’s waterfront leisure destination is transforming 150,000 sq ft leisure scheme set in a stunning location on the waterfront in the heart of

A unique blend of restaurants, cafés and bars including recently opened Cosy Club and Hub Box venues The region’s top comedy club, The Glee, and a new EVERYMAN cinema The focal point of Cardiff Bay, attracts nearly 5.5m visitors per annum It is surrounded by prestigious new offices, contemporary up-market residential projects and complementary leisure uses

Stunning waterfront location Top visitor attractions fan out around Mermaid Quay including the Millennium Centre, the recently relaunched Science Discovery Centre, , The building (the Welsh Parliament’s debating chamber and visitor centre) and The Pierhead These are to be joined by a 15,000-seat arena to be operated by Live Nation and the UK’s new Museum of Military Medicine In addition, there are planning applications for over 5,000 new homes and almost 1.3m sq ft of new offices in the area

now open!

“We’re so proud to finally open our first Welsh venue in the heart of Cardiff Bay.”

Check this out! Click for more information. Now Open! 5-screen

cinema! Everyman’s first cinema in Wales

Click for more information. Now open! Work is already underway New paving, lighting, wall finishes, on a comprehensive refurbishment landscaping, signage and wayfinding, of the public realm, introducing entrance markers, seating and a new contemporary street furniture will transform dockside feel. the visitor experience. South Wales’ leading waterfront leisure destination is now Transformation undergoing a multi-million pound transformation...

i Click for more information. Tacoma Square

Right at the heart of it all will be the new Tacoma Square, a stylish landscaped area where visitors can enjoy the waterfront and which will also play host to the centre’s extensive programme of events and entertainment. Works start Autumn 2021

i Click for more information. Car park extension Transformation The Mermaid Quay car park is to be extended and improved: · Two new floors added to existing car park; · More than 300 new spaces (up to nearly 700), including – 32 accessible spaces – 28 parent & child spaces – 20 spaces with electric vehicle charging points; · Contemporary new look; · New exits and a new layout to reduce peak-time congestion; · A new cycle hub with parking for 60 bikes · Lifts Works start 2022 The Heart of Cardiff Bay Now

PARMER MERMAID ROALD CARDIFF TECHNIQUEST QUAY DAHL WATERSIDE Now open CAR PARK PLASS SENEDD (offices) following £5.7m CARDIFF revamp 389 BAY WALES SPACES MILLENNIUM CENTRE ™ voco EVERYMAN ST CINEMA DAVID’S (5* hotel)

See how things are changing. The Heart of Cardiff Bay Future

ARENA LIGHT RAIL/ 15,000 capacity TRAM STOP multi-purpose Part of proposed event arena £1bn Cardiff proposed MERMAID QUAY “Crossrail” public CAR PARK transport project To be extended to nearly

700 PARMER MERMAID SPACES ROALD CARDIFF TECHNIQUEST QUAY DAHL WATERSIDE Now open CAR PARK PLASS SENEDD (offices) following £5.7m CARDIFF revamp 389 BAY WALES SPACES MILLENNIUM CENTRE ™ LANDSEA voco EVERYMAN GRAVING GARDENS ST CINEMA DOCKS Complementary DAVID’S leisure, hotel (5* hotel) Major new cultural & other uses attraction planned MUSEUM proposed OF MILITARY MEDICINE Including innovative Deep Space immersive visitor experience, proposed for 2022 The Heart of Cardiff Bay Planning Applications 25,000 residential units 25 residential units & 581,251 sq ft offices

432 residential units 180 residential units 201,942 sq ft offices 307 residential units 168,853 sq ft offices 31 residential units 117 residential units 71,289 sq ft offices 190,069 sq ft offices 76,381 sq ft offices 188 residential units

206 residential units

27 residential units

60 residential units

50 residential units More than 1.34 million PEOPLE LIVE IN CARDIFF’S CORE & SECONDARY CATCHMENTS* 361,468 POPULATION OF CARDIFF URBAN AREA**

*Pitney Bowes 2018 **ONS estimate, 2016 26,000 people work in Cardiff Bay* 4.55 million visitor days per annum spent in Cardiff Bay**

