2.6 CURRENT PROJECTS NO. NAME OF PROJECT DESCRIPTION MAIN CONTRACT CONTRACT CONTRACTOR VALUE START

Electrical Double Tracking Project Between Ipoh and Earthwork & Associated Works 1 MMC-Gamuda JV RM 41,210,000.00 March '09 Padang Besar. Section N1 (Sub-Package S1)

Electrified Double Tracking Project Between Ipoh 2 Drainage MMC-Gamuda JV RM 17,557,148.12 November '09 and Padang Besar.

Electrified Double Tracking Project Between Ipoh 3 Bridge ( RB 18 & RB 19 ) MMC-Gamuda JV RM 3,288,832.75 February '09 and Padang Besar.

4 Electrified Double Tracking Project Between Ipoh Bridge ( ROB10 & ROB 12 ) MMC-Gamuda JV RM 34,559,676.22 October '09 and Padang Besar.

5 Pembangunan Wilayah Ekonomi Pantai Timur Bridge Hanawin Sdn Bhd RM 34,054,534.52 March '11 ( ECER ) Jalan Persekutuan Laluan 8 & 9 ' Central Spine Road ' Pakej 3 Gua Musang, Kelantan ke Kg Relong, Pahang ( Seksyen 3F - Kg Kubang Rusa ke Kg. Sungai Yu, Pahang ).

Project Menaiktaraf Jalan Laluan 8, dari Kg Relong, 6 Pahang ke Gua Musang, Kelantan Fasa 1 (Segmen 5) Bridge Hanawin Sdn Bhd RM 3,596,644.60 15 August 2011 - Widening

Page 1 of 1 Completed-Current Project.xls 2.5 COMPLETED PROJECT IN MALAYSIA NO. NAME OF PROJECT DESCRIPTION MAIN CONTRACT CONTRACT CONTRACTOR VALUE PERIOD A Bridge Construction - (Crossing River and Traffic)

1. North-South Interurban Expressway Butterworth to Construction of 4 nos. RC Bridges ABL-Energoproject RM 2.0 Million 1992- Feb 1994 Bukit Tambun J.V.

2 Construction of 18 Holes Golf Course For Kajang Hill Construction of 3 nos RC Bridges Sato Kogyo Co., Ltd. RM 1.8 Million Jun 1993 - Dec 1993 Golf Club

3 Old Road and Bridge Replacement Project - JKR Construction of 5 nos RC Bridges at Bina Logamaya RM 1.3 Million 1992 - Dec 1993 Johor and 1 nos RC Bridge at Pahang

4 Kuala Lumpur - Petaling Jaya Traffic Dispersal Construction of 5 nos RC Bridges across Percon - Sambu RM 2.8 Million 1980 - 1983 Scheme Jalan Syed Putra, Jalan Brickfields, Jalan Bangsar, Jalan Duta & Jalan Mahameru

5 Kuala Lumpur - Karak Federal Highway Route II, Construction of 10 nos RC Bridges Sato Kogyo Co., Ltd. RM 6.0 Million 1975 - 1976 Section 4, 5, 6 & 7

6 Proposed R. C. Bridge and Ramp Over Damansara Construction of RC Bridge and Earthwork Sato Kogyo Co., Ltd. RM 1.7 Million Jul. 1994 - Jun. 1995 Link Road

7 The Construction And Completion of Bridge No. 2 Construction of RC Bridge and Earthwork Hiap Aik Const. Bhd. RM 6.5 Million Sept. 1997 - Jul. 1998 And No. 3 Lot 1971 And 1792 Ladang Pilmoor Seksyen U3, Shah Alam.

8 Upgrading And Widening of road from Sg Besi to a) Construction of New Jersey Concrete Road Builder (M) Sdn. RM 9.2 Million May. 1997 - Jan Balakong (BESRAYA) Barrier Bhd. .1999 b) Construction of Pavement & Toll Canopy at Mines North Toll Plaza, Mines North Toll Plaza & Salak Jaya c) Construction of Pile Cap and Pier for Bridge at CH 13,400 and CH 15,100

9 Western Kuala Lumpur Traffic Dispersal Scheme Construction & Completion of Pier Gamuda Berhad RM 1.8 Million Aug. 1999 Package A2 - Kerinchi Link Column & Cross Beam

