Design Guide for Rural Substations

Total Page:16

File Type:pdf, Size:1020Kb

Design Guide for Rural Substations United States Department of Agriculture Design Guide for Rural Utilities Service Rural Substations RUS Bulletin 1724E-300 Issued June 2001 (BLANK PAGE) UNITED STATES DEPARTMENT OF AGRICULTURE Rural Utilities Service RUS BULLETIN 1724E-300 SUBJECT: Design Guide for Rural Substations TO: All RUS Borrowers RUS Electric Staff EFFECTIVE DATE: Date of approval. OFFICE OF PRIMARY INTEREST: Transmission Branch, Electric Staff Division. INSTRUCTIONS: This bulletin is an update and revision of previous REA Bulletin 65-1, “Design Guide for Rural Substations” (revised June 1978). Replace previous Bulletin 65-1 with this bulletin and file with 7 CFR Part 1724. AVAILABILITY: This bulletin is available on the Rural Utilities Service website at: http://www.usda.gov/rus/electric PURPOSE: This bulletin provides a basic design guide and a reference tool for designing rural substations. GENERAL: This Bulletin has been revised to bring the publication up to date with latest industry standards, current RUS format, and technical requirements. Our thanks to Cooperative Research Network of the National Rural Electric Cooperative Association, (NRECA) which has supported this project, and it's consultant Burns & McDonnell Engineering Company for the work which has made it possible to put this revision of the design guide together. The following current and former members of the Substation Subcommittee of the (NRECA), Transmission and Distribution (T&D) Engineering Committee provided invaluable assistance in preparing this document. 1. Bardwell, Jim, SGS Witter, Inc., Albuquerque, New Mexico 2. Chapman, George, Patterson & Dewar Engineers, Inc., Decatur, Georgia 3. Eskandary, Mike, USDA-RUS-ESD-TB, Washington, DC 4. Howard, Jerrod, Central Electric Power Co-op, Inc., Columbia, SC 5. Kahanek, Bil, Lower Colorado River Authority, Austin, TX 6. Myers, Tom, Berkeley Electric Co-op, Moncks Corner, SC 7. Malone, Ken, Middle Tennessee EMC, Murfreesboro, TN 8. Nicholson, Norris, USDA-RUS-ESD-TB, Washington, DC Bulletin 1724E-300 Page 5 TABLE OF CONTENTS ABBREVIATIONS AND ACRONYMS.......................................................................................... 31 CHAPTER 1 - INTRODUCTION.................................................................................................... 37 1.1 PREFACE........................................................................................................................ 37 1.2 PURPOSE AND SCOPE ................................................................................................. 37 1.3 RELATIONSHIP OF SUBSTATION TO OVERALL POWER SYSTEM......................... 37 1.4 IMPORTANCE OF ADEQUATE SUBSTATION PLANNING AND ENGINEERING............................................................................................................... 38 1.5 TYPES OF SUBSTATIONS............................................................................................. 38 1.5.1 General.............................................................................................................. 38 1.5.2 Distribution Substations ....................................................................................... 39 1.5.3 Transmission Substations ..................................................................................... 39 1.5.4 Switching Substations .......................................................................................... 39 1.6 REFERENCES................................................................................................................. 40 CHAPTER 2 - GENERAL DESIGN CONSIDERATIONS............................................................... 41 2.1 INITIAL AND ULTIMATE REQUIREMENTS ............................................................... 41 2.2 SITE CONSIDERATIONS............................................................................................... 41 2.3 ENVIRONMENTAL CONSIDERATIONS...................................................................... 42 2.3.1 General.............................................................................................................. 42 2.3.2 Weather............................................................................................................. 46 2.3.3 Altitude .............................................................................................................. 46 2.3.4 Earthquakes ....................................................................................................... 47 2.3.5 Other Considerations........................................................................................... 50 2.4 INTERFACING CONSIDERATIONS.............................................................................. 51 2.4.1 Line Tension....................................................................................................... 51 2.5 RELIABILITY CONSIDERATIONS ............................................................................... 51 2.6 OPERATING CONSIDERATIONS ................................................................................. 52 2.7 SAFETY CONSIDERATIONS......................................................................................... 52 2.8 MAINTENANCE CONSIDERATIONS........................................................................... 52 2.9 REFERENCES................................................................................................................. 52 CHAPTER 3 - DOCUMENTS ......................................................................................................... 