COVID 19 Report

Total Page:16

File Type:pdf, Size:1020Kb

COVID 19 Report Karnali Integrated Rural Development and Research Center (KIRDARC) Nepal COVID-19 EMERGENCY RESPONSE REPORT 15th March to 15th April 2020 Context Emergency COVID-19 pandemic (WHO declared on March 11, 2020) Response Goal has virtually affected the entire world as more than 2.33 million people are infected world-wide with more than To check the spread of COVID-19 and reduce its impact 160000 causalities till the date1. Countries have been on vulnerable groups women, adolescents and Children. trying and testing measures to prevent the spread of the virus from social distancing, to limiting mass gathering, to complete lockdown of the nation. Meanwhile, Nepal is Strategic not an exception as total 31 people in Nepal have been confirmed with COVID-19 (among them, 3 have already Objectives: recovered) and 28 patients are currently receiving l Improved preventives measures against spread of treatment till 19th April 2020. The government of Nepal COVID-19 and other communicable diseases at has declared nationwide lockdown since 23rd March 2020 community level. with the intention to contain the virus in the country and th has extended lockdown until 30 April 2020. Even though l Strengthened the health service delivery at local government and people’s efforts and measures, the level. infected cases are gradually in increasing in the country. l Vulnerable communities including women, In this context, all the development and administrative adolescents and children are supported through activities are halted except government relief program, education, child protection and food security. maintaining quarantine, medical services, and some awareness in very limited vicinity against COVID-19. As Based on the aforementioned strategic objectives, a result, National economy and all walks of lives have KIRDARC has been involved in emergency support been hard hit regarding supply of daily essentials and in close coordination and support from our strategic goods, medicines, protective materials. Lack of financial partners and donors with the ultimate mission to contain resource among people especially those were living in the COVID-19. In this regard, KIRDARC has supported daily wages has been the worst. the local government and community people on preventive actions, strengthen health delivery system and support the marginalized community and people in 1 https://www.worldometers.info/coronavirus/ (Updated on 19th April 2020 vulnerable conditions. 8:45 am) We Reached People Families 48,161 29,362 Children Men Women 14,686 23,592 24,383 Major Highlights Improved preventives measures against spread of COVID-19 and other communicable diseases at community level. 25,678 3,850 People sensitized on preventives Family supported with Hand measures against COVID-19 washing materials 7,567 200 Masks distributed to community Bottles of Hand Sanitizer people (500 ml) distributed to communities and health facilities. 515 115 Awareness events organized N-95 Masks distributed to health workers 47 3785 Radio Episodes Broadcasted IEC materials distributed in the communities Strengthen Health Service Delivery at Local Level 14 7 Health facilities supported Help Desk Establishment and facilitated to establish 14 Supported Quarantines in program areas. 882,000 55 NRs. contributed in Emergency Personal Protective Equipment Relief Fund of Local provided to health workers Governments 450 People supported for securing of safe quarantine and/or isolation spaces Vulnerable communities including women, adolescents and children are supported through education, child protection and food security. 6,067 6,078 COVID-19 Vulnerable families received EMERGENCY Vulnerable families identified to sanitation and hygiene kits to RELIEF FUND distribute emergency reliefs in promote preventive measures Kalikot and Humla against COVID-19. 