Form1 DDA Slum Rehabilitation Project, Ashok Vihar

FORM 1 (I) Basic Information

S.No. Item Details 1. Name of the Project Construction of 1675 Multi-storied Dwelling Units for In-situ Rehabilitation of Slum dwellers at Jailerwala Bagh, Ashok Vihar, New

2. S.No. in the schedule 8 (b)

3. Proposed capacity / area / length / The proposed Multi-storied building will be tonnage to be handled / command for the slum dwellers residing in adjoining area / lease area / number of wells area. to be drilled No of dwelling units: 1675

4. New/Expansion/Modernization New construction

5. Existing Capacity/Area etc. -

6. Category of project i.e. ‘A’ or ‘B’ B

7. Does it attract the general No condition? If yes, please specify. 8. Does it attract the specific No condition? If yes, please specify. 9. Location Jailerwala Bagh Plot/Survey/Khasra No. Village Tehsil District Ashok Vihar State 10. Nearest railway station / airport Railway Station: along with distance in kms. Azadpur @ 0.10 km NW Airport : Indira Gandhi Airport @ 22.0 km W

11. Nearest Town, City, District Headquarters along with distance - in km. 12. Village Panchayats, Zilla North Delhi Municipal Corporation Parishad, Municipal Corporation,

ETS in association with 0 Delhi Development Authority Envisafe Environmental Consultant Form1 DDA Slum Rehabilitation Project, Ashok Vihar

S.No. Item Details Local body (complete postal addresses with telephone nos. to be given) 13. Name of the Applicant Er. Anil Kumar Aggarwal 14. Registered Address Executive Engineer (Store Division-1), Delhi Development Authority, Office of the Exectuive Engineer, Store Division – I, Azadpur, Mukarba Chowk, GTK Road, Delhi -110033. 15. Address for correspondence : Name Er. Anil Kumar Aggarwal Designation Execcutive Engineer (Store Division-1) (Owner/Partner/CEO) Address Office of the Executive Engineer, Store Division – I, Azadpur, Mukarba Chowk, GTK Road, Delhi -110033.

Pin Code 110033 E-mail [email protected] Telephone No. 011-27694055 Fax No. - 16. Details of Alternative Sites Not Applicable examined, if any. Location of these sites should be shown on a topo sheet. 17. Interlinked Projects No 18. Whether separate application of Not Applicable interlinked project has been submitted? 19. If yes, date of submission Not Applicable 20. If no, reason 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. The forest (Conservation) Act, Not Applicable 1980? The wildlife (Protection) Act, Not Applicable 1972? The C.R.Z. Notification, 1991? Not Applicable 22. Whether there is any Government No

ETS in association with 1 Delhi Development Authority Envisafe Environmental Consultant Form1 DDA Slum Rehabilitation Project, Ashok Vihar

S.No. Item Details Order/Policy relevant/relating to the site? 23. Forest land involved (hectares) Nil 24. Whether there is any litigation No pending against the project and/or land in which the project is propose to be set up? (a) Name of the Court - (b) Case No. - (c) Orders/directions of the - Court, if any and its relevance with the proposed project.

(ii) ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate Information/Checklist Yes/ S.N. quantities /rates, wherever possible) with confirmation No source of information data 1.1 Permanent or temporary No The proposed site had originally earmarked change in land use, land the land under recreational use, but DDA has cover or topography changed the land use as residential for in situ including increase in rehabilitation of the slum dwellers. As per intensity of land use (with minutes of meeting vide letter no F(2) respect to local land use 2012/MC/DDA/63 dated 7 th June 2012, the plan) proposal for change of landuse under section–11A of DDA Act of Jailorwala Bagh measuring 4 Hz in Planning Zone ‘H’ has been approved by the Authority. Further, this project is being developed for the slum colony residing adjacent to the project site. Development of this project will help in prevention of local environment which is being affected by the improper unhygienic condition in slum area. The Zonal Landuse plan and copy of committee meeting (screening committee no SCM 311 Item no 27:2013) is enclosed as Annexure I.

