Fall 2003 Volume 12, Issue 2 Riverscape Sikes Adobe Farmstead Restoration Underway!

Total Page:16

File Type:pdf, Size:1020Kb

Fall 2003 Volume 12, Issue 2 Riverscape Sikes Adobe Farmstead Restoration Underway! SAN DIEGUITO RIVER PARK newsletter fall 2003 volume 12, issue 2 RiverScape Sikes Adobe Farmstead Restoration Underway! By Susan Carter, Deputy Director estoration of the Sikes Adobe Farmstead is well underway. At this time we are restoring Ronly the farmhouse. Mark Sauer Construction, a firm that is experienced in working with historic adobe structures, began work in late March and is expected to complete the job at the end of September. (The adobe, home of 19th century settlers Zenas and Eliza Sikes, is located south of Escondido’s Westfield Shoppingtown mall and at the beginning of the Mule Hill Trail.) Other features of the farmstead site will be restored or replicated in the future when funds This photo of the Sikes Adobe Farmhouse, discovered at the are obtained. Poway Historical Society, dates to about 1885-1890. A number of interesting discoveries have been made during the reconstruction process. For exam- This was a discovery for the ple, we learned that the adobe’s original floor was researchers, who previously thought they had mar- earthen. Historians Stephen Van Wormer and Susan ried in Ohio and had come west together. Walter found that the family dug about a foot deep Long-term goals for the Sikes Adobe Farmstead down to the clay layer, then smoothed it out and are: spread a mud plaster on it. They later added a wood • Open the Sikes Adobe Farmhouse as a muse- floor, but only the joists of that original floor remain. um and educate the public about the pioneer You can keep track of the restoration on our Web farming experience via docent-led tours. site at www.sdrp.org where photos of the construc- • Furnish the house with time- and context- tion progress are being posted. appropriate furnishings, appliances, goods, The San Diego County Committee of the National decorative arts and clothing. Society of the Colonial Dames of America has taken • Restore the creamery, corral, gardens, wheat on the responsibility for furnishing the interior of the fields and expand the tours to encompass farmhouse. The committee is preparing a Historic these elements. Furnishings Report to identify what type of furniture • Nominate the Sikes Adobe Farmstead to the is appropriate for the time and income level of the National Register of Historic Places. Sikes family during the period of significance (rough- • Create a “Friends of the Sikes Adobe ly 1870-1890). Farmstead” support and fund-raising group. Colonial Dames volunteers have also been One task we’ll be working on in the near future is researching the Sikes family genealogy and have an interpretive narrative for docents as they talk to traced Zenas Sikes’ family back eight generations to the public about the Sikes Adobe Farmstead. Docent 1620 in Westhampton, Massachusetts. Zenas came tours will begin at the end of September when the west with his two brothers during the Gold Rush. restored house is opened to the public. If you are Eliza’s stepfather also headed to California from interested in becoming a docent for the Farmstead, Ohio in 1849. Eliza and her stepmother and siblings or if you are interested in becoming a Founding joined him in California in 1853 after a voyage on the Member of the Friends of the Sikes Adobe Farm- ship Westward Ho from Boston around Cape Horn. It stead, please contact the River Park at 858-674-2270. was in California that she met and married Zenas. News Save the Date – 9/28! Don’t miss the 10th Annual San Dieguito River Park Family Hike and Trail Run on Sunday, September 28! It’s your wonderful opportunity to enjoy the Park trails, spend time with family and friends, PLUS help raise money for the Park. 100% of proceeds goes toward Park programs. Thanks to our sponsors: Qualcomm, Hodges Golf, San Dieguito River Valley Conservancy, North County, Pizza Port, North County Smooth Jazz 98.1, Westfield Shoppingtown Times, Henry’s Marketplace. To register: www.sdrp.org/trailrun, www.active.com, 858-674-2275 x 14 River Park Milestone Our Generous Friends San Dieguito River Park has made great progress Mark Collins, of Evergreen Nursery, has been a on the ground with more than 17 miles of the Coast good friend to the River Park. In the past year he pro- to Crest trail completed. You can now hike, bicycle, vided equipment and a driver to help Park rangers or ride your horse uninterrupted from the Lake grade the Highway 78/Bandy Canyon Road staging Hodges Dam east to the intersection of Highway 78 area; he donated a large number of native and Bandy Canyon Road. More than $60 million plant species to be put in appropriate worth of projects such as the Sikes Adobe and the areas in the valley; and he has