Airbus Defence and Space

Total Page:16

File Type:pdf, Size:1020Kb

Airbus Defence and Space Airbus Defence and Space One mission, one team, one direction NEREUS International Conference Space4You : Space, a driver for Competitiveness and Growth 27 February 2014 Daniel Gheri [email protected] 1 One mission, one team, one direction Airbus Defence and Space: A division of the Airbus Group Tom Enders Employees*: ~ 140,000 Revenues*: ~ €56 bn Fabrice Brégier Guillaume Faury Bernhard Gerwert Employees*: ~ 73,500 Employees*: ~ 22,400 Employees**: ~ 40,000 Revenues*: ~ €39 bn Revenues*: ~ €6.3 bn Revenues**: ~ €14 bn * in 2012 ** estimate for 2014 January 2014 2 2 One mission, one team, one direction Airbus Defence and Space: A unique international leader Being strong together – 3 turn into 1 One Parent Company One Company Three Brands One Brand Multiple Business Segments Four Business Segments January 2014 3 3 One mission, one team, one direction Airbus Defence and Space: Market leading products Eurofighter A400M A330 MRTT (Multi-Role Tanker Transport) Ariane 5 Automated Transfer Vehicle (ATV) Satellites January 2014 4 4 One mission, one team, one direction Airbus Defence and Space: Our locations in Europe Germany 1. Manching Jyväskylä 2. Ulm Leiden 3. Friedrichshafen Helsinki 4. Unterschleißheim Brussels 5. Ottobrunn Eik 6. Bremen Oostkamp France 7. Toulouse 8. Elancourt 6 Warsaw 9. Les Mureaux 18 16 10. Aquitaine 17 Mielec 11. Suresnes Luxembourg 1 9 11 2 4 8 Bratislava Spain 3 5 12. Getafe 10 Torino Budapest 13. Barajas 14. Seville 7 Roma 15. Cadiz 13 12 Ankara UK Athens 16. Stevenage 14 15 17. Portsmouth 18. Newport January 2014 5 5 One mission, one team, one direction Airbus Defence and Space worldwide January 2014 6 6 Une mission, une équipe, un objectif Airbus Defence and Space : équipe de direction CEO Bernhard Gerwert Comm., Intelligence Military Aircraft Space Systems & Security (CIS) Electronics Domingo Ureña Raso François Auque Evert Dudok Thomas Müller Operations Marketing & Sales Finance Human Resources Integration Management Pilar Albiac Murillo Christian Scherer Julian Whitehead Lars Immisch Janvier 2014 7 7 One mission, one team, one direction Airbus Defence and Space: Our Business Lines Space Systems • Ariane 5, Automated Transfer Military Aircraft Vehicle, Eurostar E3000, • A400M, A330 MRTT, CN235, Pléiades, Gaia, Skynet, C212, Orlik observation satellites (Spot, TanDEM-X, TerraSaR-X, MetOp, • Eurofighter, Tornado Swarm), International Space • Barracuda, Atlante, Harfang, Station ISS, interplanetary Euro Hawk, Future European probes (Herschel, Mars Express, Male, Tracker, Tanan, Survey Solar Orbiter), Lunar Lander Copter Communication, Intelligence & Security (CIS) Electronics • Surveillance and Security Solutions, Secure • Mission Data Transfer Systems, Communications Solutions, Optics for Spectrograph Cyber Security, Coastal Instrumentation, Identification Surveillance Systems, NATO Friend or Foe (IFF) Systems, SATCOM Post-2000, Wireless Space Platform Electronics, Intranet Solutions in Theatre Space Payload Electronics January 2014 8 8 One mission, one team, one direction Space Systems • No. 2 Space company in the world • No. 1 in commercial launchers • No. 1 in European satellites • Expertise in launchers, deterrence, satellites, human space flight Portfolio • Orbital Systems including Maintenance and Operation of the International Space Station (ISS) • Launcher Systems (Ariane and other launchers) • Defence • Satellite Systems: ENS Satellites (Earth Observation, Navigation & Science) and Telecom satellites • Propulsion Systems • Atmospheric Re-entry Systems for launchers and probes January 2014 9 9 One mission, one team, one direction Electronics • Network for designers, constructors and experts at Airbus Defence and Space • Integrated expertise from various defence and space competencies Portfolio • Space Platform Electronics – Crisa, Dutch Space and former Astrium product entities in France and Germany • Space Payload Electronics – Tesat and former Astrium product entities in the UK • Sensors / Electronic Warfare / Avionics – Electronic Warfare, Radar & Identification Friend or Foe, Eurofighter Electronics, Avionics, Product Support • Optronics – Cassidian Optronics, Jena Optronics • Strategic Portfolio Management – Product and Portfolio Management, Global/Small and Medium sized Enterprises Affiliates Management, Strategy / Mergers & Acquisitions / Post Merger Integration • Engineering / Operations – Technical Synergies – Product Engineering Coordination, Tools and Processes January 2014 10 10 One mission, one team, one direction Communication, Intelligence & Security (CIS) • One-stop-shop for satellite and terrestrial communication systems and services, and defence, intelligence and security solutions • End-to-end communication and intelligence solutions Portfolio • Government Communications Systems • Business Communications Systems • Geo Information Systems • Integrated Systems • Cyber Security • Defence Systems • Border Security Systems • Satellite Communications Infrastructure and Services • Secure Communications Solutions (Secure Mobile Radio Systems) • C4ISR (Command, Control, Communications, Computers, Intelligence, Surveillance and Reconnaissance) January 2014 11 11 One mission, one team, one direction Military Aircraft • Based on the solid foundations of the Eurofighter, UAS developments and military transportation • Fleet in service maintenance, repair and overhaul (MRO) • Leader in the light and medium transport market • Combined mutual strengths, engineering and political power to develop a compelling UAS programme • All units involved in development, production or ongoing support of military aircraft • Well-placed to play a leading role in future UAS and combat a/c segments Portfolio • Eurofighter and similar combat air systems • A400M transport aircraft system • A330 MRTT (Multi Role Tanker Transport) • Light and Medium Transport Derivatives • Mission Systems • Unmanned Aerial Systems • Air Services & MRO January 2014 12 12 One mission, one team, one direction The Supplier Evaluation and Development Process Supplier Development - Communicate evaluation to the supplier - Direct debriefing - Agree improvement targets and freeze the development plan Monitor development plan Supplier Evaluation - Evaluation of the supplier performances Supply Supplier - Identification of the Improvement actions base selection (corrective, preventive) Each supplier evaluation leads to a development plan to improve the performances of the supplier January 2014 13 13 One mission, one team, one direction Supplier Evaluation criteria LOGISTICS Delivery performance Delivery conditions QUALITY COMMERCIAL 20 Contractual Behaviour Quality System, Competitiveness Process Control, 15 Responsiveness Product Quality Terms & conditions 10 5 0 CUSTOMER SUPPORT TECHNICAL Communication & relationship Tools and expertise of staff Maintenance repair Validation, verification and testing Responsiveness Technical risk managed January 2014 14 14 One mission, one team, one direction Supplier Evaluation classes and ranking A SCORE 20 Excellent 20 I - All requirements exceeded I I - Comprehensive and I persuasive evidence of a well I defined process in place, fully I I and satisfactorily performing I - Total and proactive I B I Management support 16 16 15 Good 15 I - Evidence of successful I results, all requirements I are met I I - Clear evidence of a I Threshold C documented process in I place, performing I change 13 13 12 Mandatory Improvements 12 - Requirements are met, I I but with some difficulties I (minor waivers) I I - Process not fully I D performing causing some I concerns I 8 Unacceptable 8 7 7 - Ineffective or spotty results I - No evidence or just I beginnings of system/ I I process in place I - No or just beginnings of I I recognition of needs I I I 0 0 January 2014 15 15 One mission, one team, one direction Supplier Global ranking – Toward the excellence Global results added January 2014 16 16.