808 3,740 Vulnerable families received Children and adolescents family support package. reached with sharing of targeted age specific health education Future Plans and Priorities Overall l Expand the program on preventive measures against COVID-19 in non- program local levels and districts to contain the spread of the virus. l Support to 8560 families with family support package and Hygiene Kits within April 2020 in Kalikot and Humla districts. l Support to promote the health service, child protection and education to protect from COVID-19 and other communicable diseases l Facilitate to strengthen the child protection mechanism at local level during emergency. l Identify 5000 vulnerable families to ensure the food security during the lock-down in Jumla and Kapilvastu districts. l Facilitate to promote multi-stakeholder platform to ensure children, adolescents and women are protected. l Contribute in Emergency Relief Fund of Local Government and Province Government to check the spread of COVID-19 and reduce its impacts on vulnerable groups’ women, adolescents and children. Photo Gallery Figure 1: Programme Officer Mr. Shree Bdr. Bhandari handing cheque of Rs. 2, 81,000 to the Mayor of Budhhbhumi Municipality, Kapilvastu Figure 5: Health and Hygiene Equipment supported to health post of Shuvakalika Rural Municipality of Kalikot district. Figure 2: Programme Officer Mr. Shree Bdr. Bhandari handing cheque of NRs. 2, 81,000 to Mayor of Shivaraj Municipality, Kapilvastu Figure 6: Mr. Bharat Shahi of KIRDARC Nepal inspecting the support material ready to be dispatched for the distribution Figure 3: District Coordinator Mr. Tularam Pandey handing support materials to Figure 7: SAMVAD Adolescents are demonstrating hand washing practice for Mayor of Khadachakra municipality, Kalikot community people in Kapilvastu district. Figure 4: Agreement between Chhayanath Rara municipality and KIRDARC, Figure 8: Distribution of preventive material for covid-19 at Shuvakalika RM, Kalikot Nepal, GNI Nepal and KPADF to contribute Rs. 4, 00,000 in emergency fund of Chhayanath Rara municipality, Mugu. Districts Status, Plan and Priorities Kapilvastu Kalikot l Working closely with Shivaraj Municipality l Working closely with local government and and Budhhabhumi Municipality to respond District Health Office. COVID-19. l Organized sensitization events regarding l Provided NRs. 2,41,000 each Local behavior change communication on COVID-19. Government (Shivaraj Municipality and l Reached to more than 57 communities with Buddhabhumi Municipality). risk reduction messages. l Supporting surveillance efforts at entry points l Running sensitization programs through into the Municipalities. community media. l Planning to provide family support package to l Supported to Local Government with preventive most vulnerable families. measures equipment. l Planning to broadcast Radio SAMVAD l Planning to train the 62 health workers program. and 115 community leaders on COVID-19 l Running sensitization campaigns to sensitize preparedness. people on preventive measures of COVID-19 l Supporting surveillance efforts at entry points and child protection by ensuring safety of all. into the R/Municipalities. l Planning to provide family support package to 2646 vulnerable families. Jumla Humla l Working closely with Local Governments and l Contributed NRs. 1,10,000 in District District Health Office. Emergency Relief Fund, Humla. l KIRDARC Nepal Jumla Office is working with l Working closely with Local Government and the Local Governments at district level and District Health Office. health offices to establish gaps and needs. l Carried out awareness campaigns on l Distributed behavior change communication preventive measures of COVID-19. pamphlets on containing COVID-19. l Planning to distribute hygiene kits to 1200 l Organizing awareness campaign through families in Simikot and 2000 families in community media, mobilizing staffs and Sarkegard. distributing behavior change communication l Planning to support to health facilities with pamphlets on COVID-19. health equipment and medicines. l Planning to distribute the family support package and cash to around 3500 families. Dolpa l Planning to support health facilities (PPE) to promote health service delivery at local level. l Carried out awareness campaigns on preventive measures of COVID-19. Mugu l Seeking fund to provide support to most vulnerable families. l Contributed Rs. 4,00,000 in emergency fund of Chhayanath Rara municipality. Surkhet l Organizing awareness activities in close coordination with local government and l Carried out awareness campaigns on concerned stakeholders. preventive measures of COVID-19. l Expand the areas of awareness campaign l Planning to contribute in emergency fund of against COVID-19 focusing hand washing Karnali Province contribution of 5 days salary practices and sanitation by mobilizing the of KIRADRC staffs i.e. NPR 300,000. staffs. l Planning to distribute