Liss £340,000

Total Page:16

File Type:pdf, Size:1020Kb

Liss £340,000 LISS Guide Price £340,000 Liss Guide Price £340,000 Flat 3, Little Stodham House, Liss, HAMPSHIRE. GU32 3PL A rare opportunity to acquire a large, period, three bedroom apartment in a Georgian country residence DESCRIPTION LOCATION A rare opportunity to acquire a large, period, three bedroom, apartment in a Liss (previously spelt Lys or Lyss) is a village and civil parish in the East Georgian country residence. Originally dating back to the 1800's the apartment is Hampshire district of Hampshire, England. It is 3.3 miles (5.3 km) northeast of located on the 2nd floors of this imposing house and retains many of the original Petersfield, on the A3 road, on the Hampshire/West Sussex border. Liss has its features. Little Stodham House is set in eight acres of delightful grounds and own railway station, on the Portsmouth Direct Line. The village lies in the East comes complete with garage and visitors parking and paddock. The chain free Hampshire Area of Outstanding Natural Beauty. The parish consists of 3,567 property has a fitted kitchen with breakfast bar, three double bedrooms, bathroom acres (14 km²) of semi-rural countryside, and is one of the largest in the region. and separate w/c. One of the main selling points for the flat is the stunning 22’ The earliest written mention of Liss (or Lyss as it was known then) may be that reception room with duel aspect windows overlooking amazing gardens. There is found in the Domesday Book. The village comprises of an old village at West also a Basement storage area accessed from communal entrance hall giving Liss and the modern village, which congregated around the 19th-century personal log/coal storage cupboard and communal boiler house. Southern Railway station, which is largely Victorian and later. The River Rother formed the boundary between West and East Liss. West Liss contains Grounds most of the historical and architectural interest. Suburbs later spread out toward Liss Forest. Extensive parkland gardens with large areas of sweeping lawns, banks of rhododendron, mature Canadian redwood trees and shrubs, and in spring time there are carpets of snowdrops, daffodils and crocuses. There is a resident parking area and an allocated garage. A meandering stream and peaceful seating areas helps to provide an atmosphere of tranquility and relaxation. SERVICES Mains Electricity, Mains Water. DIRECTIONS From Petersfield take the A3 northbound leaving at the Flexcombe Junction. Cross back over the A3 and take the first right (signposted to the garden centre). Little Stodham House will be found on the left hand side just before the entrance to Hilliers Garden Centre LOCAL AUTHORITY East Hampshire District Council, Penns Place. 01730 266551 TENURE Leasehold VIEWING Strictly by confirmed appointment with the Agents Office Hours Mon - Fri 8:30am – :6:30pm Saturday 9am – 4pm AGENTS NOTES Little Stodham House All dimensions are approximate and quoted for guidance only. Reference to appliances and/or services does not imply they are necessarily in working order or fit for the purpose. Buyers are advised to obtain verification from their solicitors as to the Freehold/ Leasehold status of the property and any fixtures and fittings. These particulars do not constitute or form part of an offer or contract nor may they be regarded are presentations. Approximate internal area 1599sqft /148 sqm All interested parties must themselves verify their accuracy. K173 Printed by Ravensworth 01670 713330 Keats 2 Swan Street, Petersfield, Hampshire GU32 3AD tel: 01730 262826 fax: 01730 231222 email: [email protected] www.keats.biz .
Recommended publications
  • The London Gazette, Issue 51493, Page 11268
    11268 THE LONDON GAZETTE, ?TH OCTOBER 1988 (a) to improve, raise, lower or otherwise alter highways, route, shall send to the Secretary of State for Transport at his South (b) to stop up highways, East Regional Office, Federated House, London Road, Dorking, (c) to construct new highways, Surrey RH4 1SZ not later than 17th October 1988 sufficient (d) to stop up private means of access to premises, information about the alternative route or the route of the new (e) to provide a new means of access to premises, highway, as the case may be, to enable it to be identified. Failure to comply with this Direction will entitle the Secretaries of State and all on or in the vicinity of the route of the new trunk road between the person holding the Inquiries to disregard so much of any Ham Barn and Petersfield, and provide for the transfer of those new objection as consists of such submission. Any person who has highways to the County Council of Hampshire as from the date on already submitted an alternative route to the Department is deemed which he notifies the Council that those new highways have been to have complied with this Direction and need not re-submit their completed and opened for through traffic. alternative. (7) The London-Portsmouth Trunk Road A3 (Liphook- E. W. A. Smith, a Principal for Regional Director South East Flexcombe Section) Compulsory Purchase Order (No. SE ), 19 , Region, Departments of the Environment and Transport. notice of which was published on 27th July 1988. This is an Order (Ref.