Recommended publications
  • PAR Capital Management Enters Into Binding Agreement to Subscribe to a 11.5% Stake in Icelandair Group
    April-2019 PAR Capital Management Enters Into Binding Agreement To Subscribe To A 11.5% Stake In Icelandair Group Airbus Sells Its Shares In Alestis Aerospace Ethiopian Airlines Statement On The Preliminary Report Of The Accident On ET 302 Magnetic MRO Expands Camo Capabili- ties To Two New Wide-Bodies Contents Magnetic MRO Expands Camo Capabilities To Two New Wide-Bodies 1 Starlux Airlines Orders 17 A350 XWB Aircraft For Long-Haul Services 2 ATI Extends Long-Term Purchase Agreement With Rolls-Royce 3 Airbus Sells Its Shares In Alestis Aerospace 4 KBRA Assigns Final Ratings To Maps 2019-1 Limited 5 Vietnam Airlines Showcases Its Latest Airbus A350-900, Completing Its Fleet.. 6 UIA Adjusts Its Summer 2019 Schedule 8 Gulf Air Explores Growing The Airlines Network With Strategic Partners In Russia 9 PAR Capital Management Enters Into Binding Agreement To Subscribe To A 11.5%.. 10 Nordic Aviation Capital Has Successfully Completed The Largest Ever Senior.. 11 Airbus Shareholders Approve All AGM Resolutions, Guillaume Faury Appointed CEO 12 GA Telesis Appoints Kevin Geissler, Vice President Of Aviation Lease Solutions 14 Bombardier Signs Firm Purchase Agreement For Six Q400 Turboprops 15 Aerfin: Q1 Update 16 Ethiopian Airlines Statement On The Preliminary Report Of The Accident On ET 302 18 Airbus Launches “Skywise Health Monitoring” With Us Airline Allegiant Air.. 19 Tap Air Portugal Takes Delivery Of Its First A321LR 20 Skyworks Announces Q1 2019 Activities 22 ANA Receives New Boeing 787-10 For International Routes 23 Gulf Air And Etihad Airways Sign Codeshare Agreement, Strengthening.. 24 Magnetic MRO Expands Camo Capabilities To Two New Wide-Bodies Magnetic MRO, a global provider of Total that adds new wide-body aircraft to our portfolio Technical Care for aircraft operators and lessors, complements the company’s recent business has gained EASA’s approval to offer continuing acquisition.
    [Show full text]
  • Ariane-DP GB VA209 ASTRA 2F & GSAT-10.Indd
    A DUAL LAUNCH FOR DIRECT BROADCAST AND COMMUNICATIONS SERVICES Arianespace will orbit two satellites on its fifth Ariane 5 launch of the year: ASTRA 2F, which mainly provides direct-to-home (DTH) broadcast services for the Luxembourg-based operator SES, and the GSAT-10 communications satellite for the Indian Space Research Organization, ISRO. The choice of Arianespace by the world’s leading space communications operators and manufacturers is clear international recognition of the company’s excellence in launch services. Based on its proven reliability and availability, Arianespace continues to confirm its position as the world’s benchmark launch system. Ariane 5 is the only commercial satellite launcher now on the market capable of simultaneously launching two payloads and handling a complete range of missions, from launches of commercial satellites into geostationary orbit, to dedicated launches into special orbits. Arianespace and SES have developed an exceptional relationship of mutual trust over more than 20 years. ASTRA 2F will be the 36th satellite from the SES group (Euronext Paris and Luxembourg Bourse: SESG) to use an Ariane launcher. SES operates the leading direct-to-home (DTH) TV broadcast system in Europe, based on its Astra satellites, serving more than 135 million households via DTH and cable networks. Built by Astrium using a Eurostar E3000 platform, ASTRA 2F will weigh 6,000 kg at launch. Fitted with active Ku- and Ka-band transponders, ASTRA 2F will be positioned at 28.2 degrees East. It will deliver new-generation DTH TV broadcast services to Europe, the Middle East and Africa, and offers a design life of about 15 years.