behavior change communication pamphlets on COVID-19. l Planning to support cash in Emergency Relief Fund in Soru RM, Khatyad RM and Mugum Kameron RM. l Planning to implement the emergency response project on child protection, WASH and education in technical and financial support of UNICEF. Summary of Cash/Material Support Funding Agency District Local Levels Total Kind Support Fund Materials Quantity Stromme Foundation Kapilbastu Shivraj Municipality, 1,082,000 Soap 2000 Budhabhumi Municipality Mask 864 Cash 4,82,000 Save the Children Kalikot Khandachakra 89,686 P-form 80 Municipality Raskot and Naraharinath Bed Sheet 24 Rural Municipality Blanket 24 Bucket, Jug, Soap Bar and 14 each Washing Bucket Hand wash Soap 500 Tooth Brush, Paste 40 each Nail Cutter
Recommended publications
  • Nepal Human Rights Year Book 2021 (ENGLISH EDITION) (This Report Covers the Period - January to December 2020)
    Nepal Human Rights Year Book 2021 (ENGLISH EDITION) (This Report Covers the Period - January to December 2020) Editor-In-Chief Shree Ram Bajagain Editor Aarya Adhikari Editorial Team Govinda Prasad Tripathee Ramesh Prasad Timalsina Data Analyst Anuj KC Cover/Graphic Designer Gita Mali For Human Rights and Social Justice Informal Sector Service Centre (INSEC) Nagarjun Municipality-10, Syuchatar, Kathmandu POBox : 2726, Kathmandu, Nepal Tel: +977-1-5218770 Fax:+977-1-5218251 E-mail: [email protected] Website: www.insec.org.np; www.inseconline.org All materials published in this book may be used with due acknowledgement. First Edition 1000 Copies February 19, 2021 © Informal Sector Service Centre (INSEC) ISBN: 978-9937-9239-5-8 Printed at Dream Graphic Press Kathmandu Contents Acknowledgement Acronyms and Abbreviations Foreword CHAPTERS Chapter 1 Situation of Human Rights in 2020: Overall Assessment Accountability Towards Commitment 1 Review of the Social and Political Issues Raised in the Last 29 Years of Nepal Human Rights Year Book 25 Chapter 2 State and Human Rights Chapter 2.1 Judiciary 37 Chapter 2.2 Executive 47 Chapter 2.3 Legislature 57 Chapter 3 Study Report 3.1 Status of Implementation of the Labor Act at Tea Gardens of Province 1 69 3.2 Witchcraft, an Evil Practice: Continuation of Violence against Women 73 3.3 Natural Disasters in Sindhupalchok and Their Effects on Economic and Social Rights 78 3.4 Problems and Challenges of Sugarcane Farmers 82 3.5 Child Marriage and Violations of Child Rights in Karnali Province 88 36 Socio-economic
    [Show full text]
  • Appraisal of the Karnali Employment Programme As a Regional Social Protection Scheme
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by Aston Publications Explorer Appraisal of the Karnali Employment Programme as a regional social protection scheme Kirit Vaidya in collaboration with Punya Prasad Regmi & Bhesh Ghimire for Ministry of Local Development, Government of Nepal & ILO Office in Nepal November 2010 Copyright © International Labour Organization 2010 First published 2010 Publications of the International Labour Offi ce enjoy copyright under Protocol 2 of the Universal Copyright Convention. Nevertheless, short excerpts from them may be reproduced without authoriza- tion, on condition that the source is indicated. For rights of reproduction or translation, application should be made to ILO Publications (Rights and Permissions), International Labour Offi ce, CH-1211 Geneva 22, Switzerland, or by email: [email protected]. The International Labour Offi ce welcomes such applications. Libraries, institutions and other users registered with reproduction rights organizations may make copies in accordance with the licences issued to them for this purpose. Visit www.ifrro.org to fi nd the reproduction rights organization in your country. social protection / decent work / poverty alleviation / public works / economic and social development / Nepal 978-92-2-124017-4 (print) 978-92-2-124018-1 (web pdf) ILO Cataloguing in Publication Data The responsibility for opinions expressed in signed articles, studies and other contributions rests solely with their authors, and publication does not constitute an endorsement by the International Labour Offi ce of the opinions expressed in them. Reference to names of fi rms and commercial products and processes does not imply their endorsement by the International Labour Offi ce, and any failure to mention a particular fi rm, commercial product or process is not a sign of disapproval.
