Smartway 2007 Demo, Trial Operation on Metropolitan Expressway & Spread of Smartway Project

Total Page:16

File Type:pdf, Size:1020Kb

Smartway 2007 Demo, Trial Operation on Metropolitan Expressway & Spread of Smartway Project SmartwaySmartway 20072007 Demo,Demo, TrialTrial OperationOperation onon MetropolitanMetropolitan ExpresswayExpressway && SpreadSpread ofof SmartwaySmartway ProjectProject OutlineOutline Activities toward Smartway 2007 Demo Testing on Public Roads Contents of Smartway 2007 Demo – Overview – Test Ride on Tokyo Metropolitan Expressway – Symposiums – Exhibition – Evaluation of Demonstrated Services Spread of Smartway Project 1 ActivitiesActivities towardtoward SmartwaySmartway 20072007 DemoDemo Preparations for testing are conducted in cooperation with expressway companies, private businesses, and other organizations. Testing began on May 14, 2007. FY 2008 and FY 2006 FY2007 beyond Smartway 2007 Smartway 2007 Demo Testing on public roads Trial operation Standards and Study of on-board unit ☆ specifications JEITA specifications established specifications (version 1.0) Roadside unit specifications: ☆ Invited suggestions NILIM specifications established Published in official gazette on 10/31/06; suggestions invited until 12/1/06. Preparations for Preparations and Used in testing testing (equipment) advance evaluation ▲ Used in trial operation Continued use 5.8 GHz DSRC testing stations established Verification Verification Advance plan verification Confirmation trials ▲Disclosure of advance verification findings Data collection, analysis, Verifying the results and making improvements and evaluation Identifying and coordinating the issues New IT Reform ▲ ▲ ▲▲ ITS Promotion Councils Interim summary Report on FY 2007 tests Strategy Determining the general outline of testing in FY 2008 Plans for FY 2008 tests Study of collaborative testing; collaboration Large-scale testing with related government ministries and Implementation of collaborative testing agencies ▲ Determining the plan for testing 2 TestingTesting onon PublicPublic RoadsRoads 1) Flow Chart of Testing 1.1. SelectionSelection ofof thethe routesroutes andand locationslocations 2.2.StudyingStudying thethe lineuplineup ofof servicesservices needingneeding countermeasurescountermeasures •• IIdentidentiffyingying thethe locationslocations inin needneed ofof countcountermeasuresermeasures •• IIdentidentiffyingying thethe locationslocations inin needneed ofof countcountermeasuresermeasures •• AAnalyzingnalyzing thethe reasonsreasons •• AAnalyzingnalyzing thethe reasonsreasons 3.3.TestingTesting planplan 4.4.PreparationsPreparations forfor testingtesting FY 2006 FY 2007 CollaborationCollaboration withwith 5.5.TestingTesting andand evaluationevaluation relatedrelated governmentgovernment Scale of testing ministriesministries andand agagenenciescies – Testing to begin on May 14, 2007 – 29 participating companies as of July, 2007 (11 car manufacturers and 18 manufacturers of on-board units and appliances) – Total of 60 vehicles are used for about 2000 runs. 3 TestingTesting onon PublicPublic RoadsRoads 2) Overview of the Metropolitan Expressway The Metropolitan Expressway includes nine radial roads linked to a loop line. Average daily traffic volume is approximately 1.2 million vehicles (as of September 2006). The number of accidents is 11,944 (fiscal 2006). Routes with high accident rates (cases per 100,000,000 vehicle-km) Accident rates in Route 5 12345 Route 1 descending order Route 6 Route 6 Kanagawa Total Yaesu Inner Route 4 Route 5 Circular Misato Shinjuku accidents Line Route Line Daikoku Route 7 Line Line Route 11 Route 2 Fatal and Yaesu Inner Route 4 Route 4 injury Circular Daiba Meguro Shinjuku Line accidents Route Line Line Line Route 9 Inner Circular Route 3 Route Yaesu Line Routes with greater accident density (cases / km / year) Accident rates in descending 1234 5 Route 11 order Route 1 Total Inner Route 4 Route 5 Route 11 Circular Shinjuku Ikebukur Haneda Route 2 Bay-Side Line accidents Line Daiba Line Route o Line Line Fatal and Inner Route 4 Route 6 Route 5 Route 1 injury Circular Shinjuku Misato Ikebukuro Haneda accidents Route Line Line Line Line 4 TestingTesting onon PublicPublic RoadsRoads 3) Test locations on the Metropolitan Expressway On the Metropolitan Expressway, tests were conducted on the Loop Line, Route 4, and Route 5, which have