55 3.1 GENERAL....................................................................................................................... 55 3.1.1 Possible Documents or Studies Required of the Engineer....................................... 55 3.2 NEED FOR DOCUMENTATION.................................................................................... 55 3.3 PROCEDURES................................................................................................................ 56 3.4 PROCUREMENT ............................................................................................................ 56 3.5 DRAWINGS .................................................................................................................... 57 3.5.1 General.............................................................................................................. 57 3.5.2 Quality ............................................................................................................... 57 3.5.3 Types of Drawings ............................................................................................. 59 3.6 STUDIES......................................................................................................................... 71 3.7 REFERENCES................................................................................................................. 71 Bulletin 1724E-300 Page 6 APPENDIX A—TYPICAL SUBSTATION DRAWING CHECKLIST....................................... 73 APPENDIX B—U.S. DEPARTMENT OF AGRICULTURE RURAL UTILITIES SERVICE SUBSTATION DESIGN SUMMARY ....................................................................... 91 1 INTRODUCTION ................................................................................................... 94 2 DESIGN CONSIDERATIONS................................................................................. 95 3 DOCUMENTS ........................................................................................................ 98 4 PHYSICAL LAYOUT........................................................................................... 100 5 MAJOR EQUIPMENT .......................................................................................... 104 6 SITE .................................................................................................................. 107 7 STRUCTURES...................................................................................................... 108 8 FOUNDATIONS................................................................................................... 109 9 GROUNDING....................................................................................................... 109 10 INSULATED CABLES AND RACEWAYS.......................................................... 111 11 CORROSION........................................................................................................ 112 12 PROTECTIVE RELAYING................................................................................... 112 13 INSTRUMENTS, TRANSDUCER, AND METERS ............................................... 114 14 SUBSTATION AUTOMATION............................................................................ 114 15 AC AND DC AUXILIARY SYSTEMS.................................................................. 115 16 CONTROL HOUSE .............................................................................................. 116 17 COMMUNICATIONS........................................................................................... 117 CHAPTER 4 - PHYSICAL LAYOUT ........................................................................................... 119 4.1 INTRODUCTION.......................................................................................................... 119 4.2 LAYOUT CONSIDERATIONS..................................................................................... 119 4.2.1 Initial Design Parameters .................................................................................
Recommended publications
  • Analysis of a Floating Vs. Grounded Output Associated Power Technologies
    To Float or Not to Float? Analysis of a floating vs. grounded output Associated Power Technologies Introduction In electrical circuits, voltage is always measured between two points: a point of high potential and a point of low or zero potential. The term “reference point” denotes the point of low potential because it is the point to which the voltage is referenced. An example of a voltage measurement is shown in Figure 1. Figure 1: Voltage measurement between line (high) and neutral (low) with the neutral tied to a ground reference point. The voltage at the low reference point is often referred to as a “ground” or “earth ground” because it is tied directly to the earth. Grounding electrical circuits is necessary for safety in the event that a fault occurs within the system. Without a good ground, there could be potential shock hazards on any piece of electronic equipment. Grounded systems can present their own set of problems. Small differences in potential within a grounding system can cause ground loops and these loops can have adverse effects ranging from data loss to presenting a severe safety hazard. As a result, it is beneficial to utilize a power source that gives the operator the flexibility of choosing either a grounded or floating output reference. This article will briefly outline the concept of grounding, discuss issues with grounding systems, and provide details about how Associated Power Technologies (APT) power sources can solve common issues with safety and grounding. Earth Ground and Chassis Ground Earth and Ground are perhaps the most misunderstood terms in electronics.