    [Show full text]
  • COVID19 Reporting of Naukunda RM, Rasuwa.Pdf
    स्थानिय तहको विवरण प्रदेश जिल्ला स्थानिय तहको नाम Bagmati Rasuwa Naukunda Rural Mun सूचना प्रविधि अधिकृत पद नाम सम्पर्क नं. वडा ठेगाना कैफियत सूचना प्रविधि अधिकृतसुमित कुमार संग्रौला 9823290882 ६ गोसाईकुण्ड गाउँपालिका जिम्मेवार पदाधिकारीहरू क्र.स. पद नाम सम्पर्क नं. वडा ठेगाना कैफियत 1 प्रमुख प्रशासकीय अधिकृतनवदीप राई 9807365365 १३ विराटनगर, मोरङ 2 सामजिक विकास/ स्वास्थ्यअण प्रसाद शाखा पौडेल प्रमुख 9818162060 ५ शुभ-कालिका गाउँपालिका, रसुवा 3 सूचना अधिकारी डबल बहादुर वि.के 9804669795 ५ धनगढी उपमहानगरपालिका, कालिका 4 अन्य नितेश कुमार यादव 9816810792 ६ पिपरा गाउँपालिका, महोत्तरी 5 6 n विपद व्यवस्थापनमा सहयोगी संस्थाहरू क्र.स. प्रकार नाम सम्पर्क नं. वडा ठेगाना कैफियत 1 2 3 4 5 6 7 8 9 n ारेाइन केको ववरण ID ारेाइन केको नाम वडा ठेगाना केन्द्रको सम्पर्क व्यक्तिसम्पर्क नं. भवनको प्रकार बनाउने निकाय वारेटाइन केको मता Geo Location (Lat, Long) Q1 गौतम बुद्ध मा.वि क्वारेन्टाइन स्थल ३ फाम्चेत नितेश कुमार यादव 9816810792 विध्यालय अन्य (वेड संया) 10 28.006129636870693,85.27118702477858 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Qn भारत लगायत विदेशबाट आएका व्यक्तिहरूको विवरण अधारभूत विवरण ारेाइन/अताल रफर वा घर पठाईएको ववरण विदेशबाट आएको हो भने मात्र कैिफयत ID नाम, थर लिङ्ग उमेर (वर्ष) वडा ठेगाना सम्पर्क नं.
    [Show full text]
  • Sudha Final Paper.Pmd
    Nepal Journal of Science and Technology 11 (2010) 57-62 Effect of Climate Change on Rice Production: A Case of Six VDCs in Jumla District Sudha Sapkota1, Mina Nath Paudel2, Naresh Singh Thakur1, Megh Bahadur Nepali 1 and Reshma Neupane3 1Socioeconomics and Agricultural Research Policy Division 2Outreach Research Division and 3Agronomy Division, NARC, Khumaltar, Lalitpur e-mail:[email protected] Abstract Rice (Oryza sativa L.) is a staple crop of Nepal and is directly associated with ample water and minimum fluctuation of temperature that could affect on its production. Jumla is the unique place where rice is cultivated in the highest altitude (3000 m) in the world. To find out changes in rice production due to climatic effect, six VDCs of Jumla were chosen for the study. Household survey, participatory rapid appraisal, farmers’ group discussions and desk review were used for collecting data. Rice varieties Chandannath-1 andChandannath-3 were disseminated by the formal seed system with the aim of increasing rice productivity. Despite the replacement of local varieties by improved ones the production trend seems to be stagnant. One of the factors on stagnant of rice production in Jumla is due to the lack of desirable variety with genetic traits of early maturity, less nutrient requirement compared to Jumli Marshi to cope up with the climate congruently supporting to cultural practices regarding the unique rice production systems of Jumla. Key words: climate change, rice production, highest altitude, seed Introduction rather than in global climate patterns. The earth’s average surface temperature has increased by 10F in Jumla is a unique place in Nepal where rice is cultivated just over the last century.