    [Show full text]
  • (Liss Abbas & Liss Turney [Burgates]) 1.0 PARISH Liss 2.0 HUNDRED
    Liss Abbas & Liss Turney (Burgates) Liss (Liss Abbas & Liss Turney [Burgates]) 1.0 PARISH Liss 2.0 HUNDRED Liss (Abbas): Meonstoke (until 1831, then Finchdean) Liss (Turney): Odiham 3.0 NGR Liss (Abbas): 477500 128400 Liss (Turney): 477500 127900 4.0 GEOLOGY Liss / Burgates Folkstone Beds. 5.0 SITE CONTEXT (Maps 2 & 3) The present ‘town’ of Liss has been sub-divided into ‘East’ and ‘West’ Liss. However, these sub-divisions appertain to Modern development east and west of the railway; they have no relevance to the medieval manor estates of Liss Abbas and Liss Turney. These manors are associated with settlement areas that lie north-north-west of Liss station by 1.4km and 1.2km respectively. 5.1 Liss Abbas is represented by the site of Lyss Place (c. 70m AOD). It is the site of post-Conquest medieval fishponds and the remains of a monastic grange of St Mary’s, Winchester. 5.2 Liss Turney is less easy to identify than Liss Abbas. The best indicators of the manorial centre are the Church of St Peter at Burgates (Farm) and the area now known as Upper Green, but called Liss Green on the Tithe Map of 1840. In reality, the manor of Liss Turney is unlikely to have had a clear-cut geographical boundary. In this survey it is used a term of convenience for the settlement area that includes Burgates Farm, The Plestor, and Upper Green. This group is sometimes known as West Liss but this is a vague term of relatively recent origin. 6.0 PLAN TYPE & DESCRIPTION (Maps 4 / 1, 4 / 2, 5 / 1, 5 / 2, 6 / 1 & 6 / 2) 6.1.1 Liss Abbas: monastic grange Lyss Place is now a single farmstead and as such it would not normally fall within the scope of this survey.
    [Show full text]
  • Affordable Housing Viability Assessment
    Local Plan and Affordable Housing Viability Assessment Prepared for South Downs National Park Authority August 2017 Contents 1 Introduction 3 2 Market and policy background 4 3 Policy and development context 10 4 Methodology and viability principles 15 5 Appraisal assumptions 20 6 Appraisal outputs 33 7 Assessment of the results 34 8 Conclusions 44 Appendices Appendix 1 - Policy analysis Appendix 2 - Transaction data Appendix 3 - LHAs and Affordable rent values Appendix 4 - BCIS Appendix 5 - Results Appendix 6 - Sample appraisal Appendix 7 - Typology details and appraisal inputs Anthony Lee MRTPI MRICS Senior Director – Development Consulting BNP Paribas Real Estate 5 Aldermanbury Square London EC2V 7BP 020 7338 4061 07919 693 406 [email protected] realestate.bnpparibas.com 2 1 Introduction 1.1 South Downs National Park Authority (‘the Authority’) commissioned this study to contribute towards an existing evidence base to inform the production of its comprehensive Local Plan (‘the South Downs Local Plan’). The Local Plan will primarily seek to uphold the statutory purposes of the National Park (to preserve and enhance its natural beauty and landscape; and promoting the Park as a visitors’ destination and as a ‘green lung’ for the south east region). The Authority seeks to balance the needs of the National Park with its other statutory duty of promoting sustainable and vibrant communities, including the need to increase the provision of affordable housing to meet local needs. 1.2 The aim of the study is to assess at the viability of certain development typologies that are representative of the types of sites that are identified in the emerging Local Plan.