agreed to San Dieguito Lagoon restoration projects are under- allow a trail connection to cross his way or about to start, and properties are being Highland Valley Road operation to enable the acquired to extend the trail its intended 55-mile Poway trail connection described above. The Park length. has benefited greatly from these actions, and we All this progress has resulted in achieving another extend our thanks to Mark for his cheerful, support- milestone, this one institutional: recognition by the ive attitude. (Phone 858-485-7867) State of California as one of only 26 existing or And thank you, Bitterroot planned long-distance trail routes with statewide sig- Restoration for donating over 600 nificance. The newest edition of the California native plants to the Park for restora- Recreational Trails Plan includes the San Dieguito tion projects! Bitterroot is at 10459 River Park Coast to Crest Trail. Roselle St., Ste B, San Diego, 92121, 858-546-1980. The Trails Plan emphasizes the benefits of trails including health, recreation, transportation, clean air, social, economic, educational, energy conservation Lake Hodges Bridge Delayed and resource protection. It can be accessed at www.parks.ca.gov. Click on Planning under Other Construction of the Lake Hodges Bicycle/ Links. Pedestrian bridge will not begin this fall, as previous- ly reported. A year’s delay has been caused by federal requirements for the environmental process and by Tie to Poway Trails Secured resulting ripple effects on when we can obtain required permits. An Environmental Assessment Soon a new trail will connect the River Park’s (EA) is being prepared and circulated for federal Coast to Crest Trail with the City of Poway’s well- review. We now anticipate that a joint Mitigated known trail system, via Poway’s new Heritage Negative Declaration (MND) and EA will be distrib- Estates home development project. One goal in the uted for public review in January 2004, with con- Concept Plan for the River Park is to connect the struction to begin mid-September 2004 after next Coast to Crest Trail to other park facilities and trails, summer’s bird nesting season. providing non-motorized means of travel around the County. A Poway connection was specifically pro- posed in the Concept Plan. When Poway approved Park Receives $25,000 Grant the Heritage Estates project, the City required the developer to construct a regional trail connection. The River Park received a Wetland Recovery Permits for the connection will be required from the Project Small Program Grant of $25,000. This will be City of San Diego because a portion of the trail will used to clean up materials that were dumped over a cross property owned by San Diego. Continued on page 3 2 Executive Director’s Report exempt organization called “Save the Beach” that has Controversy Stalls Mitigation been flooding the Del Mar area with misleading infor- By Dick Bobertz, Executive Director mation designed to alarm the public (and solicit con- tributions). Don’t take my word for it that their infor- hose of you who have been awaiting implemen- mation is misleading; you decide. For example: tation of the San Dieguito Lagoon restoration The Save the Beach literature and Web site project know that it has been stymied for several consistently try to cause alarm by reporting years as a result of litigation. An ongoing controversy T “The basins would be kept permanently between Sandy Lane homeowners and the San open to the ocean through a 130-foot wide, Dieguito River Park concerns the relationship 8-foot deep channel dredged through the between opening the San Dieguito River mouth to the heart of Del Mar beach.” Using a handout ocean and the amount of sand available to maintain distributed at a recent community group Del Mar beaches. The Sandy Lane homeowners have meeting, a Save the Beach representative residences located on the beach on the south side of attacked a Southern California Edison the river that are currently in jeopardy from winter statement that the permanent channel at storm wave action and river mouth flooding. That is the river mouth would be only 2 or 3 feet because the houses were built in an area of known deep as an “Edison Distortion” and cited a natural hazard. page in the Environmental Impact Report as Understandably, they would be concerned be- proof of their 8-foot depth assertion. cause their homes are at risk now, and the long-term What does that EIR page actually say prognosis for beaches all along the California Coast about the river mouth depth? It says, “The is poor. The natural sand supply that used to nourish design inlet channel depth east of the inlet beaches after erosion from winter storms has been sill would be about 3.3 feet below MSL intercepted by flood control projects and dams built (about –3 feet NGVD) across most of the in the 1900s.
