Prepared by ULTRA-TECH Environmental Consultancy and Laboratory Proposed Residential Building Project ‘Artech Malabar Hills’, at Kasaba, Kozhikode

FORM 1

(I) Basic Information Serial Item Details Number 1. Name of the project/s Artech Malabar Hills, Residential Building Project at Kasaba Village, Kozhikode Taluk, Kozhikode District 2. S.No. in the schedule 8 (a), Category (B2) 3. Proposed Total plot area: 8277 m2 capacity/area/length/tonnage to be FSI: 3.87 handled/ command area/lease Total construction built-up area for the project: area/number of wells to be drilled 51, 688.57 m2 Coverage: 57.54 % No.of floors: G+21 floors 4. New/Expansion/Modernization New

5. Existing Capacity/Area etc. Not Applicable 6. Category of Project i.e.’A’ or ‘B’ Category (B2)

7. Does it attract the general Not Applicable condition? If yes, please specify. 8. Does it attract the specific Not Applicable condition? If yes, please specify 9. Location Kasaba Village, Kozhikode Taluk, Kozhikode District Plot/Survey/Khasra No. Resurvey No. 105/1C, 105/1 A1 and Sy No.s 989/1, 989/1,2 Village Kasaba Tehsil Kozhikode District Kozhikode State 10. Nearest railway station/airport The nearest railway stations are railway station at a along with distance in kms distance of 2.9 km and Kozhikode railway station at a distance of 3.8 km The nearest airport is Calicut International Airport at a distance of 28.4 km 11. Nearest Town, city, District The site is located within Kozhikode city Headquarters along with distance in kms. 12. Village Panchayats, Zilla Kasaba Village Office, Parishad., Municipal Corporation, Taluk Road, Kozhikode, Local body (complete postal Kerala, addresses with telephone nos. to 673012 be given 0495 2723920 13. Name of the applicant PEEVEEKAY Properties and Hotels Pvt Ltd 14. Registered address PEEVEEKAY Properties and Hotels Pvt Ltd 5th Floor, Indus Avenue, Kallayi Road, Calicut 15. Address for correspondence: Mr Viju Varghese Deputy General Manager (MEP) Artech Realtors Pvt Ltd Artech House TC/24/2014(1)

Prepared by ULTRA-TECH Environmental Consultancy and Laboratory Proposed Residential Building Project ‘Artech Malabar Hills’, at Kasaba, Kozhikode

Thycaud Thiruvananthapuram, 695014 Name Mr Viju Varghese Designation(Owner/Partner/CEO) Deputy General Manager-MEP, Artech Realtors Pvt Ltd Address Artech Realtors Pvt Ltd Artech House TC/24/2014(1) Thycaud Thiruvananthapuram, 695014 Pin Code 695014 E-mail [email protected] Telephone No. 9388189889 Fax No. -- 16. Details of Alternative Sites The site is in possession of project proponent. As per examined, if any. Location of Kozhikode City Development Plan, the site falls within these sites should be shown on a residential zone and hence no alternative site was considered toposheet. 17. Interlinked Projects No

18. Whether separate application of Not Applicable interlinked project has been submitted? 19. If yes, date of submission Not applicable

20. If no, reason Not applicable

21. Whether the proposal involves Not applicable approval/clearance under: if yes, details of the same and their status to be given (a)The Forest (Conservation) No Act,1980? (b) The Wildlife (Protection) No Act,1972? (c) The C.R.Z.Notification,1991? No

22. Whether there is any Government No Order/Policy relevant/relating to the site? 23. Forest land involved (hectares) No

24. Whether there is any litigation No. pending against the project and / or land in which the project is Affidavit to this effect is enclosed propose to be set up? (a) Name of the Court (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project

Prepared by ULTRA-TECH Environmental Consultancy and Laboratory Proposed Residential Building Project ‘Artech Malabar Hills’, at Kasaba, Kozhikode

Prepared by ULTRA-TECH Environmental Consultancy and Laboratory Proposed Residential Building Project ‘Artech Malabar Hills’, at Kasaba, Kozhikode

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

Details thereof (with approximate quantities /rates, wherever possible) S.No. Information/Checklist confirmation Yes/No with source of information data 1.1 Permanent or temporary change in land use, Yes The project site is a fallow land. Site will land cover or topography including increase be developed with a residential buildings in intensity of land use (with respect to and necessary amenities local land use plan) 1.2 Clearance of existing land, vegetation and Yes The site is fallow land with 26 end of life buildings? coconut trees, 10 Indian Almond, 4 acacia trees and 3 rain trees and 2 Vakamaram and 10 other small trees. Common Scientific No. Name Name of (Malayalam) trees in the site