    [Show full text]
  • Vacuum Recloser 3AD HG 11.42 · Edition 2018 Medium-Voltage Equipment
    Catalog Siemens Vacuum Recloser 3AD HG 11.42 · Edition 2018 Medium-Voltage Equipment siemens.com/recloser R-HG11-339.tif 2 Siemens Vacuum Recloser 3AD · Siemens HG 11.42 · 2018 Contents Contents Page Siemens Vacuum Description 5 Recloser 3AD General 6 Switch unit 7 1 Controller 7SR224 9 Medium-Voltage Equipment Controller 7SC80 14 Catalog HG 11.42 · 2018 Special functions and applications 19 Standards, ambient conditions, altitude correction factor and number of operating cycles 20 Invalid: Catalog HG 11.42 · 2016 Product range overview 21 Scope of delivery 22 siemens.com/recloser Product Selection 25 Ordering data and configuration example 26 Selection of primary ratings 27 2 Selection of controller 30 Selection of additional equipment 34 Selection of accessories and spare parts 35 Additional components for increased performance 37 3EK7 specifications according to IEC 38 3EK8 specifications according to IEEE 39 3EK7 / 3EK8 surge arresters 40 Technical Data 41 Electrical data, dimensions and weights: Voltage level 12 kV 42 3 Voltage level 15.5 kV 42 Voltage level 24 kV 43 Voltage level 27 kV 44 Voltage level 38 kV 45 Dimension drawings 46 Annex 51 Inquiry form 52 Configuration instructions 53 4 Configuration aid Foldout page The products and systems described in this catalog are manufactured and sold according to a certified management system (acc. to ISO 9001, ISO 14001 and BS OHSAS 18001). Siemens Vacuum Recloser 3AD · Siemens HG 11.42 · 2018 3 R-HG11-300.tif 4 Siemens Vacuum Recloser 3AD · Siemens HG 11.42 · 2018 Description Contents
    [Show full text]
  • Conductors/Insulators Conductors & Insulators
    Conductors/InsulatorsConductors & Insulators 1 Conductors and insulators are all around us. Those pictured here are easy to identify. Can you describe why each is either a conductor or an insulator? 2 Photo B shows how air and distance can be good insulators. Why is air a good insulator? Why is distance a good insulator? 3 It’s not always easy to tell if something is a good conductor of electricity. Which of the items pictured are good conductors? Why? 4 Which of the items pictured are good insulators? Why? 5 Explain how the items pictured could create an electrical hazard to you. Never fly a kite near power lines. Visit tampaelectric.com/safety to learn more about electrical safety. Electromagnets 1 Electromagnets are used every day to perform large and small tasks. They make it possible for a crane to pick up large pieces of metal or a pad-mounted transformer to power your home. They can even make it possible for your doorbell to ring when you have a visitor. 2 The crane magnet, pad-mounted transformer and doorbell all contain a wire-wrapped electromagnet just like the one you created in class. However, a crane magnet and pad-mounted transformer use much more electricity. 3 Which one of the photographs shows an electromagnet? 4 Which one of the photographs does not show an electromagnet? 5 How could a pad-mounted transformer be dangerous to you? 6 If you see a pad-mounted transformer that has been damaged or its door is open, how is this dangerous and what should you do? Visit tampaelectric.com/safety to learn more about electrical safety.
    [Show full text]
  • Trends in Electricity Prices During the Transition Away from Coal by William B
    May 2021 | Vol. 10 / No. 10 PRICES AND SPENDING Trends in electricity prices during the transition away from coal By William B. McClain The electric power sector of the United States has undergone several major shifts since the deregulation of wholesale electricity markets began in the 1990s. One interesting shift is the transition away from coal-powered plants toward a greater mix of natural gas and renewable sources. This transition has been spurred by three major factors: rising costs of prepared coal for use in power generation, a significant expansion of economical domestic natural gas production coupled with a corresponding decline in prices, and rapid advances in technology for renewable power generation.1 The transition from coal, which included the early retirement of coal plants, has affected major price-determining factors within the electric power sector such as operation and maintenance costs, 1 U.S. BUREAU OF LABOR STATISTICS capital investment, and fuel costs. Through these effects, the decline of coal as the primary fuel source in American electricity production has affected both wholesale and retail electricity prices. Identifying specific price effects from the transition away from coal is challenging; however the producer price indexes (PPIs) for electric power can be used to compare general trends in price development across generator types and regions, and can be used to learn valuable insights into the early effects of fuel switching in the electric power sector from coal to natural gas and renewable sources. The PPI program measures the average change in prices for industries based on the North American Industry Classification System (NAICS).
