Draft Design and Monitoring Framework

Total Page:16

File Type:pdf, Size:1020Kb

Draft Design and Monitoring Framework Draft Design and Monitoring Framework Project Number: 38272 August 2011 IND: Uttarakhand Urban Sector Development Investment Program Tranche 2 A design and monitoring framework is an active document, progressively updated and revised as necessary, particularly following any changes in project design and implementation. In accordance with ADB’s public communications policy (2005), it is disclosed before appraisal of the project or program. This draft framework may change during processing of the project or program, and the revised version will be disclosed as an appendix to the report and recommendation of the President. DESIGN AND MONITORING FRAMEWORK FOR PROJECT 2 Performance Targets and Data Sources and Assumptions Design Summary Indicators Reporting Mechanisms and Risks Impact Assumptions People, especially Pressured water supply Water supply and State government or vulnerable household,a will hours increased from 2-8 sewerage operators’ or regulator regularly revises have increased access to hours per day in 2007 to 24 third party validators’ the user charges on time. better quality and hours in 2016. service quality compliance Government financed sustainable urban Centralized sewerage reports. water supply works in infrastructure and services systems’ sewage collection Dehradun, Nainital, in 31 urban towns. from household under Haldwani, and Haridwar (synchronized with MFF’s increased from 0% in 2007 completes on time. DMF outcome) to 60% of households in UDD implements SWM, 2016. urban road, slum- Coverage of regular daily ULBs’ and waste upgrading subprojects household waste collection collection operators’ under projects 3 and 4. increased from 0% to 72% reports on household Risks of households in 2016. waste collection. Power supply to WTP, Vehicle travel time per PWD and ULB’s road STP and pumping stations kilometer reduced from [] in conditions surveys. becomes intermittent. 2007 to [] hours in 2016. O&M cost recovery from UJS’s balance sheet for the user charges increased water supply and from 30% in 2007 to 100% sewerage. in 2016. Outcome Assumptions UDD and UUDSA improve NRW reduced from Water supply and UJS and ULBs retain the infrastructure and 40%-60% in 2010 to less sewerage operators’ or trained staff for water operational sustainability in than 20% by 2016 in all third party validators’ supply operations in each water supply in 5 towns subproject towns by 2016. service quality compliance town. and sewerage 100% of STP effluent reports. infrastructureb in 2 towns. quality samples met the STP operators’ influent (consolidated MFF’s DMF government quality and effluent quality outputsc) standards by 2016. (no monitoring reports. STP in 2010) Water charge collection UJS’s balance sheet for efficiency increased from water supply and 49% in 2010 to 80% by sewerage. 2016. Sewer charge collection UJS’s balance sheet for efficiency increased from water supply and 38% in 2010 to 80% by sewerage. 2016. Outputs Assumptions 1.1 Water supply 160,000d metered piped PMU and PIU’s Subproject lands are infrastructure rehabilitated connections newly installed monitoring of project successfully transferred and constructed in at households by 2016. progress following ADB policy. Dehradun, Nainital, Four WTP (68 mld total) (sex-disaggregated and All statutory clearances Haldwani, Ramnagar and constructed and poverty level categorized are granted by government Roorkee. rehabilitated by 2016. baseline data) agencies on time. 780 km of pipes newly laid by 2016. 1.2 Sewerage 26,000d new house PMU and PIU’s Assumptions infrastructure rehabilitated connections provided in monitoring of project Subproject lands are and constructed in Roorkee by 2016. progress successfully transferred Roorkee and designed in One STP (28 mld) (sex-disaggregated and following ADB policy. Ramnagar. constructed by 2016. poverty level categorized All statutory clearances 120 km of sewer network baseline data) are granted by government newly aid in Roorkee by agencies on time. 2016. 2 Performance Targets and Data Sources and Assumptions Design Summary Indicators Reporting Mechanisms and Risks 2. Performance of water 100% of customer billede Water supply operators’ Risks supply operations by 2014. or third party validators’ Few water operators improved in Nainital. Water supply O&M staff service quality compliance participate in bidding in increased from 25 to 73f by reports. Nainital. 2016 Water supply operators’ NRW maintained at less customer records. than 20% between 2014 and 2016. 