    [Show full text]
  • Club Health Assessment MBR0087
    Club Health Assessment for District 325A1 through April 2021 Status Membership Reports Finance LCIF Current YTD YTD YTD YTD Member Avg. length Months Yrs. Since Months Donations Member Members Members Net Net Count 12 of service Since Last President Vice Since Last for current Club Club Charter Count Added Dropped Growth Growth% Months for dropped Last Officer Rotation President Activity Account Fiscal Number Name Date Ago members MMR *** Report Reported Report *** Balance Year **** Number of times If below If net loss If no When Number Notes the If no report on status quo 15 is greater report in 3 more than of officers thatin 12 months within last members than 20% months one year repeat do not haveappears in two years appears appears appears in appears in terms an active red Clubs less than two years old SC 138770 Bansbari 07/12/2019 Active 41 15 0 15 57.69% 26 0 N 1 $600.02 P,MC 138952 Bargachhi Green City 07/12/2019 Active 25 1 0 1 4.17% 24 4 N 5 142398 Biratnagar A One 08/09/2020 Active 32 32 0 32 100.00% 0 2 N 1 M,MC,SC 138747 Biratnagar Birat Medical 07/12/2019 Active 21 1 0 1 5.00% 20 3 N 3 90+ Days P,S,T,M,VP 138954 Biratnagar Capital City 07/12/2019 Active 20 0 0 0 0.00% 20 21 1 None N/R 90+ Days MC,SC M,MC,SC 140415 Biratnagar Entrepreneur 01/06/2020 Active 18 0 0 0 0.00% 20 10 2 R 10 90+ Days M 139007 Biratnagar Greater 07/12/2019 Active 31 8 3 5 19.23% 26 1 4 3 N 3 Exc Award (06/30/2020) VP 139016 Biratnagar Health Professional 07/12/2019 Active 26 4 1 3 13.04% 23 1 0 N 3 Exc Award (06/30/2020) 138394 Biratnagar Mahanagar
    [Show full text]
  • 2.3 Nepal Road Network
    2.3 Nepal Road Network Overview Primary Roads in Nepal Major Road Construction Projects Distance Matrix Road Security Weighbridges and Axle Load Limits Road Class and Surface Conditions Province 1 Province 2 Bagmati Province Gandaki Province Province 5 Karnali Province Sudurpashchim Province Overview Roads are the predominant mode of transport in Nepal. Road network of Nepal is categorized into the strategic road network (SRN), which comprises of highways and feeder roads, and the local road network (LRN), comprising of district roads and Urban roads. Nepal’s road network consists of about 64,500 km of roads. Of these, about 13,500 km belong to the SRN, the core network of national highways and feeder roads connecting district headquarters. (Picture : Nepal Road Standard 2070) The network density is low, at 14 kms per 100 km2 and 0.9 km per 1,000 people. 60% of the road network is concentrated in the lowland (Terai) areas. A Department of Roads (DoR’s) survey shows that 50% of the population of the hill areas still must walk two hours to reach an SRN road. Two of the 77 district headquarters, namely Humla, and Dolpa are yet to be connected to the SRN. Page 1 (Source: Sector Assessment [Summary]: Road Transport) Primary Roads in Nepal S. Rd. Name of Highway Length Node Feature Remarks N. Ref. (km) No. Start Point End Point 1 H01 Mahendra Highway 1027.67 Mechi Bridge, Jhapa Gadda chowki Border, East to West of Country Border Kanchanpur 2 H02 Tribhuvan Highway 159.66 Tribhuvan Statue, Sirsiya Bridge, Birgunj Connects biggest Customs to Capital Tripureshwor Border 3 H03 Arniko Highway 112.83 Maitighar Junction, KTM Friendship Bridge, Connects Chinese border to Capital Kodari Border 4 H04 Prithvi Highway 173.43 Naubise (TRP) Prithvi Chowk, Pokhara Connects Province 3 to Province 4 5 H05 Narayanghat - Mugling 36.16 Pulchowk, Naryanghat Mugling Naryanghat to Mugling Highway (PRM) 6 H06 Dhulikhel Sindhuli 198 Bhittamod border, Dhulikhel (ARM) 135.94 Km.
