05172018175714BARSUA Sail.Pdf
Total Page:16
File Type:pdf, Size:1020Kb
INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bhubaneshwar regional office Mine file No : ORI/IRON/SNG/MCDR-1/BBS Mine code : 30ORI13001 (i) Name of the Inspecting : RAM( ) RAMKISHAN R Officer and ID No. (ii) Designation : Sr. Asst. Contrl. Mines (iii) Accompaning mine : Shri B K Soren, Mine Manager, Shri P P Dev, AGM (Geo Official with Designation (iv) Date of Inspection : 09/01/2018 (v) Prev.inspection date : 15/10/2015 PART-I : GENERAL INFORMATION 1. (a) Mine Name : BARSUA (b) Registration NO. : (c) Category : A Mechanised (d) Type of Working : Opencast (e) Postal address State : ORISSA District : SUNDARGARH Village : BARSUA Taluka : BONAI Post office : TENSA Pin Code : 770042 FAX No. : 06625-236031 E-mail : [email protected] Phone : 06625-236026 (f) Police Station : Lahunipara (g) First opening date : 06/01/1960 (h) Weekly day of rest : SUN 2. Address for : BARSUA IRON MINE OF SAIL correspondance AT/PO-BARSUA DIST-SUNDERGARH 3. (a) Lease Number : ORI0155 (b) Lease area : 77.94 (c) Period of lease : (d) Date of Expiry : 31/03/2020 4. Mineral worked : IRON ORE Main PAGE : 2 5. Name and Address of the Lessee : STEEL AUTHORITY OF INDIA LIMITED PURNAPANI LIMESTONE MINE SUNDERGARH DISTRICT -770 ORISSA SUNDARGARH ORISSA Phone:0661-728121 FAX : Owner : SHRI KALYAN MAITY ISPAT BHAWAN, LODHI ROAD M/S SAIL LTD, NEW DELHI SUNDARGARH ORISSA Phone: FAX : Agent : SHRI A K PAL TENSA SUNDARGARH ODISHA SUNDARGARH ORISSA Phone: FAX : Mining Engineer Name : SHRI S K KHANDE,Full Time Qualification : B E (MINING) Appointment/ : 08/07/2016 Termination date Geologist Name : SHRI R P MONDAL,Full Time Qualification : MSC ( GEOLOGY) Appointment/ : 08/07/2016 Termination date Manager Name : SHRI B K SOREN Qualification : BSC (MINING) Appointment/ : 01/06/2016 Termination date 6. Date of approval of Mining : Mining Scheme rule 12 MCDR1988 22/02/2002 Plan/Scheme of Mining Mining Scheme rule 12 MCDR1988 04/10/2007 Renewal under rule 24 MCR1960 28/07/2008 Mining Scheme rule 12 MCDR1988 04/09/2015 PAGE : 3 PART - II : OBSERVATION/COMMENTS OF INSPECTING OFFICERS Exploration : Sl.No. Item Proposals Actual work Remarks 1a Backlog of No such drilling of 16 nos of Almost as per previous year specific boreholes carried out proposal. proposal in during the year 2016-17. the pproved document however 17 nos of boreholes proposed for the year 2016-17 1b Exploration over No such drilling of 16 nos of Almost as per lease area for specific boreholes carried out proposal. geological axis 1 proposal in during the year 2016-17. or 2 the pproved document however 17 nos of boreholes proposed for the year 2016-17 1c Exploration No such carried out by MECL and Nil Agencies and proposal. cost inccured was 117 Expenditure in lakh. lakh rupees during the year 1d Balance area to No such 370.427 ha needs to be Nil be explored to proposal in explored to brought bring Geological the approved under G1/G2 level. axis in 1 or 2 document. 1e Balance reserve As per the due to addition and Nil as on 01/04/20 approved depletion over the document on period, the iron ore 04.09.2015 reserves are 64.57 the iron ore million tonnes and reserves are resources are 87.44 64.57 million million tonnes as on tonnes and 01.04.2017. resources are 87.44 million tonnes. 1f General remarks No comments exploration proposal Nil of inspecting to offer. given approved document officers on for exploration to geology, brought remaining area exploration etc under G1/G2 level. PAGE : 4 Development : Sl.No. Item Propasals Actual work Remarks 2a Location of development is development is carried due to non development proposed in out in area-3 only by availability of w.r.t.lease area area-3 and removing OB/waste only. Forest clearance area-5 for the of adjoining lease year 2016-17. (ML-162) in which processing is carried out, mine could not be developed as proposed in the mining plan. 2b Separate benches no top soil no top soil is generated Nil. in topsoil, generation is and seperate benches in overburden and proposed and OB/waste and mineral are minerals (Rule seperate maintained with bench 15) benches in height of 10 m. OB/waste and mineral are proposed with bench height of 10 m. 2c Stripping ratio 1:0.00 t:cu.m. No production of iron due to non or ore to OB for the year ore carried out during availability of ratio 2016-17. the year 2016-17. Forest clearance of adjoining lease (ML-162) in which processing is carried out, mine not produced any mineral during the year 2016-17. 