3. PMU and PIU’s Contract award and Project information Assumptions subproject management disbursement achieved not newsletters from the PMU Trained staff stays with capacity and transparency less than 80% of the annual and PIUs. PMU and PIUs. strengthened. targets in each year from Training seminar 2008-2016. attendance and completion Project information and certificates. audit reports published regularly from 2012.g 10 PMU and 18 PIU staffh trained in ADB policies and procedures. Activities with Milestones Inputs 1.1 Water supply infrastructure rehabilitated and constructed in Dehradun, Project 2 Nainital, Haldwani, Ramnagar and Roorkee. ADB $100 million 1.1.1 Subproject land identified and transferred as required (Q4 2010-Q1 2012) Government $43 million 1.1.2 Detailed engineering designs prepared (Q4 2010-Q3 2011) Total $143 million 1.1.3 Bid documents prepared (Q3 2011) 1.1.4 Assets constructed (Q4 2011- Q4 2014) 1.1.5 Systems commissioned (Q4 2014) 1.1.6 Systems operated (from Q1 2015) 1.2 Sewerage infrastructure rehabilitated and constructed in Roorkee and designed in Ramnagar. 1.2.1 Additional surveys undertaken in Ramnagar (Q4 2011-Q3 2012) 1.2.2 Ramnagar subproject feasibility study finalized (Q3 2012) 1.2.3 Subproject land identified transferred as required in Ramnagar. (Q3 2012) 1.2.4 Subproject land identified and transferred in Roorkee. (Q4 2010-Q1 2012) 1.2.5 Detailed engineering design prepared for Roorkee (Q4 2010-Q3 2011) 1.2.6 Assets constructed for Roorkee (Q3 2011-Q4 2015) 1.2.7 System commissioned in Roorkee (Q4 2015) 1.2.8 System operated in Roorkee (from Q1 2016) 2 Performance of water supply operations improved in Nainital.. 2.1 Operations consultants selected. (Q2 2012-Q4 2012) 2.2 Additional O&M staff fielded by operations consultants (Q1 2013) 2.3 O&M manual prepared by operations consultants (Q1 2013-Q2 2013) 2.4 Technical water loss identified and managed (Q1 2013-Q4 2015) 2.5 OJT of ULB staff provided by operations consultants (Q1 2013-Q4 2015) 3 Subprojects managed on time within budget with improved transparency and safeguards compliance. 3.1 Additional PIU filed office established (Q3 2011-Q4 2011) 3.2 Works contracts procured and administered (Q4 2010-Q4 2015) 3.3 Consultant contracts extended (Q4 2012) 3.4 Project 2 PPMS developed by PMC and DSC (Q4 2011) 3.5 Project website and newsletter prepared by PMU (Q1 2012) ADB = Asian Development Bank; DSC = design and construction supervision consultant; DMF = design and monitoring framework, GIS = geographic information system; JNNURM = Jawaharlal Nehru National Urban Renewal Mission; km = kilometer; lpcd = liter per capita per day; MFF = multitranche financing facility; mld = million liters per day; MOUD = Ministry of Urban Development; NRW = nonrevenue water; OJT = on-the-job training; O&M = operations and maintenance; PIU = project implementation unit; PMC = program management consultant; PMU = program management unit; PPMS = project performance monitoring system; PWD = Public Works Department; Q = quarter; STP = sewage treatment plant; SWM = solid waste management; TPRM = ADB, Government and executing agencies’ tripartite portfolio review meeting; UDD = Urban Development Department; UJS = Uttarakhand Jal Sansthan; UUSDA = Uttarakhand Urban Sector Development Agency; ULB = urban local bodies; WTP = water treatment plant. 3 a “Vulnerable households” is defined as those fulfilling five or more of the following criteria: (i) household belongs to most backward communities, (ii) head of household is a woman, (iii) head of household is illiterate, (iv) head of household is working as a daily wage laborer, (v) household with income below poverty line, and (vi) household residing in a kutcha house. b Project 2 will results in (i) population with access to 24x7 water supply increased from 0 in 2010 to 2.2 million in 2016; and (ii) population with access to sewerage system increased from 0 in 2010 to 130,000 in 2016. These figures include men, women and children, and cases disaggregated by sex and age. c In accordance with ADB. 2007. Guidelines for Preparing a Design and Monitoring Framework. Manila. the outputs in the investment program DMF are the respective projects, and each output statement of the investment program DMF becomes the outcome of the respective project to be funded by a PFR. Also, the guidelines state more than one outcome need to be either rephrased into outputs or summarized into a single statement associated with several indicators outlining the dimensions of the outcome. d 19% of which are poor women-headed households e Billing will be made based on user charges structure incorporates concessionary rates for vulnerable households. f at least 25% of whom are women g Including the progress of implementation of gender, safeguards and other social plans. h At least 15% of key positions and 30% of support staff are women. Sources: Asian Development Bank estimates. .