1.2 Clearance of existing land, No The proposed site is a vacant land with few

ETS in association with 2 Delhi Development Authority Envisafe Environmental Consultant Form1 DDA Slum Rehabilitation Project, Ashok Vihar

Details thereof (with approximate Information/Checklist Yes/ S.N. quantities /rates, wherever possible) with confirmation No source of information data vegetation and buildings? herbs and shrubs species. 1.3 Creation of new land uses? No The land for the proposed project is now earmarked for residential landuse as per the approval from Authority.

1.4 Pre-construction Yes The geo-technical investigation of the investigations e.g. bore existing site has been completed and the houses, soil testing? findings of this investigation have been considered in the project design.

1.5 Construction works? Yes The development of Multi-storied will involve construction of 3 G+14 towers without stilts and the parking will be taken in the basement and on surface. The site layout of the proposed project is provided as Annexure II.

1.6 Demolition works? No There will not be any demolition work required for the proposed project.

1.7 Temporary sites used for Yes Mostly, local laborers from the proximity of construction works or the site will be employed. However, housing of construction Temporary sites to be used for construction workers? as well as housing of construction workers will be in the following areas i. Construction labour and construction staff dwelling units. ii. Site offices, stores, workshops. This temporary site will be on the DDA land located adjacent to the project site.

1.8 Above ground buildings, Yes The earthwork and excavation is envisaged structures or earthworks in the proposed project due to the including linear structures, construction of laying foundation and cut and fill or excavations basement parking. Building comprises of 4 residential blocks and will have maximum height of 43.5m. Block A : There are total 343 units out of which 21 units are on Ground Floor and 332 units are from first floor to fourteenth floor.

ETS in association with 3 Delhi Development Authority Envisafe Environmental Consultant Form1 DDA Slum Rehabilitation Project, Ashok Vihar

Details thereof (with approximate Information/Checklist Yes/ S.N. quantities /rates, wherever possible) with confirmation No source of information data Two Passenger lifts of size 2500x2100 and one bed/luggage lift of size 2200x3000 have been proposed. Two no. of staircases have been proposed. Block B : There are total 672 units out of which 42 uni ts are on Ground Floor and 630 units are from first floor to fourteenth floor. Three Passenger lifts and one bed lift has been proposed. Four no. of staircases have been proposed. Block C : There are total 660 units out of which 31 units are on ground floor, 44 units on first floor and 585 units from second to fourteenth floor. Three Passenger lifts and one bed lift has been proposed. Four no. of staircases have been proposed. Block D : A Community Hall, Basti Vikas Kendra and community office spaces have been have been proposed with G+3 storeys as a part of other facilities. The typical section and elevation of project site has been enclosed as Annexure III.

1.9 Underground works No Not Applicable including mining or tunneling? 1.10 Reclamation works? No Not Applicable 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and No This is a residential construction project. manufacturing processes? Hence, no manufacturing processes are involved. 1.14 Facilities for storage of Yes Construction materials like Steel, Cement, goods or materials? Sand, Stone aggregate, Bricks etc. will be procured from local market and will be temporarily stored under shed during the construction phase of the proposed project. This site will be adjacent to vacant DDA land.

ETS in association with 4 Delhi Development Authority Envisafe Environmental Consultant Form1 DDA Slum Rehabilitation Project, Ashok Vihar

Details thereof (with approximate Information/Checklist Yes/ S.N. quantities /rates, wherever possible) with confirmation No source of information data 1.15 Facilities for treatment or No SOLID WASTE disposal of solid waste or All the solid waste from the buildings will liquid effluents? be collected on a daily basis and disposed by local municipality.

WASTE WATER The proposed building project will involve generation of 819.5 KLD of waste water. For treatment of sewage water 2 nos. 500 KLD STP shall be installed. The sewage treatment plant is based on Electromagnetic bioreactor technology which is an advanced and fully automatic technology and requires very less space and less power consumption. STP treated water will be utilized for flushing and Horticulture use.

1.16 Facilities for long term No housing of operational workers? 1.17 New road, rail or sea traffic Yes Adequate transport linkage already exists. It during construction or has been estimated that the project will not operation? involve any increase in vehicular movement along the access road. Hence, the present infrastructure is sufficient for the future development as the population is already residing in this area in slum. Apart from this, DDA has proposed a new connecting road of 18m right of way for connecting ‘Choudary Devender Singh Tewatia Marg’.