Coconut Tree Cocos 26 (Thengu) nucifera

Indian Almond Terminalia 10 catappa

Acacia Acacia 4 auriculiformis

Rain tree Samanea 3 (Mazhamaram) saman

Vakamaram Albizia 2 lebbeck

Others 10

To compensate for this, a green belt will be developed with native species. 1.3 Creation of new land uses? No The project site is a fallow land. Site will be developed into a residential buildings and other necessary amenities 1.4 Pre-construction investigations e.g. bore Yes Geotechnical Investigation will be houses, soil testing? carried out. 1.5 Construction works? Yes Construction of Residential Building and

Prepared by ULTRA-TECH Environmental Consultancy and Laboratory Proposed Residential Building Project ‘Artech Malabar Hills’, at Kasaba, Kozhikode

related infrastructure 1.6 Demolition works? No No demolition will be carried out 1.7 Temporary sites used for construction works No No housing or accommodation for or housing of construction workers? construction workers is planned as the labourers deployed will be accommodated offsite and will be the responsibility of the contractor. 1.8 Above ground buildings, structures or Yes The building is constructed above ground. earthworks including linear structures, cut and The land is level and hence cutting and fill or excavations filling are not needed. 1.9 Underground works including mining or No Does not involve mining or tunnelling. tunneling? 1.10 Reclamation works? No Not involved 1.11 Dredging? No Not involved 1.12 Offshore structures? No Not involved 1.13 Production and manufacturing processes? No Not involved 1.14 Facilities for storage of goods or materials? Yes During construction phase temporary storage facilities will be created onsite to store the construction raw materials. 1.15 Facilities for treatment or disposal of solid Yes  For treatment of sewage, STP will be waste or liquid effluents? constructed.  Treated effluent will be recycled for flushing and gardening  The sludge from STP will be disinfected, dried, composted and used as manure  The solid waste generated shall be segregated at source to biodegradable, non-biodegradable and domestic hazardous waste  All the organic solid waste generated will be treated onsite in biogas plant, and the slurry from biogas plant will be treated in STP  All the recyclable solid waste shall be send to recyclers  All the domestic hazardous waste will be handed over to authorized waste facility operators 1.16 Facilities for long term housing of operational No All the operational workers will be from workers? the district itself and no housing accommodation will be provided to them. 1.17 New road, rail or sea traffic during Yes Additional road traffic during the construction or operation? operation phase is envisaged 1.18 New road, rail, air waterborne or other No The site is abutting Mini Bypass road transport infrastructure including new or which is 20m wide, and a side road altered routes and stations, ports, airports etc? which is 7m wide

Prepared by ULTRA-TECH Environmental Consultancy and Laboratory Proposed Residential Building Project ‘Artech Malabar Hills’, at Kasaba, Kozhikode

1.19 Closure or diversion of existing transport No There will not be any closure or routes or infrastructure leading to changes in diversion of existing transport routes or traffic movements? infrastructure leading to changes in traffic movements 1.20 New or diverted transmission lines or No There is no transmission pipelines along pipelines? the project site 1.21 Impoundment, damming, culverting, No There will not be any impoundment, realignment or other changes to the hydrology damming, culverting, realignment or of watercourses or aquifers? other changes to the hydrology of water courses or aquifers 1.22 Stream crossings? No There are no stream crossings 1.23 Abstraction or transfers of water form ground Yes Water will be extracted from the existing or surface waters? bore wells during construction phase. Water from the Kerala Water Authority will be available during the operation phase. 1.24 Changes in water bodies or the land surface Yes There will be an increase in run off after affecting drainage or run-off? the development which will be mitigated by installing ground water recharge pits, storm water detention and controlled release structures. Hence runoff will be reduced before the pre construction scenario. 1.25 Transport of personnel or materials for Yes There will be transport of personnel and construction, operation or decommissioning? construction materials during the construction phase. Precautions will be taken to reduce the impact of the vehicular movement by trying to avoid the vehicular trips during peak hours 1.26 Long-term dismantling or decommissioning No Not applicable or restoration works? 1.27 Ongoing activity during decommissioning No Not applicable which could have an impact on the environment? 1.28 Influx of people to an area in either Yes Since it is a residential development, temporarily or permanently? there will be influx of people to occupy the dwelling units. It is estimated that there will be an influx of maximum 1035 persons to occupy the residential units. 1.29 Introduction of alien species? No There will not be any introduction of .alien species. Only indigenous plants will be raised for the green belt 1.30 Loss of native species or genetic diversity? No The site is a fallow land in the city. Earlier it was a coconut garden. At present there are only 26 end of life coconut trees, 10 Indian Almond, 4 acacia and 3 rain trees and 2 Vakamaram and 10 other small trees. A greenbelt will