2d Quantity of No proposal Not generated. Nil. topsoil for the year generation in m3 2016-17. PAGE : 5 2e Quantity of Nil for the 0.5 million cu.m. due to non overburden year 2016-17. availability of generation in m3 Forest clearance of adjoining lease (ML-162) in which processing is carried out, mine could not be developed as proposed in the mining plan. violation issued letter no: ORI/IRON/SNG/MCDR- 1/BBS/VOL-II/2518 dated 12/01/2018. 2f General remarks The due to non availability Nil of inspecting development of of Forest clearance of officers on the mine is adjoining lease (ML-162) development of not carried in which processing is pit w.r.t. type out as per carried out, mine could of deposit etc approved not be developed as document for proposed in the mining the year 2016- plan. 17. Exploitation: Sl.No. Item Propasals Actual work Remarks 3a Number of pit 2 pits, Area-3 only Devlopment work due to non proposed for and Area-5 for carried out in Area-3. availability of production the year 2016- Forest clearance 17. of adjoining lease (ML-162) in which processing is carried out, mine could not produced iro ore. 3b Quantity of ROM 4.98 Million Nil due to non mineral tonnes for the availability of production year 2016-17. Forest clearance proposed of adjoining lease (ML-162) in which processing is carried out, mine could not produced iron ore. PAGE : 6 3c Recovery of 67% Nil Nil sailable/usable mineral from ROM production 3d Quantity of No proposal. Nil Nil mineral reject generation 3e Grade of mineral No proposal. Nil Nil rejects generation and threshold value declared. 3f Quantity of sub 1.68 million 0.81 million tonnes. Nil grade mineral tonnes for the generation. eyar 2016-17. 3g Grade of sub +45-57%Fe +45-57%Fe Nil grade mineral generation 3h Manual / Mechanised Mechanised. Nil Mechanised method adopted for segregating from ROM 3i Any analysis or Slime Not carried out. due to non beneficiation benfeficiation availability of study proposed proposed. Forest clearance and carried out of adjoining lease for sub grade (ML-162) in which mineral and processing is rejects. carried out. 3j Provision of drill machine: drill machine: 150 mm, Nil drilling and 150 mm, class- class-II,III with NONEL blasting in II,III with initiation for blasting mineral benches NONEL are proposed. initiation for blasting are proposed. 3k Provision of excvation is excvation is carried out Nil mining proposed by by excvators and machineries in excvators and dumpers, excvator: 7.5 mineral benches dumpers, cu.m. truck: 100 tonnes excvator: 7.5 cu.m. truck: 100 tonnes PAGE : 7 3l Whether height height of height of bench proposed Nil of benches in bench proposed is 10 m and suitable. overburden and is 10 m and mineral suitable suitable. for method of mining proposed in MP/SOM 3m Total area 177.8 ha at 169.28 ha. Nil covered under the end of excavation/pits plan period 2019-20. 3n Ore to OB ratio 1:0 t.cu.m. Nil due to non for the pit/mine for the year availability of during the year. 2016-17. Forest clearance of adjoining lease (ML-162) in which processing is carried out, mine could not be produced iron ore. 3o Total area put Total area: Total area: 311.1 ha at in use under 319.62 ha at the end of 2016-17, different heads the end of excavation: 169.28 ha, at the end of plan period sub grade stack: 68.71 year 2019-20, ha, roads&infra: 23.67 excavation: ha, green belt: 49.44 177.8 ha, sub ha. grade stack: 68.71 ha, roads&infra: 23.67 ha, green belt: 49.44 ha. 3p Production of 2012-13: 2.5 2012-13: 2.28 million due to non ROM mineral million tonnes tonnes of iron ore availability of during the last of iron ore 2013-14: 1.91 mi.t. Forest clearance five year period 2013-14: 2.5 2014-15: 0.27 mi.t. of adjoining lease as applicable mi.t. 2015-16: Nil (ML-162) in which 2014-15: 2.5 2016-17: Nil processing is mi.t. carried out, mine 2015-16: 5.99 could not produced mi.t. iron ore from 2016-17: 4.97 2015-16 to 2016- mi.t. 17. PAGE : 8 3q General remarks Mine should be only development work Nil of inspecting developed and carried out by not officers on produce iron producing the iron ore. method of mining ore as per etc. mining plan. the development work should not be carried out till getting of the FC. Solid Waste Management - Dumping: Sl.No. Item Propasals Actual work Remarks 4a Separate dumping No proposal OB/waste, sub grade violation issued of topsoil, OB for generation mineral generated are letter no: and mineral of top soil, mixed and dumed over ORI/IRON/SNG/MCDR- rejects (Rule OB/waste only subgrade dump.