high rates and high densities of accident occurrence. Itabashi-Honcho Curve :Information provision on forward Center Circular Route Ouji Line obstacles Itabashi JCT :Information provision on conditions ahead Kita-Ikebukuro Curve :Merge support Higashi-Ikebukuro Curve :map-linked services Higasi- Ikebukuro Route 5 Misakicho Curve Nishikanda inbound Iidabashi Curve Gaien(Static Image) Sanbancho Curve Takebashi JCT Benkeibori Curve Kandabashi Takebashi (Static Image) SanguBashi Akasaka S Curve JCT Akasaka TN Kandabashi Shinjuku Curve JCT Eifuku(Highway Radio) Kitanomaru Hakozaki Route 4 TN JCT Miyakezaka JCT Tanimachi Route 3 JCT Inner Circular Line 5 TestingTesting onon PublicPublic RoadsRoads 4) Concept of Evaluation 1. Verifying system functions y Determining whether roadside units and on-board units are functioning as required with regard to data collection, processing, and supply functions. y Determining whether multiple ways of detecting phenomena, having different implementation costs, are capable of adequate detection of phenomena. (Evaluation indices) Detection rates by sensors and interpretation software, etc. 2. Verifying system effectiveness based on vehicle behavior • Determining whether drivers adequately follow the expected behavior upon receiving information. ( Evaluation indices) Presence of sudden braking, abrupt steering, etc. 3. Verifying system effectiveness based on driver opinions • Determining whether drivers actually perceive the system's intended effects. ( Evaluation indices ) Perceived level of effectiveness, willingness to pay, effectiveness of information supply, desire to continue using the system, etc. 6 OverviewOverview ofof SmartwaySmartway 20072007 DemoDemo Smartway 2007 Demo held at Tokyo International Forum & on Metropolitan Expressway from October 14 to 17, 2007. ● TestTest RideRide onon MetropolitanMetropolitan ExpresswayExpressway --1414 testtest carscars Itabashi JCT Center Circular Route --EEnglishnglish voicevoice announceannounce ● (Opened in December 2007) Route 5 Ikebukuro Line ● Exhibitions Exhibitions ※By bus --IITSTS On-BoardOn-Board && RoadsideRoadside UnitsUnits Hatagaya - Equipped cars ◎● ● - Equipped cars ● ● ● ● - Panels ● Takebashi - Panels JCT ● ● ● ●● Route 4 Shinjuku Line ● Miyakezaka SymposiumsSymposiums JCT Kasumigaseki --SSmartwaymartwaySSymposiumymposium Route 3 Shibuya Line --AAHSHS && JSCEJSCE SymposiumSymposium ● ● Parking (opened(opened atat thethe samesame time)time) Inner Circular Route Tanimachi JCT ★ Tokyo Sponsored by MILIT, NILIM, and MEX Co. Ltd International Forum Shibakouen Demonstrated Services ●:Information provision on forward obstacles ● :Merge support ●:map-linked services :Information provision on conditions ahead ◎● :Providing Positional Information 7 OverviewOverview ofof SmartwaySmartway 20072007 DemoDemo Smartway 2007 Demo held at Tokyo International Forum & on Metropolitan Expressway from October 14 to 17, 2007. TestTest RideRide onon MetropolitanMetropolitan ExpresswayExpressway --1414 testtest carscars --EEnglishnglish voicevoice announceannounce ExhibitionsExhibitions Number of Partcipants --IITSTS On-BoardOn-Board && RoadsideRoadside UnitsUnits Opening Ceremony 400 --EEquippedquipped carscars Test Ride on MEX --PPanelsanels 666 (54 from abroad) Smartway Symposium 350 SymposiumsSymposiums No Prior Registration 201 --SSmartwaymartwaySSymposiumymposium (Exhibition Only) --AAHSHS && JSCEJSCE SymposiumSymposium Press (opened(opened atat thethe samesame time)time) 35 Sponsored by MILIT, NILIM, and MEX Co. Ltd TOTAL 1,652 8 TestTest RideRide onon TokyoTokyo MetropolitanMetropolitan ExpresswayExpressway 3) Lineup of Demonstrated Services(1/2) System System summary Providing information • Roadside sensors detect stopped vehicles or on obstacles ahead congestion beyond a curve with poor AuAudidioo++VisualVisual visibility and warn drivers entering the curve by visual and audio information. Beep! Congestion ahead. Drive carefully! Providing information • Road conditions ahead are communicated to on conditions ahead drivers in visual form to call their attention. AuAudidioo++VisualVisual Traffic is congested in the direction of XXX. ÷ ÷ Providing information • Road traffic information on congestion, etc., on conditions ahead is supplied in audio form by highway radio. AudiAudioo onlonlyy The current travel time from xxx to xxx is about xxx minutes. Merging assistance 左から合流車、注意 • Roadside sensors detect vehicles approaching AudiAudioo ++ ViVisualsual ! a merge point. Just before the merge point, Beep! Vehicles merging drivers are alerted to the presence of merging from the left. vehicles by visual and audio information. Drive carefully! 