Prepared by ULTRA-TECH Environmental Consultancy and Laboratory Proposed Residential Building Project ‘Artech Malabar Hills’, at Kasaba, Kozhikode

be developed with indigenous plants. There will not be any loss of native species or genetic diversity. 1.31 Any other actions? No Not applicable

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Details thereof (with approximate S.No Information/checklist Yes/No quantities /rates, wherever possible) with . confirmation source of information data 2.1 Land especially undeveloped No The site is fallow land with end of life or agricultural land (ha) coconut trees and wild bushes. 2.2 Water (expected source & Yes Descripti Quantity Source of competing users) unit: on of water water supply KLD required (kLD) Construct ion phase For 5 Drinking water workers cans (domestic) For 6 Bore wells workers (flushing) For 10-20 Bore wells constructi (Dependin on activity g on the constructi on activity) Operation phase (Non Monsoon Season) Domestic 93 KWA supply, Harvested rain water after filtration and UV disinfection and bore wells Flushing 47 Treated sewage from STP Gardening 7 Treated sewage from STP Swimmin 6 KWA supply, g pool Harvested rain water after filtration and UV disinfection and bore wells Total 153 Operation phase ( Monsoon Season) Domestic 93 KWA supply, Harvested rain

Prepared by ULTRA-TECH Environmental Consultancy and Laboratory Proposed Residential Building Project ‘Artech Malabar Hills’, at Kasaba, Kozhikode

water after filtration and UV disinfection and bore wells Flushing 47 Treated sewage from STP Swimmin 6 Harvested rain g pool water after filtration and UV disinfection , bore wells and KWA supply, Total 146

2.3 Minerals (MT) No No minerals are required, except for aggregates which are derived from minor minerals. 2.4 Construction material – stone, Yes The construction materials required during the aggregates, sand / soil construction phase are (expected source – MT) Steel - 28132 MT Coarse aggregate - 183420 m3 Fine aggregate - 61503 m3 Cement - 14400750 Tonnes 2.5 Forests and timber (source No Not required. – MT) Steel/Aluminium/ uPVC will be used for windows and doors 2.6 Energy including electricity Yes Power requirement during the construction phase and fuels (source, competing will be 40 kW. During the operation phase the users) Unit: fuel (MT), energy power requirement will be 2500kVA. The source (MW) of power will be KSEB. For common area and outdoor lighting, the source of power is solar energy. For this purpose PV units with 15 kW will be installed. 2.7 Any other natural resources Yes  Solar energy (30 kW) proposed to be utilized (use appropriate standard for outdoor lighting. units)  Two PV panels of 15 kW each will be installed.  It is proposed to save 24kW/day by the use of solar energy

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Details thereof (with approximate quantities/rates, wherever possible) with source S.No. Information/Checklist Yes/No of information data confirmation 3.1 Use of substances or materials, No The only hazardous materials used during which are hazardous (as per construction will be fuels and engine oils in MSIHC rules) to human health makeup quantities. Proper collection and offsite transfer of these materials will leave no significant or the environment (flora, fauna, impact on the environment. and

Prepared by ULTRA-TECH Environmental Consultancy and Laboratory Proposed Residential Building Project ‘Artech Malabar Hills’, at Kasaba, Kozhikode

water supplies) 3.2 Changes in occurrence of No The site will be maintained free of impounded disease or affect disease vectors stagnant water to avoid breeding of vectors. Hence (e.g. insect or water borne vector borne diseases are not likely to occur. diseases) 3.3 Affect the welfare of people e.g. Yes Will positively affect the quality of life of local by changing living conditions? people by providing affordable housing and direct employment in the project. 3.4 Vulnerable groups of people No None of the vulnerable groups are near or around who could be affected by the the site. The project site has no economic activity project e.g. hospital patients, for many years. The surroundings have housing children, the elderly etc., and community facilities around. 3.5 Any other causes No None

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

Details thereof (with approximate quantities/rates, wherever possible) with S.No. Information/Checklist Yes/No source of information data confirmation 4.1 Spoil, overburden or mine wastes No Not applicable