    [Show full text]
  • ANDLERS WOOD LISS CALA HOMES BUILT for YOUR NEXT CHAPTER 4 Local Area Photography Stock Photography
    CALA HO ME S ANDLERS WOOD LISS CALA HOMES BUILT FOR YOUR NEXT CHAPTER 4 Local area photography Stock photography ANDLERS WOOD YOUR IDYLLIC RURAL RETREAT A characterful selection of 3, 4 and 5 bedroom homes, Andlers Wood is situated in the picturesque village of Liss in the South Downs National Park. Light, spacious and finished to a high specification, these semi-detached and detached homes are designed for contemporary family living, with convenient amenities and commuter links close by. Artist’s impression of Andlers Wood Local area photography 6 Photography from a previous CALA development Photography from a previous CALA development BUYING NEW IS BETTER WITH CALA CALA PEACE OF MIND A 10-year NHBC Buildmark Warranty, 24-hour response service for emergency calls and after-sales service for two years following all purchases. MOVE CHAIN-FREE Our 100% Part Exchange* service frees you from being in a chain. For more information and to use our part exchange calculator to see what you could save, visit cala.co.uk/part-exchange MORE CHOICE With a selection of kitchens and bathrooms, you can choose the cabinets, tiles and floorings to suit you. Choices are subject to build stage. A VIBRANT NEW COMMUNITY Many residents of new developments find that they quickly become part of an inclusive community of like-minded people. LESS MAINTENANCE A new build home requires lower maintenance compared to an old house, saving you time and money. THE BEST OF BOTH CALA homes balance modern contemporary design with traditional architecture to enhance their characterful surroundings. ENERGY EFFICIENT Enjoy reduced gas and electricity bills and a better insulated, more energy efficient home, compared to a Victorian home with some modern updates.** SAFE AS HOUSES Built with safety in mind, our homes comply with the latest Health and Safety standards, including modern consumer units and ample, well positioned sockets, multi-point locks and Photography from a previous CALA development mains powered smoke alarms.
    [Show full text]
  • Strategic Corridor Evidence Base
    Transport Strategy for the South East ___ Strategic Corridor Evidence Base Client: Transport for the South East 10 December 2019 Our ref: 234337 Contents Page 4 Introduction 4 Definitions 5 Sources and Presentation 6 Strategic Corridor maps Appendices SE South East Radial Corridors SC South Central Radial Corridors SW South West Radial Corridors IO Inner Orbital Corridors OO Outer Orbital Corridors 3 | 10 December 2019 Strategic Corridor Evidence Base Introduction Introduction Definitions Table 1 | Strategic Corridor definitions 1 This document presents the evidence base 5 There are 23 Strategic Corridors in South East Area Ref Corridor Name M2/A2/Chatham Main Line underpinning the case for investment in the South England. These corridors were identified by SE1 (Dartford – Dover) East’s Strategic Corridors. It has been prepared for Transport for the South East, its Constituent A299/Chatham Main Line SE2 Transport for the South East (TfSE) – the emerging Authorities, and other stakeholders involved in the South (Faversham – Ramsgate) East M20/A20/High Speed 1/South Eastern Main Line SE3 Sub-National Transport Body for South East England development of the Economic Connectivity Review. (Dover – Sidcup) A21/Hastings Line – in support of its development of a Transport Since this review was published, the corridors have SE5 (Hastings – Sevenoaks) A22/A264/Oxted Line Strategy for South East England. been grouped into five areas. Some of the definitions SC1 (Crawley – Eastbourne) and names of some corridors cited in the Economic South M23/A23/Brighton
    [Show full text]
  • Transforming the Countryside the Electrification of Rural Britain 1St Edition Pdf, Epub, Ebook
    TRANSFORMING THE COUNTRYSIDE THE ELECTRIFICATION OF RURAL BRITAIN 1ST EDITION PDF, EPUB, EBOOK Paul Brassley | 9781472441270 | | | | | Transforming the Countryside The Electrification of Rural Britain 1st edition PDF Book New other. By , two-thirds of rural dwellings had been connected to a centrally generated supply, but the majority of farms in Britain were not linked to the mains until sometime between and Converted from 6. The Independent. The system was converted to third rail in see below. By using our services, you agree that we may use cookies. Retrieved 19 May Advertisement Hide. The Cumbernauld Line to Springburn and the remaining section of the Motherwell to Cumbernauld Line was electrified in mid See all articles in The revolution of electricity. Archived from the original on 27 August British Railways chose this as the national standard for future electrification projects outside of the third rail area in Dublin: Stationery office. In , the government's preferred option was to use diesel trains running on biodiesel , its White Paper Delivering a Sustainable Railway , [6] ruling out large-scale railway electrification for the following five years. In the s, the lines to Chingford, Enfield Town and Cheshunt were electrified at 6. Deposit Details. About this product Product Information It is now almost impossible to conceive of life in western Europe, either in the towns or the countryside, without a reliable mains electricity supply. Item Type: Book. Rail transport in Scotland is a devolved matter for the Scottish Government but they too have pursued electrification with multiple schemes in the Central Belt. During the early s, the whole of this line was converted to 6.