    [Show full text]
  • ELECTRIC POWER | April 14-17 2020 | Denver, CO | Electricpowerexpo.Com
    Presented by: EXPERIENCE POWER ELECTRIC POWER | April 14-17 2020 | Denver, CO | electricpowerexpo.com 36006 MAKE CHANGE HAPPEN ON THE alteRED POWER LANDSCAPE! The global power sector is undergoing dramatic changes, driven by many economic, technological and efficiency factors. Rapid reductions in the cost of solar and wind technologies have led to their widespread adoption. To accommodate soaring shares of these variable forms of generation, innovations have also emerged to increase supply-side, demand-side, grid, and storage flexibility. ELECTRIC POWER is the ONLY event providing real-world, actionable content year-round in print, online, and in person that can be applied immediately at your facility, and it’s your best opportunity to discover, learn and make change happen within your organization. OPERATIONS & MAINTENANCE | BUSINESS MANAGEMENT | ENABLING TECHNOLOGIES | SYSTEM DESIGN It’s the conference I make it a point to attend every year. All of the programs really provide an opportunity for the “ attendees to go back to their plant the very next week and look at something a different way or try“ out a new process or procedure. It’s been a great opportunity to make contacts and meet new vendors and suppliers of goods and services and has opened up the opportunity for everyone to exchange information and facts. Melanie Green, Sr. Director — Power Generation, CPS Energy CO-locATED EVENTS ENERGY PROVIDERS COALITION FOR EDUCATION ELECTRIC POWER | April 14-17 2020 | Denver, CO | electricpowerexpo.com WHY EXHIBIT & SPONSOR? • BRANDING • BUILD RELATIONSHIPS/NETWORKING • THOUGHT LEADERSHIP • DRIVE SALES 2200 700 38 100+ 85% Attendees Conference Delegates Countries End-User Companies of attendees are from the top 20 U.S.
    [Show full text]
  • DIV-16 Electrical Labor
    Division 16 Electrical Estimating Tips General 163 Motors, Starters, Boards & Estimators for this division item shall have full Switches knowledge of the system and working knowledge Estimator shall include all supporting systems used, prepare a complete take-off quantities, for these items, whether it is a foundation, code requirements, specifications, and bracket or a piece of wood. SCECO requirements. 164 Transformers & Bus Ducts 160 Raceways Never forget to include the equipment cost for Conduit should be taken off in three main such installation, whether scaffolding, lifts or categories: power distribution, branch power, cranes. and branch lighting, so the estimator can concentrate on systems and components, 165 Lighting therefore making it easier to ensure all items Productivity rate for lighting fixtures varies with have been accounted for. For cost modifications the number of fixtures included in a single room. for elevated conduit installation, add the Estimators are advised to increase productivity percentage to labor according to the height of rate of lighting fixtures in large rooms including installation for all and only the quantities more than six (6) fixtures. exceeding the different height levels and number of building floors. 168 Special Electrical System Usually most of these systems are let to 161 Conductors & Grounding specialized contractors, provisions for special Remember that aluminum wiring of equal installation requirements shall be consulted. capacity is larger in diameter than copper and may require larger conduit. If more than three 169 Utilities wires at a time are being pulled, deduct Usually these items are let to specialty percentages from the labor hours of that contractors, whether for transmission lines and grouping of wires.
    [Show full text]
  • Best Practice Guide to Cable Ladder and Cable Tray Systems
    Best Practice Guide to Cable Ladder and Cable Tray Systems Channel Support Systems and other Associated Supports November 2012 BEAMA Best Practice Guide to Cable Ladder and Cable Tray Systems Including Channel Support Systems and other Associated Supports Companies involved in the preparation of this Guide Contents INTRODUCTION 5 DEFINITIONS AND ABBREVIATIONS 6 1. Packing Handling and Storage 8 1.1 General Packing and Handling 8 1.2 Loading and offloading recommendations 9 1.3 Storage 11 2A. Installation of the system 12 2.1 Common tools for Installation 12 2.2 Structural characteristics 12 2.3 Support Systems 18 2.4 Straight cable ladder and cable tray lengths 29 2.5 Coupler types (refer to manufacturer’s literature) 32 2.6 Fixings 36 2.7 Fittings 36 2.8 Accessories 39 2.9 Site modification 39 2.10 Earth protection and EMC 40 2B. Installation of Cable 41 2.11 Preparation 41 2.12 Wiring Regulations 41 2.13 Power Cables 41 2.14 Data Cables 46 2.15 Expansion 46 2.16 Electro Mechanical Effects 46 3. Environment 48 3.1 Selecting the right material and finish 48 3.2 Finishes 56 3.3 Non-Metallic systems 61 3.4 Loadings 63 3.5 Temperature 65 4. Health & Safety 67 5. Maintenance 68 5.1 Inspection 68 5.2 Removal of cables 68 5.3 On site repairs 68 6. Sustainability 69 6.1 Sustainable development 69 6.2 REACH regulations 69 6.3 The management of WEEE and RoHS 69 6.4 Environmental footprint 70 7. Applicable Standards 71 Companies involved in the preparation of this Guide 72 FIGURES Figure 1: Methods of removal 9 Figure 2: Loaded beams 13 Figure
