Welcome to Scatec Solar

Total Page:16

File Type:pdf, Size:1020Kb

Welcome to Scatec Solar Company presentation – January 13 – page 1 Welcome to Scatec Solar predictable our values driving results change makers working together copyright: Scatec Solar Solutions GmbH www.scatecsolar.com • [email protected] Company presentation – January 13 – page 2 Scatec Solar – who are we our vision: What we do: Improving our future We leverage our experience and vertically integrated business model to identify and realize new high return project development opportunities our values: predictable driving results changemakers working together copyright: Scatec Solar Solutions GmbH www.scatecsolar.com • [email protected] 7 Company presentation – January 13 – page 3 Scatec Solar – a brief overview Established: 2007, HQ in Oslo Employees: 80 Main shareholders: Scatec* 62.5 %, Itochu 37.5 % Unique vertically integrated, scalable and flexible business model • All required competences in-house to ensure a successful project • On-the-ground technological expertise with best practice processes and risk management Excellent track record across multiple markets in different roles and applications Milano, Italy 2010, 7.2 MWp • Track record of approx. 270 MW installed, 70 MW under O&M, 50 MW sales of project rights • Project finance track record of more than 800 M€ • Ownership of 22 MW of assets in Czech Republic, Italy and US Highly successful in the South African IPP program, business development initiatives across a diversified set of markets • Firm back-log of 190 MW in South Africa • Exclusive agreement with IFC covering West and Central Africa • Joint development agreement in Japan Sulkov, Czech R 2010, 10 MWp copyright: Scatec Solar Solutions GmbH * Includes Scatec controlled shares www.scatecsolar.com • [email protected] Company presentation – January 13 – page 4 Scatec Solar is fully integrated downstream and possesses all the required capabilities to realize a project Project development Financing Construction Own / operate (1-2 years) (6-12 months) (2-5 months) ▪ Scatec Solar seeks to be an early ▪ Arrange debt and equity ▪ Engineering and ▪ Scatec Solar takes entrant into new markets capital for individual system design equity positions with projects or portfolios an aim to recycle capital ▪ By partnering with local players we ▪ Procurement and within 3-5 years seek to get access attractive supply chain projects and secure all the required management ▪ Currently holds 20 MW permits to construct a PV park of assets in Czech ▪ Construction and quality Republic and US control ▪ Operates plants throughout its lifetime ▪ Currently 65 MW under operation copyright: Scatec Solar Solutions GmbH www.scatecsolar.com • [email protected] Company presentation – January 13 – page 5 On-the-ground technological expertise with best practice processes and risk management Track record of approx. 265 MW in Germany, Czech Republic, Italy, France, and South Africa In-house capabilities Triple ISO certified World’s first triple certified solar • Engineering system integrator for • Design • Quality (ISO 9001) • Supply chain • Environment (ISO 14001) management • Occupational Health and Safety (OHSAS 18001) • Project management • Operation and Sample projects: MW sized power plants Maintenance Ground mounted PV Roof top PV PV Carports Sulkov, Czech R. 2010, 10 MWp DHL roof, Italy, 2010, 7.2 MWp Quinciuex, France, 2011, 8MWp copyright: Scatec Solar Solutions GmbH www.scatecsolar.com • [email protected] Company presentation – January 13 – page 6 We have a worldwide presence 1 Overview Norway HQ Germany US ▪ Execution hub Czech R Japan France Central America MENA Romania Hawaii India Saudi Arabia South America ▪ Rural el project West / Central Africa Project development Ownership of assets EPC services South Africa Planned copyright: Scatec