9 TestTest RideRide onon TokyoTokyo MetropolitanMetropolitan ExpresswayExpressway 3) Lineup of Demonstrated Services(2/2) System System summary Information provision • Using 5.8 GHz DSRC, wireless LAN, etc. to provide (IP data link) Internet connectivity to vehicles parked at service areas, parking areas, etc. Public wireless LAN access point Public wireless Use of various LAN provider • Using various communications media, including public C通信ommunications wireless LAN. Communications provider Server Aその他多様ccess poinなメデts to ィア variのアクous otセhスerポ イント Internet media media • Studying uses such as simple bus location services in Notebook PC, etc. rural areas, based on the results of proving tests. Map-linked services
Recommended publications
  • Urban Expressway
    Urban Expressway Roads for automobile exclusive use separated from open roads without crossing at grade are necessary to alleviate automobile congestion and eliminate through traffics from open roads. The Tokyo Metropolitan Government started the study in 1951, the Urban Expressway Network of 8 Routes, road with a length of approx. 71km, was approved as the City Planning for the first time in August 1959,and based on the recommendation for the construction of the Urban Expressway System by the Committee on Capital Construction in 1953, “Basic Policy for the Tokyo City Planning Urban Expressway” of the Ministry of Construction approved in 1957 and the consideration by the Task Force for the Tokyo City Planning Urban Expressway,. Since then, as there were additional new routes, extension of existing routes and a part of alignment change etc., the routes approved in the City Planning are 19 routes with 3 branch routes, of approx. 226km, as of Mar. 2013. Among the routes already approved in the City Planning, the following are currently in service: the Routes of No.1, No.2, No.2 Branch Route, No.3, No.4, No.4 Branch Route, No.5, No.6, No.7, No.8, No.9, No.12, Bay Shore Branch Route, Adachi Line, Katsushika-Edogawa Line, Bay Shore Route, Oji Line, Shinjuku Line, a part of Outer Circular Route (from Oizumi 5-chome to Oizumi 1-chome, Nerima Ward) and a part of Harumi Line (from Toyosu 6-chome to Ariake 2-chome, Koto Ward), total 17 routes, 3 branch routes, road length approx. 196km, are in service now.
    [Show full text]
  • Location Map Location Map
    ロケーションマップ〈お車でのご案内〉 ロケーションマップ〈電車でのご案内〉 Location Map Location Map 東京湾 東京湾 Tokyo Bay Tokyo Bay 竹芝客船ターミナル Takeshiba Passenger Terminal アジュール竹芝 3F Azur Takeshiba 竹芝駅直結 ノースタワー サウスタワー ノースタワー North 日の出桟橋 North Tower Tower South Tower 竹芝客船ターミナル (*) Hinode Pier Takeshiba Passenger Terminal アジュール竹芝 川崎重工業東京本社ビル 竹芝桟橋入口 Azur Takeshiba Kawasaki Heavy 新交通ゆりかもめ 浜離宮恩賜庭園 Takeshiba Sanbashi サウスタワー Industries Bldg. New Transit Yurikamome Hama-rikyu Gardens South Tower 川崎重工業 竹芝駅 東京本社ビル Takeshiba sta. Kawasaki Heavy 台場・豊洲 方面 四季劇場 春・秋 For Daiba,Tyosu 四季劇場 春・秋 Industries Bldg. (2017年6月下旬~ ホテル タビノス (2017年6月下旬~ 一時休止) Hotel Tavinos 一時休止) 新交通 Shiki Theater 海岸通り 竹芝駅 Shiki Theater Takeshiba sta. ゆりかもめ (Temporary closed ファミリー マ ート Kaigan-dori (Temporary closed New Transit from June,2017.) Family Mart ) from June,2017. Shimbashi Yurikamome Shiodome, For 汐留 首都高速都心環状線 Metropolitan Expressway Inner Circular Route ・ 出口 S4 至 汐 新橋 海岸1丁目方面 留出口 浜崎橋 JCT 至芝浦 JCT Metropolitan Expressway Inner Circular Route 首都高速都心環状線 for Shiodome Exit HamazakibashiJCT 東京ガス for ShibauraJCT Exit S4 芝商業高校前 ビル 汐 留 ビ ル ディング 方面 首都高速都心環状線Kaigan-dori for Kaigan 1-chome Shiodome Bldg. Shibashogyo Koko 旧芝離宮恩賜庭園 Tokyo 海岸通り Kyu Shiba-rikyu Gardens 東京ガスビル Gas Bldg. 東芝ビル 旧芝離宮恩賜庭園 Tokyo Gas Bldg. Toshiba Bldg. Kyu Shiba-rikyu Gardens 汐 留 ビ ル ディング 北口 南口 Shiodome Bldg. North South JR Exit Exit 東 京 モノレー ル JR浜松町駅 Tokyo Monorail JR Hamamatsucho sta. JR浜松町駅 文化放送 東芝ビル JR Hamamatsucho sta. Metropolitan Expressway Inner Circular Route Nippon Cultural Toshiba Bldg. 至東京方面 至品川方面 Broadcasting inc. For Tokyo 世界貿易 For Shinagawa モノレール浜松町駅 センタービル 15 Tokyo Monorail B2出口 第一京浜 Daiichi Keihin 世界貿易 Hamamatsucho sta. World Trade Center Bldg. センタービル Exit B2 モノレール浜松町駅 東 京 モノレー ル Tokyo Monorail World Trade Tokyo Monorail Hamamatsucho sta.