    [Show full text]
  • Overview of Electric Power Supply Systems
    Overview of Electric Power Supply Systems Why are electric power systems studied? What are the characteristics of power systems that justify spending a whole course on them? There are many answers to each of these questions; this course will touch on a few of them. You will recall that ECE370 gave an overview of the circuit theory associated with electrical power and it is worth recalling that most power systems are three-phase and that when balanced systems are being analyzed these are usually drawn in terms of a one-line diagram, i.e. a single line is used to denote the three phases, which may or may not also have a neutral. The US Electric Power System The main aspects that describe power systems are: size, complexity and economic impact. Utility power systems cover vast territory, are subject to the whims of nature, are interconnected to each other, the quality of their commodity affects the ability of industry to produce effectively, and the price of their commodity has a significant impact on the economy of their service area. Controlling power systems requires that electricity be supplied at the correct frequency, satisfactory voltage, with its phases balanced, have low harmonic content, and with all protection systems coordinated. The foregoing has to be achieved without overloading equipment and at the lowest cost to the consumer (after the utility makes a reasonable profit.) All this is complicated by the fact that demand for electricity changes throughout the day (and week, and season) and that electricity can not be readily stored in a practical manner.
    [Show full text]
  • Using Immersive Virtual Reality for Electrical Substation Training
    ISBN: 978-989-8533-40-1 © 2015 USING IMMERSIVE VIRTUAL REALITY FOR ELECTRICAL SUBSTATION TRAINING Eduardo H. Tanaka1, Juliana A. Paludo1, Carlúcio S. Cordeiro1, Leonardo R. Domingues1, Edgar V. Gadbem1 and Adriana Euflausino2 Eldorado Research Institute1, CPFL2, Campinas, SP, Brazil ABSTRACT Usually, distribution electricians are called upon to solve technical problems found in electrical substations. In this project, we apply problem-based learning to a training program for electricians, with the help of a virtual reality environment that simulates a real substation. Using this virtual substation, users may safely practice maneuvers with varying degrees of complexity. To improve the user’s sense of immersion, interactive devices such as the Oculus Rift virtual reality headset are going to be adopted. The project’s stakeholders had a good impression of the device and believe that the proposed methodology will improve the training and effect positively the electricians’ performance, reducing accidents inside the substation area and decreasing the time required to reestablish the power supply after a failure. KEYWORDS Electrical Simulation, Immersive Virtual Reality, Interactive Devices, Problem-Based Learning, Training Staff. 1. INTRODUCTION The electric power system consists of power generation, transmission and distribution networks, and load consumption. The power generation is the origin of the electrical energy. A transmission network is composed by high-voltage power lines, which drive electric power from a generation station to a load center area, as they are usually far apart for long distances. A distribution system has medium and low voltage networks and conducts electrical energy from the transmission system to industrial, commercial and residential loads.
    [Show full text]
  • Lecture 09 Closing Switches.Pdf
    High-voltage Pulsed Power Engineering, Fall 2018 Closing Switches Fall, 2018 Kyoung-Jae Chung Department of Nuclear Engineering Seoul National University Switch fundamentals The importance of switches in pulsed power systems In high power pulse applications, switches capable of handling tera-watt power and having jitter time in the nanosecond range are frequently needed. The rise time, shape, and amplitude of the generator output pulse depend strongly on the properties of the switches. The basic principle of switching is simple: at a proper time, change the property of the switch medium from that of an insulator to that of a conductor or the reverse. To achieve this effectively and precisely, however, is rather a complex and difficult task. It involves not only the parameters of the switch and circuit but also many physical and chemical processes. 2/44 High-voltage Pulsed Power Engineering, Fall 2018 Switch fundamentals Design of a switch requires knowledge in many areas. The property of the medium employed between the switch electrodes is the most important factor that determines the performance of the switch. Classification Medium: gas switch, liquid switch, solid switch Triggering mechanism: self-breakdown or externally triggered switches Charging mode: Statically charged or pulse charged switches No. of conducting channels: single channel or multi-channel switches Discharge property: volume discharge or surface discharge switches 3/44 High-voltage Pulsed Power Engineering, Fall 2018 Characteristics of typical switches A. Trigger pulse: a fast pulse supplied externally to initiate the action of switching, the nature of which may be voltage, laser beam or charged particle beam.
