity 3 compressed earth block 24 compressed earth block 24 Ceiling button for fabric ceiling 23 Lintel 23 Orientation L L Orientation up 22 22 80x40x3mm RHS Purline Frame material 38mm LTZ Profile 38mm LTZ Profile Frame material 21 +2.335 21 c/c 1250mm Welded to Rafter 38mm LTZ Profile 20 20 25mm thick reinforced 6mm figured glass fixed 6mm figured glass fixed Sill 19 19 Gutter Glazing ferrocement panel 18 18 17 17 +3.00 Sill height variable 16 16 80x40x3mm RHS Rafter ROOF LEVEL View from Side Glazing & Louvers 4mm clear glass 15 +1.645 15 Opposite to Opening 14 14 Side 13 13 BEAM 22 100 80 60 12 12 down pipe 11 11 View from Side +2.335 compressed earth block 10 compressed earth block 10 Opposite to Opening 9 9 Side +1.645 69 66 66 8 8 ROOF DETAIL: D-01 60 7 7 Sc. 1:20 6 6 63 63 5 5 150 4 4 +0.15 90 90 3 3 +0.15 2 +0.15 2 100 80 1 1 ±0.00

Bond Pattern Elevation Bond Pattern Elevation stainless steel stainless steel gate Ironmongry standard bolt latch reveted on the inside of toilet locable door door handle

1 REV -01 30 JULY 2020 UNOPS-ETOH 22 UNOPS - ETOH. Interlock Internal Finish Schedule DONOR 1 5 11 5 1 1 2 3 Government of Japan PARTNER Floor A F.F. polished cement screed - -

1 Oromia Education Bureau H=115mm PROJECT Improvement of Sanitation Facilities and Renovation Skirting B 100 mm high colored - -

9 of School for IDP Lalisa Watta School

11 cement plaster. 170cm high colored cement 140cm high colored cement LOCATION Hydrofoam block Oromia Regional State Wall C plaster followed by Hydrofoam plaster followed by Hydrofoam faced finished 1 block faced finished block faced finished East Welega Zone Woreda Sasiga Wereda SCALE DRAWING TITLE W=220mm D 1:50:1:20 L=220mm TO 250mm Ceiling - - - GIRL'S LATRINE WALL FINISH,WINDOW & DATE DOOR SCHEDULE & ROOF DETAILS July. 2020 1 4 12 4 1 REG. NO. SIGN. DR NO. Compressed earth block Sill E 30mm thick concrete window sill- - Designed by SC. 1:10 A.G. AR FIN Drawn by A.S. Checked by B.M. 13/19 Approved by S.M. 1 2

+4.50

A B C A B C EGA Roof 532 532 +3.15 +3.15 125 385 125 385

22 104 20 173 213 +2.33 +2.33

compressed earth block 1 1 +1.65 +0.15 D4 Toilet Solar panel on roof top 2m2 168 22 80 90 22 170 22 G. FLOOR LEVEL G. FLOOR LEVEL 1375m 1375m D4 +0.15 +0.15 W3 Toilet Battery room D4 ±0.00 ±0.00

2m2 2m2 80 P 124 22 170 22 170 22 P P P

low wall F.F. polished cement screed Solar panel on roof top North- West Side Elevation 580 580 602 602 636 636

154 Sc. 1:50

155 185 22 urinal 22 22 2m2 F.F. polished cement screed

+0.15 60 PWD - Toilet W3 5m2 Solar panel on roof top F.F. polished cement screed 2 1 D3

301 22 185 22 140 2 2 +4.50 22 104 20 157 229

125 385 Roof Vent Roof Vent 532 +3.15 +3.15

compressed earth block STUDENTS' - BOYS' LATRINE STUDENTS' - BOYS' LATRINE +2.33

FLOOR PLAN ROOF PLAN +1.65 Sc. 1:50 Sc. 1:50

G. FLOOR LEVEL G. FLOOR LEVEL 1375m 1375m +0.15 +0.15 ±0.00 ±0.00

South - West Side Elevation Sc. 1:50

B C C B A C B A EGA sheet roof A Purlins Steel TRUSS +4.50 +4.50 +4.50 Ceiling button for fabric ceiling +4.00 +4.00 +4.00