    [Show full text]
  • View / Download
    www.arianespace.com www.starsem.com www.avio Arianespace’s eighth launch of 2021 with the fifth Soyuz of the year will place its satellite passengers into low Earth orbit. The launcher will be carrying a total payload of approximately 5 518 kg. The launch will be performed from Baikonur, in Kazakhstan. MISSION DESCRIPTION 2 ONEWEB SATELLITES 3 Liftoff is planned on at exactly: SOYUZ LAUNCHER 4 06:23 p.m. Washington, D.C. time, 10:23 p.m. Universal time (UTC), LAUNCH CAMPAIGN 4 00:23 a.m. Paris time, FLIGHT SEQUENCES 5 01:23 a.m. Moscow time, 03:23 a.m. Baikonur Cosmodrome. STAKEHOLDERS OF A LAUNCH 6 The nominal duration of the mission (from liftoff to separation of the satellites) is: 3 hours and 45 minutes. Satellites: OneWeb satellite #255 to #288 Customer: OneWeb • Altitude at separation: 450 km Cyrielle BOUJU • Inclination: 84.7degrees [email protected] +33 (0)6 32 65 97 48 RUAG Space AB (Linköping, Sweden) is the prime contractor in charge of development and production of the dispenser system used on Flight ST34. It will carry the satellites during their flight to low Earth orbit and then release them into space. The dedicated dispenser is designed to Flight ST34, the 29th commercial mission from the Baikonur Cosmodrome in Kazakhstan performed by accommodate up to 36 spacecraft per launch, allowing Arianespace and its Starsem affiliate, will put 34 of OneWeb’s satellites bringing the total fleet to 288 satellites Arianespace to timely deliver the lion’s share of the initial into a near-polar orbit at an altitude of 450 kilometers.
    [Show full text]
  • The Defense Industry in an Age of Austerity P
    The Economics of Peace and Security Journal, ISSN 1749-852X Smith, The defense industry in an age of austerity p. 18 © www.epsjournal.org.uk – Vol. 8, No. 1 (2013) of the arms industry. SIPRI (2000, The defense industry in an age of austerity p. 315) estimated that arms Reductions in military expenditure will production (domestic demand plus generate pressures to restructure the defense industry. This article explores Ron Smith exports minus imports) in 1997 was only 56 percent of its 1987 level in the implications of a more peaceful the U.S., 77 percent in France, and evolution of military expenditure for ven without the U.S. budget battles, with their fiscal cliffs and sequestration, the economic structure of this industry. deficit-reduction pressures and withdrawal from Afghanistan would have 90 percent in the U.K. Arms sales by the top-100 companies in the For example, since military Econstrained future U.S. military expenditure, just as austerity constrains expenditure and defense industry European military expenditure. Reductions in military expenditure will generate SIPRI list measured in 2010 prices rose from $257bn in 2002 to $411bn concentration have moved in opposite pressures to restructure the defense industry. The proposed merger of BAE Systems directions in the past, future cuts in and EADS, announced in September 2012 and killed by German government in 2010, and then fell by 5 percent in 2011. such spending might be expected to opposition a month later, is an early indication of such pressures. While history does lead to a more concentrated industry. not repeat itself, it may be informative to examine an earlier period of restructuring, The U-shaped pattern in military between the end of the cold war in 1990 and the beginning of the “war on terror” in expenditure was matched by an 2001, to see what we might expect in response to future cuts.
    [Show full text]
  • PRESS-KIT-VV19-08122021-EN.Pdf
    www.arianespace.com www.avio.com www.avio Arianespace’s seventh launch of 2021 with the second Vega of the year will place its satellite passengers into Sun-synchronous orbit. The launcher will be carrying a total payload of approximately 1 029 kg. The launch will be performed in Kourou, French Guiana. MISSION DESCRIPTION 2 PLÉIADES NEO 4 SATELLITE 3 Liftoff is planned on at exactly: FOUR AUXILIARY PAYLOADS 4 - 5 09:47 p.m. Washington, D.C. time, 10:47 p.m. Kourou time, VEGA LAUNCHER 6 01:47 a.m. Universal time (UTC), August 17, LAUNCH CAMPAIGN 7 03:47 a.m. Paris time, August 17, 10:47 a.m. Tokyo time, August 17. FLIGHT SEQUENCES 7 STAKEHOLDERS OF A LAUNCH 8 The nominal duration of the mission (from liftoff to separation of the satellites) is: 1 hour, 44 minutes and 59 seconds. Satellite: Pléiades Neo 4 Customer: Airbus Defence and Space - Intelligence Satellites: Four auxiliary payloads Cyrielle BOUJU [email protected] +33 (0)6 32 65 97 48 For Pléiades Neo For the four auxiliary payloads Francesco DE LORENZO • Perigee altitude: 614 km • Perigee altitude: 540 km [email protected] • Apogee altitude: 625 km • Apogee altitude: 554 km + 39 (0)6 97285317 • Inclination : 97.89 degrees • Inclination : 97.55 degrees First Pléiades Neo constellation satellites have been achieved within only five years, thanks to the hard work of over 500 people, across seven sites in Europe, to deliver first-class 14 km swath imagery at 30 cm native resolution, capable to daily collect up to 2 million km² and image the entire Earth landmass five times per year.