10 Western Kuala Lumpur Traffic Dispersal Scheme Construction & Completion of Widening Gamuda Berhad RM 0.2 Million Mar. 2000 Package A1 - Jalan Pantai Dalam ( KL Bound & PJ of Underbridge Bound )

11 Sungai Phase 3 Project Subcontract for the Contract 1:- Construction of RC Bridge Gamuda Berhad RM 2.7 Million Apr. 2000 - Oct. Supply & Construct Bridge Structure Over Sg. and Earthwork 2001 Selangor & Sg. Luit Contract 2:- Supply & Launch Post RM 2.9 Million Jun. 2001 - Oct. 2001 Tensioned 'T' Beam for Sg. Selangor &

12 Proposed Construction & Completion of Bridge BR 8 Contract 1:- Construction of RC Pylon, Road Builder (M) Sdn. RM 2.0 Million Aug. 1999 - Jul. 2001 at Putrajaya Butress, Strut At Abutment Wall Bhd.- Hasrat Sedaya Sdn. Bhd. JV Contract 2:- Construction of Bridge RM 3.5 Million Aug. 1999 - Feb. Deck, Webs & Diaphragm 2002

Page 1 of 9 Completed-Current Project.xls 2.5 COMPLETED PROJECT IN MALAYSIA NO. NAME OF PROJECT DESCRIPTION MAIN CONTRACT CONTRACT CONTRACTOR VALUE PERIOD

13 Pembinaan Jambatan Baru Dan Jalan Dari Tendong Cast - Insitu Box Girder At KG. Pendek Strike Achievement RM 310,876.40 Nov. 2001 - May Ke Wakaf Che Yeh, Kelantan D.N. Side Sdn. Bhd. 2002

14 Construction Of Bridge For Development On Lot Construction of RC Bridge CE Precast Sdn. Bhd. RM 451,793.24 Jul. 2002 - Oct. 2002 8762, 8766, 8765 And 2324, Mukim Kajang, Daerah Hulu Langat, Selangor Darul Ehsan

15 Cadangan Manaikkan Taraf Jalan Utama Jalan & Construction of Pedestrian Bridge Lingkaran Mekar Sdn. RM 330,000.00 Aug. 2002 - Nov. Persiaran Murni, UEP , Mukim Bhd. 2002 Damansara, Daerah Petaling, Selangor Darul Ehsan For M/S Majlis Perbandaran Subang Jaya

16 Proposed Bridge Across Shapadu Highway At Bukit Construction of RC Bridge & Earthwork Hiap Aik Construction RM 2,366,330.00 July '01 - May '03 Rajah Development, (Stage 1), Mukim Kapar, Daerah Berhad Kelang, Selangor.

17 Cadangan Membina Pencawang Elektrik No.SS 11/52 Construction & Completion of Cable Lingkaran Mekar Sdn. RM 203,000.00 May 2003 untuk 56 unit lot Banglo yang mengandungi 31 units Bridge Bhd. di Fasa 2D/1A & 25 units di Fasa 2D/1B di atas sebahagian lot asal 956 dan Lot 83, Mukin Damansara Daerah Petaling, Selangor

18 Cadangan Menaikkan Taraf Jalan Utama Jalan Jengka To Design, Supply, Construct and Lingkaran Mekar Sdn. RM 360,000.00 Apr '03 - Jun '03 & Persiaran Murni, UEP Subang Jaya, Mukim Complete pedestrian Bridge No.2 at Bhd. Damansara, Daerah Petaling, Selangor Subang Jaya. Persiaran Tujuan, SS19

19 Western Kuala Lumpur Traffic Dispersal Scheme Construction Of Bridge Super-Structure '( Gamuda Engineering RM 6,337,066.00 Mar '02 - Oct '03 WKLTDS - Package C Pier , Portal Frames And Crossbeam ) Sdn. Bhd.

