PROJECT MANUAL for LANE ESD WESTMORELAND CAMPUS
Total Page:16
File Type:pdf, Size:1020Kb
PROJECT MANUAL for LANE ESD WESTMORELAND CAMPUS SCHOOL VOLUNTARY SEISMIC STRENGTHENING 1717 City View Street Eugene, Oregon Date: April 2, 2021 Bid/Permit Set STRUCTURAL ENGINEER WRK Engineers 215 W 12th Street 202 Vancouver, WA 98660 (360) 695-9731 ARCHITECTS BBL Architects 200 North State Street Lake Oswego, Oregon 97034 (503) 635-4425 WESTMORELAND CAMPUS VOLUNTARY SEISMIC STRENGTHENING SECTION 00 01 10 TABLE OF CONTENTS NOTE: Division and Section numbers listed in the Table of Contents and items of work included in each Section conform in general to CSI's MasterFormat, 2010 Upgrade Edition. Section numbers listed are merely for identification and may not be consecutive. Users of this Project Manual shall check the specification with the Table of Contents to be sure each Section is included and shall check each Section to be sure each consecutively numbered pages within each Section is included. The last page of each Section has the statement "END OF SECTION". DIVISIONS AND SECTIONS DIVISION 00: PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 TABLE OF CONTENTS 00 01 15 LIST OF DRAWINGS 00 41 00 ATTACHMENT A-BID SUBMITTAL FORM 00 52 00 ATTACHMENT B-OWNER CONTRACTOR AGREEMENT AIA CONTRACT A101-2017 EXHIBIT A 00 72 00 ATTACHMENT C- GENERAL CONDITIONS A201-2017 WORKING DRAFT DIVISION 01: GENERAL REQUIREMENTS 01 11 00 SUMMARY OF WORK 01 23 00 ALTERNATES 01 26 13 CONTRACTOR'S REQUEST FOR INFORMATION REQUEST FOR INFORMATION FORM 01 31 13 PROJECT COORDINATION 01 31 19 PROJECT MEETINGS 01 33 00 SUBMITTAL PROCEDURES 01 35 53 SECURITY PROCEDURES 01 45 23 TESTING LABORATORY SERVICES 01 50 00 TEMPORARY FACILITIES AND CONTROLS 01 58 00 PROJECT IDENTIFICATION 01 60 00 PRODUCT REQUIREMENTS SUBSTITUTION REQUEST FORM 01 70 00 EXECUTION AND CLOSEOUT REQUIREMENTS 01 74 23 FINAL CLEANING DIVISION 02: EXISTING CONDITIONS 02 41 13 SELECTIVE STRUCTURE DEMOLITION DIVISION 03: CONCRETE NOT USED DIVISION 04: MASONRY NOT USED DIVISION 05: METALS 05 50 00 METAL FABRICATIONS DIVISION 06: WOOD, PLASTICS, AND COMPOSITES 06 10 00 ROUGH CARPENTRY 06 11 00 WOOD FRAMING 06 16 00 SHEATHING 06 41 00 ARCHITECTURAL WOOD CASEWORK 06 46 00 WOOD TRIM Page 1 of 3 WESTMORELAND CAMPUS VOLUNTARY SEISMIC STRENGTHENING SECTION 00 01 10 TABLE OF CONTENTS DIVISION 07: THERMAL AND MOISTURE PROTECTION 07 01 50.19 PREPARATION FOR REROOFING 07 21 00 THERMAL INSULATION 07 27 00 AIR BARRIERS 07 46 29 PLYWOOD SIDING 07 54 19.05 MECHANICALLY – ATTACHED THERMO PLASTIC MEMBRANE ROOFING 07 62 00 SHEET METAL FLASHING AND TRIM 07 65 00 FLEXIBLE FLASHING 07 72 00 ROOF ACCESSORIES 07 84 00 FIRESTOPPING 07 92 00 JOINT SEALANTS (DOW CORNING) DIVISION 08: OPENINGS 08 54 43 FIBERGLASS WINDOWS 08 81 00 GLASS GLAZING DIVISION 09: FINISHES 09 29 00 GYPSUM BOARD 09 51 00 ACOUSTICAL CEILINGS 09 65 13 RESILIENT BASE & ACCESSORIES 09 91 00 PAINTING DIVISION 10: SPECIALTIES 10 11 16 MARKERBOARDS 10 11 23 TACKBOARDS (PICTURE FRAMED) DIVISION 11: EQUIPMENT NOT USED DIVISION 12: FURNISHINGS NOT USED DIVISION 13: SPECIAL CONSTRUCTION NOT USED DIVISION 14: CONVEYING EQUIPMENT NOT USED DIVISION 21: FIRE SUPPRESSION NOT USED DIVISION 22: PLUMBING NOT USED DIVISION 23: HEATING, VENTILATION, AND AIR-CONDITIONING (HVAC) NOT USED DIVISION 26: ELECTRICAL NOT USED