    [Show full text]
  • Wide Map Overall
    31-1, Nihonbashi-Hamacho 2-chome, Chuo-ku,Tokyo 103-0007 Japan TEL:81-3-5643-2633 FAX: 81-3-5643-3381 http://www.sakura-netek.com/ Access • 1min Walk from Toei Shinjuku Line Hamacho Station (A2 Exit) • 7min Walk from Toei Asakusa Line Ningyocho Station (A3 or A4 exit) • 7min Walk from Tokyo Metro Hibiya Line Ningyocho Station (A1 Exit) • 10min Walk from Tokyo Metro Hanzomon Line Suitengumae Station (7th Exit) Hamacho Center Building is a building where the Meiji Theatre (Meijiza) is located. Overall MAP Sumida River Shin- N ohashi Yasukuni Dori Metropolitan Expressway No. 6 Mukojima Route Asakusabashi Shin-ohashi west Kinza Dori Toyoko Inn APA Hotel Hamacho Park Tokyo-eki Higashinihonbashi A1 Exit Nihonbashi Shin-ohashi Mae Hamacho eki ● Bakurocho Hamacho Minami Station Station Toyoko Inn ● Tokyo Nihonbashi Station A2 Exit Hamacho Meijiza Mae Family Mart Seijo Ishii Bakuroyokoyama Kiyosubashi Dori Station Hisamatsucho Lawson Hamacho Hamacho Police Box Bakurocho Park Mae Nakanohashi Shin-ohashi Dori Hisamatsu Sakura Finetek Japan Co., Ltd Police Station Hamacho Center Building 13F TORNARE Kurakakekyou Nihonbashi Hamacho Yokocho Hisamatsu Amazake BUILD Police Station Mae NTT Post Ofce Ningyocho Kodenmacho Station Family Mart Sanchome ● Suiten-gu A4 Exit A3 Exit Shigemori Police ● A1 Exit● 7th Exit● Eishindo Box Kodenmacho Station Ningyocho Station Ningyocho Dori Suitengumae Station Ningyocho Amazake Suitengu Mae Yokocho Wide Map ● Route Map (Detail) ● Route Map Bakurocho Sakura Finetek Japan Co., Ltd. Kanda Sakura Global Holding Co., Ltd. Higashi Bakuro nihonbashi Ueno Shin yokoyama Ikebukuro Nihonbashi Kodenmacho Hamacho Bakurocho Kanda Hamacho Shin Morishita Nihonbashi Ningyocho Sakura Global Holding Co., Ltd. Mitsukoshi Suitengumae mae Tokyo Kayabacho Ningyocho Sakura Finetek Japan Co., Ltd.