Recommended publications
  • Directory Establishment
    DIRECTORY ESTABLISHMENT SECTOR :URBAN STATE : UTTARANCHAL DISTRICT : Almora Year of start of Employment Sl No Name of Establishment Address / Telephone / Fax / E-mail Operation Class (1) (2) (3) (4) (5) NIC 2004 : 0121-Farming of cattle, sheep, goats, horses, asses, mules and hinnies; dairy farming [includes stud farming and the provision of feed lot services for such animals] 1 MILITARY DAIRY FARM RANIKHET ALMORA , PIN CODE: 263645, STD CODE: 05966, TEL NO: 222296, FAX NO: NA, E-MAIL : N.A. 1962 10 - 50 NIC 2004 : 1520-Manufacture of dairy product 2 DUGDH FAICTORY PATAL DEVI ALMORA , PIN CODE: 263601, STD CODE: NA , TEL NO: NA , FAX NO: NA, E-MAIL 1985 10 - 50 : N.A. NIC 2004 : 1549-Manufacture of other food products n.e.c. 3 KENDRYA SCHOOL RANIKHE KENDRYA SCHOOL RANIKHET ALMORA , PIN CODE: 263645, STD CODE: 05966, TEL NO: 1980 51 - 100 220667, FAX NO: NA, E-MAIL : N.A. NIC 2004 : 1711-Preparation and spinning of textile fiber including weaving of textiles (excluding khadi/handloom) 4 SPORTS OFFICE ALMORA , PIN CODE: 263601, STD CODE: 05962, TEL NO: 232177, FAX NO: NA, E-MAIL : N.A. 1975 10 - 50 NIC 2004 : 1725-Manufacture of blankets, shawls, carpets, rugs and other similar textile products by hand 5 PANCHACHULI HATHKARGHA FAICTORY DHAR KI TUNI ALMORA , PIN CODE: 263601, STD CODE: NA , TEL NO: NA , FAX NO: NA, 1992 101 - 500 E-MAIL : N.A. NIC 2004 : 1730-Manufacture of knitted and crocheted fabrics and articles 6 HIMALAYA WOLLENS FACTORY NEAR DEODAR INN ALMORA , PIN CODE: 203601, STD CODE: NA , TEL NO: NA , FAX NO: NA, 1972 10 - 50 E-MAIL : N.A.