    [Show full text]
  • Forests and Watershed Profile of Local Level (744) Structure of Nepal
    Forests and Watershed Profile of Local Level (744) Structure of Nepal Volumes: Volume I : Forest & Watershed Profile of Province 1 Volume II : Forest & Watershed Profile of Province 2 Volume III : Forest & Watershed Profile of Province 3 Volume IV : Forest & Watershed Profile of Province 4 Volume V : Forest & Watershed Profile of Province 5 Volume VI : Forest & Watershed Profile of Province 6 Volume VII : Forest & Watershed Profile of Province 7 Government of Nepal Ministry of Forests and Soil Conservation Department of Forest Research and Survey Kathmandu July 2017 © Department of Forest Research and Survey, 2017 Any reproduction of this publication in full or in part should mention the title and credit DFRS. Citation: DFRS, 2017. Forests and Watershed Profile of Local Level (744) Structure of Nepal. Department of Forest Research and Survey (DFRS). Kathmandu, Nepal Prepared by: Coordinator : Dr. Deepak Kumar Kharal, DG, DFRS Member : Dr. Prem Poudel, Under-secretary, DSCWM Member : Rabindra Maharjan, Under-secretary, DoF Member : Shiva Khanal, Under-secretary, DFRS Member : Raj Kumar Rimal, AFO, DoF Member Secretary : Amul Kumar Acharya, ARO, DFRS Published by: Department of Forest Research and Survey P. O. Box 3339, Babarmahal Kathmandu, Nepal Tel: 977-1-4233510 Fax: 977-1-4220159 Email: [email protected] Web: www.dfrs.gov.np Cover map: Front cover: Map of Forest Cover of Nepal FOREWORD Forest of Nepal has been a long standing key natural resource supporting nation's economy in many ways. Forests resources have significant contribution to ecosystem balance and livelihood of large portion of population in Nepal. Sustainable management of forest resources is essential to support overall development goals.
    [Show full text]
  • Jumla Community Development Project a Project Proposal
    Jumla Community Development Project A Project Proposal April 2011 – December 2014 by Govinda Development Aid Association, Aalen, Germany in cooperation with Shangrila Association, Jumla, Nepal Jumla Community Development Project • April 2011 – December 2014 2 Table of contents 1. Background..........................................................................................6 2. Problems, opportunities and development intervention..................7 3. Project Beneficiaries.........................................................................12 4. Project Description............................................................................12 4.1 Project goal .....................................................................................13 4.2 Project purposes/ outcomes..........................................................13 4.3 Project Outputs ...............................................................................14 4.4 Project Activities.............................................................................15 5. Project Methodology .........................................................................24 5.1 Self-help groups and Cooperative organization ..........................25 5.2 Horizontal learning .........................................................................25 5.3 Affirmative action............................................................................25 5.4 Use of different methods in awareness and educative process 25 5.5 Team building and office set up ....................................................26
    [Show full text]
  • 36172-042: Project Completion Report
    Completion Report Program Number: 36172 Grant Numbers: 0118/0206 August 2014 Nepal: Governance Support Program (Subprogram I) This document is being disclosed to the public in accordance with ADB’s Public Communications Policy 2011. CURRENCY EQUIVALENTS (As of 31 May 2014) Currency Unit – Nepalese rupee/s (NRe/NRs) At Appraisal At Completion 30 September 2008 31 May 2014 NRe1.00 = $0.013522 $0.01054 $1.00 = NRe73.9519 NRe94.8035 ABBREVIATIONS ADB – Asian Development Bank ASIP – annual strategic implementation plan CAC – citizen awareness center CCU – cluster coordination unit CIDA – Canadian International Development Agency CSO – civil society organization DDC – district development committee FCGO – Financial Comptroller General Office GESI – gender equality and social inclusion GSP 1 – Subprogram I of governance support program IEC – information, education, and communication JFA – joint financing arrangement LBFAR – local body financial administration regulation LBFC – Local Bodies Fiscal Commission LGAF – local governance and accountability facility LGCDP – local governance and community development program LPC – local peace committee MCPM – minimum conditions and performance measures MOF – Ministry of Finance MLD – Ministry of Local Development MOFALD – Ministry of Federal Affairs and Local Development NAC – national advisory committee NGO – nongovernment organization NPC – National Planning Commission NRM Nepal Resident Mission OAG – Office of the Auditor General of Nepal OSR – own-source revenue PEFA- – public expenditure and financial assessment and FRRAP fiduciary risk reduction action plan PCU – program coordination unit PFM – public financial management SARD South Asia Regional Department SWAP sector-wide approach TA technical assistance VDC – village development committee WCF – ward citizen forum NOTES (i) The fiscal year (FY) of the Government and its agencies ends on 15 July.