    [Show full text]
  • The Merger Between EADS BEA SYSTEMS
    Research Network on Innovation Réseau de Recherche sur l’Innovation WORKING PAPERS DOCUMENTS DE TRAVAIL N°33 / 2013 MERGERS FAILURE IN THE EUROPEAN DEFENCE TECHNOLOGICAL AND INDUSTRIAL BASE. THE CASE OF EADS / BAE SYSTEMS Pierre BARBAROUX Blandine LAPERCHE 1 MERGERS FAILURE IN THE EUROPEAN DEFENCE TECHNOLOGICAL AND INDUSTRIAL BASE. THE CASE OF EADS / BAE SYSTEMS Pierre BARBAROUX1 Blandine LAPERCHE2 Summary: This paper deals with the project of a merger between BAE systems and EADS, announced in September 2012 and finally cancelled one month later. It investigates the rationale of the merger project and the reasons that explain its collapse. Our first aim is to assess the importance - usually put forward in the literature - of the pre-merger phase in the success or the failure of a merger project. Our second aim is to put forward the specificities of mergers when defence firms are involved. Using a single case study methodology, we show that the economic rationality of the project was based on industrial complementaries, economic synergies and personal motives. We then investigate the many political divergences, specific to the defence industry, that emerged during the pre merger phase. Finally, considering the economic and political stakes, we suggest the merger project appeared as too big to succeed. Key words: Merger, EADS, BAE Systems, Defence, European Defence Technological and Industrial Base (EDTIB) JEL Codes: L10 (Industrial Organization – general), L64 (industry Studies – Armaments), G.34 (Corporate Finance and Governance : Mergers, acquisition, restructuring) © Réseau de Recherche sur l’Innovation, 2013 1 Centre de recherche de l’armée de l’air (CReA) Equipe Management des organisations de défense (MOD) EOAA/CReA BA 701 13661 SALON AIR Research Network on Innovation [email protected] 2 Lab.RII-ULCO/ CLERSE UMR8019 Université Lille Nord de France Research Network on Innovation [email protected] 2 MERGERS FAILURE IN THE EUROPEAN DEFENCE TECHNOLOGICAL AND INDUSTRIAL BASE.
    [Show full text]
  • Airbus Wins European Space Agency TRUTHS Mission Study for Metrological Traceability of Earth Observation Data
    Airbus wins European Space Agency TRUTHS mission study for metrological traceability of Earth observation data TRUTHS to provide benchmark of Earth’s Radiation budget by consistent calibration traced to a metrological reference Consistent calibration will also enhance existing satellite missions @AirbusSpace @ESA_EO #SpaceMatters #satellite Stevenage, 3 November 2020 – Airbus has been awarded the lead in the European Space Agency (ESA) contract for the TRUTHS A/B1 (System feasibility Studies and Pre- Developments) as part of ESA’s Earth Observation Earth Watch programme. The TRUTHS satellite mission will collect measurements of the Sun radiation and of the sunlight reflected off Earth's surface traced to an absolute metrological reference, which will then be used to improve the climatological data sets and calibrate the observations of other satellites. This space-based climate and calibration observing system will enable data from other satellites to be compared more easily providing greater standards of data harmonisation for even more accurate climate change forecasts. TRUTHS stands for Traceable Radiometry Underpinning Terrestrial and Helio Studies. The study will define the TRUTHS mission system implementation concept as well as focus on the preparation of critical technologies ahead of implementation of the mission in 2023. TRUTHS will carry a Cryogenic Solar Absolute Radiometer (CSAR) to provide a primary calibration standard in order to benchmark measurements of both incoming solar radiation and outgoing reflected radiation - measured with a Hyperspectral Imaging Sensor (HIS) also part of the payload - with unprecedented accuracy. These measurements will give the ability to estimate radiative imbalance underlying climate change and, importantly, in a shorter time than is currently possible.