4.2 Municipal waste (domestic and or Yes Solid Waste generation (kg/day) commercial wastes) Average No During construction of phase construction Non Biodegr Total workers per Biode adable day grada ble 150 9 21 30

Buildi Solid Waste generation ng (kg/day) During operation phase Biodegra Non Total dable Biode gradab le Resid 362 155 518 ential

4.3 Hazardous wastes (as per Yes Waste oil generated from DG sets shall be Hazardous Waste Management stored at separate location duly marked and will Rules) be sold to the recyclers, authorized by KSPCB. 4.4 Other industrial process wastes No Not applicable 4.5 Surplus product No Not applicable 4.6 Sewage sludge or other sludge from Yes Sewage sludge from STP will be digested in effluent treatment the biogas plant

Prepared by ULTRA-TECH Environmental Consultancy and Laboratory Proposed Residential Building Project ‘Artech Malabar Hills’, at Kasaba, Kozhikode

4.7 Construction or demolition wastes Yes Construction waste of inorganic origin will be used to lay foundation of roads and walkways. 4.8 Redundant machinery or equipment No Any machinery or equipment used for construction will be removed from site by the contractor as per the terms of contract. 4.9 Contaminated soils or other No Not applicable materials 4.10 Agricultural wastes No Not applicable 4.11 Other solid wastes No Not applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Details thereof (with approximate quantities/rates, wherever possible) with S.No. Information/Checklist Yes/No source of information data confirmation 5.1 Emissions from combustion of fossil Yes D.G. Sets will be used during power failure. fuels from stationary or mobile The DG sets purchased will meet CPCB norms. sources

5.2 Emissions from production processes No Not applicable 5.3 Emissions from materials handling Yes Fugitive dust emission due to handling and including storage or transport loading-unloading activities is envisaged during construction phase. So as to reduce this ready mix concrete will be used. To minimize traffic related dust, areas of vehicular movement will be sprayed with water. 5.4 Emissions from construction Yes The project may cause rise in dust levels during activities including plant and construction phase. Precautions would be taken equipment to reduce dust generation during construction phase by the following management practices.  Use of RMC will eliminate the handling of cement, sand and concrete thus dust emission will be minimized  Water will be sprinkled at regular intervals to reduce dust. 5.5 Dust or odours from handling of Yes Dust generation will be controlled by materials including construction  Use of RMC will eliminate the handling materials, sewage and waste of cement, sand and concrete  Water sprinkling will be done at regular intervals  The STP will operate in aerobic mode and no odours are expected  Proper ventilation will be provided for STP  No odorous matter will be used or generated 5.6 Emissions from incineration of No Not applicable waste 5.7 Emissions from burning of waste in No As a good environmental management practice,

Prepared by ULTRA-TECH Environmental Consultancy and Laboratory Proposed Residential Building Project ‘Artech Malabar Hills’, at Kasaba, Kozhikode

open air (e.g. slash materials, wastes will not be burnt. construction debris) 5.8 Emissions from any other sources No Not applicable

6. Generation of Noise and Vibration, and Emissions of Light and Heat: Yes/No Details thereof (with approximate quantities/rates, wherever possible) with source of S.No. Information/Checklist confirmation information data with source of information data 6.1 From operation of equipment e.g. engines, Yes (but The following power machines will ventilation plant, crushers insignificant be used ) 1. Concrete pump (for RMC) 2. Excavator for material and

soil handling 3. Boring instrument 4. DG Set 5. Steel cutting saw 6. Hand tools For control of noise following measures shall be adopted:  Properly maintained equipment will be used  High noise generating construction activities would be carried out only during day time and in with noise barrier  Workers working near high noise construction machinery would be supplied with ear plugs  Construction work will be done only during the day time to avoid annoyance to neighboring site 6.2 From industrial or similar processes No Not applicable 6.3 From construction or demolition Yes Noise Pollution Control : Noise pollution will occur due to operation of machinery and movement of vehicles. The following good management practices would be implemented. High noise generating construction activities would be carried out only during day time  Installation, use and maintenance of mufflers on equipment  Workers working near high noise construction machinery would be supplied with ear