20 New Pantai Highway (NPE) (a) Construction of Monsoon Drain R.C. Road Builder (M) Sdn. RM 25,101,269.58 May 01 - Mar 04 Slab, Pedestrian Bridge and Triple Box Bhd. Culvert At CH12950 (b) Construction of Underpass at PJS 8/1

(c) Retaining Wall At Allignment C From CH 640 To CH 1400 (RHS) And CH 1970 (d) RC Works for Bridge BR 12 (e) Casting of Precast Concrete Parapets, Construction of Cast-in-situ Parapets and New Jersey Barrier (f) RC Works for Pedestrian Bridge PB3A, PB7, PB8 , PB10 & PB11 (g) Concrete Pavement and Ancillary Works for Toll Plaza and RC Works for id

21 Cadangan Merekabentuk, Membina dan Menyiapkan Construction and Completion of Parit AKM Sdn. Bhd. RM 6,717,269.58 Nov '02 - May '04 Jalan Pintas Bandar Muar (Parit Bunga Interchange) Bunga Over Parit Tiram

22 Jambatan Di Atas Landasan ERL Menghubungkan P7 Construction And Completion of Bridge Loh & Loh RM 4,828,435.75 Jul '03 - Dec '04 Ke Terminal Pengangkutan '( Package C ) Constructions Sdn. Bhd.

Page 2 of 9 Completed-Current Project.xls 2.5 COMPLETED PROJECT IN MALAYSIA NO. NAME OF PROJECT DESCRIPTION MAIN CONTRACT CONTRACT CONTRACTOR VALUE PERIOD

23 Kerja-Kerja Tambahan Bagi Meningkatkan - Reinforced Concrete Bridge Works At Road Builder (M) Sdn RM 1,659,067.35 Jan '05 - Aug '05 Persimpangan Lampu Isyarat Di Jalan Balakong/ Seri Kembangan Interchange'- Bhd RM 1,650,000.00 Lebuhraya Sungai Besi Dan Persimpangan Mines V.O.1 - Precast Prestressed Reinforced RM 458,466.45 Resort - Jalan Balakong Concrete Beam '- RM 3,767,533.80 V.O.2 - Slab Over Existing Block Drain

24 New Pantai Highway Additional Works - R.C. Retaining Wall at Tujuan, Jengka Road Builders (M) Sdn RM 1,547,927.04 Aug '04 - Dec '05 and Kewajipan Interchange Bhd - V.O.1 - Precast Concrete Parapet, Cast- RM 3,404,133.46 In-Situ, Parapet & New Jersey Barrier - V.O.2 - R.C. Retaining Wall At Gasing RM 393,598.04 Ramp & Besraya Link RM 5,345,658.54

25 Cadangan Reka,Membina Dan Menyiapkan Kerja- Reinforced Concrete Works At Ramp A, Road Builder (M) Sdn RM 11,595,503.88 Jun '05 - Jul '06 Kerja Tambahan Bagi Meningkatkan Persimpangan Ramp B And Ramp D Bhd Lampu Isyarat Di Jalan Balakong/ Lebuhraya Sungai Besi Dan Persimpangan Mines Resort/Jalan Balakong

-V.O.1 - Embankment For Ramp A- Abutment A1 -V.O.2 -V.O.3 - Extra Over For Concrete, Formwork and Staging

26 Kuala Lumpur-Putrajaya Highway Package 5 Precast Parapet Cantilever Sdn. Bhd 1,214,925.35 Jul '06 - Jun '07

27 Design, Construction, Completion and Commissioning Casting of 2 Nos Prestressed (Post Ice-Loh & Loh JV RM 266,928.66 Nov '07 of Integrated Customs, Immigration and Quarantine Tensioned) Precast T-Beams Complex at Johor Bahru, Johor- Link Bridge To City Square

Projek Membina Jejambat Melintasi Landasan Brigde Structure Works Pesona Metro Sdn Bhd RM 46,385,327.00 Dec '07 28 Keretapi di Jalan Pelabuhan Klang, Selangor Darul Ehsan

Cadangan Kerja-Kerja Pembersihan Dan Pengindahan Bridge Over Diversion Channel Pesona Metro Sdn Bhd RM 747,000.00 Jan '08 Sg. Melaka Secara 'Design & Build' Untuk Majlis 29 Perbandaran Melaka Bersejarah.Phase III. Parcel 4.

Menaiktaraf Jalan Pasir Puteh / Gong Kulim,Tok Bali, Casting Of T Beam Concrete Empire Sdn RM 233,520.00 Aug '08 30 Kelantan Darul Naim Bhd

Design, Consruction, Completion, Testing, 31 Commissioning and Maintenance of the Double Track Viaduct Batang Melaka Fajar Baru Sdn Bhd RM 9,336,435.20 February '09 Between Seremban & Gemas.