    [Show full text]
  • ARIANE 5 Data Relating to Flight 225
    KOUROU August 2015 ARIANE 5 Data relating to Flight 225 EUTELSAT 8 West B Intelsat 34 Data relating to Flight 225 Flight 225 Ariane 5 Satellites: EUTELSAT 8 WEST B – INTELSAT 34 Content 1. Introduction .................................................................... 3 2. Launcher L579 ............................................................... 4 3. Mission V225 ............................................................... 10 4. Payloads ...................................................................... 19 5. Launch campaign ........................................................ 32 6. Launch window ............................................................ 35 7. Final countdown .......................................................... 36 8. Flight sequence ........................................................... 40 9. Airbus Defence and Space and the ARIANE programmes ........................................................................ 42 2 Data relating to Flight 225 1. Introduction Flight 225 is the 81st Ariane 5 launch and the fourth in 2015. It follows on from a series of 66 consecutive successful Ariane 5 launches. This is the 51st ARIANE 5 ECA (Cryogenic Evolution type A), the most powerful version in the ARIANE 5 range. Flight 225 is a commercial mission for Ariane 5. The L579 launcher is the twenty-fifth to be delivered by Airbus Defence and Space to Arianespace as part of the PB production batch. The PB production contract was signed in March 2009 to guarantee continuity of the launch service after completion
    [Show full text]
  • We All Fly. More and More. Making Global Air Traffic Sustainable Is a Shared Responsibility
    1 ALOFTAN INFLIGHT REVIEW WE ALL FLY. MORE AND MORE. MAKING GLOBAL AIR TRAFFIC SUSTAINABLE IS A SHARED RESPONSIBILITY. 2 LOREM IPSUM DOLOR IMPRINT ALOFT AN INFLIGHT REVIEW is jointly published by the Heinrich Böll Foundation and the Airbus Group German edition: OBEN IHR FLUGBEGLEITER Managing editor, author (unless otherwise specied): Dietmar Bartz Art director: Ellen Stockmar Translator: Maureen Polaszek Proofreader: Maria Lanman Editorial responsibility (V.i.S.d.P): Annette Maennel, Heinrich Böll Foundation 1st edition, May 2016 For further inquiries please contact: Ute Brümmer, Heinrich Böll Foundation, Schumannstraße 8, 10117 Berlin, bruemmer boell.de Florian Keisinger, Airbus Group, Rahel-Hirsch-Straße 10, 10557 Berlin, orian.keisinger airbus.com Print: Druckerei Conrad GmbH, Berlin climate neutrally printed on 100% recycled paper Order and download address: Heinrich-Böll-Stiftung, Schumannstraße 8, 10117 Berlin, Germany, www.boell.de/aloft 2 ALOFT AN INFLIGHT REVIEW 3 EDITORIAL DEAR READERS! ir trac is a key component of our modern, globally Despite all the improvements in noise and emission protec- connected world. This applies to both our profes- tion that have been made in recent years, a great deal must be sional and our private lives. Aviation has created a done from a political and technical point of view. global neork connecting people and goods. It is An ongoing controversy is how to regulate the aviation in- A hard for anyone who wants to become familiar with the world dustry and what constraints are eective. At best, they should and participate in global exchange to refrain from flying. take place at an international level, establish a uniform com- We currently record about 3.3 billion air trips per year.
    [Show full text]
  • V-Band Communications Link Design for a Hosted Payload September 9
    V‐Band Communications Link Design For A Hosted Payload Anthony Zunis, SCaN SIP Intern Deboshri Sadhukhan, SCaN SIP Intern Keeping the universe connected. John Alexander, SCaN SIP Intern David Avanesian, Systems Engineer Eric Knoblock, Systems Engineer September 9, 2013 Outline 1. Introduction – Task Objectives – Hosted Payload Locations – V‐Band Link Architecture 2. Hosted Payload Study – Hosted Payload Descriptions – Considerations – Satellite Bus Examples – Satellite Specification Summaries 3. V‐Band Communications Link Design & Analysis – Link Budget Description – V‐Band Considerations – MATLab Data and Results – V‐Band Data and Results – Future Work 1. Introduction Task Objectives • Hosted Payload Study Analyze commercial GEO/LEO satellite hosted payload specifications Assess how NASA can use hosted payload capabilities • V‐Band Link Analysis Research, analyze, and determine feasibility of high frequency communications at V‐band (50‐75 GHz) Defining applications for high‐frequency communications Assessing link design and performance based on varying parameters • V‐Band Hosted Payload Application Determining the size and power consumption of the associated communications payload Interpreting the feasibility of implementation within the accommodation constraints of a hosted payload Hosted Payload Satellite GEO (HPSG) Station MOC NISN Hosted Payload Satellite LEO (HPSL) Low Earth Orbit (LEO) Geosynchronous Earth Orbit (GEO) Hosted Payload Locations & Architecture Design for V-Band V-band User Missions Title: V-Band Architecture High-Level Operational Concept Graphic NISN Figure/Table/Type: OV-1 Date: 6/21/2011 Version: 1 Figure: 1 2. Hosted Payload Study What is a Hosted Payload? • Refers to the utilization of available capacity on commercial satellites to accommodate additional payloads (e.g., transponders, instruments, etc.) • By offering "piggyback rides“ on commercial communication satellites already scheduled for launch, costumers such as government agencies can send sensors and other equipment into space on a timely and cost‐effective basis.