Solar Solutions GmbH www.scatecsolar.com • [email protected] Company presentation – January 13 – page 7 Scatec Solar has a solid track record … Cumulative project size MWp Track record: • No calls on performance or warranty bonds, • No loss-making contracts. • All projects completed without significant overrun on time or cost • Performance expectations met or exceeded Cumulative number of projects1 1 Small rooftop projects are grouped and listed as “one project” per year copyright: Scatec Solar Solutions GmbH SOURCE: Scatec Solar www.scatecsolar.com • [email protected] Company presentation – January 13 – page 8 … across various roles, markets and applications Track record across various roles various markets various applications Proven project development Business model is scalable Proven execution in and EPC capabilities across new markets multiple applications Proven and diverse experience in multiple geographies, different roles and different applications copyright: Scatec Solar Solutions GmbH www.scatecsolar.com • [email protected] Company presentation – January 13 – page 9 Scatec Solar has a project finance track record of ~EUR 800 million Debt financing track record Asset structuring and management experience • Non-recourse financing of 3 plants (13 MW) in Germany in • 7,5 MW of operating assets in Germany (from late 2008 / 2009, totaling EUR 35 mill (5 facilities) early 2009, under management) • 20 MW of operating assets in Czech Rep. (from late 2009 / • Non-recourse financing of 1 plant (7 MW) in Italy in 2010, late 2010, under management) totaling EUR 17 mill (1 facility) • 9 MW of operating assets in Italy (from late 2009 – early • Non-recourse portfolio financing of 4 plants (20 MW) in 2011, recently sold) Czech Rep. in 2010-11, totaling ~EUR 65 mill (7 fac.) • 190 MW already structured in South Africa. Additional volumes in preparation. • Non-recourse portfolio financing of 9 plants (9 MW) in Italy in 2010-11, totaling EUR 33 million (9 facilities) Equity sale track record • 9 MW of operating assets in Italy sold to an institutional • Credit approval for financing of 3 plants (190 MW) in South equity investor in late 2011 Africa in 2011-12, totaling ~EUR 550 mill (6 fac.) • An additional 2 MW sold to another investor in Q2 2012 copyright: Scatec Solar Solutions GmbH www.scatecsolar.com • [email protected] Company presentation – January 13 – page 10 The Czech parks owned and operated by Scatec Solar are consistently overperforming relative to original expectations Production (kWh), actual vs budget (%) Plant Size (kW) 2011 (whole year) 2012 Jan - May Hrusovany 3 133 +13% +19% All parks have consistently shown a Mramotice substantial overproduction relative to budget. 2 648 + 11% + 16% Since actual solar irradiation have varied less than +/- 1.5% during the Sulkov same period, this reflects a real 9 993 + 11% + 23% technical over performance relative to expectations Svitavy 4 033 + 7% + 20% Note: The Svitavy park showed less positive deviation in 2011 due to extraordinary downtime in connection with equipment upgrade copyright: Scatec Solar Solutions GmbH www.scatecsolar.com • [email protected] Company presentation – January 13 – page 11 Scatec Solar has been awarded three projects in the first and second rounds of the REFIT program Round 1: Round 2: • Results were announced on December 7th 2011 • Results were announced in May 2012 • Only Wind and Solar projects were given allocation • 9 PV projects totaling 417 MW were awarded • 18 PV projects (totaling 632 MW) were awarded; ranging in • Scatec Solar submitted 5 projects and was awarded 2; size from 5 to 75MW (75 = capacity ceiling for PV) the Dreunberg and Linde, totaling 115MW, more than • Scatec Solar was awarded the Kalkbult project (75MW) 25% of the total • Financial close in November 2012 • Financial close scheduled for April, 