32 Projek Menaiktaraf Jalan Laluan 8, dari Kg Relong, RC Bridge & Culvert Vehicular Hanawin Sdn Bhd RM 6,745,114.80 April '09 Pahang ke Gua Musang, Kelantan fasa 1 (Segmen5) Underpass

A Bridge Construction - (M arine)

1 Malaysia - Singapore Second Crossing Bridge Project Marine activities in construction of Shimizu Corporation RM 6.5 Million Dec.1994 - Feb. 1997 Precast Caissons, Pile-Cap, Pier Column and Cross Head

Page 3 of 9 Completed-Current Project.xls 2.5 COMPLETED PROJECT IN MALAYSIA NO. NAME OF PROJECT DESCRIPTION MAIN CONTRACT CONTRACT CONTRACTOR VALUE PERIOD

2 Proposed Muar Bridge - Package B Muar Bridge RC Works - Package B AKM Sdn. Bhd. RM 2,725,311.00 Apr. 2001 - May 2002

3 The Proposed Muar Bridge Bypass Road In Muar, Reinforced Concrete Deck, Pylon Head Ranhill Civil Sdn. Bhd. RM 2,850,000.00 Jul 01 - Oct '03 Johor Including Saddles Installation

The Replacement of Sitra Bridges, Kingdom of Causeway Bridges Gamuda Berhad RM 34,929,978.93 November '06 4 Bahrain

B H eavy I ndustrial Plant Works

1 Petronas Second Refinery -Line 1, Sg Udang, Melaka Construction of Foundations and Drainage Shimizu - Peremba RM 0.5 Million Jun 1993 - Jan 1994 Works

2 Kedah Cement New Plant , Teluk Ewa, Langkawi, Construction of Foundation, Silo and Sato Kogyo Co., Ltd. RM 12.0 Million 1982 - 1984 Kedah Drainage Work

3 Kedah Cement Sdn. Bhd. North Port Klang- Terminal Construction of Terminal, Jetty and Silo Sato Kogyo Co., Ltd. RM 5.3 Million Feb. 1995 -Jul. 1995 2nd Berth and Silo No.3

4 Petronas Second Refinery, Plant II, Sg Udang, Melaka Construction of Tank Foundation Fire Sajaya - Yong Nam JV. RM 35.0 Million Dec. 1995 - May. Dike Wall and Treatment Plant 1998

5 TITAN LDPE Project - CBS Contract Tanjung Construction of ISBL Foundations and PC Shimizu Corporation RM 4.0 Million Jun. 1998 - Apr. 1999 Langsar Johor Structure

6 Proposed 3 x 700MW Coal Fired Power Plant at Construction of Cooling Water Intake, AKM Sdn Bhd RM 6,682,811.60 Sept '04 - Sep '05 Tanjung Bin, Johor. Pump Pit and Offshore Discharge Culvert

C Jetty Construction

1 Construction of Telok Ewa Jetty, Pulau Langkawi, Construction of 400m long Jetty Arm, Sato Kogyo Co., Ltd. RM 5.9 Million 1976 - 1979 Kedah Jetty Head and Sub-Jetty

2 Construction of Ferry Terminal 2 at Pulau Pinang and Construction of Passenger Jetties BMB Construction RM 2.0 Million 1973 - 1975 Butterworth

3 Construction of Wharf at Pasir Gudang Construction of Container Wharf BMB Construction RM 2.5 Million 1974

4 Sembawang Shipyard Expansion Project at Pasir Construction of Jetty Facilities and G & C Construction RM 1.5 Million Feb. 1994 - Oct. 1994 Gudang Platform

D Tunnel Lining Works Cut and Cover T unnel

1 Proposed Stormwater Management and Road 'Tunnel Construction and Completion of MS04 U- MMCEG-Gamuda RM826,733.35 Aug '03 - Oct '03 (SMART) Project Contract No D6-5-001 Section base at KL Seremban for South Joint Venture Ingress/Egress

Page 4 of 9 Completed-Current Project.xls 2.5 COMPLETED PROJECT IN MALAYSIA NO. NAME OF PROJECT DESCRIPTION MAIN CONTRACT CONTRACT CONTRACTOR VALUE PERIOD