    [Show full text]
  • Of Large-Scale Field Operational Test for “Automated Driving System”
    Press Release October 3, 2017 Cabinet Office Counsellor for Common Service Platform, Bureau of Science, Technology and Innovation Start of Large-Scale Field Operational Test for “Automated Driving System” “Automated Driving System,” part of the Cross-ministerial Strategic Innovation Promotion Program (SIP), has launched the Large-Scale Field Operational Test to accelerate the practical application of technologies necessary to implement the system. Over 20 organizations including Japanese and overseas automakers are participating in the Large-Scale Field Operational Test, which begins today and will be conducted progressively on the Tomei Expressway, Shin-Tomei Expressway, Shuto Expressway and Joban Expressway and on surface streets in the Tokyo waterfront area (see attached materials). 1. Developments to date In the SIP “Automated Driving System,” research and development has been progressing since fiscal 2014 aiming at reduction of the number of traffic accidents and realization of the Next Generation Transportation System through real-world application of the Automated Driving System, with a focus on five key technology fields as cooperation areas among industries, academia and governments: Dynamic Map1, HMI2, Cyber Security, Pedestrian Traffic Accident Reduction, and Next Generation Transport. 1. High-precision three-dimensional digital map for automated driving. 2. Human-Machine Interface: Safe and smooth technology interfaces in case of switching between human and system operation. 2. Overview of Large-Scale Field Operational Test Technologies researched and developed in the five above-mentioned focus areas will be tested to accelerate the practical application of the Automated Driving System in real environments of public roads, with the participation of automakers and other stakeholders. 1 The results of research and development will be reviewed by numerous stakeholders and advance to future R&D, and the participation of overseas manufacturers will promote international collaboration and global standardization.
    [Show full text]
  • Japan C2 Shinjuku Route
    Japan C2 Shinjuku Route This project profile has been compiled by the Japanese OMEGA Team, Tokyo Institute of Technology. Please Note: This Project Profile has been prepared as part of the ongoing OMEGA Centre of Excellence work on Mega Urban Transport Projects. The information presented in the Profile is essentially a 'work in progress' and will be updated/amended as necessary as work proceeds. Readers are therefore advised to periodically check for any updates or revisions. The Centre and its collaborators/partners have obtained data from sources believed to be reliable and have made every reasonable effort to ensure its accuracy. However, the Centre and its collaborators/partners cannot assume responsibility for errors and omissions in the data nor in the documentation accompanying them. 2 CONTENTS A INTRODUCTION Type of project Overview Location Current Status B BACKGROUND TO PROJECT Principal project objectives The 1960s and 1970s The 1980s and 1990s The 2000s Key enabling mechanisms and decision to proceed Main organisations involved Metropolitan Expressway Co. Ltd Tokyo Metropolitan Government Ministry of Land, Infrastructure and Transport Local government Contractors The Japan Expressway Holding and Debt Repayment Agency Planning and environmental regime Land acquisition C PRINCIPAL PROJECT CHARACTERISTICS Route and alignment Main and intermediate hubs, nodes and termini Project costs Project delivery timeline Main engineering features Main contracts and contractors Major civil engineering components D PROJECT TIMELINE Project timeline Key timeline issues E PROJECT FUNDING/FINANCING Introduction Background to funding/financing Role of traffic forecasts Funding sources Commentary on funding/financing approach 3 F OPERATIONS Traffic volume Safety measures Commentary G BIBLIOGRAPHY 4 List of tables Table 1: Decision Making for the Metropolitan Expressway C2 Shinjuku Route .................
    [Show full text]
  • SUBWAY & BUS ACCESS Roppongi Hills Access PERSONAL CAR & TAXI ACCESS
    003 Shinanomachi Chiyoda Line SUBWAY & BUS ACCESS Nogizaka Nogizaka MORI Tameike Ark Hills Sta. to Oedo Line TOWER Tokyo Metro Hibiya Line“ Roppongi Sta.” (H04) Tokyo Midtown Roppongi Sta. 2F Exit 1C: 0 min.-walk (Direct connection via concourse) * Toei Oedo Line/Roppongi Sta. Exit 3: 4-min. walk Oedo Line * Toei Oedo Line/Azabu-juban Sta. Exit 7: 5-min. walk The National Art Center, Roppongi Sta. Nanboku Line Hibiya Line * Metrol Namboku Line/Azabu-juban Sta. Exit 4: 8-min. walk Tokyo Roppongi Street Roppngi Itchome Sta. Roppongi Street “Roppongi Sta.” Exit 1C Loop No.3 “Roppongi 6-Chome” B.S. (bound for Shimbashi) (Direct connection from From JR Shibuya Station Aoyama Cemetery Metro Hat Metro Hat B1) Toei RH01 Route Bus (Shibuya Sta. Roppongi Hills) Hibiya Line ⇔ Roppongi Crossing Roppongi Sta. Direct shuttle service (approx. 12 min.) Toei TO01Loop Route Bus (Shibuya Sta.⇔Roppongi Hills) ”Roppongi Hills” &“ Roppongi Hills Keyakizaka bus stops (approx. 15 min.) Azabu Loop No. 3 Police Station 66 Plaza Roa Bldg. Toei TO01Route Bus (Shibuya Sta.⇔Shinbashi Sta.) Roppongi 6-Chome” B.S. ”Roppongi 6-Chome” bus stop (approx. 14 min.) Roppongi Hills AXIS Bldg. Gaien-Higashi St. (bound for Shibuya) Nishi-Azabu Azabu Juban Mori Toei SHIBU88 Route Bus (Shibuya Sta.⇔Shinbashi Sta. North Exit) Crossing “Roppongi Tower Shibuya ”Roppongi 6-chome” bus stop (approx. 20 min.) 6-Chome” B.S. Imoaraizaka Iikura Grand Roppongi Hills Mohri Garden Ramp From JR Shinbashi Station Route 3 Shibuya Line Toriizaka Exit Hyatt MORI TOWER Tokyo Toei TO01Route Bus (Shinbashi Sta.⇔Shibuya Sta.) Museum Cone ”Roppongi 6-Chome” bus stop (approx.