+3.75 +3.40 Roof Vent D-01 +3.15 +3.15 +3.15 +3.00 +3.00 +3.00 ROOF LEVEL ROOF LEVEL ROOF LEVEL +2.33 +2.33 +2.33 +2.33 compressed earth block compressed earth block Corridor Corridor +1.65

Battery room Toilet Corridor +1.05 HWB +1.05

Steel Post urinal Steel Post Steel Post G. FLOOR LEVEL G. FLOOR LEVEL G. FLOOR LEVEL G. FLOOR LEVEL G. FLOOR LEVEL G. FLOOR LEVEL 1 REV -01 30 JULY 2020 UNOPS-ETOH 1375m 1375m 1375m 1375m 1375m 1375m +0.15 +0.15 +0.15 +0.15 +0.15 +0.15 ±0.00 ±0.00 ±0.00 ±0.00 ±0.00 ±0.00 UNOPS - ETOH.

DONOR Government of Japan South - West Side Elevation North - East Side Elevation PARTNER Sc. 1:50 Sc. 1:50 Oromia Education Bureau PROJECT 3 cm thick polished cement screed Dressed stone pavement (Basola) Improvement of Sanitation Facilities and Renovation 5 cm cement screed Red ash of School for IDP Lalisa Watta School 10 cm RC slab compacted selected material LOCATION 25cm hard core Oromia Regional State compacted selected material East Welega Zone Woreda Sasiga Wereda SCALE DRAWING TITLE 1:50 Section P-P BOY'S LATRINE FLOOR PLAN, DATE Sc. 1:50 ROOF PLAN,SECTION & ELEVATIONS July. 2020 REG. NO. SIGN. DR NO. Designed by A.G. AR FIN Drawn by A.S. Checked by B.M. 14/19 Approved by S.M. compressed earth block compressed earth block

compressed earth block compressed earth block

compressed earth block

tb gb flashing waterproofed colored pull handle waterproofed colored cement plaster cement plaster gb gb gb low wall 01 04 02 tp 03 gb 140 140 140 140 tp waterproofed colored waterproofed colored cement plaster cement plaster

D3 hwb

PWD WC Cubicle PWD WC Cubicle PWD WC Cubicle PWD WC Cubicle View 01 View 02 View 03 View 04 PWD WC Cubicle Floor Plan

Window Schedule Stone Slab Copping Course Stone Slab Copping Course EGA sheet roof Element ID D3 D4 Element ID W3 26 26 Purlins Quantity 1 3 Quantity 2 25 25 Steel TRUSS Orientation L L Orientation up compressed earth block 24 compressed earth block 24 Ceiling button for fabric ceiling 23 Lintel 23 Frame material 38mm LTZ Profile 38mm LTZ Profile Frame material 38mm LTZ Profile 22 22 80x40x3mm RHS Purline c/c 1250mm Welded to Rafter 25mm thick reinforced 21 +2.335 21 Glazing 6mm figured glass fixed 6mm figured glass fixed Sill 20 20 ferrocement panel 19 19 Gutter Sill height variable 18 18 17 17 +3.00 View from Side Glazing & Louvers 4mm clear glass 16 16 ROOF LEVEL Opposite to Opening 80x40x3mm RHS Rafter Side 15 +1.645 15 22 14 14 100 80 60 BEAM 13 13 View from Side +2.335 12 12 down pipe Opposite to Opening

11 11 69 Side +1.645 compressed earth block 10 compressed earth block 10 66 66 60 9 9 ROOF DETAIL: D-01

8 8 63 63

7 7 Sc. 1:20 150 6 6 +0.15 5 5 90 90 4 4 3 3 100 80 +0.15 2 +0.15 2 1 1 ±0.00 stainless steel stainless steel gate Ironmongry standard bolt latch reveted on Bond Pattern Elevation Bond Pattern Elevation the inside of toilet locable door door handle

1 REV -01 30 JULY 2020 UNOPS-ETOH Internal Finish Schedule UNOPS - ETOH. Interlock 1 2 3 DONOR 22 Government of Japan Floor A F.F. polished cement screed - - 1 5 11 5 1 PARTNER H=115mm Oromia Education Bureau Skirting B 100 mm high colored - - PROJECT 1 cement plaster. Improvement of Sanitation Facilities and Renovation 170cm high colored cement 140cm high colored cement of School for IDP Lalisa Watta School Hydrofoam block Wall C plaster followed by Hydrofoam plaster followed by Hydrofoam LOCATION