2013 copyright: Scatec Solar Solutions GmbH www.scatecsolar.com • [email protected] Company presentation – January 13 – page 12 Scatec Solar is securing growth opportunities across diverse markets 4 Business Dev. US: Europe: 1-2 new growth opportunities Scatec Solar is focusing on 5-6 • 55 MW of project rights in • Currently assessing opportunities in business development activities at California and Hawaii already Romania, Cyprus and Jordan any given time – utilizing the sold. 200 MW in Utah in • Recently signed an EPC contract and strength of our integrated business advanced stage development business development cooperation in model and strong network of local • Cooperation with wind developer Romania and international partners in Texas to offer hybrid solutions South America: Assessing Japan: Scatec Solar has a JV with opportunities Itochu in an attractive market • Dedicated team is assessing • Japan has introduced an attractive opportunities feed-in-tariff regime • Scatec Solar has a JV with Ecosystem Japan, a subsidiary of West Africa: High growth market, cooperation South Africa: key market in 2012 Itochu. Installations and revenue with International Finance Corporation (IFC) and 2013 expected in 2013 • A joint development agreement with IFC • Backlog of 190MW, targeting (private arm of the World Bank) signed in additional projects for phase 3 June 2012 • Will be used as starting point for • Plan to build a portfolio of projects in Benin, further expansion to nearby Burkina Faso, Cameroon, Niger, and Togo countries copyright: Scatec Solar Solutions GmbH www.scatecsolar.com • [email protected] Company presentation – January 13 – page 13 West Africa – Growth Region in Need of Electricity Estimated cost of electricity delivered by diesel ▪ Strong growth region with huge power demand generator ▪ PV is competitive in this segment as costs for operating diesel generators and heavy fuel plants
Recommended publications
  • Renewable Energy Risking Rights & Returns
    ` RENEWABLE ENERGY RISKING RIGHTS & RETURNS: An analysis of solar, bioenergy and geothermal companies’ human rights commitments SEPTEMBER 2018 CONTENTS CONTENTS Executive summary 1 Introduction 4 Analysis 6 1. Leaders and laggards 6 2. Public commitment to human rights 12 3. Commitment to community consultations 12 4. Access to remedy 14 5. Labour rights 16 6. Supply chain monitoring 17 Recommendations 19 Annex 21 Photo credit: Andreas Gücklhorn/Unsplash EXECUTIVE SUMMARY EXECUTIVE SUMMARY Key messages Renewable energy is key for our transition to a low-carbon economy, but companies’ human rights policies and practices are not yet strong enough to ensure this transition is both fast and fair. Evidence shows failure to respect human rights can result in project delays, legal procedures and costs for renewable energy companies, underlying the urgency to strengthen human rights due diligence. We cannot afford to slow the critical transition to renewable energy with these kinds of impediments. As renewable energy investments expand in countries with weak human rights pro- tections, investors must step up their engagement to ensure projects respect human rights. Renewable energy has experienced a fourfold bioenergy and geothermal industries, increase in investment in the past decade. echoing findings from ourprevious analysis of Starting at $88 billion in 2005, new wind and hydropower companies. investments hit $349 billion in 2015.1 This eye-catching rise in investments is a welcome Alongside the moral imperative, companies trend and reflects international commitments can also avoid significant legal risks, project to combatting climate change and providing delays and financial costs by introducing access to energy in the Paris climate rigorous human rights due diligence policies agreement and the Sustainable Development and processes.
