TSO “Augstsprieguma tīkls”
Varis Boks AS”Augstsprieguma tīkls” Bord member BBaallttiicc aandnd UUPPSS inteerrccoonnnectedd ggrriid
Estonia
Russia Latvia
Lithuania
Poland Belorus Transmission Network
E S TON I A
Ventspils
Ventamonjaks
A
I
S
S
U R Liepâja
330 sadale
L I T HUA NI A
S U R O L E B HHVVNN aaddmmiinniissttrraattiioonn ssttrruuccttuurree
“Augstsprieguma tîkls”
structure TSO number of employees and education
Personal education
Tranmission grid
The length of transmission Networks ( km) 110 kV networks 330 kV networks TSO HVN substations
Substations installed transformers capacity Substations number
IMP TRANSMISSION S Y STEM EXP
330 kV
L . . TRANSMISSION A.T NETWORK 330/110 kV 110 kV
. . . L Tr - ri DISTRIBUTION SYSTEM 110 / 20,10,6 kV 20,10,6 kV 20,10,6 kV
L . . . 6-20 voltage 20,10,6/0.4 kV
DISTRIBUTION NETWORK 0.4 kV 0.4 kV
0,4 voltage
L L
ENTRY CHARGE, AT THE CONNECTION POINT;
EXIT CHARGE, AT THE CONNECTION POINT;
CUSTOMER
4% Sale 80% 41% Distribution
11% 40% Transmission
44% Energy
0%
Tariff structure Electricity Demand Forecast
GWh 13000
11000
9000
7000 Most likely 5000 Maximum
3000
1000 2005 2010 2015 2020 2025 Peak Load Forecast
MW 2800
2600 Fact Most likely 2400 Maxim um
2200
2000
1800
1600
1400
1200
1000 1985 1990 1995 2000 2005 2010 2015 2020 2025 Winter Peak Load Distribution
Year Pmax, MW Incl. network losses, MW 2004 1240 36.5
2025 2120 57
E sto nia
Ventspils Valmiera
67.2 115.8 84.9 133.4 a e s Rīga ic Gulbene lt Tukums a B 31.3 53.6 100.5 59.5 902.1
a
478.9 i
s
Salaspils s
u
R 198.7 120.6 Rēzekne
Brocēni 41.6 63.2 Liepāja Jelgava 25 40.1 Krustpils
85.3 124.4 79.9 214.3 47.8 79.3
Lithuania Daugavpils
81.8 133.5
Load in 2004, MW s ru Load in 2025, MW lo e B Structure of Electricity Supply in Latvia 12000 G Wh D G Power import 10000 C entral Thermal PP C entral H ydro PP 8000
6000
4000
2000
0
5 6 7 8 9 0 1 2 3 4 5 6 7 8 9 0 1 2 3 4 98 98 98 98 98 99 99 99 99 99 99 99 99 99 99 00 00 00 00 00 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2
Average shares of different sources: • Daugava HPP - 46% (25%-65%) • Riga CHP - 20% • Subsidized IPPs - 4% • Import - 30% (10%-50%) Large Power Plants in Latvia Name Start of Number Power operation of units Capacity, MW Plavinas HPP 1965-1966 10 868.5
Kegums HPP-1 1939. 4 72.1 (1947-1953) Kegums HPP-2 1979 3 192
Riga HPP 1974-1975 6 402
Riga CHP-1 2005 3 144
Riga CHP-2 1975-1979 4 390
Total 31 2068.6 Distributed Generation in Latvia (2003) Type Number of Power plants Capacity, MW Hydro 149 26,2 Wind 16 26.9 Biogas 1 2 Landfill gas 1 5,3 Cogeneration 29 67,6 Total 196 128,0 CHPs Under Construction
1. Reconstruction of Riga CHP-2 (1 x 420 MW, CCGT CHP, natural gas); 2. Imanta CHP (in Riga) (48 MW, CCGT CHP, natural gas);
Other Power Plants under Consideration 1. Coal-fired power plant in Ventspils (and / or) Liepaja (400 MW, CHP, coal / biomass / peat); 2. New hydro power plant in Jekabpils and Daugavpils (hydro turbogenerators, JHPP = 30 MW, DHPP=100 MW) 3. Distributed generation, including RES and CHP
Generation distribution in Latvia
Year Pgen, MW 2004 685 2025 2200
E sto nia
Ventspils Valmiera a 5 12 e 5 30 s ic lt a Rīga B Gulbene 6 13
a
1150 i 314
s
s
u
Aizkraukle Rēzekne R 2 8 Jelgava Liepāja 347 488 5 21
425
Lithuania Daugavpils
1 53
Generation in 2004, MW s ru Generation in 2025, MW lo e B 110 kV Transmission Network Development Uz Sindi ESTONI A
Ventspils
Ventamonjaks
Liepāja
R
U
S
S
I A
LITHUANIA
S U R O L E A p z ī m ē j u m i : B Elektrostacija 330 kV gaisvadu līnijas 110 kV gaisvadu līnijas Apakšstacijas 330 kV 110 kV kabeļu līnijas Apakšstacijas 110 kV 330 kV perspektīvās EPL Persp ektīvās apakšstacijas 110 kV perspektīvās EPL 110 kV Transmission Network
Developmeuz Cnarnikavu t in Riga Region Vecāķi
Bolderāja 1 Vecmīlgrāvis
Daugavgrīva Mīlgrāvis Bolderāja 2 Mežaparks uz Ropažiem Osta
Sarkandaugava Berģi
Salamandra
T E C 1
VEF Vairogs Jugla
I m a n t a Spilve Skanste
uz Priedaini Iļģuciems II Andrejsala Purvciems
Iļģuciems Grīziņkalns Bastejkalns Matīsa Hanza Zemitāni
Zunda Centrālā Vēsturiskais Zolitūde centrs Deglava
Mārupe Biblioteka
Torņakalns
Lucavsala Bieriņi Jāņciems Krasta T E C 2
Apzīmējumi:
r i
g u z S a l a s p i l i
u z O 330 kV apakšstacija
B i š u c i e m s Sķirotava 110 kV apakšstacija Granīta 330 kV EPL Tīraine Dienvidu tilts 110 kV EPL Dārziņi Perspektīvā 110 kV apakšstacija Rumbula u i ain Ol z z Perspektīvā 330 kV EPL u Ķe ka vu Perspektīvā 110 kV kabeļlīnija Salaspils
u z J e gl a Perspektīvā 110 kV gaisvadu līnija uv
R H E S Possible Interconnections between Latvian and Neighbouring Power Systems Kingisepp Estlink
Harku Püssi
Kiisa Paide Eesti Lihula Tartu Sindi
Pskov
Var. B Tsirguliina Velikoreckaja West Baltic Link to Gotland Island Var. A Valmiera Gulbene New coal PP Ventspils 200-400 MW Latvija Rossija Rīga Salaspils Pļaviņas Brocēni Krustpils Rēzekne Jelgava Ķegums New coal PP Daugavpils 200-400 MW Grobiņa Līksna Mažeikiai Panevežys Telšiai Utena Polock Swindlit Šiauliai Ignalina
Klaipēda Lietuva Jonava Kaunas Lietuvos ES Smorgon Sovetsk Jurbarkas Molodechno Kruonio Rossija Vilnius Alytus Kaliningrad CHP Kaliningrad Belarus
Elk Lida
Matki
Elblag
Narew