    [Show full text]
  • Electrical Modeling of a Thermal Power Station
    Electrical Modeling of a Thermal Power Station Reinhard Kaisinger Degree project in Electric Power Systems Second Level Stockholm, Sweden 2011 XR-EE-ES 2011:010 ELECTRICAL MODELING OF A THERMAL POWER STATION Reinhard Kaisinger Masters’ Degree Project Kungliga Tekniska Högskolan (KTH) Stockholm, Sweden 2011 XR-EE-ES 2011:010 Table of Contents Page ABSTRACT V SAMMANFATTNING VI ACKNOWLEDGEMENT VII ORGANIZATION OF THE REPORT VIII 1 INTRODUCTION 1 2 BACKGROUND 3 2.1 Facilities in a Thermal Power Plant 3 2.2 Thermal Power Plant Operation 4 2.2.1 Fuel and Combustion 4 2.2.2 Rankine Cycle 4 2.3 Thermal Power Plant Control 6 2.3.1 Turbine Governor 7 2.4 Amagerværket Block 1 7 2.5 Frequency Control 9 2.5.1 Frequency Control in the ENTSO-E RG Continental Europe Power System 9 2.5.2 Frequency Control in the ENTSO-E RG Nordic Power System 10 2.5.3 Decentralized Frequency Control Action 11 2.5.4 Centralized Frequency Control Action 12 3 MODELING 14 3.1 Modeling and Simulation Software 14 3.1.1 Acausality 14 3.1.2 Differential-Algebraic Equations 15 3.1.3 The ObjectStab Library 15 3.1.4 The ThermoPower Library 16 3.2 Connectors 16 3.3 Synchronous Generator 17 3.4 Steam Turbine 22 3.5 Control Valves 23 3.6 Boiler, Re-heater and Condenser 23 3.7 Overall Steam Cycle 23 3.8 Excitation System and Power System Stabilizer 24 3.9 Turbine Governor 25 3.10 Turbine-Generator Shaft 26 3.11 Overall Model 26 3.12 Boundary Conditions 27 3.13 Simplifications within the Model 28 3.13.1 Steam Cycle 28 3.13.2 Governor 28 3.13.3 Valves and Valve Characteristics 29 3.13.4
    [Show full text]
  • Electricity and Natural Gas Classroom Presentation Vocabulary List
    Natural Gas and Electricity Vocabulary List Alternative Fuel - A popular term for "non-conventional" transportation fuels made from natural gas (propane, compressed natural gas, methanol, etc.) or biomass materials (ethanol, methanol). Ampere - A unit of measure for an electrical current; the amount of current that flows in a circuit at an electromotive force of one Volt and at a resistance of one Ohm. Abbreviated as amp. Appliance - A piece of equipment, commonly powered by electricity, used to perform a particular energy-driven function. Examples of common appliances are refrigerators, clothes washers and dishwashers, conventional ranges/ovens and microwave ovens, humidifiers and dehumidifiers, toasters, radios, and televisions. Atom -the basic unit of a chemical element. Battery - An energy storage device made up of one or more electrolyte cells. Biomass - Any organic (plant or animal) material which is available on a renewable basis, including agricultural crops and agricultural wastes and residues, wood and wood wastes and residues, animal wastes, municipal wastes, and aquatic plants. Boiler - A tank in which water is heated to produce either hot water or steam that is circulated for the purpose of heating and power. Chemical Energy - Energy stored in a substance and released during a chemical reaction such as burning wood, coal, or oil. Circuit(s) - An electric circuit is a path in which electrons from a voltage or current source flow. The point where those electrons enter an electrical circuit is called the "source" of electrons. The point where the electrons leave an electrical circuit is called the "return" or "earth ground". Climate Change - A term used to refer to all forms of climatic inconsistency, but especially to significant change from one prevailing climatic condition to another.
    [Show full text]