    [Show full text]
  • Annual Report
    Annual Report 2018 2 Our vision Improving our future Our mission To deliver competitive and sustainable solar energy globally, to protect our environment and to improve quality of life through innovative integration of reliable technology Our values Predictable Working together Driving results Changemakers Scatec Solar ASA - Annual Report 2018 3 Contents Scatec Solar in brief 4 Value chain 6 Market development 7 CEO letter 8 Our people 10 Sustainability highlights 12 Report from the Board of Directors 15 Executive Management 34 Board of Directors 36 Consolidated financial statements Group 40 Notes to the Consolidated financial statements Group 46 Parent company financial statements 112 Notes to the parent company financial statements 116 Other definitions 137 Responsibility statement 138 Alternative Performance Measures 139 Appendix 142 Auditor’s report 144 4 Scatec Solar in brief Scatec Solar is an integrated independent solar power producer, delivering affordable, rapidly deployable and sustainable source of clean energy worldwide. As a long-term player, Scatec Solar develops, builds, owns, operates and maintains solar power plants, and has solid installation track record of more than 1 GW. The company has a total of 1.7 GW in operation and under construction in Argentina, Brazil, the Czech Republic, Egypt, Honduras, Jordan, Malaysia, Mozambique, Rwanda, South Africa and Ukraine. With an established global presence and a significant project pipeline, the company is targeting a capacity of 3.5 GW in operation and under construction by
    [Show full text]
  • Scatec Solar ASA Prospectus 12 November 2020
    Scatec Solar ASA – Prospectus Listing of up to 20,652,478 Private Placement Shares issued in connection with a Private Placement _______________________________ The information in this prospectus (the "Prospectus") relates to the listing on Oslo Børs by Scatec Solar ASA, ("Scatec Solar" or the "Company"), a public limited company incorporated under the laws of Norway (together with its consolidated subsidiaries, the "Scatec Solar Group") of 20,652,478 new shares in the Company (the "Private Placement"), each with a nominal value of NOK 0.025 (the "Private Placement Shares"), issued in a private placement directed towards Norwegian and international investors for gross proceeds of approximately NOK 4,750 million, issued at a subscription price of NOK 230 per share (the "Subscription Price"). 13,768,280 of the Private Placement Shares were issued on 21 October according to a board authorisation (the "New Shares"), and the remaining 6,884,198 will be issued according to a resolution by the General Meeting on 12 November 2020 (the "Borrowed Shares"). The Company's existing shares are listed on the Oslo Børs under the ticker code "SSO". Except where the context requires otherwise, references in this Prospectus to "Shares" will be deemed to include the existing Shares and the Private Placement Shares. All of the existing shares in the Company are, and the Private Placement Shares will be, registered in the VPS in book-entry form. All of the Shares rank pari passu with one another and each carry one vote. Investing in the Company's Shares involves a high degree of risk. See Section 2 "Risk factors" beginning on page 8 and Section 4 "General information".
    [Show full text]
  • Notes to the Parent Company Financial Statements
    Notes to the parent company financial statements Scatec Solar ASA - Annual Report 2019 111 Notes to the parent company financial statements Note 1 General information Scatec Solar ASA is incorporated and domiciled in Norway. solar photovoltaic (PV) power plants including project The address of its registered office is Askekroken 11, development, financing, construction, ownership, and NO-0277 OSLO, Norway. Scatec Solar was established on operation and maintenance. 2 February 2007. The Company is listed on the Oslo Stock Exchange. Scatec Solar ASA (“the Company”), its subsidiaries and investments in associated companies and joint ventures The consolidated financial statements for the full year 2019 (“the Group” or “Scatec Solar”) is a leading independent solar were authorised for issue in accordance with a resolution by power producer. The Company is pursuing an integrated the Board of Directors on 26 March 2020. business model across the complete lifecycle of utility-scale Note 2 Accounting principles Statement of compliance The financial statements of Scatec Solar ASA are prepared applicable on the transaction date. Non-monetary items in accordance with the Norwegian Accounting Act of 1998 that are measured at their fair value expressed in a foreign and Norwegian Generally Accepted Accounting Principles currency are translated using the exchange rate applicable on (NGAAP). the balance sheet date. Basis for preparation Revenues and cost of sales The financial statements have been prepared on a historical Scatec Solar ASA develops project rights that are the basis for cost basis. construction of solar PV plants. Revenues are partly derived from the sale of these project rights. These transactions Accounting estimates and judgements are primarily made with project companies which are under In preparing the financial statements, assumptions and the control of the Group.
