REGION Preliminary Approximate cadastral № Location land plot Possible ways of use Infrastructure Encumbrances value, area, ha thousand USD Berezino district 1 Berezino town, Promyshlennyj lane 0.9 construction of a Motor road М-4 Minsk- abscent 53,46 manufacturing facility Mogilev (650 m). Motor road R-67 – 290 m. Electricity supply – over 1000 V. Heating, drinking water, wells, gas supply – 100 m.

2 Berezino district, 1.18 construction of a roadside Motor road М-4 Minsk- abscent 2,597 motor road M-4 Minsk-Mogilyov (km service facility Mogilev. Electricity supply – 99 left) over 1000 V.

3 Berezino town, Sokolovsky str., 1 11.5801 construction of manufacturing Motor road М-4 Minsk- abscent 935,672 facilities Mogilev (2200 m). Motor road R-67 – 1500 m. Electricity supply – over 1000 V. Drinking water, wells, gas supply.

Borisov district 4 Hugly village 1.8 construction of manufacturing connection to the operating abscent 24,3 facilities utilities is possible

5 Borisov town, 0.5 hotel facilities connection to the operating abscent 215,3 Gagrin str. utilities is possible (in the complex with an underconstruction football statium)

6 near agro-town Velyatichi 12 construction of a сommercial possibility of connection to abscent 39,6 dairy farm (1050 heads of medium pressure gasmain milking herd) and power transmission line fo 10 kV

Vilejka district 7 Vilejka town, "Severnyj 2" building 1 allocation of auto service electricity supply – 250 m, abscent 68,5 estate entities - garage water supply – 500 m, gas supply – 1000 m, draining – 400 m, no driveways

8 Vilejka town, "Severnyj 2" building 6.8 allocation of a logistic center railway, gas supply – 1000 abscent 669,12 estate m, water supply – 450 m, electricity supply – 700 m

9 Vilejka town, "Severnyj 2" building 0.5 allocation of auto service gas supply – 900 m, water abscent 34,25 estate entities - garage supply – 400 m, electricity supply – 450 m, draining – 200 m, driveways – 400 m

Volozhin district 10 Volozhin town, 0.35 construction of an electricity supply – 300 m abscent 30,345 Y.Kolasa str. manufacturing facility

Dzerzhinsk district 11 Stankovo ​​village council, 1 construction of manufacturing asphalt driveway, possibility abscent 10,6 near Stankovo village facilities of connection to gas supply

12 Stankovo ​​village council, 1.6 construction of manufacturing asphalt driveway, possibility abscent 16,96 Stankovo village facilities of connection to gas supply

Kletsk district 13 town, Lenin str. 9.9 construction of a productive railway, asphalt driveway, abscent 496,98 entity gas supply, electricity supply, water supply – up to 100 m

14 Kletsk town, 2 construction of a productive asphalt driveway, gas abscent 115,6 Victory str. entity supply, electricity supply, (furplant district) water supply, sewerage up to 100 m 15 Kletsk town, 1.6 construction of a productive asphalt driveway, gas abscent 106,24 Victory str. entity supply, electricity supply, water supply, sewerage up to100 m

16 Kletsk town, 0.5 construction of a productive asphalt driveway, gas abscent 28,9 Lermontov str. entity supply, electricity supply, water supply, sewerage up to 100 m

17 Kletsk town, Kirov str. 0.6 construction of a productive asphalt driveway, electricity abscent 39,84 entity supply, water supply up to 100 m

Kopyl district 18 Kopyl, Tymkovichskaya str. 10 industrial facilities location 100 km away from Minsk; abscent 335 distance to railway - 7 km, other utilities are available

19 Internatsyonal village, Buchatinsky 1.5 production facilities, agro- 189 km away from Misnk abscent 3,45 village council tourism г.Минска; distance to railway - 7 km

Krupki district 20 Krupskij settlement (61 km (left) 5 construction of manufacturing road – 50 m, water supply, abscent 36,5 motor road facilities electricity supply R-19 Tolochin – )

21 Bobr settlement 4.5 construction of manufacturing road, water supply, abscent 22,5 facilities electricity supply

22 Uhvala agro-town (98 km (right) 4 construction of manufacturing road, water supply, abscent 11,2 motor road facilities electricity supply R-62 Chashniki – Bobrujsk)

23 Yanovshchina village 2.5 construction of manufacturing road, water supply, abscent 5,5 facilities electricity supply

24 Zamki agro-town, Molodezhnaya 0.5 construction of commenrce road, water supply, abscent 2,4 str. facilities electricity supply

25 Velikaya Sloboda village (motor 1 construction of motor road road, water supply, abscent 14,3 road service and commerce electricity supply – 30 m N-8645 Krupki – Gapanovichi) facilities

26 Yanovshсhina village (motor road N- 0.25 construction of motor road road, water supply, abscent 0,7 3802 Chereya – Kholopenichi) service and commerce electricity supply facilities 27 close to the bridge over Bobr river 0.15 construction of motor road road – 10 m, electricity abscent 0,36 (motor road R-1948 (right) Tolochin service and commerce supply – Krupki) facilities

28 Krupki town, 7, Kommunal'naya str. 0.48 construction of manufacturing road, water supply, abscent 31,779 facilities electricity supply – 10 m

29 Krupki town, 0.5 construction of a trade facility road, water and electricity abscent 50,65 "Severny" building estate, supply Vasnetsova str. 30 Krupki town 0.43 construction of a water power paved access road, abscent 19,558 station electricity, water supply