    [Show full text]
  • Persons Coming from Nearby Stations, and Airports
    ACCESS 1/5 ( ) Persons coming from nearby stations, and airports Nihon Keizai JR神田駅 Shimbun Tokyo Kanda Headquarters Station Building Kandabashi Toll Gate Japan Meteorological Agency 内線 Tokyo Regional Headquarters, JMA ノ EXIT 4 丸 竹橋駅 Inner Circular Route ロ Takebashi Tokyo Station Fire JA 東京メト Depart- build- Keidanren Marunouchi Line ment ing Kaikan EXIT C2a KDDI Otemachi HOSHINOYA Building Tokyo EXIT C4 JR線 EXIT C5 Yomiuri JR Line Shimbun Building Ascott Marunouchi Tokyo 大手町駅 Hanzomon Line 東京メトロ半蔵門線 Otemachi Station Aman Tokyo OOTEMORI PALACE HOTEL TOKYO Tozai Line 東京メトロ東西線 Eitai-dori 永代通り 内堀通り MARUNOUCHI HOTEL Uchibori-dori Shin- Shangri-La Marunouchi Hotel, Bldg. Tokyo 都営三田線 Mita Line 東京駅 Tokyo Chiyoda 東京メトロ千代田線Line Station 丸の内北口 Daimaru Tokyo 外堀通り Marunouchi JR東京駅 Bldg. 日比谷通り Tokyo 二重橋前駅 Station Nijubashimae Sotobori-dori Station Hibiya-dori Access from nearby stations Directly connected to Otemachi Station on the Tokyo Metro Chiyoda Line, Marunouchi Line, Hanzomon Line, Tozai Line,and Toei Subway Mita Line 5-minute walk from Takebashi Station on the Tokyo Metro Tozai Line 14-minute walk from JR Tokyo Station (from the Marunouchi Central Gate) 12-minute walk from JR Kanda Station (from the South Exit) *Walking time varies depending on the time of day. Access from the airport Haneda Airport: 42 minutes by train, 33 minutes by car (via Kandabashi IC) *To Haneda Airport Terminal 1 Station Narita Airport: 70 minutes by train, 72 minutes by car (via Gofukubashi IC) *To Narita Airport Station *The time required varies depending on the time of day and congestion. Transfers and waiting times are not included. Also, the time required by car is assumed to use the highway.
    [Show full text]
  • EDOBUS at the Bus Stops Listed Below, Passengers Can Make a Connection to Another Edo Bus This Is a Book of 11 Tickets for Edo Bus Without Expiration
    2021 July issue 2021.7 Both cards, PASMO and Suica, are accepted. When the card is touched to the payment machine by a passenger, the fare is automatically charged to the card. Inside the bus, you can add the money to the card by one thousand yen at the minimum. If the card is lost, it CHUO CITY COMMUNITY BUS Edo Bus Service Information and may not be reissued. Fare Preschool age: Free *1 PASMO is a registered trademark of Pasmo Co., Ltd. 100 yen (adult and child) *2 Suica is a registered trademark of East Japan Railway Company. *No discount is available for senior passes or disability certificate holders. *For information about where to buy these tickets, Operation The bus arrives every 20 minutes Cost efficient tickets: see the list of ticket selling locations. (see the back of this map for the timetable) Multi-ticket EDOBUS At the bus stops listed below, passengers can make a connection to another Edo Bus This is a book of 11 tickets for Edo Bus without expiration. yen Changing without paying any additional fare (a transit ticket is necessary for transferring buses). If book 1,000 Buses you need a transit ticket, please tell it to the bus driver when you get on the first bus of This ticket is used for one-day only (taking Edo bus as many times your journey. One-day pass 300 yen as you like for one-day) Chuo City Office (North Loop ⇄ South Loop) One-month The pass is valid for one month and in bearer form.