2 SMART Project Contract No D6-5-002 Construction and Completion of MS04 U- MMCEG-Gamuda RM 8,476,677.03 Sept '03 - Oct '04 Section Wall (129 length) and MS04 Box- Joint Venture Section (389 length) at KL Seremban for South Ingress/Egress

3 SMART Project Contract No D6-5-009 Construction and Completion of MS02/04 MMCEG-Gamuda RM 4,197,027.60 May '04 - Mar '05 Double Box-Section for 89m length at Joint Venture Istana Island and 40m length at Sg. Kerayong Box of the South Ingress/Egress

4 SMART Project Construction and Completion of MS02 U- MMCEG-Gamuda RM 2,970,000.00 Jan '05 - May '05 Section at KL~Seremban (SIE) Joint Venture VO 1 RM 431,000.00 RM 3,410,307.00

D Tunnel Lining Works Cut and Cover T unnel (continue)

1 SMART Project Contract No D6-5-022 Construction and Completion of MS02/04 MMCEG-Gamuda RM 2,970,307.00 May '04 - Mar '05 Double Box-Section for117m length at Joint Venture

2 Proposed Stormwater Management and Road Tunnel Proposed Construction And Completion MMCEG-Gamuda RM 6,240,185.98 Dec '05 - Jun '06 (SMART) Project Contract No D6-5-032 Of MS 02/04 Double Box Tunnel Section Joint Venture of The South Ingress/Egress at the following area :- a) Chainage 42.568 to 15.308 @ 107.74m Length at BP Island b) Chainage 392 to 437.50 @ 45.50m Length at Sg Kerayong Phase II (Inc. Cross Passage c) Chainage 195.025 to 281.128 @ 175.51m Length at MS 03 U-Section

3 SMART Project Contract No D5-5-022 Construction & Completion of MN 03/04 MMCEG-Gamuda RM 2,227,147.35 Feb '06 - Jun '06 Double Box Section At Jalan Tun Razak Joint Venture For North Ingress Egress -V.O.1 - Construction & Completion of Pump Sump at NIE RM 39,007.01 RM 2,266,154.36

Concrete Pavement Works (PQC) and T BM Push T hrough Preparation Works

4 SMART Project Contract No D6-5-029 Construction And Completion Of MMCEG-Gamuda RM 1,607,602.91 Sept '05 - Jul '06 Concrete Pavement at KL-Seremban For Joint Venture South Ingress Egress

5 SMART Project South Junction Box Contract No D4- Construction and Completion of R.C. Slab MMCEG-Gamuda RM 632,918.70 Apr '05 - May '05 6-036 for Junction Box and Gate House at South Joint Venture Junction Box -Package Ref No. : D4-6-36

Page 5 of 9 Completed-Current Project.xls 2.5 COMPLETED PROJECT IN MALAYSIA NO. NAME OF PROJECT DESCRIPTION MAIN CONTRACT CONTRACT CONTRACTOR VALUE PERIOD D Tunnel Lining Works Junction Box and Shaft

1 Proposed Stormwater Management and Road 'Tunnel Construction & Completion of Shaft MMCEG-Gamuda RM 14,839,908.24 Oct '05 - Mar '07 (SMART) Project South Junction Box, Shaft & Structure for South Junction Box Joint Venture Gatehouse Contract No D4-4-044

-V.O.1 - TBM Push Through Preparation RM 48,118.38 Works At SJB RC Track RM 14,858,026.62

2 SMART Project - North Junction Box CNC Water RC Structure Work or Cut & Cover MMCEG-Gamuda RM 2,163,034.24 Jun '07-Jul '07 Tunnel And Gate House Lower Deck Contract No D4- Tunnel And Remaining Works Of Gate Joint Venture 4-056 House

Bored T unnel Road Deck Construction

3 Proposed Stormwater Management and Road Tunnel Construction and Completion of MMCEG-Gamuda RM 9,763,946.00 Dec '04 - Jan '06 (SMART) Project Contract No H1-1-006 Reinforced Concrete Road Deck - Section Joint Venture I:NVS-NJB -V.O.1 - To Replace RC Concrete RM 194,771.07 Launching Platform to Steel Launching Platform - V.O.2 - To Supply And Installation of RM 1,209,362.60 Secondary M&E Concrete Wall (By high Pressure Concrete Pumping) Including Mesh Reinfocement RM 11,168,079.67