Recommended publications
  • SDRP Trail Event Policy
    SAN DIEGUITO RIVER PARK TRAIL EVENTS POLICY February 2010, Updated April 2013 PURPOSE Requests are frequently made to the City or County of San Diego or the San Dieguito River Park for permission to hold events on San Dieguito River Park Trails. The purpose of this policy is to provide direction as to how such requests will be processed and what the guidelines for approval are. POLICY It is the policy of the San Dieguito River Park that events that have the potential to impact the natural habitat, water quality, or wildlife along San Dieguito River Park trails, to damage trails, lead to erosion, or disrupt the general public’s ability to enjoy the trails shall be regulated to minimize such impact. It is further the policy of the San Dieguito River Park that such events may be allowed provided that the conditions and procedures described in this policy are adhered to. Examples of the types of events that are covered under this policy include: charity events, high school physical education activities, exercise workshops, reunions, bicycle rides, church and scout community events, fitness functions, weddings, etc. The planned size of the event and the proposed location determine how much the trail and surrounding environment would be impacted, and how much of an impact on staff time there would be; therefore this information is used to evaluate the proposed event, determine the permit fee, and decide whether or not the event should be allowed. Permission to hold an event may be withdrawn if SDRP determines that the event would have an adverse impact on the Park environment due to unforeseen circumstances that arose after permission was granted.
    [Show full text]
  • Initial Study
    SAN DIEGUITO RIVER VALLEY REGIONAL OPEN SPACE PARK JOINT POWERS AUTHORITY 18372 Sycamore Creek Road Escondido, CA 92025 (858) 674-2270 INITIAL STUDY PROJECT NAME SAN DIEGUITO RIVER PARK LAKE HODGES PEDESTRIAN/BICYCLE BRIDGE PROJECT LOCATION The project is generally located west of I-15, south of Via Rancho Parkway, and northwest of West Bernardo Drive in the City of San Diego’s San Pasqual Valley Plan area (Figures 1 and 2). PURPOSE AND MAIN FEATURES OF THE PROPOSAL PROJECT SUMMARY The San Dieguito River Park Joint Powers Authority (JPA) proposes to construct a 990-foot-long pedestrian/bicycle bridge and related trail connections across Lake Hodges linking the Lake Hodges North Shore Trail with the Bernardo Bay trail staging area and Piedras Pintadas Trail (Figures 1 and 2). The bridge would not accommodate equestrian use. The bridge is proposed approximately 1,000 feet west of Interstate 15 (I-15) as it passes over Lake Hodges in the San Pasqual Valley. The project site is located on land owned by the City of San Diego Water Department and within the San Dieguito River Park Focused Planning Area (FPA). The project currently under consideration is proposed in the San Dieguito River Park Concept Plan (1994). The bridge is also mentioned as a potential future project in the City of San Diego adopted San Pasqual Valley Plan (1995). In addition, the bridge is identified as a “Programmed Bikeway Project” Class I bicycle transportation facility in the City’s Bicycle Master Plan (2002). The project would be constructed by the JPA with funds from the Federal Highway Administration Transportation Enhancement Activity (TEA) grant administered by the California Department of Transportation, District 11.
    [Show full text]
  • Meeting Notice and Agenda
    Members Todd Gloria, Chair Council President City of San Diego Judy Ritter, Vice Chair Mayor, Vista (Representing North County Inland) Mary Sessom Mayor, Lemon Grove (Representing East County) Lisa Shaffer TRANSPORTATION Councilmember, Encinitas (Representing North County Coastal) COMMITTEE Cheryl Cox Mayor, Chula Vista (Representing South County) AGENDA Ron Roberts, Supervisor County of San Diego Harry Mathis, Chairman Friday, September 5, 2014 Metropolitan Transit System Mark Packard, Vice Chair 9 a.m. to 12 noon North County Transit District SANDAG Board Room Tom Smisek 401 B Street, 7th Floor San Diego County Regional Airport Authority San Diego Alternates Mark Kersey, Councilmember City of San Diego Sam Abed Mayor, Escondido AGENDA HIGHLIGHTS (Representing North County Inland) Kristine Alessio Vice Mayor, La Mesa • PUBLIC HEARING: PROPOSED FINAL 2014 (Representing East County) REGIONAL TRANSPORTATION IMPROVEMENT Lee Haydu PROGRAM Mayor, Del Mar (Representing North County Coastal) Michael Woiwode • SAN DIEGO FORWARD: THE REGIONAL PLAN: Councilmember, Coronado PREFERRED REVENUE CONSTRAINED (Representing South County) TRANSPORTATION SCENARIO Greg Cox, Supervisor County of San Diego Dianne Jacob, Chairwoman County of San Diego Al Ovrom Metropolitan Transit System PLEASE SILENCE ALL ELECTRONIC DEVICES DURING THE MEETING Rebecca Jones / John Aguilera North County Transit District Lloyd Hubbs YOU CAN LISTEN TO THE TRANSPORTATION COMMITTEE San Diego County Regional Airport Authority MEETING BY VISITING OUR WEBSITE AT SANDAG.ORG Advisory Members Laurie Berman / Bill Figge District 11, Caltrans MISSION STATEMENT Raymond Hunter, Sr. (Jamul) The 18 cities and county government are SANDAG serving as the forum for regional decision-making. Allen Lawson (San Pasqual) SANDAG builds consensus, makes strategic plans, obtains and allocates resources, plans, engineers, Southern California Tribal Chairmen’s Association and builds public transit, and provides information on a broad range of topics pertinent to the region's quality of life.
