Karnataka, Multi- Storeyed Building, 3Rd Floor, Gate No
Total Page:16
File Type:pdf, Size:1020Kb
File No.P-17024/12/2020-RC File No. P-17024/12/2020-RC (FMS-369983) Government of India Ministry of Rural Development (RC Division) Krishi Bhawan, New Delhi Dated 11th May, 2021 To The Principal Secretary, Panchayati Raj & Rural Development Department, Government of Karnataka, Multi- Storeyed Building, 3rd Floor, Gate No. 3, Ambedkar Road, Bangalore - 560001, Karnataka. Sub: Karnataka State–Proposal cleared under PMGSY-III, Batch I of 2019-20– Revised cost for the proposal under PMGSY-III of 2019-20, Batch-I. Sir, I am directed to refer to this Ministry’s letter of even number dated 2nd March, 2020 regarding clearance of the project proposal of Karnataka under PMGSY- III, Batch-I of 2019-20 and to say that the project proposals were sanctioned subject to the condition, among others, that the State will verify all the DPRs as per the observation of the Empowered Committee regarding the provisions of CD works, retaining walls, road safety items, etc., and ensure that the corrections have been made in all the DPRs before according technical sanction. The State was further asked to provide the statement showing MoRD sanctioned cost and cost corrected at the time of technical sanction. 2. Based on the compliance report submitted by the State Government, the Ministry hereby accords approval to the revised Value of Project (VoP), the MoRD Share and the State Share of the project sanctioned to the State under PMGSY-III, Batch-I, 2019-20, as per summary given below:- Items Up-gradation LSBs Total roads Value in Rs Crore 2,094.35 44.63 2,138.98* No. of works 445 26 445 roads 26 LSBs Length in km 3,226.21 1,023.67 m 3,226.21 Km roads 1,023.67 m LSBs Average cost per Km (Rs. In 64.92 4.36/m Lakhs) *MoRD Share: Rs. 1,254.50 Crores State Share: Rs. 884.48 Crores File No.P-17024/12/2020-RC 3. The OMMAS based road list and district abstract with revised cost are enclosed herewith. 4. All other terms and conditions attached to the clearance of aforesaid project vide this Ministry's letter of even number dated 2nd March, 2020 shall remain the same. 5. This issues with the approval of the Competent Authority. Yours faithfully, (Lalit Kumar) Deputy Secretary to the Government of India Tel: 011- 23382406 E-mail:- [email protected] Copy to :- 1. Chief Engineer, KRRDA, 3rd Floor, Anandarao Circle, Bangalore-560009, Karnataka. 2. Director (Technical), NRIDA with a request to ensure compliance on the conditions imposed and bring to Ministry's notice in case of non-compliance on the conditions imposed. 3. Director (P-I), Director (P-II), Director (P-III), Director (F & A), NRIDA, New Delhi. File No.P-17024/12/2020-RC Signature Not Verified Digitally signed by LALIT KUMAR Date: 2021.05.12 14:19:18 IST Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter - District Wise Abstract State : Karnataka Sanction Year : 2019-2020 Batch : 1 Collaboration : Regular PMGSY Sr.No. District No of Road Length MoRD Cost State Cost (Rs Total Cost Maint. Cost Habs (1000+, 500+, 250+, <250, Total) Works (Kms) / Bridge (Rs Lacs) Lacs) (Rs Lacs) (Rs Lacs) Length (Mtrs) 1 2 3 4 5 6 7 8 9 Road Proposals 1 Bangalore R 15 97.940 3,499.02 2,393.75 5,892.77 547.03 (27 , 53 , 42 , 60 , 182) 2 Bangalore U 14 128.890 6,332.89 4,465.88 10,798.77 795.31 (77 , 51 , 37 , 52 , 217) 3 Belgaum 43 307.395 11,078.37 7,714.93 18,793.30 1,599.44 (116 , 25 , 8 , 0 , 149) 4 Bellary 1 5.540 205.69 138.15 343.84 32.04 (2 , 1 , 2 , 0 , 5) 5 Bijapur 14 111.520 4,170.43 2,943.72 7,114.15 683.13 (39 , 11 , 9 , 4 , 63) 6 Chamarajanagar 16 106.085 3,185.59 2,255.93 5,441.52 494.79 (51 , 28 , 17 , 7 , 103) 7 Chickballapur 17 157.790 5,083.26 3,474.86 8,558.12 884.06 (40 , 58 , 51 , 44 , 193) 8 Chickmagalur 20 168.635 6,221.90 4,596.34 10,818.24 913.62 (36 , 32 , 42 , 145 , 255) 9 Chitradurga 11 69.630 2,479.07 1,685.78 4,164.85 360.44 (31 , 16 , 6 , 8 , 61) 10 Dakshina