    [Show full text]
  • Asset Book 2017
    Otemachi Building, 6-1, Otemachi 1-chome, Chiyoda-ku, Tokyo 100-8133, Japan MITSUBISHI ESTATE CO., LTD. http://www.mec.co.jp/index_e.html ASSET BOOK 2017 Printed in Japan 1,800m 1,200m N Kokyo (Imperial Palace) Gaien National Garden Palace Hotel Tokyo Otemon Tower • NIKKEI Bldg. MARUNOUCHI TODAY Palace JX Bldg. Bldg. Otemachi 1-2 Project (Planned Completion in FY2020) Otemachi JA Bldg. Park Bldg. SMBC Keidanren Nippon Life Ote Center Bldg. Wadakura-bori Head Ofce Hibiya-bori Moat Marunouchi Kaikan Bldg. Babasaki-bori Moat Moat Garden Tower Hibiya Station, Chiyoda Line New Hibiya Hibiya Station, Toei Mita Line Otemachi Station, Toei Mita Line Project Hibiya-dori Ave. Hibiya Otemachi Station, Chiyoda Line Marine Bldg. Nijubashimae Station, Chiyoda Line Marunouchi Police Sta. SMBC East Tower Marunouchi OTEMACHI Hibiya Meiji Seimei Kan Kishimoto KDDI Imperial Mitsui Bldg. Tokyo Toho Sankei Bldg. Theater Otemachi Bldg. FINANCIAL CITY Bldg. Bldg. Kaijo Yomiuri Twin Tower Marunouchi Marunouchi Shimbun GRAND CUBE Bldg. Togyo Kaikan- DN Mitsubishi Nichido Otemachi First Square Ofce Bldg. Nippon Broadcasting Tower 21 Marunouchi 5th St. 3-2 Project Corp. Yusen Bldg. Bldg. 1-3 Project The System Bldg. (Planned Completion Head Ofce (Annex) (Planned Completion Peninsula in October 2018) in September 2020) Marunouchi 4th St. Meiji Yasuda Seimei Bldg. Marunouchi 3rd St. Tokyo St. 2nd Marunouchi Sanshi Kokusai Bldg. Marunouchi- HOSHINOYA Tokyo Kaikan Bldg. Nakadori Bldg. Marunouchi 1st St. Otemachi Bldg. Otemachi Naka-dori Ave. Hibiya Station, Hibiya Line Marunouchi Naka-dori Ave. Marunouchi Naka-dori Ave. Otemachi Naka-dori Ave. Gyoko-dori Ave. Gyoko-dori OTEMACHI FINANCIAL CITY Shin-Kokusai Ave.
    [Show full text]
  • Statistical Method for Pre-Trip Traffic Conditions Prediction
    STATISTICAL METHOD FOR PRE-TRIP TRAFFIC CONDITIONS PREDICTION Hiroshi WARITA Metropolitan Expressway Public Corporation, 43-5, Nihonbashi-Hakozakicho, Chuo-ku, Tokyo 103-0015, TEL: +81-3-5640-4857, Fax: +81-3-5640-4881, E-mail: [email protected] Hirohisa MORITA Professor, Research Institute of Science & Technology, Nihon University 7-24-1, Narashinodai, Funabashi, Chiba 274-0063, Japan TEL: 81-47-469-5504, Fax: +81-47-469-2581, E-mail: [email protected] Edward CHUNG Visiting Professor, Center for Collaborative Research, University of Tokyo 4-6-1 Komaba, Meguro-ku, Tokyo 153-8904, JAPAN TEL: +81-3-5452-6529, FAX: +81-3-5452-6420, E-mail: edward @iis.u-tokyo.ac.jp Masao KUWAHARA Professor, Center for Collaborative Research, University of Tokyo 4-6-1 Komaba, Meguro-ku, Tokyo 153-8505, JAPAN TEL: +81-3-5452-6418, FAX: +81-3-5452-6420, E-mail: [email protected] Atsushi TANAKA Tokyo Headquarters, Oriental Consultants Co.,Ltd. 3-5-7 Hisamoto, Takatsu-ku, Kawasaki City, Kanagawa, 213-0011, Japan TEL: +81-44 812 8813 FAX: +81-44 812 8823 E-mail: [email protected] ABSTRACT Traffic information on the Metropolitan Expressway network is supplied via various media. Current available real time information is associated with present traffic condition. However, current real time information is not suitable for pre-trip decisions as the information does not factor in the time interval to joining the expressway network and this is subject to considerable prediction errors. This research involved the proposal of a method for matching historic traffic data with real-time traffic data as a means of predicting the travel times and bottleneck status immediately prior to departure.