4 SMART Project - SVS ~ SJB Contract No H1-1-039 Construction And Completion of MMCEG-Gamuda RM 7,542,731.56 Feb '06 - Aug '06 Reinforced Concrete Road Deck - Section Joint Venture III-B : South Ventilation Shaft - South Junction Box (Upper Deck)

E Concrete Pavement -Runway, T axiway & Parking Apron (PQC)

1 The Redevelopment of Pulau Langkawi Airport Construction of Runway and Taxiway Sato Kogyo Co., Ltd. RM 1.3 Million 1985 - 1987

2 Kuala Lumpur International Airport, Runway 1 Construction of Pavement Quality Ireka - Negeri RM 1.2 Million Jul. 1996 - Feb. 1997 Concrete works for Runway 1 Roadstone-Daewoo JV

3 KLIA Apron & Cross Taxiway W2/X3-South RA 05 Construction of Pavement Quality Citra Muda Ready RM 3.0 Million Mar.1997 - Dec. Concrete for Apron Slab Built-Konsortium 1997

4 KLIA Runway 2 - Compass Base Construction of Pavement Quality IJM Corporation Bhd. RM 0.5 Million Jun. 1997 - Sept. Concrete for Apron Slab 1997

5 KLIA Engineering Support Buildings for MAS Brehad Construction of Pavement Quality Nam - Fatt - Gurun JV. RM 5.3 Million Jul. 1997 Concrete

6 KLIA The Execution And Completion Of Construction of Truck Pavement Concrete Bina Puri Sdn. Bhd. RM 2.2 Million Mar. 1998- Jul. 1997 Infrastructure Works For Malaysian Airline System Bhd.

Page 6 of 9 Completed-Current Project.xls 2.5 COMPLETED PROJECT IN MALAYSIA NO. NAME OF PROJECT DESCRIPTION MAIN CONTRACT CONTRACT CONTRACTOR VALUE PERIOD

7 KLIA Mas Ground Support Facilities - Catering Construction of Execution And Usaha Cerakin Sdn. RM 0.9 Million Jan. 1998 - Apr. 1998 Building Completion Of Concrete Pavement Works Bhd.

8 KLIA Proposed Mas Advanced Cargo Centre Construction of Pavement Quality Dywidag - IJM Joint RM 0.4 Million Jan. 1998 - Mar. Concrete Works at Trucks Dock Areas Venture 1998

9 Upgrading And Widening Of Federal Route 1 From Construction of Reinforced Concrete Ireka Engineering & RM 1.0 Million Apr. 1998 - Jan. 1998 Connarght Interchange To Saujana Impian Junction, Pavement Construction Sdn. Bhd. Section 2

10 New Bintulu Airport, Bintulu, Sarawak Rigid Parking Apron And Slotted Drain Global Upline Sdn. RM 1,800,417.40 May. 2002 - Oct. Bhd. 2002

11 Upgrading Of Miri Airport, Parking Apron Extension Parking Apron Extension Ekran Berhad RM 199,911.00 Nov. 2002 - Dec. 2002

12 Proposed Design, Build, Testing And Commissioning Rigid Pavement Works Road Builder (M) Sdn RM 997,993.00 Aug '06 - Mar '07 For Upgrading For New Large Aircraft (A380) Bhd Operations At KL International Airport, Sepang, Malaysia - Terminal Building Renovation And Upgrading Works Related To Airside Facilities

13 Proposed Design, Build, Testing And Commissioning Concrete Apron And Drainage System Zelan Construction Sdn RM 2,665,954.00 Jul '06-Sep '07 Of A New A380 Hangar / Workshop Facilities And Bhd Associated M&E Works At Mas Complex, Kuala Lumpur International Airport, Sepang, Malaysia. Packaghe No. MAS/016(A)-Pavement Quality Concrete (PQC)

14 Proposed Modification of Non-Stop Through Traffic Concrete Pavement Works AAR Enterprise Sdn RM 947,962.40 Dec '07 ~ March '08 Between Ipoh (S) and Jelapang (Package 5) Bhd

15 Proposed Cutting And Assembly Workshop At PLO 3, Supply and Lay Pavement Quality Road Builder (M) Sdn RM 3,000,000.00 Oct '07- Jun '08 Jalan Pekeliling, Pasir Gudang, Johor Darul Takzim Concrete and Associated Works Bhd

F D rainage & Road Works / Earthworks

1 Slope Rehabilitation Works At 245.9km North Bound Construction of Pipe Culvert, Slope Nusantara JV Mersing RM 0.6 Million Apr. 1997 - Jun. 1997 Seremban-Ampat Expressway Repair - Gabions Construction Engineering Sdn. Bhd.