    [Show full text]
  • UTTARAKHAND Sectorwise Gross District Domestic Product (GDDP ) for the Year : 2005-06 ( at Current Prices) Rs Lakh Sr
    UTTARAKHAND Sectorwise Gross District Domestic Product (GDDP ) for the year : 2005-06 ( At Current Prices) Rs Lakh Sr. District Agricul- Forestry Fishing Mining & Manufa- Regi- Un Electricity, Constru- Trade,Hotels Railways No. Name ture & Logging Quarrying cturing stered regd. Gas & ction & Resta- MFG. MFG. MFG. W.supply urants 1 2 3 4 5 6 7 8 9 10 11 12 13 1 Uttarkashi 23523 3512 11 136 1495 111 1384 1280 8701 5600 0 2 Chamoli 29078 1752 25 1356 3326 256 3070 6869 16217 10214 134 3 Rudraprayag 9097 695 7 559 1199 205 994 514 9720 7458 384 4 Tehri Garhwal 37811 1080 8 9938 7940 4891 3049 3059 40788 24927 201 5 Dehradun 32657 6148 40 4897 16489 1255 15234 8649 72430 108870 7087 6 Garhwal 27110 2444 17 1836 16527 13332 3195 4020 23831 27803 393 7 Pithoragarh 29542 963 19 1143 4994 119 4875 2853 18667 15547 86 8 Bageshwar 12914 922 6 1527 1605 154 1451 749 8937 6521 67 9 Almora 51898 1002 11 549 5963 1681 4282 2420 22812 20160 460 10 Champawat 17192 4616 5 1551 2078 179 1899 981 6652 8814 67 11 Nainital 37345 12942 10 18250 22460 13298 9162 3672 29806 53824 6886 12 Udham Singh Nagar 82737 7606 541 1514 42652 23267 19385 2213 35013 73509 4575 13 Hardwar 92540 4058 353 5687 210124 186892 23232 3396 55220 90764 14732 Source: Directorate of Economics and Statistics,Govt. of Uttarakhand 1 of 8 UTTARAKHAND Sectorwise Gross District Domestic Product (GDDP ) for the year : 2005-06 ( At Current Prices) Rs Lakh Sr.
    [Show full text]
  • Common Service Center, District-Haridwar
    VLEs Details -Common Service Center, District-Haridwar SN District Tehsil Block VLE Name Contact Number Panchayat Address 1 HARIDWAR Laksar bhagwanpur Ajeet Singh 8650594978 Bhurna Laksar Laksar 2 HARIDWAR Hardwar Bhadrabad Sumit Tiwari 9045000108 \N Raamgarh Bheemgodakhadkhadiharidwaruttarakhand 3 HARIDWAR Roorkee laksar Bindu 9410710758 Raheempur 4 HARIDWAR Roorkee laksar Alok Kumar 8909464540 Imlikhera Imlikhera Dharampur Roorkee 5 HARIDWAR Roorkee narsan Praveen Kumar 9837194900 Sherpur Khelmau 6 HARIDWAR Roorkee Roorkee Anuj Kumar 9639829870 Bajuhedi mooldaspur roorkee 7 HARIDWAR Roorkee Roorkee Amit Kumar 8560579592 Mooldaspur 8 HARIDWAR Roorkee Bhadrabad Alka 9720860085 Mandawali Mandawali Narsan 9 HARIDWAR Roorkee Bhadrabad Deepak Kumar Singh 8433407886 Paniyala Chandapur Paniyala Chandpur 10 HARIDWAR Roorkee bhagwanpur Sonu Kumar 9927141508 Sikanderpur Bhainswal SIKANDERPUR ROAD PRIMARI SCHOOL SIKANDERPUR 11 HARIDWAR Laksar Roorkee Devender Kumar 9758692310 Dhadheki Dhana Laksar 12 HARIDWAR Laksar narsan Ajeet Kumar 7617642205 Kanewali Raisingh 13 HARIDWAR Roorkee Bhadrabad Vipin Kumar Agarwal 7535970405 \N 7 Civil Lines 7 Civil Lines Roorkee 14 HARIDWAR Laksar Laksar MANISH KUMAR 7351234344 Munda Khera Khurd SOCIETY ROAD LAKSAR 15 HARIDWAR Roorkee Bhadrabad Bhupendra Singh 9520378210 \N Left Canal Road 13/2 Left Canal Road Roorkee 16 HARIDWAR Roorkee laksar Sandeep Kumar Saini 9837543618 Khatka Roorkee Roorkee 17 HARIDWAR Roorkee Roorkee Jishan Ali 9837376973 Jainpur Jhanjheri JAINPUR JHANJHERI JAINPUR JHANJHERI 18 HARIDWAR
    [Show full text]
  • (Муссури) Travel Guide
    Mussoorie Travel Guide - http://www.ixigo.com/travel-guide/mussoorie page 1 Max: 19.5°C Min: Rain: 174.0mm 23.20000076 When To 2939453°C Mussoorie Jul Mussorie is a picturesque hill Cold weather. Carry Heavy woollen, VISIT umbrella. station that offers enchanting view Max: 17.5°C Min: Rain: 662.0mm of capacious green grasslands and 23.60000038 http://www.ixigo.com/weather-in-mussoorie-lp-1145302 1469727°C snow clad Himalayas. A sublime Famous For : City Aug valley adorned with flowers of Jan Cold weather. Carry Heavy woollen, different colors, cascading From plush flora and fauna to rich cultural Very cold weather. Carry Heavy woollen, umbrella. waterfalls and