    [Show full text]
  • HAMPSHIRE Two Buildings on the Isle of Wight Are Included Below the Table for Hampshire
    Tree ring dated buildings © VAG 2021 INDEX OF TREE-RING DATED BUILDINGS IN ENGLAND COUNTY LIST approximately in chronological order, revised to VA51 (2020). © Vernacular Architecture Group 2021 These files may be copied for personal use, but should not be published or further distributed without written permission from the Vernacular Architecture Group. Always access these tables via the VAG website. Unauthorised copies released without prior consent on search engines may be out of date and unreliable. Since 2016 a very small number of construction date ranges from historical sources have been added. These entries are entirely in italics. Before using the index you are recommended to read or print the introduction and guidance, which includes a key to the abbreviations used on the tables HAMPSHIRE Two buildings on the Isle of Wight are included below the table for Hampshire. County – Felling date Placename Address VA ref Description / keywords NGR Historic range HE ref and later Other refs Hamps 1244 -1249 Hambledon Manor Farm 30.106 Oxf Bishop’s house. Stone. This date is for floor joists, but they might not be in a primary SU 646151 context. Also see 1473 -78. Hamps 1248 + Bentworth Hall Place 39.135 Oxf Aisled hall. Date from arcade plate in hall range was1248 +, but primary timbers in SU 663399 porch dated 1295 -1327 (qv) Hamps 1249 1250 Wherwell The Old Stables, 27.99 Oxf Guest hall or infirmary. Raised aisle roof 8.23m wide. Mortice & tenoned straight arch- SU 392406 Wherwell Priory (1) braces up to tiebeam and arcade braces; passing braces, notched lap joints, ashlar pieces? (not shown in Fig 1.8 in Roberts), splayed and tabled scarf.
    [Show full text]
  • Update Report Apr-Jun 2010
    UPDATE REPORT OF PLANNING CONSULTATIONS RECEIVED BY THE SOUTH DOWNS NATIONAL PARK AUTHORITY to 30/06/2010 Adur Application Recvd Location Details of application Authority C/D Right Right LPA Contrary to Reference response retained used Decision NPA view? ADC/0185/10 02/06/2010 Erringham Farm Mill Hill One agricultural worker's dwelling (house No. 2 to Object - question Delegate No No Pending Shoreham West Sussex the east) (outline with access details) need for two dwellings on-site Arun Application Recvd Location Details of application Authority C/D Right Right LPA Contrary to Reference response retained used Decision NPA view? FN/27/10 24/05/2010 Land at Junction of Beech Amendments to planning permission FN/48/07 Object - would result Delegate No No Refused No Road with Elm Rise, Findon substitution of single garage with double garage and in the loss of a tree re-siting. Alterations to proposed driveway. to be retained or prevent its replacement Brighton & Hove Application Recvd Location Details of application Authority C/D Right Right LPA Contrary to Reference response retained used Decision NPA view? BH2010/01454 07/06/2010 Woodingdean Business Park, Erection of industrial and storage buildings with No objection - Delegate No No Permitted No Bexhill Road, Adjacent to associated offices and a wind turbine together with impact on Park of Falmer Road, Woodingdean, provision for access, servicing parking and both building and Brighton landscaping. turbine acceptable BH2010/00625 04/05/2010 Plot of land to 2, Longhill Application to extend time limit for implementation of Object - allowed Delegate No No Pending Road, Brighton previous approval APP/Q1445/A/06/2031544 for the previously on construction of a two storey detached house with appeal, but National new access from Longhill Road.
    [Show full text]
  • Proposed Submission East Hampshire District Local Plan: Housing and Employment Allocations
    Proposed Submission East Hampshire District Local Plan: Housing and Employment Allocations April 2015 Contents 1. Introduction ...............................................................................3 What is this about?........................................................................................................ 3 What is the Housing and Employment Allocations Plan? .............................................. 4 How is this linked to Neighbourhood Planning .............................................................. 7 What should I look at?................................................................................................... 7 How can I get involved? ................................................................................................ 8 What happens next? ..................................................................................................... 8 The East Hampshire Context ........................................................................................ 9 2. Proposals for Settlements ...................................................... 12 3. Alton (Neighbourhood Plan to allocate housing sites) ......... 13 EMP1 Land at Lynch Hill ......................................................................................... 14 EMP2 Land at Wilsom Road ................................................................................... 16 4. Horndean ................................................................................. 19 HN1 Land East of Horndean .................................................................................