Kannada 12 107.310 5,470.30 4,007.41 9,477.71 653.21 (10 , 23 , 38 , 61 , 132) 11 Davanagere 16 166.864 6,194.71 4,283.12 10,477.83 831.15 (90 , 50 , 31 , 20 , 191) 12 Dharwad 9 77.870 3,295.24 2,298.01 5,593.25 459.94 (40 , 9 , 8 , 1 , 58) 13 Gadag 4 28.400 989.48 692.45 1,681.93 167.09 (11 , 0 , 0 , 0 , 11) 14 Gulbarga 25 170.268 6,550.88 4,469.80 11,020.68 961.11 (72 , 25 , 24 , 17 , 138) 15 Hassan 21 116.460 4,988.04 3,642.87 8,630.91 655.35 (41 , 63 , 62 , 139 , 305) 16 Haveri 20 162.790 6,136.26 4,328.85 10,465.11 1,102.30 (75 , 15 , 2 , 2 , 94) 17 Kodagu 12 78.528 3,212.55 2,304.31 5,516.86 486.06 (15 , 13 , 20 , 75 , 123) 18 Kolar 21 165.225 5,783.07 4,034.23 9,817.30 761.01 (60 , 99 , 73 , 72 , 304) 19 Koppal 5 36.400 1,294.89 890.99 2,185.88 205.37 (25 , 5 , 1 , 3 , 34) 20 Mandya 32 189.635 6,801.10 5,024.21 11,825.31 1,039.36 (97 , 61 , 46 , 49 , 253) 21 Mysore 17 116.506 4,708.59 3,391.94 8,100.53 507.67 (92 , 69 , 36 , 32 , 229) 22 Raichur 5 42.190 1,851.99 1,272.99 3,124.98 245.81 (16 , 1 , 4 , 12 , 33) 23 Shimoga 22 140.995 5,024.33 3,674.59 8,698.92 811.84 (44 , 37 , 29 , 75 , 185) 24 Tumkur 42 246.806 8,980.28 6,194.61 15,174.89 1,403.38 (113 , 123 , 152 , 275 , 663) 25 Udupi 5 36.227 1,592.54 1,147.56 2,740.10 186.16 (0 , 4 , 15 , 39 , 58) 26 Uttara Kannada 20 135.075 5,364.39 3,772.16 9,136.55 875.65 (11 , 27 , 51 , 371 , 460) 27 Yadgir 6 55.240 2,280.07 1,560.90 3,840.97 335.60 (25 , 1 , 4 , 0 , 30) Roads Total 445 3,226.214 1,22,774.93 86,660.34 2,09,435.27 17,997.92 (1256 , 900 , 810 , 1563 , 4529) Long Span Bridge Proposals 1 Belgaum 1 16.300 50.96 33.97 84.93 0.00 - 2 Davanagere 1 83.000 267.37 178.25 445.62 0.00 - 3 Dharwad 7 229.150 451.87 301.25 753.12 0.00 - 4 Gadag 3 72.720 127.46 84.98 212.44 0.00 - 5 Gulbarga 1 43.500 87.41 58.27 145.68 4.32 - 6 Haveri 3 88.260 138.79 92.53 231.32 0.00 - 7 Tumkur 5 152.540 211.31 140.87 352.18 0.00 - 8 Udupi 4 300.000 1,214.79 813.86 2,028.65 31.25 - 9 Uttara Kannada 1 38.200 125.29 83.53 208.82 0.00 - Bridges Total 26 1,023.670 2,675.25 1,787.51 4,462.76 35.57 - Grand Total 471 Total Road 1,25,450.18 88,447.85 2,13,898.03 18,033.49 (1256 , 900 , 810 , 1563 , 4529) Length:3226.214 Kms Total LSB Length:1023.670 Mtrs Page 1 of 1 Generated On : 12/05/2021 11:35 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter Sanction Letter No :369983 Sanction Date : 02/03/2020 State : Karnataka Sanction Year : 2019-2020 Batch : 1 Collaboration : Regular PMGSY Note : All Costs are in Lakhs and Lengths are in Kms. Sr. Core Name of Road / Bridge Category New Road (Kms) / Carriage Stage Const. CD Work MoRD Cost State Cost Total Cost Maint. Cost Habs (1000+, Network No. (N/U) Technology Bridge (Mtrs) Way Width (Nos) (Rs Lacs) (Including (Including (Rs Lacs) 500+, 250+, Length Additional Additional <250, Total) State Share) State Share) (Rs Lacs) (Rs Lacs) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Road Proposals District- Bangalore R Block- Devanahalli 1 MRL07 MRL07-MDR (Budigere road) Upgarde -- 6.550 3.750 Complete 12 215.53 147.46 362.99 41.21 (2 , 2 , 3 , 2 , 9) to Tellahally agrahara road via Boodihal, Channahally,Chikka Hosahally 2 MRL21 MRL21-NH-207 to Taluk Upgarde Waste Plastics 11.380 3.750 Complete 18 490.16 334.90 825.06 66.99 (3 , 7 , 3 , 0 , 13) Border via, konaginabele, Doddakurubarahally, Varadenahally, Naganayakanahally, 3 MRL09 MRL09-SH 104 to Taluk Upgarde Waste Plastics 3.840 3.750 Complete 10 190.69 130.21 320.90 22.60 (0 , 8 , 1 , 0 , 9) Border via, Kondenahally, Kaggalahally, Jonnahally, Devanayakanahally Block Devanahalli Total 21.770 40 896.38 612.56 1,508.94 130.80 (5 , 17 , 7 , 2 , 31) Block- Doddaballapur 4 MRL06 MRL06-Kondasandra to MDR Upgarde -- 4.400 3.750 Complete 11 166.18 113.59 279.77 25.90 (1 , 2 , 4 , 5 , 12) 22 via Thubagere, Nellugudige, Geddalapalya, Palpaldinne Page 1 of 71 Generated On : 12/05/2021 11:35 AM Pradhan Mantri Gram Sadak Yojana Road List for attachment with Sanction Letter Sr.