    [Show full text]
  • Clipping Files Guide
    Clipping Files (rev. 11/2018) - # - 4-S Ranch – see: Ranches: 4-S Ranch - A - Acacia Animal Health Center Actors / Actresses Actors / Actresses: Astaire, Fred Adamski, George Adobe – see: Sikes Adobe; see: also Architecture: Local; see also: Historic Homes / Buildings– Adobe Adobe Buildings – see: Historic Homes / Buildings Adult Education Afghanistan/Iraq War Agriculture Agriculture: Avocado – see: Avocado Industry Agriculture: Citrus – see: Citrus Industry Agriculture: Cucumbers Agriculture: Grapes Agriculture: Labor Agriculture: Macadamia Nuts Agriculture: Mushrooms Agriculture: Pests Agriculture: Proteas Air Disasters: Pan Am / KLM – Canary Islands, March 27, 1977 Air Disasters: PSA 182 – San Diego, September 25, 1978 Air Quality Airport – see: Aviation/Airport; see also: Engel, John Alpine Alzheimer’s Family Center Ambulance Service American Bicentennial American Legion – J. B. Clark Post 149 American Society of Women Accountants (ASWA) Amnesty – see: Hispanics Amigos Del Valle Escondido Animal Shelter – see: Escondido Humane Society Andreason, A. F. “Andy” Annexation – see: Escondido Annexation Anniversaries: Escondido – see: Escondido: Anniversaries Anza-Borrego Desert State Park Anza-Borrego Desert State Park – Borrego Springs Anza-Borrego Desert State Park – Carrizo Springs Anza-Borrego Desert State Park – Pegleg Smith 1 Anza-Borrego Desert State Park – Vallecito Stage Station Anza-Borrego Desert State Park – Wildflowers Apartments Apartments: Eagle Crest (Grand Ave. & Rose St.) Apartments: Latitude33 (Washington & Center City
    [Show full text]
  • Meeting Notice and Agenda
    MEETING NOTICE AND AGENDA BICYCLE-PEDESTRIAN WORKING GROUP The Bicycle and Pedestrian Working Group may take action on any item appearing on this agenda. Wednesday, February 14, 2007 9:30 – 11:30 a.m. SANDAG, 7th Floor Conference Room 401 B Street, Suite 800 San Diego, CA 92101-4231 Staff Contact: Chris Kluth (619) 699-1952 [email protected] AGENDA HIGHLIGHTS • 2008 ANNUAL PROJECT STATUS REVIEW SANDAG offices are accessible by public transit. Phone 1-800-COMMUTE or see www.sdcommute.com for route information. Secure bicycle parking is available in the building garage off of 4th Avenue. In compliance with the Americans with Disabilities Act (ADA), SANDAG will accommodate persons who require assistance in order to participate in SANDAG meetings. If such assistance is required, please contact SANDAG at (619) 699-1900 at least 72 hours in advance of the meeting. To request this document or related reports in an alternative format, please call (619) 699-1900, (619) 699-1904 (TTY), or fax (619) 699-1905. BICYCLE-PEDESTRIAN WORKING GROUP Wednesday, February 14, 2007 ITEM # RECOMMENDATION 1. INTRODUCTIONS 2. PUBLIC COMMENT AND COMMUNICATIONS +3. SEAMLESS TRAVEL STUDY – BICYCLE AND INFORMATION PEDESTRIAN COUNTING METHODOLOGY SANDAG is participating in a regionwide study to develop a methodology for monitoring bicycle and pedestrian activity. Staff will provide a briefing on the study and request input from the Working Group about locations for monitoring nonmotorized traffic. +4. NOTICE OF AVAILABILITY OF THE INFORMATION REGIONAL COMPREHENSIVE PLAN: ESTABLISHING A BASELINE FOR MONITORING PERFORMANCE MEMO In 2006, SANDAG completed the Regional Comprehensive Plan: Establishing a Baseline for Monitoring Performance.