streams is just a heritage, Mussoorie is a hill station that has umbrella. Max: 17.5°C Min: Rain: 670.0mm 23.10000038 everything to attract any traveler. Popularly Max: 6.0°C Min: Rain: 51.0mm 1469727°C feast to eyes. 6.800000190 known as "the Queen of the Hills", the hill is 734863°C Sep at an elevation of 6,170 ft, thus making it a Feb Cold weather. Carry Heavy woollen, perfect destination to avoid scorching heat Very cold weather. Carry Heavy woollen, umbrella. of plains. The number of places to visit in umbrella. Max: 16.5°C Min: Rain: 277.0mm 21.29999923 Mussoorie are more than anyone can wish Max: 7.5°C Min: Rain: 52.0mm 7060547°C 9.399999618 for. Destinations like Kempty Falls, Lake 530273°C Oct Mist, Cloud End, Mussoorie Lake and Jwalaji Mar Cold weather. Carry Heavy woollen, Temple are just the tip of the iceberg.
    [Show full text]
  • CTRI Trial Data
    PDF of Trial CTRI Website URL - http://ctri.nic.in Clinical Trial Details (PDF Generation Date :- Wed, 29 Sep 2021 00:41:18 GMT) CTRI Number CTRI/2020/06/025642 [Registered on: 05/06/2020] - Trial Registered Prospectively Last Modified On 26/05/2020 Post Graduate Thesis Yes Type of Trial Interventional Type of Study Other (Specify) [LARYNGOSCOPE] Study Design Randomized, Parallel Group, Active Controlled Trial Public Title of Study Comparision Of, Changes in Body, During Intubation In Raised Blood Pressure Patient By Using Different Laryngoscope Scientific Title of Comparative study of Hemodynamic response during Laryngoscopy and Endotracheal Intubation Study with MacIntosh, MacCoy and King Vision Video Laryngoscope in Controlled Hypertensive Patients Secondary IDs if Any Secondary ID Identifier NIL NIL Details of Principal Details of Principal Investigator Investigator or overall Name URMILA PALARIA Trial Coordinator (multi-center study) Designation Professor Affiliation Government Medical College, Haldwani Address Dr Urmila Palaria, Department Of Anaesthesiology Critical Care Pain And Palliative Medicine, Government Medical College Rampur Road, Haldwani, Nainital, 263139 Uttarakhand India Nainital UTTARANCHAL 263139 India Phone 9897088443 Fax Email [email protected] Details Contact Details Contact Person (Scientific Query) Person (Scientific Name Urmila Palaria Query) Designation Professor Affiliation Government Medical College, Haldwani Address Dr Urmila Palaria, Department Of Anaesthesiology Critical Care Pain And Palliative
    [Show full text]
  • Uttarakhand Emergency Assistance Project: Rehabilitation of Damaged Roads in Dehradun
    Initial Environmental Examination Project Number: 47229-001 December 2014 IND: Uttarakhand Emergency Assistance Project Submitted by Uttarakhand Emergency Assistance Project (Roads & Bridges), Government of Uttarakhand, Dehardun This report has been submitted to ADB by the Program Implementation Unit, Uttarkhand Emergency Assistance Project (R&B), Government of Uttarakhand, Dehradun and is made publicly available in accordance with ADB’s public communications policy (2011). It does not necessarily reflect the views of ADB. Initial Environmental Examination July 2014 India: Uttarakhand Emergency Assistance Project Restoration Work of (1) Tyuni–Chakrata-Mussoorie–Chamba–Kiriti nagar Road (Package No: UEAP/PWD/C23) (2) Kalsi- Bairatkhai Road (Package No: UEAP/PWD/C24) (3) Ichari-Kwano-Meenus Road (Package No: UEAP/PWD/C38) Prepared by State Disaster Management Authority, Government of Uttarakhand, for the Asian Development Bank. i ABBREVIATIONS ADB - Asian Development Bank ASI - Archaeological Survey of India BOQ - Bill of Quantity CTE - Consent to Establish CTO - Consent to Operate DFO - Divisional Forest Officer DSC - Design and Supervision Consultancy DOT - Department of Tourism CPCB - Central Pollution Control Board EA - Executing Agency EAC - Expert Appraisal Committee EARF - Environment Assessment and Review Framework EC - Environmental Clearance EIA - Environmental Impact Assessment EMMP - Environment Management and Monitoring Plan EMP - Environment Management Plan GoI - Government of India GRM - Grievance Redressal Mechanism IA -