Prepared by ULTRA-TECH Environmental Consultancy and Laboratory Proposed Residential Building Project ‘Artech Malabar Hills’, at Kasaba, Kozhikode

muffs/ear plugs

6.4 From blasting or piling No Not applicable 6.5 From construction or operational traffic Yes During Construction phase: There will be transport of materials for construction work. Vehicular trips will be scheduled for non-peak traffic hours and avoiding the time slots for conveyance of the school children Operation Phase : Entrance will be designed and manned to avoid traffic hold up at entrance. Circulation and parking will be one-way only so that traffic flow will be smooth. Adequate parking space is provided to avoid on-road parking. Green belt and garden trees will be planted to mitigate noise and traffic related pollution. 6.6 From lighting or cooling systems No Building space will be illuminated according to task based standards. External lighting will be controlled so as not to cause illumination beyond the project site. 6.7 From any other sources No Not applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

Details thereof (with approximate quantities/rates, S.No. Information/Checklist confirmation Yes/No wherever possible) with source of information data 7.1 From handling, storage, use or spillage of No This is a residential building hazardous materials project. Hence hazardous materials will not be handled except for fuels used in vehicles, and special oils used in vehicles and machinery. No maintenance workshop is proposed on site. Hence hazards from these materials will not occur.

Prepared by ULTRA-TECH Environmental Consultancy and Laboratory Proposed Residential Building Project ‘Artech Malabar Hills’, at Kasaba, Kozhikode

7.2 From discharge of sewage or other effluents to No Sewage and sullage will be water or the land (expected mode and place of collected and treated as per discharge) norms prescribed by State Pollution Control Board. The

treated water will be reused for flushing and gardening within the premises. Excess quantity of treated sewage would be polished through subsurface flow engineered wetland and then discharged in to the existing natural drain. 7.3 By deposition of pollutants emitted to air into the No Dust will be generated during land or into water construction phase from earthwork and movement of vehicles. Appropriate fugitive dust control measures, including water sprinkling of exposed areas and dust covers for trucks, will be provided to minimize any impacts. DG stack height shall be as per CPCB guidelines. 7.4 From any other sources No Not applicable 7.5 Is there a risk of long term build up of pollutants in No Not applicable the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment Details thereof (with S.No. approximate quantities/rates, Information/Checklist confirmation Yes/No wherever possible) with source of information data

8.1 From explosions, spillages, fires etc from storage, No Not applicable handling, use or production of hazardous substances 8.2 From any other causes No Not applicable

8.3 Could the project be affected by natural disasters No The site is a stable land form causing environmental damage (e.g: Floods, with less than 1 m top soil earthquakes, landslides, cloudburst etc)? followed by laterite followed by bed rock. Hence the site is not prone to landslide or subsidence. The site is not prone to flood as the storm water runoff will be controlled by intercepting the run off for roof top harvesting and for ground water recharging and controlled release. This will reduce

Prepared by ULTRA-TECH Environmental Consultancy and Laboratory Proposed Residential Building Project ‘Artech Malabar Hills’, at Kasaba, Kozhikode

contribution of the development to offsite flooding. Earthquake : The structure of the building is designed as per IS codes (IS 1893–2002, IS 4928–1993, IS: 13920–1997) for Zone III.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

Details thereof (with approximate quantities/rates, S. No. Information/Checklist confirmation Yes/No wherever possible) with source of information data 9.1 Lead to development of supporting. facilities, ancillary development or development STP will be installed onsite for stimulated by the project which could have impact treating the sewage.

on the environment e.g.: Biodegradable solid waste will be

treated onsite. Non-biodegradable • Supporting infrastructure (roads, power supply, Yes materials will be sold to waste or waste water treatment, etc.) authorized recyclers

• housing development Yes This project is for developing residential apartments No • extractive industries

No Not applicable • supply industries

• other No Not applicable

9.2 Lead to after-use of the site, which could have an No The project is for residential units impact on the environment with an expected safe life time of more than 50 years. End of use (decommissioning) will leave the site with no hazardous materials 9.3 Yes Kozhikode Corporation area is undergoing a very precarious situation regarding infrastructure, especially housing, waste management and roads. The project is located within 2 km radius (aerial) from Kozhikode CBD and is easily accessible to many reputed educational

Prepared by ULTRA-TECH Environmental Consultancy and Laboratory Proposed Residential Building Project ‘Artech Malabar Hills’, at Kasaba, Kozhikode

institutions such as the Malabar Christian College, many religious and historically important places such as the Tali temple, reputed hospitals such as the Baby Memorial Hospital, tourist hotspots such ss Sarovaram Biopark exist within 5 km radius. The location will slowly develop in to active suburb with many other services to cater to the residential population of Artech Malabar Hills. The project will also create / add job opportunities for support staff like Security, Maintenance, Household Workers etc. 9.4 Have cumulative effects due to proximity to other Yes The cumulative effect will be existing or planned projects with similar effects increase in population density in the area with increase in vehicles, traffic and MSW and sewage. The project has adequate parking space, STP and SWM facilities for its use. Only cumulative impact will be on traffic. The project has direct access to arterial road which is designed with adequate carrying capacity for future traffic in the city (III) Environmental Sensitivity