1.18 New road, rail, air No The necessary infrastructure facilities have waterborne or other been already developed. transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of No There will not be any closure or diversion of existing transport routes or existing transport routes or infrastructure infrastructure leading to changes due to proposed project.

ETS in association with 5 Delhi Development Authority Envisafe Environmental Consultant Form1 DDA Slum Rehabilitation Project, Ashok Vihar

Details thereof (with approximate Information/Checklist Yes/ S.N. quantities /rates, wherever possible) with confirmation No source of information data changes in traffic movements? 1.20 New or diverted Yes Project will involve laying of new transmission lines or transmission lines and pipelines of water, pipelines? waste water and storm water internally within the project premises. However, external lines will be provided by designated agency for water and electricity.

1.21 Impoundment, damming, No culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No 1.23 Abstraction or transfers of Yes The water requirement during the water from ground or construction phase will be met through water surface waters? tanker. While during operation phase of the project, water will be supplied by DJB water supply/ground water will be provided.

1.24 Changes in water bodies or No No water body will be affected by the the land surface affecting proposed project. However, the project will drainage or run-off? involve construction of paved areas and hence the quantity of surface runoff will slightly increase due to reduced infiltration. Interlocking grass paver blocks will be used along the sides of building while suitable rain water harvesting structure will be provided for ground water recharge.

1.25 Transport of personnel or Yes Construction labourers and material materials for construction, transportation will be there during the operation or construction phase of the proposed project decommissioning? 1.26 Long-term dismantling or No Not Applicable decommissioning or restoration works? 1.27 Ongoing activity during No Not Applicable decommissioning which

ETS in association with 6 Delhi Development Authority Envisafe Environmental Consultant Form1 DDA Slum Rehabilitation Project, Ashok Vihar

Details thereof (with approximate Information/Checklist Yes/ S.N. quantities /rates, wherever possible) with confirmation No source of information data could have an impact on the environment? 1.28 Influx of people to an area Yes There may be a temporary influx of in either temporarily or population mostly labourers during the permanently? construction phase. As the project site is near to slum, the chances of influx of construction laborers is less.

1.29 Introduction of alien No No introduction of alien species will occur as species? this is purely residential project. 1.30 Loss of native species or No None genetic diversity? 1.31 Any other actions? No None

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Details thereof (with approximate Sl. Information/checklist Yes / No quantities /rates, wherever possible) with No. confirmation source of information data 2.1 Land especially No Total 4.0 Ha of land will be required for the undeveloped or proposed project. This land is owned by agricultural land (acres) DDA and presently it is a vacant land. 2.2 Water (expected source & Yes During construction phase, water will be competing users) unit: sourced by tankers. During operational phase KLD water will be sourced by DJB.

Daily requirement of water during operational phase will be 1024.38 KLD having following uses Domestic: 683 KLD Flushing: 341 KLD Filter Back wash: 10 KLD Horticulture: 26 KLD This water demand will be met from DJB and recycling of treated water.

2.3 Minerals (MT) No Not Applicable 2.4 Construction material – Yes Aggregate: 30,000 cu. m.

ETS in association with 7 Delhi Development Authority Envisafe Environmental Consultant Form1 DDA Slum Rehabilitation Project, Ashok Vihar

Details thereof (with approximate Sl. Information/checklist Yes / No quantities /rates, wherever possible) with No. confirmation source of information data stone, aggregates, Cement: 10,000 MT sand/soil (expected source Steel: 2,700 MT – MT) 2.5 Forests and timber Yes Minimal use of timber will be made which (source – MT) will be source from the local market.

2.6 Energy including Yes During operation phase, power requirement electricity and fuels is expected to be of about 6524 KW. It will (source, competing users) be sourced from Tata Power Delhi Unit: fuel (MT), energy Distribution Limited (TPDDL). (KW) 2 DG sets of 500 KVA capacities each have been proposed for the project. Fuel consumption for DG sets has been calculated to be 100 lit/hr of HSD (Low sulphur Variety). As per the latest CPCB norms, DG sets will have acoustic and silencer for mitigation of noise pollution.