2 Commuter Oil Station At Main Terminal Building KL Design, Supply And Installation Of Pre- Road Builder (M) Sdn. RM 0.3 Million Oct. 2000 - Dec. International Airport, Sepang - Package PTC26 cast Concrete Retaining Wall Bhd. 2000

3 Cadangan Membina Dan Menyiapkan Pembangunan Construction and Completion of Road Builder (M) Sdn. RM 1,775,002.50 Oct. 2001 - May Istana Melawati Dan Kerja-Kerja Yang Berkaitan Reinforced Concrete Retaining Wall Bhd. 2002 Dengannya Di Atas Sebahagian PT111, Persint 1, Putrajaya Untuk Tetuan Perbandaran Putrajaya

Page 7 of 9 Completed-Current Project.xls 2.5 COMPLETED PROJECT IN MALAYSIA NO. NAME OF PROJECT DESCRIPTION MAIN CONTRACT CONTRACT CONTRACTOR VALUE PERIOD

4 Cadangan Menaiktaraf Jalan Subang 3 Ke USJ 1 dan Road Kerb works including Scupper Sempurna Laris Sdn. RM 376,105.00 Jun 2003 Jalan USJ 8 ke USJ 1, Petaling Jaya, Selangor untuk Opening and Scupper Pipe Bhd. tetuan Majlis Perbandaran Subang Jaya

5 Drainage Works For Menaik Taraf Jalan Subang 3 Ke Drainage Works Sempurna Laris Sdn. RM 267,000.00 USJ 1 Dan Jalan Dari USJ 8 Ke USJ 1 Subang Jaya Bhd.

6 Construction, Completion And Maintenance Of Construction and Completion Of Lingkaran Mekar Sdn. RM 303,835.25 Aug '03 - Sep '03 Arterial Roads, Water Supply And Trunk Sewer Retaining Wall Bhd. Mains, Sewer Manholes And Ancillary Works For Stage 2A

7 Proposed Earthworks, Roadworks, Drainage Worka Road Kerb works Including Scupper Sempurna Laris Sdn. RM 90,802.00 Mar ,03 - Apr '03 And Electrical Services For Proposed J1 & J7 Road, Opening & Scupper Pipe Bhd. Bandar Wangsa Maju, Kuala Lumpur

8 Cadangan Menaiktaraf Jalan-Jalan Utama Di Puchong Road Kerb and Drainage Works at Sri Sempurna Laris Sdn. RM 418,600.00 Oct '03 - May '04 Perdana, Taman Perindustrian Sri Serdang Utara Serdang Road Kerb and Drainage Works Bhd. RM 615,480.00 Selangor Darul Ehsan Untuk Majlis Perbandaran at Persiaran Puchong Perdana RM 1,034,080.00 Subang Jaya

9 Cadangan Pindaan Pelan Yang Diluluskan Kepada Construction and Completion Of Pembinaan Angkasan RM 147,939.60 Sept '04 - Nov '04 Pelan Susunatur Yang Mengandungi Perdagangan, Retaining Wall At Water Tank, Wangsa Holdings Sdn Bhd Plaza Lanskip, Tangki Air, Rumah Pum Dan Rezad Maju. TNB Di Atas Lot 28060 - Lot 28065, Wangsa Maju, Mukim Setapak, Dalam Bandaraya Kuala Lumpur.