    [Show full text]
  • Dehradun, India Sdgs Cities Challenge Snapshot
    SDGs Cities Challenge Module Three Dehradun, India SDGs Cities Challenge Snapshot Challenge Overview Urban service delivery in Dehradun is facing increasing stress due to high levels of urbanisation and governance gaps in the service delivery architecture. Dehradun, being the state capital, caters to a wide range of institutional, educational and tourism needs. The provisioning of urban infrastructure in the city – both quantity and quality - has not kept pace with the rapid rate of urbanisation over the past two decades. RapidThe extremely urbanisation, narrow coupled roads in with the core unprecedented city area, inadequate growth in traffic management numberthroughout of register the city edand vehicles a general and lack influx of proper of vehicles road hierarchy on city requires a sustained roadseffort overfrom a surrounding period of time areas, to reorganise has contributed the road tosector. large Public-scale transport, which is in increasea rudimentary of traffic state, in alsothe city.requires The largeextremely scale investmentnarrow roads to supportin economic activity thecommensurate core city area, with inadequate the growth trafficpotential. management With more than 300 schools in the city, the throughoutincreasing intensity the city of and traffic a general has resulted lack of in proper traffic congestion road and delays and increased accidents and pollution levels. which pose potential threat to the safety hierarchy requires a sustained effort over a period to and security of school students during their commute to schools. reorganise the road sector. Our proposal calls for a child friendly mobility plan for the city, with Our challenge is to plan our urban communities and city- emphasis on providing access to safe and affordable mobility systems in neighbourhoods in a way that makes the city accessible to their journey between home and school.
    [Show full text]
  • The Preparatory Survey for Uttarakhand Forest Resource Management Project in India
    Japan International Cooperation Agency (JICA) Forest Department The State of Uttarakhand, India The Preparatory Survey for Uttarakhand Forest Resource Management Project in India Final Report Volume I I I: Attachment February 2014 NIPPON KOEI CO., LTD. JICA Pr eparatory Sur vey for Uttarakhand Forest Resource Management Project ATTACHMENT List of Attachment Attachment 2.2.1 Socio-economic Profile of Uttarakhand ................................................................................. 1 Attachment 2.7.1 Relevant Projects/ Programs on Watershed Management, Forestry Sector and Livelihood Improvement .......................................................................................................................... 4 Attachment 2.7.2 Map: Watershed Forest Projects ............................................................................................ 5 Attachment 2.7.3 List of Districts and Blocks covered by Watershed Management/ Livelihood Projects ........ 6 Attachment 2.7.4 List of Divisions covered by Forestry related Projects .......................................................... 7 Attachment 3.1.1 Map: Project Area Priority Ranges ........................................................................................ 8 Attachment 3.1.2 List of Recommended Priority Ranges and their District and Tehsil (Sub-District) .............. 9 Attachment 3.2.1 Map: Forest Crown Density Uttarakhand, 2011 .................................................................. 10 Attachment 3.2.2 Division-Wise Forest Cover ...............................................................................................