DIVISION 27: COMMUNICATIONS NOT USED Page 2 of 3 WESTMORELAND CAMPUS VOLUNTARY SEISMIC STRENGTHENING SECTION 00 01 10 TABLE OF CONTENTS DIVISION 28: ELECTRONIC SAFETY AND SECURITY NOT USED DIVISION 31: EARTHWORK NOT USED DIVISION 32: EXTERIOR IMPROVEMENTS NOT USED DIVISION 33: UTILITIES NOT USED DIVISION 34: TRANSPORTATION NOT USED DIVISION 41: MATERIAL PROCESSING AND HANDLING EQUIPMENT NOT USED END OF SECTION Page 3 of 3 WESTMORELAND CAMPUS VOLUNTARY SEISMIC STRENGTHENING SECTION 00 01 15 LIST OF DRAWINGS NOTE: Users of this Project Manual shall check the Construction Documents with the List of Drawings to be sure each sheet is included. LIST OF DRAWINGS TITLE G0.01 COVER SHEET AND SHEET INDEX G0.2 ABBREVIATIONS AND SYMBOLS G0.3 SITE PLAN AND CODE SUMMARY DEMOLITION D1.1 DEMOLITION ROOF PLAN D2.1 BUILDING B-DEMOLITION PLAN D2.2 BUILDING D & E-DEMOLITION PLAN D2.3 DEMOLITION ENLARGED ROOF PLAN D2.4 DEMOLITION ENLARGED ROOF PLAN D2.5 DEMOLITION ENLARGED ROOF PLAN D2.6 DEMOLITION ENLARGED ROOF PLAN D2.7 DEMOLITION REFLECTED CEILING PLAN D2.8 DEMOLITION REFLECTED CEILING PLAN D3.1 ELEVATIONS D3.2 ELEVATIONS D3.3 ELEVATIONS D3.4 ELEVATIONS D3.5 ELEVATIONS D3.6 ELEVATIONS D3.7 ELEVATIONS D3.8 ELEVATIONS D3.9 ELEVATIONS D3.10 ELEVATIONS D3.11 ELEVATIONS D4.1 DEMOLITION ENLARGED ROOF PLAN D4.2 DEMOLITION ENLARGED ROOF PLAN D4.3 DEMOLITION ENLARGED ROOF PLAN D4.4 DEMOLITION ENLARGED ROOF PLAN STRUCTURAL S0.1 GENERAL STRUCTURAL NOTES S0.2 SPECIAL INSPECTION TABLES S2.1 BUILDING B-FOUNDATION STRENGTHENING PLAN S2.2 BUILDING D & E- FOUNDATION STRENGTHENING PLAN S2.3 BUILDING B-ROOF STRENGTHENING PLAN S2.4 BUILDING D & E-ROOF STRENGTHENING PLAN S2.5 BUILDING F-COVERED WALKWAY STRENGTHENING PLAN-BID ALTERNATE S2.6 BUILDING E-NONSTRUCTURAL BRACING PLAN S4.1 SCHEDULES S7.1 WOOD DETAILS S7.2 WOOD DETAILS S8.1 NONSTRUCTURAL DETAILS ARCHITECTURAL A0.1 SITE PLAN AND CODE SUMMARY A1.1 OVERALL ROOF PLAN Page 1 of 2 WESTMORELAND CAMPUS VOLUNTARY SEISMIC STRENGTHENING SECTION 00 01 15 LIST OF DRAWINGS A4.1 ENLARGED ROOF PLAN A4.2 ENLARGED ROOF PLAN A4.3 ENLARGED ROOF PLAN A4.4 ENLARGED ROOF PLAN A4.5 EXTERIOR ELEVATIONS A5.1 DETAILS A5.2 DETAILS A5.3 DETAILS END OF SECTION Page 2 of 2 WESTMORELAND CAMPUS VOLUNTARY SEISMIC STRENGTHENING SECTION 00 41 00 ATTACHMENT A-BID SUBMITTAL FORM The undersigned hereby proposes to furnish all necessary materials, superintendence, labor, plant, equipment, tools, and accessories to perform and complete the renovation project WESTMORELAND CAMPUS SCHOOL SEISMIC REHABILITATION AT 1717 City View Street, Eugene Oregon in all respects and in full conformity with Contract Documents as prepared by WRK Engineers, 215 W 12 th Street 202, Vancouver, WA 98660 (360) 695-9731. Per the Contract Documents associated with this project, the District reserves the right to award contracts, or to reject all bids as may be determined to be in the best interest of the District. Total Base Bid $ Dollars Alternate #1 Removal of existing roofing system and sheet metal flashing at Roof F covered walkway roof and installation of new PVC roofing system over roof underlayment to existing plywood roof deck and installation of new sheet metal flashing. See Sheet D1.1 & A1.1 for detailed location. Alternate#1 $ Dollars Alternate #2 Removal of existing roofing system and sheet metal flashing at