Shand Shelton list of Live Venues This is not a full list of all of our live performance projects

Seating Venue Description Scope of Services Project Cost Capacity*

New Zealand

Stage house and dressing room block design and technical Theatre Architects and Theatre Consultancy Completed 2004 Civic Invercargill 1015 systems and redevelopment of auditorium. $15.8m

New house and redevelopment back of house, refurbish of Project Management and Architectural Design, Theatre Completed 2010 St James Gore 450 auditorium. A technology upgrade and a new heating and ventilation Consultancy, Construction Management and Programming $2.75m system overview, Financial Management New build, theatre, front of house, stage house and back of house. Theatre Architects and Theatre Consultancy Completed 2008 Ashburton Trust Event 500 $5m Centre New build on a restricted site, including 700 seat flexible proscenium Theatre Planner, Architects and Theatre Technical Consultant Completed 2016 ASB Theatre Marlborough 711 and concert venue with Studio Theatre and large riverside function $24m space and flexible foyer. A heritage restoration, strengthening of a multipurpose performance Development Director, Theatre Planner and Theatre Technical Completed 1998 St James Wellington 1553 venue. Stage house and back of house rebuild, plus home for the Consultant, Contract Management and Financial Control $21.5m Royal NZ Ballet. Staged redevelopment of exterior façade, café fit out, foyers upgrade, Project and Construction Management 2013 House Wellington auditorium upgrade and reseating, stage house and flying system $4+m to date 1381 upgrade, smoke extract installation. Full redevelopment plan including seismic upgrade (awaiting funding). Total development in order of $30m Project involved upgrade the Theatre, including new entry and back Project Management and Theatre Architects Completed 2009 Hastings Municipal Theatre of house. Combined with Municipal building flat floor multipurpose Five stages Architectural Design, Project Management, Financial $14m 980 Hawkes Bay Opera House space, including café and covered courtyard. Control and Theatre Consultants

Stage house redevelopment Stage 1 To redevelop the existing stage Theatre Planner, Architects and Theatre Technical Consultant Completed 2011 Rotorua Civic Theatre house and back of house of the Civic Theatre. $4.7m 895 Renamed Sir Howard SHMPAC Stage 2 Full seismic upgrade of front of house to provide In design Current Performing Arts Centre performing arts centre (three performing venues) $22.5m The project was carried out in two phases – phase 1 construction of Project Management, Architectural Design, Theatre Consultancy Completed 2013 Waipawa Town Hall the new stage house and back of house facilities and refurbish of and Programming, Financial Management and Reporting $9.5m 340 (Theatre Redevelopment) auditorium. Phase 2 multipurpose studio and flat floor space and courtyard. Adaptive re-use of an existing building including strengthening to Theatre Planner, Architects, Theatre Technical Consultant, Contract Competed 2015 War Memorial Theatre, 550 100% of NBS. New stage house, back of house and new entry foyer administrators; Financial Control and Project Management $9.5m Gisborne with substantial refurbishment of auditorium.

Seating Venue Description Scope of Services Project Cost Capacity*

Australia

1700 A heritage restoration, stage house and back of house re build. Theatre Planner, Architects, Theatre Technical Consultant, Completed 2004

Construction and Project Managers, Financial Control Aus$9m (Studio Theatre Her Majesty Theatre, Design only of a flexible 300 seat studio theatre, restaurant and bar design only) Melbourne addition. Aus$6m

Proposed works to conserve and rehabilitate the Theatre. Design Feasibility 2018 (awaiting funding) Est. Aus$10m Enmore Theatre Sydney 2000

Roger Shand

*Main Performance Venue Only 4 September 2019

2 | P a g e