    [Show full text]
  • Arctic Norwegian Equities Monthly Report April 2021
    Arctic Norwegian Equities Monthly Report April 2021 FUND COMMENTS Arctic Norwegian Equities gave 0.4% return in April -(I class) versus 1.9% for the OSEFX benchmark index. Year-to- date the fund is up 6.4% compared to 10.3% for the OSEFX index. Since inception the fund has returned 194% ver- sus 164% for the benchmark index. April was yet another good month for the equity markets, with gains across sec- tors. Commodity prices continued to rise in April. In April positive attribution for the Fund versus the benchmark index came from overweights in Atea and Rana Gruber, and underweight Scatec Solar. Atea is a large overweight for Arctic Norwegian Equities. The company deliv- ered quarterly results showing 11 percent topline growth year-over-year, and rising profits in all its regions. Den- mark contributed most significantly to improving results. Atea’s operating margin rose to 1.8 percent from 0.4 per- cent last year. The fund has a position in Rana Gruber. Iron ore prices rose 185.5 dollar per tonne in April. This com- pares to an approximate 70-dollar break-even level for Rana’s net result and cash flow. The fund is underweight in Scatec Solar. Year-to-date the stock has declined with other shares in the renewable space. In addition, the Scatec share got a lower weight in an important European renewables index. In April Scatec announced results for the first quarter which were in-line with market expectations. The company however announced a breach of financial cove- nants for non-recourse debt in Ukraine.
    [Show full text]
  • Annual Report 2020 3
    Annual Report 2020 2 Scatec ASA - Annual Report 2020 3 Contents Scatec in brief 5 Market outlook 6 Acquisition of leading hydropower player SN Power 8 CEO letter 10 Our people 12 Sustainability highlights 14 Report from the Board of Directors 15 Executive Management 34 Board of Directors 36 Consolidated financial statements Group 38 Notes to the Consolidated financial statements Group 46 Parent company financial statements 107 Notes to the parent company financial statements 113 Responsibility statement 133 Alternative Performance Measures 134 Other definitions 138 Appendix 140 Auditor’s report 142 About Scatec Scatec is a leading renewable power producer, delivering affordable and clean energy worldwide. As a long- term player, Scatec develops, builds, owns and operates solar, wind and hydro power plants and storage solutions. In the first half of 2021, Scatec will have a total of 3.3 GW in operation on four continents and more than 500 employees. The company is targeting 15 GW capacity in operation or under construction by the end of 2025. Scatec is headquartered in Oslo, Norway and listed on the Oslo Stock Exchange under the ticker symbol ‘SCATC’. 4 Our vision Improving our future Our mission To deliver competitive and sustainable renewable energy globally, to protect our environment and to improve quality of life through innovative integration of reliable technology Our values Predictable Working together Driving results Changemakers Scatec ASA - Annual Report 2020 5 Key facts Employees In operation FY 2020 Project pipeline at year-end
    [Show full text]
  • Third Quarter
    Third quarter 2019 About Scatec Solar Scatec Solar is a leading integrated independent solar power producer, delivering affordable, rapidly deployable and sustainable clean energy worldwide. A long- term player, Scatec Solar develops, builds, owns and operates solar power plants and has an installation track record of more than 1.3 GW. The company has a total of 1.9 GW in operation and under construction on four continents. With an established global presence and a significant project pipeline, the company is targeting a capacity of 4.5 GW in operation and under construction by end of 2021. Scatec Solar is headquartered in Oslo, Norway and listed on the Oslo Stock Exchange under the ticker symbol ‘SSO’. Asset portfolio 1) CAPACITY ECONOMIC MW INTEREST 2) In operation Egypt 390 51% South Africa 190 45% Brazil 162 44% HQ Malaysia 197 100% Honduras 95 51% Ukraine Ukraine 47 51% Czech Republic Jordan 43 62% Mozambique 40 52% Jordan Czech Republic 20 100% Rwanda 9 54% Egypt Bangladesh Total 1,193 59% Mali Honduras Under construction Vietnam Ukraine 289 96% Malaysia South Africa 258 46% Argentina 117 50% Rwanda Brazil Malaysia 47 100% Total 711 70% Mozambique Projects in backlog South Africa Vietnam 188 65% Argentina Ukraine 65 65% Bangladesh 62 65% Mali 33 51% Honduras 18 70% Total 366 64% Grand total 2,270 63% Projects in pipeline 5,245 Solar power plants in operation: 1,193 MW Plants under construction: 711 MW Projects in backlog: 366 MW Segment overview Power Production The plants produce electricity for sale under long term power purchase agreements (PPAs), with state owned utilities or corporate off-takers, or under government-based feed-in tariff schemes.