Roof Gym, G & H covered walkway roof and installation of new PVC roofing system over roof underlayment to existing plywood roof deck and installation of new sheet metal flashing. See Sheet D1.1 & A1.1 for detailed location. Alternate#2 $ Dollars Bidder's Name: The undersigned has attached the required 10% Bid Security to this Bid. If awarded the Contract, the undersigned agrees to be bound by the Agreement with the Owner, to present the required performance and payment bonds within 15 days of Notification to Proceed and to substantially complete the work within the time stipulated in Section 01 11 00, Summary of Work. Addenda: Receipt is hereby acknowledged of Addendum ______________________ through ____________________. The Undersigned certifies that: (1) This Bid has been arrived at independently and is being submitted without collusion with and without any agreement, understanding, or planned common course of action with any other vendor of materials, supplies, equipment or services described in the invitation to bid designed to limit independent bidding or competition; and (2) The contents of the Bid have not been communicated by the Undersigned or its employees or agents to any person not an employee or agent of the Undersigned or its surety on any Bond furnished with the Bid and will not be communicated to such person prior to the official opening of the Bid. Page 1 of 3 WESTMORELAND CAMPUS SEISMIC STRENGTHENING SECTION 00 41 00 ATTACHMENT A-BID SUBMITTAL FORM Insurance: Is your insurance equal to or greater than required? Liability & Property Damage _____ Yes _____ No Company: Vehicle Liability _____ Yes _____ No Company: Worker's Compensation _____ Yes _____ No Company: Representations and Certifications: 1. It is understood that the Bidder, before signing his/her proposal, has made a careful examination of the plans, specifications, and character of work required; that he/she has made a careful examination of the location and condition of the work, verified all measurements at the job site, and sources of supply of materials. 2. Oregon Business Registration: To transact business in the State of Oregon, a Bidder must be registered with the State of Oregon Corporations Division. Please indicate your business' current registration type with an "X" in the appropriate space: Corporate Registration Assumed Business Name Registration 3. Oregon Reciprocal Preference Law (ORS 279.029): In compliance with ORS 279.029, each Bidder must state in its proposal whether it is a resident or non-resident bidder. Bids that fail to provide this information will be considered nonresponsive and will be rejected. DEFINITION - RESIDENT BIDDER: A bidder that has paid unemployment taxes or income taxes in this state during the 12 calendar months immediately preceding submission of the bid, has a business address in this state and has stated in the bid whether the bidder is a "resident bidder." DEFINITION – NON-RESIDENT BIDDER: A bidder who is not a resident bidder as defined above. Indicate by an "X" in the appropriate space whether you are an Oregon resident bidder or non-resident bidder: Oregon Resident Bidder Non-Resident Bidder 4. The Undersigned agrees to be bound by and will comply with the provisions of ORS 279C.838 and 279C.840 pertaining to the payment of the prevailing rates of wage.