2.7 Any other natural No resources (use appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Details thereof (with approximate Sl. Information/Checklist Yes/ quantities/rates, wherever possible) with No. confirmation No source of information data 3.1 Use of substances or Yes Fuel used for D.G. sets, will be stored in materials, which are drums at earmarked locations. hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of No There will be no chance of occurrence of disease or affect disease diseases as the solid waste generated will be vectors (e.g. insect or water managed as per Municipal Solid Waste borne diseases) (Management and Handling) Rules, 2000. The construction area will be kept clean and

ETS in association with 8 Delhi Development Authority Envisafe Environmental Consultant Form1 DDA Slum Rehabilitation Project, Ashok Vihar

Details thereof (with approximate Sl. Information/Checklist Yes/ quantities/rates, wherever possible) with No. confirmation No source of information data free from disease vectors. 3.3 Affect the welfare of Yes The project will generate employment people e.g. by changing opportunities during the construction phase living conditions? depending on the skill sets of available workers. During the operation phase, community will get well developed living atmosphere, which will enhance the socio-economic upliftment of the area.

3.4 Vulnerable groups of No Noise and air pollution control measures will people who could be be taken so as to cause no harm to nearby affected by the project e.g. residents. hospital patients, children, the elderly etc., 3.5 Any other causes No

4. Production of solid wastes during construction or operation or decommissioning (MT/month) Details thereof (with approximate Sl. Information/Checklist Yes/No quantities/rates, wherever possible) with No. confirmation source of information data 4.1 Spoil, overburden or mine No Not Applicable wastes 4.2 Municipal waste domestic Yes Approximately 4.5 MT (0.6 kg/capita/day, and or commercial Total Population: 7,538) of waste will be wastes) generated daily 4.3 Hazardous wastes (as per Yes The waste oil will be generated from the Hazardous Waste D.G. sets only during maintenance. About Management Rules) 650 l/yr waste oil will be generated annually taking into consideration maintenance twice in a year.

4.4 Other industrial process No Not Applicable wastes 4.5 Surplus product No Not Applicable 4.6 Sewage sludge or other No Not Applicable sludge from effluent treatment

ETS in association with 9 Delhi Development Authority Envisafe Environmental Consultant Form1 DDA Slum Rehabilitation Project, Ashok Vihar

Details thereof (with approximate Sl. Information/Checklist Yes/No quantities/rates, wherever possible) with No. confirmation source of information data 4.7 Construction or Yes The construction and demolition waste will demolition wastes consist of excess earth and construction debris along with cement bags, steel in bits and pieces, insulating and packaging material etc.

Top cover of the earth will be preserved for developing green cover.

Excess earth and construction debris will be reused for backfilling in the same premise or in the nearby low laying area with prior permission from land owners.

Cement bags, waste paper and cardboard packing material will be sold off to recyclers. Unusable steel scrap will also be collected at site and sold to recyclers.

4.8 Redundant machinery or No Not applicable equipment 4.9 Contaminated soils or No Not applicable other materials 4.10 Agricultural wastes No Not applicable 4.11 Other solid wastes No Not applicable

*Source – Generation of MSW observed in metro cities “Manual of Municipal Solid waste management: by Central Public Health and Environment

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) Details thereof (with approximate Sl. Information/Checklist Yes/No quantities/rates, wherever possible) with No. confirmation source of information data 5.1 Emissions from Yes There will be generation of flue gas emission combustion of fossil fuels from diesel operated machinery during from stationary or mobile construction phase. sources During operational phase, in case of power failure DG Sets will be operated. It will maintain pollution level at the lowest.

ETS in association with 10 Delhi Development Authority Envisafe Environmental Consultant Form1 DDA Slum Rehabilitation Project, Ashok Vihar

Details thereof (with approximate Sl. Information/Checklist Yes/No quantities/rates, wherever possible) with No. confirmation source of information data D.G. Sets (kg/hr) 2 X 500 kVA SPM*: 0.043 (µg/m 3) 3 NO x*: 1.09 (µg/m ) CO*: 0.04 (µg/m 3)

5.2 Emissions from No As the proposed project is a construction production processes project, no production processes will be involved. 5.3 Emissions from materials No Not envisaged. handling including storage or transport 5.4 Emissions from Yes There will be chances of fugitive emission construction activities during various activities in construction phase. including plant and equipment However, adequate control measures like water sprinkling, provision of wind curtain, covered storage etc. will be adopted to reduce the changes of fugitive emission during construction phase.