9 faced finished 11 block faced finished block faced finished Oromia Regional State East Welega Zone Woreda Sasiga Wereda Ceiling D - - - SCALE

W=220mm 1 DRAWING TITLE L=220mm TO 250mm 1:50:1:20 BOY'S LATRINE WALL FINISH,WINDOW & DATE DOOR SCHEDULE & ROOF DETAILS July. 2020 Sill E 30mm thick concrete window sill- - Compressed earth block 1 4 12 4 1 REG. NO. SIGN. DR NO. Designed by SC. 1:10 A.G. AR FIN Drawn by A.S. Checked by B.M. 15/19 Approved by S.M. 1376 m

Legend 25 1. Proposed classroom block - 1 T 26 3210 28 389 76.1m 2. Proposed classroom block - 2 2960 5382 63517 3. Informal shaded area 24 3390 20 4. Proposed Administration Block with Lavatories for Teachers and Staff (Septic Tank underneath) 637 276 5. Proposed Lavatories for students Separate buildings (Septic Tank underneath) 22 23 3097 892 Key 6.Existing New Classroom (relatively) 28 2501 18 8 1375m 7. Existing old classroom S 24 678 ±0.00 24 Existing Buildings 3022 947 941

8. Existing administration building 876 Proposed Buildings and Facilities 7 19 1375m 4 22 ±0.00 9. Proposed fenced ground water reservoir 3022

686 206 +0.15 16 and water tank 413.6m 941 851 1375m 1051 297 ±0.00 568 1375m 10. Proposed Outdoor assembly area 297 10 ±0.00 1758 11. Proposed Playground 13 6 3506 10227 96.1m 1010 12. Water Points 22 1051 1375m ±0.00 ±0.00 1375m 22 13. Proposed library, laboratory and guidance counseling 2165 27 ±0.00

14. Multi purpose hall including feeding center and kitchen Steel Pergola 2 T 1374 m 1748 4967 15. Sports field Steel Pergola 3

Steel Pergola

16. Existing dry pit latrine - to be demolished 4967 A 1375m 1 ±0.00 1051 17. Main Gate (Students' Access) 1 11 24 18. Official Gate (pedestrian) 240 1375m ±0.00 27

19. Flag pole 9 A S 930 1051 22 1 20. Vehicular access 0 1375m 28 ±0.00 21. Bore hole 1962 767 4878 22. Paved walkway 4045 22 5 11 2930 23. Proposed parking (vehicle and/or carts and horses 300 24. Proposed Green area maintaining existing trees 14 5 8000 N 25. Minor road 22 782 26. Prospective Highway 23 12 27. Outdoor Education Area 3964 300 323 28. Proposed Security guard house 1378 m 29. Future Expansion area Loading/ 30. Horticulture and education center 1018 Unloading 31 31. Service Gate 15 175.1m 26 22

10000 29 22

22

14725 22 22 21

11270 300 112.9m 806

1379 m

22 30

126.8m

1376 m 123.3m 1375 m SETTING - OUT GUIDE SC 1:1000

Existing Proposed Proposed 1 REV -01 30 JULY 2020 UNOPS-ETOH Classroom Classroom Classroom 4 3 2 1 4 3 2 1 UNOPS - ETOH.

DONOR Fence FFL.1375.50m FFL.1375.50m Fence Government of Japan ±0.00 ±0.00 PARTNER 1375.25m Oromia Education Bureau PROJECT Setting - out guide Section S-S Improvement of Sanitation Facilities and Renovation Sc. 1:500 of School for IDP Lalisa Watta School LOCATION Oromia Regional State +5.65 East Welega Zone Woreda Sasiga Wereda Green Roof Green Roof Green Roof Green Roof Maintenance Access

Maintenance Access SCALE Maintenance Access Maintenance Access DRAWING TITLE Fence FFL.1375.50m Fence 1:1000,1:200 ±0.00 SETTING - OUT GUIDE & SECTION S-S & T-T DATE 1375.25m July. 2020 REG. NO. SIGN. DR NO. Designed by A.G. AR FIN Setting - out guide Section T-T Drawn by A.S. Sc. 1:500 Checked by B.M. 16/19 Approved by S.M. 60x60x3.0mm RHS Barber wire fence Column h=2500mm 60x60x3.0mm RHS Bracing