Lyuban' district 31 Lyuban' town, Borovika str. (in the 0.5 construction of manufacturing possibility of connection to abscent 12,05 area of a former garment factory) facilities gas pipeline, power transmission line, sewerage 32 Lyuban' town, Borovika str. (in the 1 construction of manufacturing possibility of connection to abscent 10,4 area of the "Fishplant") facilities gas pipeline, power transmission line, sewerage 33 town settlement Urech'e, 7 construction of manufacturing possibility of connection to abscent 140,7 Kommunal'naya str., facilities power transmission line, in the area "Byvshaya smolokurnya" sewerage, railway – 500 m

Myadel' district 34 0.3 km to the south-west of 17 alloction of alternative energy power supply, asphalt abscent 0,805 Rudoshany facilities driveways 35 Myadel' town, Internationalnaya str. 1 manufacturing facility electricity abscent 70,9

36 urban-type settlement Svir', 0.5 manufacturing facility electricity abscent 3,8 Krasnoarmeiskaya str.

37 0.1 km to north of Stoudenitsa 6 allocation of renewable energy electricity abscent 21 village facilities

Puhovichi district 38 Shackoe motorway, adjoining to 4 construction of manufacturing water supply up to 120 m, there are 29,2 Mar'ina Gorka town facilities draining up to 500 m, constraints in use electricity supply up to 200 m, gas supply up to 100 m

39 near Blon' agro-town 0.4 construction of communal water supply up to 400 m, abscent 3,52 facilities draining up to 400 m, electricity supply up to 100 m, gas supply up to 200 m

Sloutsk district 40 Sloutsk town, Lenina str., along the 1.5 construction of manufacturing motor road R-43 – 0 km, abscent 232,2 motor road R-43 the border of facilities power transmission line 10 Russian Federation-Krichev- (k)V – 0.6 km, water Bobrujsk-Ivacevichi (355 km to the pipeline – 20 m, gas left) pipeline – 160 m, railway – 0 km 41 Sloutsk town, 1 construction of manufacturing motor road R-43 – 0,7 km, abscent 322,6 Gagarina str. facilities power transmission line 10 (k)V – 0.2 km, water pipeline – 0 m, gas pipeline – 320 m, heat distribution system – 250 m

42 Sloutsk town, M.Bogdanovicha str., 2.4 construction of manufacturing motor road R-43 – 5,5 km, abscent 311,52 95 km (former fuel storage) and storage base power transmission line 10 (k)V – 0,2 km, water pipeline – 180 m, railway – 0 km

43 Sloutsk town, M.Bogdanovicha str., 5 construction of manufacturing power transmission line 10 abscent 717,5 95 km (close to the regional facilities (k)V – 0 km, heat supply consumer's association base) system – 0 m, railway – 0 km 44 Sloutsk town, M.Bogdanovicha str., 7 construction of manufacturing power transmission line 10 abscent 1 004,500 95 km (to the east of petrolbase) facilities (k)V – 0 km, heat supply system – 0 m, railway – 0 km 45 Sloutsk town, M.Bogdanovicha str., 11.5 construction of manufacturing power transmission line 10 abscent 1650,25 95 km (to the north of miitary facilities (k)V – 0 km, passage of service) vehicles and possibility of connection to the operating utilities

Smolevichy district 46 Berezovitsa village of Smolevichy 9.7219 manufacturing facilities motor road Р-53 –1 km abscent 70,97 district (OJSC "Smolevichi Broyler")

Soligorsk district 47 Soligorsk town, 2 construction of a connection to the operating abscent 2 438,600 Naberezhnaya str. multifunctional family utilities is possible recreation center Starye dorogi district 48 Noviny village 15 manufacturing facilities infrastructure available abscent 150

49 Starye Dorogi town, Zvezdnaya str. 0.32 manufacturing facilities infrastructure available abscent 19,2

50 Starye Dorogi town, Kirova str. 3 manufacturing facilities infrastructure available abscent 180

51 Starije Dorogi, 40, 0.31 manufacturing facilities infrastructure available abscent 43,307 Moskovskay str.

Stolbtsy district 52 Stolbtsy town, 17ogo Sentjabrja str. 3.2 renewable energy production infrastructure available abscent 209,28

53 Stolbtsy town, Mashinostroitelej str. 5 logistics infrastructure available abscent 656,5 district 54 Uzda town, 4 manufactuing and storage possibility of connection to the remains of 268,4 Jengel'sa str. facilities gas pipeline, water pipeline, foundation sewerage – 0.2 km; note: the base remains

55 near Telyakovo village 4 manufactuing and storage possibility of connection to remains of cattle- 10,4 facilities gas pipeline, water pipeline breeding buildings – and structures 150 m, local sewerage; note: remains of the stock farm buildings and constructions

Cherven district 56 Doubovruch'e village of Cherven 1.7 construction of a water supply - 30 m, power abscent 4,76 district (OJSC "Rovanichi") manufacturing facility transmission line

57 Vinogradovka village of Cherven 3 construction of a water supply - 30 m, power abscent 8,4 district (OJSC "Rovanichi") manufacturing facility transmission line - 30 m

Zhodino town 58 Zhodino town, 3.9 construction and maintenance motor road of republican abscent 620,49 near Zelenoborskaya str. of manufacturing, municipal value - 3,5 km, railway and storage facility station – 2,5 km, railway line – 0,2 km, water supply up to 1000 m, electricity supply up to 1000 m, gas supply up to 1000 m