Aerial distance (within S.No. Areas Name/ 15 km.) Identity Proposed project location boundary 1 Areas protected under international No None within 15 km conventions, national or local radius legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive Sarovaram BioPark- for ecological reasons - Wetlands, Separated by highway and 0.5 km watercourses or other water bodies, canal coastal zone, biospheres, mountains, forests

Prepared by ULTRA-TECH Environmental Consultancy and Laboratory Proposed Residential Building Project ‘Artech Malabar Hills’, at Kasaba, Kozhikode

3 Areas used by protected, important or Sarovaram BioPark- sensitive species of flora or fauna for Separated by highway and 0.5 km breeding, nesting, foraging, resting, canal over wintering, migration 4 Inland, coastal, marine or underground Canoli Canal 0.3 k m waters Ottukulam Lake 1 km 3 km Korapuzha 7.00 km 3.0 km Arabian Sea

State, National boundaries No None within 15 km radius 6 Routes or facilities used by the public Sarovaram Biopark 0.5 km for access to recreation or other tourist, pilgrim areas 7 Defense installations No None within 15 km radius 8 Densely populated or built-up area Kozhikode City The site is inside Kozhikode Corporation 9 Areas occupied by sensitive man-made Schools

land uses (hospitals, schools, places of St. Vincent Colony Higher 0.70km worship, community facilities) Secondary School

Karuna Special School 0.80km

Nadakkavu Girls School 1.82 Km

Govt. Achuthan Girls Higher 2.43 km Secondary School

St. Joseph Boys Secondary 2.53km School

Presentation High School 3.23km

Bharathiya Vidhya Bhavan 4.45km

School

5km Al- Haramain English School

Apex International School 5.68km

MES Raja Residential School 5.91km

Global English School 7.52km

Prepared by ULTRA-TECH Environmental Consultancy and Laboratory Proposed Residential Building Project ‘Artech Malabar Hills’, at Kasaba, Kozhikode

Colleges Brindhavan College Group of Institutions 0.83km

Malabar Christian College 1.50km

College of Applied Science, 1.30km Kozhikode

Govt. College of Teacher 1.92km Education

Holy Cross Institute of 1.25km Management and Technology

Waves Institute of Fashion 1.79km Designing

Clusters College for Media 2.11km and Design

Cubatic College of Interior 2.57km

Designing

IIKM Business School 3.82km

St. Alphonsa College 7km

Vedavyasa Institute of technology 12.34km

Temples Azhakodi Devi Temple 0.43km

Sree Renuka Mariyamman 2.15km Kovil

Tali Mahakshetram 2.18km

Church

0.92km Infant Jesus Church

Christian Church 1.31km

St. Mary’s CSI Church 1.59km

Prepared by ULTRA-TECH Environmental Consultancy and Laboratory Proposed Residential Building Project ‘Artech Malabar Hills’, at Kasaba, Kozhikode

CSI Church 1.67km

St. Pauls Marthoma Church 1.77km

CMI St. Thomas Church 1.81km

Mosque

Masjid- Ul- Mannar 1.30km

Jilla Palli 1.61km

Moideena Palli 2.08km

Mele Palayam Juma Musjid 2.22km

Mishal Mosque 2.90km

Hospitals

Baby Memorial Hospital 0.70km

Al Salama Eye Hospital 1km

Fathima Hospital 1.37km

National Hospital 1.40km

Comtrust Charitable Trust 1.56km Eye Hospital

Malabar Hospitals 1.60km

Malabar Eye Hospital 1.67km

Ahalia Foundation Eye 2.14km Hospital 10 Areas containing important, high quality Sarovaram BioPark or scarce resources 0.5 km (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or No None within 2 km radius environmental damage. (those where existing legal environmental standards are exceeded)

Prepared by ULTRA-TECH Environmental Consultancy and Laboratory Proposed Residential Building Project ‘Artech Malabar Hills’, at Kasaba, Kozhikode

12 Areas susceptible to natural hazard which No None within could cause the project to present 15 km radius environmental problems

(earthquakes, subsidence, landslides, erosion, flooding

or extreme or adverse climatic conditions)

(IV). Proposed Terms of Reference for EIA studies: Not applicable