    [Show full text]
  • PORTSMOUTH) BRANCH on WOKING STATION Iain Wakeford 2014
    THE IMPACT OF THE GUILDFORD (& PORTSMOUTH) BRANCH ON WOKING STATION Iain Wakeford 2014 William Prosser’s Patent Principle was to use normal wooden wheels and rails, but have guide wheels at 45º to hold the carriages on the tracks. ven before the railway was opened to On the 29th December 1843 the London & the agreement the Guildford Junction Railway Woking Common there were plans to South Western decided to support the new line, were to complete the line by the 1st May 1845 E build a branch line to Guildford. In March but only on the condition that Prosser's system using iron rails instead of wood, with 1838 the London & Southampton Railway put was dropped. The Guildford Junction Railway earthworks and bridges wide enough for forward plans for a five and a half mile line, Act was passed on the 10th May 1844 and on doubling. The line was to terminate in a field which was revised in 1840 to include an the 27th September they agreed to sell out to owned by the Earl of Onslow, just to the north of extension to Farnham Road, Guildford. The the London & South Western for £75,000. By the Guildford to Farnham turnpike road. When scheme involved a completely level track, with the line was opened five days late, on the 5th a huge embankment 42 feet above the Hoe May 1845, Woking became an important Stream at Mayford. This was abandoned and in railway junction and to cope the station was 1843 a new company, announced plans to partially rebuilt.
    [Show full text]
  • Portsmouth Mainline and Island Line
    PORTSMOUTH MAINLINE AND ISLAND LINE On 19 May 2019, South Western Railway will be introducing changes to its timetable, adding over 300 train services per week across the network. Many of these service enhancements are based on consultations that were undertaken with stakeholders. We are very pleased to see these improvements come to fruition. The highlights for the Portsmouth direct line are: • Additional peak hour services on the Portsmouth direct line • Additional services between Waterloo and Hedge End, Botley, Fareham • Additional late evening weekday services to / from Waterloo and Haslemere / Portsmouth • Additional Sunday afternoon fast Waterloo – Portsmouth and Southsea services in both directions (routed via Cobham) • Doubling of the frequency of services at Godalming • New Farnham to Guildford service • The Island Line summer Sunday service of two trains per hour will continue throughout the winter • The detailed changes to the Portsmouth direct and Island Line services have been grouped below as follows: • New, extended or reduced services • Changes to stopping patterns (some of these are incorporated in 1. above) New Extended or Reduced Services Mondays to Fridays Additional AM peak services • 05.12 Portsmouth Harbour to Waterloo (06.51) additional service calling at Portsmouth & Southsea (05.17), Fratton (05.21), Havant (05.30), Petersfield (05.44), Haslemere (05.57), Godalming (06.07), Guildford (06.15), Worplesdon (06.20), Woking (06.27) • 05.45 Waterloo to Portsmouth Harbour (07.51) additional service calling at Clapham
    [Show full text]
  • Liss Neighbourhood Development Plan
    FOREWORD Two years ago, Liss Parish Council decided that the village should have a Neighbourhood Development Plan. A dedicated team of volunteers has now produced this Plan for the Parish Council. The Plan provides a vision and objectives for the future of Liss, followed by planning policies and development briefs for our preferred green field sites for new housing to be built over the next twelve years. Careful thought has also been given to the village’s infrastructure, community facilities, and the environment. There has been a concerted drive to consult all who live in Liss and to involve the community through public forums and exhibitions. The Plan reflects, as far as it can, the aspirations and concerns of the villagers, and I consider that it provides the best template for our future within the South Downs National Park. After the National Park’s scrutiny and an independent examination, there will be a referendum in the village in 2017. A positive outcome, requiring a 50% vote in favour of the Plan, will mean that it binds developers legally to the Plan’s development proposals. I particularly thank all who have contributed to the Plan’s production. It has been a major undertaking which should allow our village to develop in a positive direction. Vice Admiral Sir John Dunt KCB BSc CEng FIET Chairman, Liss Village Neighbourhood Development Plan Steering Group The Neighbourhood Plan group, through the leadership of Sir John Dunt, and the determination of the project manager Roger Hargreaves, have worked diligently to develop this plan. Following the extensive public consultation carried out by the group, I believe the plan reflects the will of the community and balances the need for new housing with maintaining the unique character and landscape of our ‘hidden village’.
    [Show full text]