    [Show full text]
  • Dehradun Mussoorie Ropeway Project District Dehradun Uttarakhand
    DEHRADUN MUSSOORIE ROPEWAY PROJECT DISTRICT DEHRADUN UTTARAKHAND An Uttarakhand Tourism Development Board Initiative Government of Uttarakhand Dehradun April 2018 INDEX 1. Objective 2. Project 3. Alignment 4. Technology 5. Annual Traffic 6. Purkulgaon 7. Mussoorie 8. Project Area 9. Estimated Project Cost 10. Ropeways – Infrastructure Status 11. Proposed PPP Structure 12. Proposed Eligibility Criteria 13. EOI Application 2 OBJECTIVE Ropeways / Cable Cars - An Integrated & Sustainable Transport Solution for twin cities of Dehradun & Mussoorie • Would reduce vehicular traffic on Mussoorie road, thereby reducing pollution / congestion. • Reduce travel time in peak season - 2 /3 hours to about 20 min. • Resolve Parking issues • Best suited for eco-sensitive zone such as Doon Valley • An added attraction for the city 3 PROJECT Aerial Passenger Ropeway between Dehradun (Purkulgaon / Mussoorie Road) and Mussoorie (Library taxi stand) Multi-level Parking & other commercial developments at Terminal Points. 4 ALIGNMENT 30°27'35.50"N 78°3'58.50"E 30°24'47.00"N 78°4'2.00“E 5 TECHNOLOGY Items Description Length of the Ropeway 5.58 kms (approx.) Vertical rise 1,006 m Proposed Technology Mono-cable Detachable Gondola (MDG) Design Capacity 2000 PPHPD Line Speed (avg.) 4.5 m / sec Travel Time (approx) 18 - 20 min. Towers 30-35 Cabins (both directions) 75 Seating capacity 10 Terminal Stations 2 Construction Period 2 years Standards CEN / IS 6 MUSSOORIE ANNUAL TRAFFIC (in lakhs) Decadal cumulative annual growth rate is 2.9% Source: Tourism Department, Government of Uttarakhand 7 PURKULGAON (PROPOSED LOWER TERMINAL POINT) 8 LAND AVAILABILITY Khasra No. Area in Ha. 236 GHA 2.265 242 1.424 237 1.947 Total 5.636 Tourism land as per govt.
    [Show full text]
  • Dr Bhuwan Chandra Melkani Dept of Commerce MB
    BIO-DATA 1. Name and full correspondence address : Dr Bhuwan Chandra Melkani Dept of Commerce M. B. Govt. P. G. College, Haldwani (Nainital) Uttarakhand – 263139 2. E-mail and contact number(s) : [email protected] 9411161894(M) 3. Institution : M. B. Govt. P. G. College, Haldwani (Nainital) Uttarakhand 263139 4. Date of Birth: 28-03-1980 5. Academic Qualification (Undergraduate Onwards) S. Degree Year Subject University/Institution Division No. 1 B. Com 2000 Mgmt Group 1st Kumaun University, Nainital Second ,Accounting Group-2nd Bus, Eco and Business Law-3rd Group 2 M. Com 2002 Commerce(Accounting Kumaun University, Nainital Second Group) 3 Ph. D 2007 Commerce Kumaun University, Nainital - 6. Ph. D thesis title: Uttaranchal Main Zila Dudgh Utpadak Sahkari Sanghon Ki Karya Pranali Ka Mulyankan 7. Work experience 1 Contract Govt. Degree College, Jaiti, 25 Sep 2010 02 Jan Fixed Salary Lecturer Ramnagar & M.B.G.P.G 2017 College, Haldwani 2 Assistant M.B.G.P.G College, 02 Jan Still working 15600-39100 Professor Haldwani 2017 8. No. of Ph. D./M. Phil guided (Pursuing/Awarded Degree) S. No. Name of Student Title of Ph. D/M. Phil Year of Award 1. Anil Kumar - Pursuing 2. Tanuj - Pursuing 3. Vineet Pathak - Pursuing 4. Mukesh Upadhya - Pursuing 9. Published Books/Reports/Chapters/Articles etc.(Article published in ISBN only) S. Chapter Title/Paper Book Title Author’s Name Publisher Year with No. Title /Article/Journal ISBN Name 1 GST & Indian GST-A Road Map of Bhanu,Vinay 2018 Economy:Issues & Economic & Bhuwan Chandra Challenges Development for Melkani ISBN 978-93- (pg no- 8-13) New India 82972-25-9 2 ग्रामीण महिऱाओ के Vidyawarta Bhuwan Chandra Vidyawarta Vol-08, Issue सशक्तिकरण मे द嵍ु ध Melkani 15, 2016 핍यवसाय की भूममका (pg No- 153-157) ISSN 2319- 9318 3 महिऱाओ के सामाक्िक Research Journal of Bhuwan Chandra Madhya Pradesh 2010 एवं आ셍थिक ववकास मे Social & Life Melkani Vol-08,Year 04 महिऱा डरे ी की भूममका Sciences (pg No- 947-950) ISSN 0973- 3914 10.