    [Show full text]
  • San Dieguito River Park Joint Powers Authority Revenues/Expenditures/Accomplishments 1989-2014
    San Dieguito River Park Joint Powers Authority Revenues/Expenditures/Accomplishments 1989-2014 Prepared by San Dieguito River Park Staff September 2014 San Dieguito River Park Joint Powers Authority 18372 Sycamore Creek Road Escondido, CA 92025 (858) 674-2270 (858) 674-2280 (Fax) www.sdrp.org 1 San Dieguito River Park Joint Powers Authority Board of Directors, 2014 Chair, Dave Roberts, San Diego County Supervisor Vice-Chair, Don Mosier, Del Mar City Council Olga Diaz, Escondido City Council Jim Cunningham, Poway City Council Mark Kersey, San Diego City Council Sherri Lightner, San Diego City Council Dianne Jacob, San Diego County Supervisor Dave Zito, Solana Beach City Council Tom Golich, Chair, Citizens Advisory Committee Becky Bartling, Ex Officio, 22nd District Agricultural Association 2 Table of Contents Introduction ................................................................................................................................. 1 Witch Fire of 2007 ....................................................................................................................... 1 JPA Agreement ........................................................................................................................... 5 Revenues .................................................................................................................................... 6 Expenditures ............................................................................................................................. 11 Accomplishments .....................................................................................................................
    [Show full text]
  • Bicycle Master Plan
    Bicycle Master Plan City of Escondido Case File No. PHG 12-0018 City Council Sam Abed, Mayor Marie Waldron, Deputy Mayor Olga Diaz, Council Member Ed Gallo, Council Member Michael Morasco, Council Member Staff Recognition Jay Paul, Associate Planner-Project Manager Jay Petrek-Principal Planner Peggy Chapin – Contract Planner Homi Namdari-Assistant City Engineer Ali Shahzad-Associate Engineer, Traffic Samuel Cottrell-Associate Engineer, Design Daniel Hildebrand-GIS Manager Jennifer Kay-GIS Technician (Draft CC – October 2012) Adopted by City Council Resolution No. 2012-162 on October 2012 City of Escondido Bicycle Facilities Master Plan TABLE OF CONTENTS Executive Summary ES 1 Project Scope 4 ES.2 Background 4 ES 3 Relationship to Other Plans and Policies 5 ES 4 Goals and Objectives 5 ES 5 Key Findings and Recommendations 5 Chapter 1 Introduction 1.1 Project Scope 9 1.2 Objectives 9 1.3 The Cyclist’s Perspective 9 1.4 Project Approach 11 1.5 Field Work and Methodology 12 1.6 Community Input 12 1.7 Complete Streets 12 1.8 Transportation and Mobility 13 1.9 Compliance with State Law 13 1.10 Trip Origin and Destination Analysis 13 1.11 Opportunities and Constraints 13 1.12 Recommendations and Priorities 14 Chapter 2 Existing Conditions 2.1 Setting, Existing and Proposed Land Use 16 2.2 Bicycle Facilities and Infrastructure 17 2.1.1 Class I Facilities 2.1.2 Class II Facilities 2.1.3 Class III Facilities 2.3 Existing Facilities 19 2.4 Trail Connections 24 2.5 Transit Connections 24 2.6 Location of Shower Facilities and Public Restrooms 25 2.7
    [Show full text]
  • Bicycle Master Plan
    PLAN REPORT CITY OF SAN DIEGO BICYCLE MASTER PLAN May 2002 Table of Contents Chapter 1: INTRODUCTION ........................................................... 1 Background..............................................................................................1 Transportation Access.................................................................................1 Reasons for the Plan...................................................................................2 Intent of the Plan ......................................................................................2 Consistency with other Plans.........................................................................3 Implementation of Proposed Action ................................................................5 Chapter 2: GOALS, OBJECTIVES AND POLICY ACTIONS........................... 7 Goals .....................................................................................................7 Goal 1: Bicycle Transportation ...................................................................7 Goal 2: Bicycle Transportation ...................................................................7 Goal 3: Local and Regional Bikeway Network ..................................................7 Goal 4: Bicycle Benefits ...........................................................................7 Objectives...............................................................................................7 Objective A: Implement the Bicycle Master Plan..............................................7
    [Show full text]