    [Show full text]
  • Food Insecurity and Undernutrition in Nepal
    SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics Acknowledgements The completion of both this and the earlier feasibility report follows extensive consultation with the National Planning Commission, Central Bureau of Statistics (CBS), World Food Programme (WFP), UNICEF, World Bank, and New ERA, together with members of the Statistics and Evidence for Policy, Planning and Results (SEPPR) working group from the International Development Partners Group (IDPG) and made up of people from Asian Development Bank (ADB), Department for International Development (DFID), United Nations Development Programme (UNDP), UNICEF and United States Agency for International Development (USAID), WFP, and the World Bank. WFP, UNICEF and the World Bank commissioned this research. The statistical analysis has been undertaken by Professor Stephen Haslett, Systemetrics Research Associates and Institute of Fundamental Sciences, Massey University, New Zealand and Associate Prof Geoffrey Jones, Dr. Maris Isidro and Alison Sefton of the Institute of Fundamental Sciences - Statistics, Massey University, New Zealand. We gratefully acknowledge the considerable assistance provided at all stages by the Central Bureau of Statistics. Special thanks to Bikash Bista, Rudra Suwal, Dilli Raj Joshi, Devendra Karanjit, Bed Dhakal, Lok Khatri and Pushpa Raj Paudel. See Appendix E for the full list of people consulted. First published: December 2014 Design and processed by: Print Communication, 4241355 ISBN: 978-9937-3000-976 Suggested citation: Haslett, S., Jones, G., Isidro, M., and Sefton, A. (2014) Small Area Estimation of Food Insecurity and Undernutrition in Nepal, Central Bureau of Statistics, National Planning Commissions Secretariat, World Food Programme, UNICEF and World Bank, Kathmandu, Nepal, December 2014.
    [Show full text]
  • Tila Karnali Watershed Profile: Status, Challenges and Opportunities for Improved Water Resource Management
    Cover photo: A view of the confluence of the Tila Karnali and the Humla Karnali rivers in the Tila- Karnali Watershed, Kalikot. Photo credit: USAID Paani Program II TILA KARNALI WATERSHED PROFILE: STATUS, CHALLENGES AND OPPORTUNITIES FOR IMPROVED WATER RESOURCE MANAGEMENT Program Title: USAID Paani Program DAI Project Number: 1002810 Sponsoring USAID Office: USAID/Nepal IDIQ Number: AID-OAA-I-14-00014 Task Order Number: AID-367-TO-16-00001 Contractor: DAI Global LLC Date of Publication: March 28, 2019 The authors’ views expressed in this publication do not necessarily reflect the views of the United States Agency for International Development or the United States Government. III Table of Contents TABLES ....................................................................................................................... VI FIGURES ................................................................................................................... VIII ABBREVIATIONS ..................................................................................................... IX ACKNOWLEDGEMENTS .......................................................................................... 1 EXECUTIVE SUMMARY ............................................................................................ 2 1. TILA KARNALI WATERSHED: NATURE, WEALTH AND POWER ..... 10 2. NATURE........................................................................................................... 11 2.1. TILA KARNALI WATERSHED ...............................................................................
    [Show full text]
  • RAMS) + Performance-Based Contracting (PBC)
    Road Asset Management Systems (RAMS) + Performance-Based Contracting (PBC) Session 1.1: RAMS Introduction Serge Cartier van Dissel February 2021 Agenda Day 1 Day 2 Day 3 Road Asset Management System Road Asset Management System Performance Based Contracting (RAMS) (RAMS) (PBC) Session 1.1 Session 2.1 Session 3.1 RAMS RAMS Data Management PBC Introduction & Introduction & Data Analysis Performance Standards Break Break Break Session 1.2 Session 2.2 Session 3.2 RAMS RAMS PBC Inspections & Data Collection Integration Payments Road Asset Management System Any system that is used to collect, manage and analyse road data for road planning and programming purposes Function of a RAMS: Optimizing the level and the allocation of road funding in relation to medium- and long-term results regarding road conditions and road user costs • Define the road network maintenance, rehabilitation and upgrading needs • Based on condition data • Determine the required budget to address those needs • Determine how the available budget is best allocated • To different roads and networks (class, traffic, etc.) • To different treatment types (routine, periodic, rehabilitation, upgrading) • Based on agreed prioritization criteria • Economic (e.g. road user costs, traffic levels) • Social (e.g. population, minimum access) • Predict the impact of that budget allocation • Future road network conditions • Future maintenance and rehabilitation costs • Monitor the road network over time Road Asset Management System • Data collection • Road data (inventory, condition, traffic,
    [Show full text]