    [Show full text]
  • Finland 1. Finland
    Epicos 2016 Special Focus: Finland Volume 8 Number 04 – Wednesday, 27 January 2016 Part I: Finland 1. Finland: Future Defence Budget and Procurements 2. Finnish Defence Industry: Main Competences & Total Turnover 3. Epicos “Industrial Cooperation and Offset Projects” 4. Advanced Fiber Optics Cable Repair System 5. Comprehensive military shooting training system based on optoelectronic technology 6. News from our A&D Business Network Part II: Epicos Newsroom 1. ESA selects Airbus Defence and Space for two new Sentinel-2 satellites 2. Rockwell Collins technology aids in historic first KC-46A tanker refueling flight 3. SAAB Receives Order from EDA for Carl-Gustaf Ammunition 4. First China Airlines A350XWB takes shape in Airbus’ Final Assembly Line 5. Rheinmetall creates Europe’s leading producer of military vehicles © Epicos Informational Services Page 1 Epicos 2016 Special Focus: Finland Finland: Future Defence Budget and Procurements Finnish defence budget for 2016 is estimated to reach, according to the country’s authorities, 2886.3 million Euros, significantly augmented (227.5) compared to the 2015 defence budget. This is mainly a result of postponing the payment schedules of some earlier materiel projects. From this amount the biggest percentage, will be used to cover the payroll of the defence forces’ personnel, accounting for 783.5 million Euros (approximately 27.1% of the country’s defence budget), slightly decreased compared to 2015, when it reached 793.4 accounting for 29.8% of total defence budget. Operational expenses and procurement of materiel follow with 701.6 (accounting for 24.3% of the total budget) and 544.7 million (accounting for 18.9% of the total budget) respectively.
    [Show full text]
  • 2014-03-22 SES ASTRA 5B Launch Success-E
    Press release SES: ASTRA 5B SATELLITE LAUNCH SUCCESS ON ARIANE 5 ASTRA 5B will offer state-of-the-art capacity for CEE, Russia and CIS from 31.5 degrees East/ Satellite also carries SES’s second EGNOS hosted payload for the European Commission Luxembourg, 22 March 2014 – SES S.A. (NYSE Euronext Paris and Luxembourg Stock Exchange: SESG) announces that the ASTRA 5B satellite was successfully orbited by an Ariane 5 rocket from the European spaceport in Kourou, French Guyana, at 19:05 local time on March 21 st , 2014 (23:05 CET; 18.05 EDT). ASTRA 5B was built by Airbus Defence and Space Systems in Toulouse, France, based on the highly reliable Eurostar E3000 platform. The satellite will be located at the orbital position of 31.5 degrees East and is equipped with 40 Ku-band transponders (36 MHz equivalent) as well as 6 Ka- band transponders. ASTRA 5B will extend SES’s transponder capacity and geographical reach over Central and Eastern Europe, Russia and the Commonwealth of Independent States for DTH, direct-to-cable and contribution feeds to digital terrestrial television networks. The spacecraft also carries the second SES hosted L-band payload for the European Commission’s European Geostationary Navigation Overlay Service (EGNOS). EGNOS helps to verify, improve and report on the reliability and accuracy of positioning signals in Europe. ASTRA 5B had a launch mass of 5724 kilograms, and will have a wingspan of 40m once its solar arrays are deployed in orbit, and a spacecraft power of 13kW at the end of its 15-year design lifetime.
    [Show full text]