5.5 Dust or odours from Yes There will be formation of dust during handling of materials loading/unloading and handling of construction including construction material. However, adequate control measures materials, sewage and as mentioned above will be adopted. waste 5.6 Emissions from No Not applicable incineration of waste 5.7 Emissions from burning No Burning of waste will not be carried out in the of waste in open air (e.g. proposed premise. slash materials, construction debris) 5.8 Emissions from any other No Not envisaged. sources *-Calculated based on Auto Fuel Policy, 2003, Ministry of Petroleum & Natural Gas, GoI #- Calculated based on oil consumption rate the fuel

ETS in association with 11 Delhi Development Authority Envisafe Environmental Consultant Form1 DDA Slum Rehabilitation Project, Ashok Vihar

6. Generation of Noise and Vibration, and Emissions of Light and Heat: Details thereof (with approximate Sl. Information/Checklist quantities/rates, wherever possible) with Yes/No No. confirmation source of information data with source of information data 6.1 From operation of Yes Acoustic enclosures will be provided to the equipment e.g. engines, D.G. sets to limit the noise level to 75 dB (A) ventilation plant, crushers at 1 m from the enclosure. 6.2 From industrial or similar No Not Applicable processes 6.3 From construction or Yes Nose will be generated during construction and demolition transportation activities. However, it will be for short term only.

The noise levels likely to be generated from the construction equipments at a distance of 50 ft. from the source are as given below: Concrete mixer : 82- 87 dB truck Mobile cranes : 80-85 dB Hammering : 85-90 dB Loader : 79-86 dB

6.4 From blasting or piling No No blasting or piling operation is involved. 6.5 From construction or Yes Noise from traffic movement is expected operational traffic during construction of the proposed project, as this phase will involve movement of trucks carrying construction materials. However, it will be less both in intensity as well as duration. 6.6 From lighting or cooling Yes Noise will be generated from running of D.G. systems sets. However, the D.G. sets will be placed in a separate shed and will be enclosed in a acoustic enclosure, as per the guidelines of CPCB. Hence, no adverse impact on noise is anticipated from DG set operation.

6.7 From any other sources No Not envisaged

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

ETS in association with 12 Delhi Development Authority Envisafe Environmental Consultant Form1 DDA Slum Rehabilitation Project, Ashok Vihar

Details thereof (with appr oximate Information/Checklist S.N. Yes/No quantities/rates, wherever possible) with confirmation source of information data 7.1 From handling, storage, use Yes Negligible amount of waste oil (approx. 650 or spillage of hazardous l/yr) will be generated from D.G. sets during materials maintenance (considering two maintenances per annum). The waste oil will be stored in sealed containers and will be sold to authorized recyclers.

7.2 From discharge of sewage or No The waste water generated will be treated in other effluents to water or an onsite in STP based on electromagnetic the land (expected mode and Bio reactor technology (EBR), of capacity place of discharge) 1000 KLD. The treated water will be used for flushing in toilets and for horticulture purpose with dual pumping system.

7.3 By deposition of pollutants No D.G. sets will be provided with stacks of emitted to air into the land or adequate height. Hence, the pollutants will into water be dispersed effectively and will not deposit on land or water body.

7.4 From any other sources No Not envisaged 7.5 Is there a risk of long term No Not envisaged build up of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment Details thereof (with approximate Information/Checklist S.N. Yes/No quantities/rates, wherever possible) with confirmation source of information data 8.1 From explosions, spillages, No Not Applicable fires etc from storage, handling, use or production of hazardous substances 8.2 From any other causes No --

8.3 Could the project be affected No The site lies in Zone IV as per BIS 1893. by natural disasters causing The building design and construction will

ETS in association with 13 Delhi Development Authority Envisafe Environmental Consultant Form1 DDA Slum Rehabilitation Project, Ashok Vihar

Details thereof (with approximate Information/Checklist S.N. Yes/No quantities/rates, wherever possible) with confirmation source of information data environmental damage (e.g. be carried out with due consideration to floods, earthquakes, seismic zone. The seism—zoning map of landslides, cloudburst etc)? is enclosed as Annexure IV.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality Details thereof (with approximate Information/Checklist S.N. Yes/No quantities/rates, wherever possible) with confirmation source of information data 9.1 Lead to development of supporting. facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: • Supporting infrastructure No The proposed project is the rehabilitation (roads, power supply, of existing slum area which will help in waste or waste water further improving the environmental treatment, etc.) quality of the surrounding due to improvement in hygiene and living • housing development No condition.