10 Construction, Completion And Maintenance Of Road Kerb and Drainage Works Pembinaan Angkasan RM 821,483.33 Jun '04 - Jun '05 Arterial Roads, Sewer Mains And Maholes, Water Holding Sdn Bhd Pipe System And Ancillary Works For Putra Heights Development

11 STP - Pantai & Puchong Sewer Network Repair New Jersey Barrier at Panta Dalam Shimizu Corporation RM 33,000.00 Feb '06 - Feb '06

12 The Construction & Completion Of Earthworks, U-Drain And Box Culvert SPS Strategi Sdn Bhd RM 662,215.68 Aug '06 - May '07 Retaining Wall, Main Drains, Drain Outfall Structure, Service Main, Water Main And Ancillary Works For Proposed USJ Height Development On Lot 1017, 1018, 1063-1098 And 1134 Mukim Damansara

13 Proposed Construction & Completion Of Roads And Concrete Walkway SPS Strategi Sdn Bhd RM 676,800.00 Feb '07 - Jun '07 Drainage (Package 4) For Proposed Development On Lots 1971 & 1962, Ara Damansara (Ladang Pilmoor), Seksyen PJU1A, Petaling Jaya, Selangor Darul Ehsan Doe Messrs Sime Pilmoor Development Sdn. Bhd.

Proposed Contruction Of Earthworks,Roadworks And Drainage Works SPS Strategi Sdn Bhd RM 1,730,448.9 Dec '07 Ancilarry Works For Road 1 And Road 2 Intersection 14 Linking To Western Abutment Of Bridge 25 Of NSECL For Sime UEP Height Sdn Bhd

Page 8 of 9 Completed-Current Project.xls 2.5 COMPLETED PROJECT IN MALAYSIA NO. NAME OF PROJECT DESCRIPTION MAIN CONTRACT CONTRACT CONTRACTOR VALUE PERIOD 15 Cadangan Menbina Tembok Penahan Construction Of Retaining Wall Amanzitra Corporation S RM 319,911.83 July '10 (Retaining Wall) Bagi Cadangan Taman Tasek Perdana Sebagai Taman Botani Di Wilayah Persekutuan Kuala Lumpur (2010/A170)

G Building Works 1 Design And Construction Of New Office Paint And Construction of R.C. Concrete Transfield Project (M) RM 1.0 Million Nov. 1997 Fabrication Facility Of Part Of Lot 9258, Nilai, Negeri Reinforcement Works And All Associated Sdn. Bhd. Sembilan. Works

2 Design And Construction Of New Office, Paint And Construction & Complete of Brickwork's, Transfield Project (M) RM 0.4 Million Mar. 1998 - Apr. Dabrication Facility On Part Of Lot 9258, Nilai, Plastering, Screening, Planting & All Sdn. Bhd. 1998 Negeri, Sembilan. Associated works

3 The Proposed Serdang Hospital In Serdang Construction and Completion of RC Work Ranhill Civil Sdn. Bhd. RM 170,000.00 Nov '02 - Feb '03 at Hospital Block Atrium Area

4 The Proposed Serdang Hospital In Serdang Construction & Completion Of RC Works Ranhill Civil Sdn. Bhd. RM 147,000.00 Dec '02 - Feb '03 At Apartment Block G1 From Water Tank Level to Lift Motor Room Roof Slab Level

H Water T reatment Plant, Reservoir and D am Structure Works

1 Construction of Malut Dam at Pulau Langkawi Construction of 250m long transfer tunnel, Sato Kogyo Co., Ltd. RM 5.5 Million 1984 - 1986 Water Intake, Outfall structure and Spillway

2 Construction Bekok Dam - Johore Construction of Drainage and Sato Kogyo Co., Ltd. RM 0.2 Million Jun 1991 - Dec 1991 Maintenance Work

3 Johor River Waterworks Extension Scheme Stage 4&5 Construction of concreting, Carpentery & Chai Mio Construction RM 1.1 Million May. 1999 Civil & Building work at Kota Tinggi for Public & Barbending works Sdn. Bhd. Utility Board Singapore

4 Pembinaan Empangan Jus, Loji Lancang Dan Loji Construction and Completion Water Road Builder (M) Sdn. RM 4,382,523.14 Jun' 01 - Jul '03 Baru Gadek. Retaining Structure To Dam Site Bhd.

5 Pembinaan Empangan Jus Serta Kerja-Kerja Yang Construction And Completion of Transfer Road Builder (M) Sdn. RM 2,268,984.51 Jul '02 - Jul '03 Berkaitan (Pakej A) For Perbandaran Air Melaka Pumping Station Bhd.

Page 9 of 9 Completed-Current Project.xls