*Cardiff Bay/ ward, NOMIS 2016 **Cardiff STEAM 2015 75% of visitors to Mermaid Quay are ABC1* TOTAL ECONOMIC IMPACT OF VISITORS TO CARDIFF BAY £241 MILLION PER ANNUM**

*Mall Research Consultancy, 2016 **Cardiff STEAM 2015 JOLYONS JOLYONS & CWTCH BAR & CWTCH BAR GROUND FLOOR TERRACE LEVEL B BUS STOP DUCHESS B BUS STOP DUCHESS APRIL 2021 OF DELHI APRILW 2021ALES MILLENNIUM OF DELHI WALES MILLENNIUM Customer lifts CustomerCENTRE lifts CENTRE TAXI RANK TAXI RANK Stairs to first floor, public access ELI JENKINS PH Stairs to first floor, public access ELI JENKINS PH

Mermaid TESCO EXPRESS Mermaid Quay Quay Available DOMINO’S RES T

PIZZA RES T Mermaid Mermaid Coming soon A Quay units TAYLORS ESTATE Quay units JRC GLOBAL BUFFET A URANT 101 AGENTS URANT 101 OCEAN BUILDINGS OCEAN BUILDINGS Seating JRC GLOBAL Seating area BUFFET area

UNIT 15 ROALD DAHL PLASS ROALD DAHL PLASS FABULOUS WELSHCAKES

ARD UNIT 19A VIP VIP UNIT 13 LOUNGE

LADBROKES ARD GLEE CLUB PAVERS SHOES CÔTE SERVICE Y UNIT 20 WAGAMAMA SERVICE Y ORGE STREET BUPA DENTAL CARE ORGE STREET GREGGS WAGAMAMA GEMENT BAYSIDE SUITE ZIZZI LA CHA CHA LA CHA CHA BRASSERIE

TAPAS & WINE BAR BUTE STREET TAPAS & WINE BAR BUTE STREET NEW G E NEW G E MAN A P YAKITORI#1 DEMIRO’S P RESTAURANT THE ATRIUM EVERYMAN THE ATRIUM PIERHEAD BELLINI’S PIERHEAD RESTAURANT 380 SPACES 380 SPABUILDINGCES BUILDING ZIA UB ZIA X

BUS STOP Y STAIRS TO BUS STOP EVERYMAN A OSY C L ON SALT SALT OUS L TERRACE UNIT 22 HUBB O C

B Y THE SEA B KEN PICTON A HAIR & SPA LAS OS T KEN PIC T HAIR & S P RIDICU L C RICH B IGUANAS URANT EVERYMAN PIZZA EXPRESS TACOMA A

STUART STUART SIGNOR TACOMA NANDO’S SQUARE ALENTINO STREET STREET V STUART STREET SQUARE STUART STREET REST STAIRS TO TECHNIQUEST EVERYMAN TECHNIQUEST

SUSHI DAY GIN & B BILL’S SUBWAY EVERYMAN BILL’S LOWER BO LOWER BO ARDWALK SENEDD ARDWALK SENEDD THE DOCK THE DOCK ST DAVID’S HOTEL ST DAVID’S HOTEL AKE ASSEMBLY ASSEMBLY LOWER BO LOWER BO GIN & BAKE AQUABUS ARDW AQUABUS ARDW STOP ALK STOP ALK

CADWALADER’S LANDSEA SQUARE 50 SHORT ST LANDSEA SQUARE 50 SHORT ST AY BERTHS AY BERTHS

J D WETHERSPOON C J D WETHERSPOON OFFI C THE BAY THE BAY O N N NOT TO NOT TO SCALE SCALE

GROUND FLOOR TERRACE LEVEL Malcolm Reid T: 020 7409 2100 M: 07850 027 659 e: [email protected] Be part of the

transformation of Chris O’Mahony T: 0117 910 2204 M: 07870 555 988 Mermaid Quay – e: [email protected]\ get in touch today!

mermaidquay .co.uk

Misrepresentation act: While every effort has been made to ensure accuracy, no responsibility is taken for any error, omission or misstatement in these particulars. These particulars do not constitute an offer or contract. No responsibility or warranty whatever is made or given either during negotiations or in particulars by vendor, lessor or the agents. July 2021.

Siren | +44 20 7478 8300 | sirendesign.co.uk | S013169