• extractive industries No

• supply industries No

• other No 9.2 Lead to after-use of the site, No Not Applicable which could have an impact on the environment 9.3 Set a precedent for later No -- developments 9.4 Have cumulative effects due No Not envisaged to proximity to other existing or planned projects with similar effects.

ETS in association with 14 Delhi Development Authority Envisafe Environmental Consultant Form1 DDA Slum Rehabilitation Project, Ashok Vihar

(II) ENVIRONMENTAL SENSITIVITY

Aerial distance Name/ (within 15 km.) S.N. Areas Identity Proposed project location boundary 1 Areas protected under Northern Ridge Forest 5 km international conventions, national or local legislation Central Ridge Forest 9 km for their ecological, landscape, cultural or other Other Important Ecological Area beyond 15 km: related value Bird Sanctury, Noida, 28 km Uttar Pradesh

Asola Wild Life Sanctuary, 43 km Asola, New Delhi 2 Areas which are important River Yamuna 7 km or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, None important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or None underground waters 5 State, National boundaries Haryana 17 km

Uttar Pradesh 10 km 6 Routes or facilities used by None the public for access to recreation or other tourist, pilgrim areas. 7 Defense installations None 8 Densely populated or built- Yes The project is located up area in Ashok Vihar which is a populated area.

ETS in association with 15 Delhi Development Authority Envisafe Environmental Consultant

Form1 DDA Slum Rehabilitation Project, Ashok Vihar

List of Annexures:

Annexure No Detail 1 Zonal Landuse plan and copy of committee meeting (screening committee no SCM 311 Item no 27:2013) 2 Site layout of the proposed project 3 elevation of project site 4 The seism—zoning map of India & project site

ETS in association with 17 Delhi Development Authority Envisafe Environmental Consultant Form1 DDA Slum Rehabilitation Project, Ashok Vihar

Annexure I: Zonal Development Plan of the Asoke Vihar (Master Plan and earmarked for residential area)

ETS in association with 18 Delhi Development Authority Envisafe Environmental Consultant Form1 DDA Slum Rehabilitation Project, Ashok Vihar

DDA Notification for Change in Landuse Plan

ETS in association with 19 Delhi Development Authority Envisafe Environmental Consultant Form1 DDA Slum Rehabilitation Project, Ashok Vihar

ETS in association with 20 Delhi Development Authority Envisafe Environmental Consultant Form1 DDA Slum Rehabilitation Project, Ashok Vihar

ETS in association with 21 Delhi Development Authority Envisafe Environmental Consultant Form1 DDA Slum Rehabilitation Project, Ashok Vihar

ETS in association with 22 Delhi Development Authority Envisafe Environmental Consultant Form1 DDA Slum Rehabilitation Project, Ashok Vihar

ETS in association with 23 Delhi Development Authority Envisafe Environmental Consultant Form1 DDA Slum Rehabilitation Project, Ashok Vihar

ETS in association with 24 Delhi Development Authority Envisafe Environmental Consultant Form1 DDA Slum Rehabilitation Project, Ashok Vihar

Annexure II: Project Site layout

ETS in association with 25 Delhi Development Authority Envisafe Environmental Consultant Form1 DDA Slum Rehabilitation Project, Ashok Vihar

Annexure III: Elevation of project site

ETS in association with 26 Delhi Development Authority Envisafe Environmental Consultant Form1 DDA Slum Rehabilitation Project, Ashok Vihar

ETS in association with 27 Delhi Development Authority Envisafe Environmental Consultant Form1 DDA Slum Rehabilitation Project, Ashok Vihar

Annexure IV: Seismic—zoning map of India

ETS in association with 28 Delhi Development Authority Envisafe Environmental Consultant