Roof

120 100mm thick slab Barber wire fence 60x60x3.0mm RHS 250 Barber wire fence Column h=2500mm

Leaf guard to gutter

60x60x3.0mm RHS Bracing

300mm long angle iron reinforcing steel welded to the post 10 25 15 Leaf shedding

100 150mm thick RC floor slab 100 rainhead Ø8 c/c200 top & bottom

500mm retaining wall 250mm hard core 500mm retaining wall Min.300mm thick well compacted 50mm lean concrete 50mm lean concrete Inlet strainer basket 50 selected fill (95% proctor) 50 Natural soil 100mm thick RC floor slab Ø8 c/c200 single layer 150mm thick slab 60x60x3.0mm RHS SECTION X-X 250mm hard core Scale 1:25 Door h=2000mm Min.300mm thick well compacted X X selected fill (95% proctor) Natural soil Garden tap 800 560 Silmline rain water tank overflow

Barber wire fence 20,000ltrs First flush divertr

60x60x3.0mm RHS 250 Column h=2500mm

60x60x3.0mm RHS Flap valve De-sludging valve Column h=2500mm Drain to storm water

300mm long angle iron reinforcing steel welded to the post Rain Water harvesting system Scale 1:25 100

Gate Detail Sc. 1:25 Ø50 to EWT 100mm thick slab 120 Masonry Wall Taps Barber wire fence 26 80 400 60 460 60 18 520 250 420 Water Reservoir Plate Form and Fence Plan HAND WASH PLAN Scale 1:25 Scale 1:25 Plastered +1.30 Taps +1.30

Taps

4200 +0.60 +0.60

Masonry Wall 1 REV -01 30 JULY 2020 UNOPS-ETOH

±0.00 ±0.00 UNOPS - ETOH. Plastered +1.30 DONOR Government of Japan Taps FRONT ELEVATION RIGHT ELEVATION PARTNER Scale 1:25 Scale 1:25 Oromia Education Bureau 26 400 18 PROJECT

40 Plastered +0.60 +1.30 +1.30 Improvement of Sanitation Facilities and Renovation

130 of School for IDP Lalisa Watta School

20 Taps 100 Masonry Wall LOCATION Oromia Regional State 1300 40 ±0.00 East Welega Zone Woreda Sasiga Wereda +0.60 SCALE DRAWING TITLE 1:25 35 Water Reservoir Platform and Fence,Water Points DATE Masonry Wall & Rain Water harvesting system Details July. 2020 840 REG. NO. SIGN. DR NO. ±0.00 ±0.00 Designed by A.G. AR FIN

HWT DETAIL HAND WASH TROUGH (HWT) PERSPECTIVE VIEW Drawn by REAR ELEVATION LEFT ELEVATION A.S. Scale 1:25 Scale 1:25 Checked by Scale 1:25 Scale 1:25 B.M. 17/19 Approved by S.M. A B 420 A B 278 131 329 22 256 22 120 36 278 1 2 2 1 22 22 1 33 1 Toilet EGA Roof

80 D1 2m2 120 +3.95 +3.95 +3.95

+0.15 Vent Pipe EGA Roof 62 22 Ø75mm +3.15 +3.15 Toilet M M

80 D1 2m2 M 100 M

+2.33 +2.33 +2.33 22 42 550 528 506 550 528 559 EGA Roof 550 polished F.F. Roof Vent Roof Vent Roof Vent +2.00 cement screed Toilet

80 D1 2m2 100

Vent Pipe

±0.00 22 Ø75mm 62 compressed earth block 100 22 156 22 120 G. FLOOR LEVEL G. FLOOR LEVEL G. FLOOR LEVEL G. FLOOR LEVEL Toilet 1375m 1375m 1375m 1375m 120 2m2 89 D1 +0.15 +0.15 +0.15 +0.15 ±0.00 ±0.00 ±0.00 ±0.00