    [Show full text]
  • First Quarter
    First quarter 2021 2 First quarter 2021 About Scatec Scatec is a leading renewable power producer, delivering affordable and clean energy worldwide. As a long- term player, Scatec develops, builds, owns and operates solar, wind and hydro power plants and storage solutions. Scatec has more than 3.5 GW in operation and under construction on four continents and more than 500 employees. The company is targeting 15 GW capacity in operation or under construction by the end of 2025. Scatec is headquartered in Oslo, Norway and listed on the Oslo Stock Exchange under the ticker symbol ‘SCATC’. To learn more, visit www.scatec.com. Asset portfolio 1) Segment overview Capacity Economic Development & Construction Technology MW interest 2) The Development & Construction segment derives its In operation revenues from the sale of development rights and con- Philippines 642 50% struction services delivered to power plant companies Laos 525 20% where Scatec has economic interests. South Africa 448 45% Egypt 380 51% Power Production Uganda 255 28% The power plants produce electricity for sale primarily Malaysia 244 100% under long term power purchase agreements (PPAs), Brazil 162 44% with state owned utilities or corporate off-takers, or Ukraine 133 73% under government-based feed-in tariff schemes. The Honduras 95 51% Jordan 43 62% average remaining PPA duration for power plants in Mozambique 40 53% operation is 18 years. The electricity produced from Vietnam 39 100% the power plants in the Philippines is sold on bilateral Czech Republic 20 100% contracts and the spot market, under a renewable Rwanda 9 54% operating license.
    [Show full text]
  • Investor Presentation
    Investor presentation February 2020 Disclaimer The following presentation is being made only to, and is only directed at, persons to whom such presentation may lawfully be communicated (’relevant persons’). Any person who is not a relevant person should not rely, act or make assessment on the basis of this presentation or anything included therein. The following presentation may include information related to investments made and key commercial terms thereof, including future returns. Such information cannot be relied upon as a guide to the future performance of such investments. The release, publication or distribution of this presentation in certain jurisdictions may be restricted by law, and therefore persons in such jurisdictions into which this presentation is released, published or distributed should inform themselves about, and observe, such restrictions. This presentation does not constitute an offering of securities or otherwise constitute an invitation or inducement to any person to underwrite, subscribe for or otherwise acquire securities in Scatec Solar ASA or any company within the Scatec Solar Group. This presentation contains statements regarding the future in connection with the Scatec Solar Group’s growth initiatives, profit figures, outlook, strategies and objectives as well as forward looking statements and any such information or forward- looking statements regarding the future and/or the Scatec Solar Group’s expectations are subject to inherent risks and uncertainties, and many factors can lead to actual profits and developments deviating substantially from what has been expressed or implied in such statements. 2 Contents • Introduction • The solar market • Our backlog & pipeline • Our business model • Financials • Outlook and guidance The 40 MW Mocuba solar plant, Mozambique.