    [Show full text]
  • Company Detail
    Company Detail S Categories of Product Company Name Address Licence No Licence Date Validity No. Permitted M/ s Aglomed Ltd. C/o Plot no. 14, Sector 6A, Form 25-A: 29/UA/LL/of 2005 tablets, capsules, oral 1 M/s Divin Formulation Sidcul IIE, BHEL, Form 28-A: 24/UA/LL/SC/P of 28/10/2005 31/12/2010 liquids, injectables Pvt. Ltd Haridwar 2005 (b_lactum & non b_lactum) cream, face mask, F-117, Industrial Area 2 M/s A.R.Z. Enterprises Form 32: 13/C/UA/2004 17/08/2004 16/08/2009 shampoo, scrub, sun screen Bhadrabad, Haridwar lotion, moisturizer M/s A.K. Laboratories Ltd Form 25-A: 4/UA/LL/ of 2005 Sec 6A, IIE, Sidcul, tablets, capsules & liquid 3 C/o Akums Drugs & Form 28-A: 3/UA/LL/SC/P of 15/04/2005 14/04/2010 Ranipur, Haridwar (UA) oral Pharmaceuticals Ltd. 2005 tablets, capsules, liquid orals & external Plot No. 20, Sec 3, IIE Form 25: 9/UA/2007 Form 28: 4 M/s Acacia Biotech Ltd. 24/01/2007 23/01/2012 preparation (non b_lactum) Sidcul, U.S. Nagar 10/UA/SC/p-2007 & tablets, capsules & dry powder (b_lactum) M/s Acinta Plot no.- 21, Raipur, Tablets, Capsules, Liquid From 28-A-59/UA/LL/SC/P- Pharmaceuticals Pvt.Ltd. Bhagwanpur, Roorkee, Orals, Ointment & Dry 5 2010, Form 25-A- 25/05/2010 04/05/2015 C/o M/s APS Biotech Distt. Haridwar, Syrup of other than beta 53/UA/LL/2010 Pvt.Ltd. Uttrakhand Lactum antibiotics Plot No.
    [Show full text]
  • Water Equity and Tourism: a Case of Nainital District, Uttarakhand Yamini Yogya
    Water Equity and Tourism: A Case of Nainital District, Uttarakhand Yamini Yogya Introduction This study is based on fieldwork that was carried out in the North Indian state of Uttarakhand over the course of a few years since 2014 under two projects. The first project was the Himalayan, Adaptation, Water and Resilience, where I was involved in the capacity of a research intern. The objective of the working package I was a part of aimed at exploring the impact of climate change on the livelihoods of communities living in the Upper Ganga Basin. The second project, carried out in the Kumaon region of Uttarakhand mapped the impact of multiple stressors (both climatic and non- climatic) on mountain farmers in two blocks of the Nainital district. This paper draws from both field experiences and data, but focusses primarily on observations and on- field narratives from Ramgarh and Dhari blocks of Nainital district in Uttarakhand. Urbanization and the increase in tourism infrastructure in the district over the past decade has resulted in a conflict over water access and equity. An increase in tourism operators in the region has led to a change in the social and cultural fabric of the norms that had been in place for decades. The development of tourism infrastructure has put an incredible amount of pressure on an already fragile mountain ecosystem, and necessitates the inequitable sharing of an extremely limited natural resource. At the village level, the local self-government or the Panchayat is tasked with dealing with conflicts that arise from the mis-appropriation of water.
    [Show full text]