2 22 22 22 2 36 278 North- West Side Elevation South- West Side Elevation 329 Sc. 1:50 Sc. 1:50 COMMUNITY LATRINE ROOF PLAN COMMUNITY LATRINE FLOOR PLAN Sc. 1:50 Sc. 1:50

A B EGA sheet roof Purlins Steel TRUSS

B Ceiling button for Vent cap B A fabric ceiling A +3.95 +3.70 +3.95 +3.70 +3.70 D-01 +3.40 +3.15 +3.15 +3.00 +3.15 +3.00 +3.00 ROOF LEVEL louver top window ROOF LEVEL +2.33 ROOF LEVEL compressed earth block Roof Vent compressed earth block

Corridor Toilet +1.05

Vent Pipe G. FLOOR LEVEL Ø75mm G. FLOOR LEVEL G. FLOOR LEVEL G. FLOOR LEVEL 1375m 1375m G. FLOOR LEVEL G. FLOOR LEVEL 1375m +0.15 +0.15 1375m +0.15 +0.15 ±0.00 ±0.00 +0.15 +0.15 ±0.00 ±0.00 ±0.00 ±0.00 280

50 50 200 50 North - East Side Elevation South - West Side Elevation Sc. 1:50 Sc. 1:50

Dressed stone pavement (Basola) Red ash 45000 compacted selected material 250 500mm-1000mm thick Masonry wall and cement mortar 1 REV -01 30 JULY 2020 UNOPS-ETOH UNOPS - ETOH. 3 cm thick polished cement screed DONOR

5 cm cement screed 50 10 cm RC slab 100 200 100 Government of Japan 25cm hard core PARTNER compacted selected material Oromia Education Bureau Section M-M PROJECT Sc. 1:50 Improvement of Sanitation Facilities and Renovation of School for IDP Lalisa Watta School LOCATION Oromia Regional State East Welega Zone Woreda Sasiga Wereda SCALE DRAWING TITLE 1:50 COMMUNITY LATRINE FLOOR PLAN, DATE ROOF PLAN,SECTION & ELEVATIONS July. 2020 REG. NO. SIGN. DR NO. Designed by A.G. AR FIN Drawn by A.S. Checked by B.M. 18/19 Approved by S.M. Stone Slab Copping Course EGA sheet roof 26 Purlins 25 Steel TRUSS Element ID D1 compressed earth block 24 Ceiling button for fabric ceiling 23 Quantity 4 22 80x40x3mm RHS Purline Orientation L 21 c/c 1250mm Welded to Rafter 20 Frame material 38mm LTZ Profile 19 Gutter 18 Glazing 6mm figured glass fixed 17 +3.00 16 80x40x3mm RHS Rafter ROOF LEVEL 15 View from Side 14 13 BEAM Opposite to Opening 12 down pipe Side 11 80 compressed earth block 10 9 8 ROOF DETAIL: D-01 7 Sc. 1:20 66 6

5 63 4 3 +0.15 2 90 1 80

Bond Pattern Elevation stainless steel gate Ironmongry bolt latch reveted on the inside of toilet door

Internal Finish Schedule Interlock 22 1 2 3

1 5 11 5 1 Floor A F.F. polished cement screed - -

H=115mm 1 Skirting B 100 mm high colored - - cement plaster. 9

11 170cm high colored cement 140cm high colored cement Hydrofoam block Wall C plaster followed by Hydrofoam plaster followed by Hydrofoam faced finished block faced finished block faced finished 1 W=220mm Ceiling D - - - L=220mm TO 250mm

Compressed earth block 1 4 12 4 1 Sill E 30mm thick concrete window sill - - SC. 1:10

1 REV -01 30 JULY 2020 UNOPS-ETOH UNOPS - ETOH.

DONOR Government of Japan PARTNER Oromia Education Bureau PROJECT Improvement of Sanitation Facilities and Renovation of School for IDP Lalisa Watta School LOCATION Oromia Regional State East Welega Zone Woreda Sasiga Wereda SCALE DRAWING TITLE 1:50:1:20 COMMUNITY LATRINE WALL FINISH,WINDOW & DATE DOOR SCHEDULE & ROOF DETAILS July. 2020 REG. NO. SIGN. DR NO. Designed by A.G. AR FIN Drawn by A.S. Checked by B.M. 19/19 Approved by S.M.