    [Show full text]
  • Annual Report
    Annual Report 2020 2 Scatec ASA - Annual Report 2020 3 Contents Scatec in brief 5 Market outlook 6 Acquisition of leading hydropower player SN Power 8 CEO letter 10 Our people 12 Sustainability highlights 14 Report from the Board of Directors 15 Executive Management 34 Board of Directors 36 Consolidated financial statements Group 38 Notes to the Consolidated financial statements Group 46 Parent company financial statements 107 Notes to the parent company financial statements 113 Responsibility statement 133 Alternative Performance Measures 134 Other definitions 138 Appendix 140 Auditor’s report 142 About Scatec Scatec is a leading renewable power producer, delivering affordable and clean energy worldwide. As a long- term player, Scatec develops, builds, owns and operates solar, wind and hydro power plants and storage solutions. In the first half of 2021, Scatec will have a total of 3.3 GW in operation on four continents and more than 500 employees. The company is targeting 15 GW capacity in operation or under construction by the end of 2025. Scatec is headquartered in Oslo, Norway and listed on the Oslo Stock Exchange under the ticker symbol ‘SCATC’. 4 Our vision Improving our future Our mission To deliver competitive and sustainable renewable energy globally, to protect our environment and to improve quality of life through innovative integration of reliable technology Our values Predictable Working together Driving results Changemakers Scatec ASA - Annual Report 2020 5 Key facts Employees In operation FY 2020 Project pipeline at year-end
    [Show full text]
  • The Norwegian Government's Strategy for Green Competitiveness
    Norwegian Government Strategy Better growth, lower emissions – the Norwegian Government’s strategy for green competitiveness Contents Foreword . 3 Cooperation and dialogue between authorities, researchers and the business sector . 30 . Introduction . 5. Education and lifelong learning . 31. What is green competitiveness? . 9 Infrastructure for green solutions . .33 . An integrated policy for green competitiveness . .11 . New technology in the electricity supply system . .33 . Principles of green competitiveness . .15 . Developing an emission-free transport system . 33. Markets for green solutions . 17 Electrification of the transport sector . 35 Emissions trading and taxation . 17. Digitalisation and autonomous technology . 36 A range of instruments to promote green markets . 18. Carbon capture and storage . 37 Green and innovative public procurement . 21 Better management of climate risk New legislation and better advice and guidance for and funding of green solutions . 41 public purchasers . 21 . Climate risk . 41 Action to promote green and innovative Funding of green solutions . .42 . procurement . 22 A circular economy . .45 . Research, innovation and technology development . 25 A circular economy will alter the competition Targeted initiatives and special focus on R&D framework . 46 on climate and environment . 25 More robust markets for secondary raw materials . 47 Enova . 26 . Sustainable use and export of sustainable biological Innovation Norway . 26. resources . 47. The Research Council of Norway . .27 . Increasing exports of
    [Show full text]
  • Clean Energy Investing: Globla Comparison of Investment Returns
    Clean Energy Investing: Global Comparison of Investment Returns March 2021 A Joint Report by the International Energy Agency and the Centre for Climate Finance & Investment Table of Contents 03 Executive Summary 05 Introduction 08 Analytical Methods 11 Key Investment Characteristics 14 Results 14 Global Markets 18 Advanced Economies 19 Emerging Market and Developing Economies 20 China 21 Transition Companies 22 The Covid Market Shock 24 Irrational Exuberance? 26 Conclusions 29 Acknowledgments 30 Annex A – Definition of Key Terms 32 Annex B – IEA Scenarios 33 Annex C – Fama-French Five-Factor Model 34 Annex D – Fossil Fuel Portfolio 48 Annex E – Renewable Power Portfolio 2 Executive Summary To shed light on the long-term prospects for clean energy, we investigate the historical financial performance of energy companies around the world in search of broad structural trends. This is the second in a series of joint reports by the International Energy Agency and Imperial College Business School examining the risk and return proposition in energy transitions. In this paper, we extend our coverage of publicly-traded renewable power and fossil fuel companies to the following: 1) global markets, 2) advanced economies, 3) emerging market and developing economies, and 4) China. We calculate the total return and annualized volatility of these portfolios over 5 and 10-year periods. Table 1 shows the 5 and 10-year results, up to December 31, 2020. Table 1 – Summary of Key Findings Global Markets Portfolios Advanced Economies Portfolios Fossil Fuel Renewable
    [Show full text]