    [Show full text]
  • Tokyo Office
    ACCESS MAP Tokyo Office Otemachi Park Building 1-1-1 Otemachi, Chiyoda-ku, Tokyo 100-8136, Japan (Reception: 20th Floor) TEL : 81-3-6775-1000 Ote-mon Gate Tokyo Fire Department Tokyo Metro Tozai Line Tokyo Metro Hanzomon Line Uchibori-dori Ave. Wadakura Nikkei Gyoko-dori Ave. Gyoko-dori Fountain Park Palace Hotel Building Palace Tokyo Otemon Building Tower Otemachi JA Building Park Exit C5 Building Exit C6a Babasaki-bori Moat Wadakura-bori Moat Ote Center Keidanren Building Kaikan Toei Mita Line Exit C4 Mita Line Otemachi Station Hibiya-dori Ave. Kandabashi Chiyoda Line Nijubashimae Station Chiyoda Line Otemachi Station Ramp Shuto Expressway Inner Circular Route (Route C1) Inner Circular Expressway Shuto Tokyo Metro Chiyoda Line Eitai-dori Ave. Hanzomon Line Otemachi Station Otemachi Otemachi Financial First Square City Grand Cube Otemachi HOSHINOYA Marunouchi Naka-dori Ave. Building Tokyo Tozai Line Otemachi Station Tozai Otemachi Financial City Marunouchi Shin-Marunouchi Marunouchi Otemachi Tower Building Building Eiraku Building South Tower North Tower Tokyo Metro Marunouchi Line Marunouchi Line Tokyo Station Marunouchi Line Otemachi Station JR Sobu Line, Yokosuka Line Tokyo Station Marunouchi OAZO Marunouchi South Exit Marunouchi Urbannet Otemachi Building Central Exit Marunouchi Hotel The Tokyo Station Hotel Marunouchi Shin-Otemachi North Exit Building N JR Sobu Line JR Tokyo Station JR Yamanote Line Access by Train Otemachi Station (Exit C6a leads directly into the building.) Uchibori-dori Ave. Tokyo Metro T09 Tozai Line, C11 Chiyoda Line, Z08 Hanzomon Line, M18 Marunouchi Line and Exit C5 I09 Toei Mita Line Otemon Tower Otemachi OUT Eitai-dori Ave. Park Tokyo Station (Accessible from the station through the Building underground passage.) IN JR, Tokyo Metro M17 Marunouchi Line Ote Center Building Exit C4 Exit C6a Access by Car Hibiya-dori Ave.
    [Show full text]
  • Decision Made on the Development Outline of the Roppongi 3-Chome Hotel Project (Tentative Name) Opening Planned for Early 2020
    August 28, 2018 Press Release Mitsui Fudosan Co., Ltd. Mitsui Fudosan Hotel Management Co., Ltd. Decision Made on the Development Outline of the Roppongi 3-Chome Hotel Project (Tentative Name) Opening Planned for Early 2020 Tokyo, Japan, August 28, 2018 - Mitsui Fudosan Co., Ltd., a leading global real estate company headquartered in Tokyo, and Mitsui Fudosan Hotel Management Co., Ltd. are pleased to announce that they have decided on the development outline for the Roppongi 3-Chome Hotel Project (tentative name) to be built at 62-1 and other lots, Roppongi 3-chome, Minato-ku, Tokyo. This project will involve Mitsui Fudosan Co., Ltd. building the hotel on a site borrowed from multiple companies that own it, and following completion of construction, Mitsui Fudosan Hotel Management Co., Ltd. operating it as a hotel. Construction of the new building started in February 2018, and the opening of the hotel is scheduled for early 2020 with 260 guestrooms (planned). The location of the project is not far from large-scale, multi-use facilities such as Tokyo Midtown and Roppongi Hills and offers outstanding access to public transport being just 5 minutes on foot from Roppongi on the Tokyo Metro Hibiya and Toei Oedo subway lines and 7 minutes on foot from Roppongi-itchome on the Tokyo Metro Namboku Line. Roppongi is widely recognized as a business and tourism spot, not only within Japan, but also among inbound tourists, and this hotel will respond to accommodation needs for domestic and overseas customers as a base to stay for business, tourism or leisure. Mitsui Fudosan Hotel Management currently operates 6,402 rooms in 25 facilities throughout Japan under Mitsui Garden Hotels, its upper middle-class lodging-focused hotel brand, and THE CELESTINE HOTELS, its high-class lodging-focused hotel brand.
    [Show full text]