FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act
Total Page:16
File Type:pdf, Size:1020Kb
FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office Region IV-A 2,341 projects 47,975,175,000 Batangas 1st District Engineering Office 154 projects 1,818,944,000 BATANGAS (FIRST) 154 projects 1,818,944,000 OO1: Ensure Safe and Reliable National Road System 27 projects 1,000,297,000 Asset Preservation - Preventive Maintenance - Secondary Roads 143,550,000 1. P00400846LZ 310102100381000 60,594,000 Palico-Balayan-Batangas Rd - K0123 + 000 - K0124 + 500 P00400846LZ-CW1 Preventive Maintenance of Road: Preventive Lane Km 6.000 58,473,210 Central Office / Asphalt Overlay - along Maintenance of Batangas 1st Palico-Balayan-Batangas Rd Road: Asphalt District (S01854LZ) K0123 + 000 - K0124 + Overlay Engineering Office 500 P00400846LZ-EAO 2,120,790 Central Office / Batangas 1st District Engineering Office 2. P00400847LZ 310102100472000 52,181,000 Tagaytay-Nasugbu Rd - K0090 + 000 - K0091 + 268 P00400847LZ-CW1 Preventive Maintenance of Road: Preventive Lane Km 5.076 51,137,380 Batangas 1st Asphalt Overlay - along Maintenance of District Tagaytay-Nasugbu Rd (S05790LZ) Road: Asphalt Engineering Office K0090 + 000 - K0091 + 268 Overlay / Batangas 1st District Engineering Office P00400847LZ-EAO 1,043,620 Batangas 1st District Engineering Office / Batangas 1st District Engineering Office 3. P00400848LZ 310102100473000 30,775,000 Tagaytay-Nasugbu Rd - K0091 + 319 - K0092 + 000 P00400848LZ-CW1 Preventive Maintenance of Road: Preventive Lane Km 2.736 30,159,500 Batangas 1st Asphalt Overlay - along Maintenance of District Tagaytay-Nasugbu Rd (S05790LZ) Road: Asphalt Engineering Office K0091 + 319 - K0092 + 000 Overlay / Batangas 1st District Engineering Office P00400848LZ-EAO 615,500 Batangas 1st District Engineering Office / Batangas 1st District Engineering Office MYPS: 03/03/2020 02:21:52 pm Page 1 of 718 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office Asset Preservation - Preventive Maintenance - Tertiary Roads 86,604,000 4. P00400843LZ 310103100511000 39,476,000 Lemery-Taal Diversion Rd - K0128 + (-800) - K0128 + (-306), K0128 + (-269.4) - K0128 + 179 P00400843LZ-CW1 Preventive Maintenance of Road: Preventive Lane Km 3.770 38,686,480 Batangas 1st Asphalt Overlay - at Specific Maintenance of District Locations along Lemery-Taal Road: Asphalt Engineering Office Diversion Rd (S05019LZ) K0128 + Overlay / Batangas 1st (-800) - K0128 + 179 District Engineering Office P00400843LZ-EAO 789,520 Batangas 1st District Engineering Office / Batangas 1st District Engineering Office 5. P00400844LZ 310103100513000 35,675,000 Talisay-Laurel-Agoncillo Rd - K0122 + (-974) - K0122 + 000 P00400844LZ-CW1 Preventive Maintenance of Road: Preventive Lane Km 3.896 34,961,500 Batangas 1st Asphalt Overlay - along Maintenance of District Talisay-Laurel-Agoncillo Rd Road: Asphalt Engineering Office (S00515LZ) K0122 + (-974) - K0122 Overlay / Batangas 1st + 000 District Engineering Office P00400844LZ-EAO 713,500 Batangas 1st District Engineering Office / Batangas 1st District Engineering Office 6. P00400845LZ 310103100512000 11,453,000 Palico Cadre Rd - K0094 + (-149) - K0094 + 460 P00400845LZ-CW1 Preventive Maintenance of Road: Preventive Lane Km 1.218 11,223,940 Batangas 1st Asphalt Overlay - along Palico Maintenance of District Cadre Rd (S01855LZ) K0094 + Road: Asphalt Engineering Office (-149) - K0094 + 460 Overlay / Batangas 1st District Engineering Office P00400845LZ-EAO 229,060 Batangas 1st District Engineering Office / Batangas 1st District Engineering Office Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope 100,000,000 Collapse, and Landslide - Secondary Roads MYPS: 03/03/2020 02:21:52 pm Page 2 of 718 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office 7. P00400059LZ 310108100309000 100,000,000 Ternate-Nasugbu Rd - K0085 + 288 - K0085 + 433 P00400059LZ-CW1 Construction of Road Slope Construction of Square 5,715.900 96,500,000 Central Office / Protection Structure - along Road Slope meters Batangas 1st Ternate-Nasugbu Rd (S01859LZ) Protection District K0085 + 288 - K0085 + 433 Structure Engineering Office P00400059LZ-EAO 3,500,000 Central Office / Batangas 1st District Engineering Office Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along 12,952,000 National Roads - Secondary Roads 8. P00402544LZ 310111100186000 12,952,000 Palico-Balayan-Batangas Rd - K0131 + 000 - K0131 + 668 P00402544LZ-CW1 Construction of Drainage Structure Construction of Lineal 1,336.000 12,692,960 Batangas 1st along Road - along Drainage meters District Palico-Balayan-Batangas Rd Structure along Engineering Office (S01854LZ) K0131 + 000 - K0131 + Road / Batangas 1st 668 District Engineering Office P00402544LZ-EAO 259,040 Batangas 1st District Engineering Office / Batangas 1st District Engineering Office Network Development - Road Widening - Secondary Roads 409,641,000 9. P00400295LZ 310202100582000 50,000,000 Balayan-Balibago Rd - K0111 + 416 - K0112 + 649 P00400295LZ-CW1 Road Widening - along Road Widening Lane Km 2.462 49,000,000 Batangas 1st Balayan-Balibago Rd (S05016LZ) District K0111 + 416 - K0112 + 649 Engineering Office / Batangas 1st District Engineering Office P00400295LZ-EAO 1,000,000 Batangas 1st District Engineering Office / Batangas 1st District Engineering Office 10. P00400296LZ 310202100583000 42,500,000 Balayan-Balibago Rd - K0116 + 000 - K0117 + 026 MYPS: 03/03/2020 02:21:52 pm Page 3 of 718 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office P00400296LZ-CW1 Road Widening - along Road Widening Lane Km 2.050 41,650,000 Batangas 1st Balayan-Balibago Rd (S05016LZ) District K0116 + 000 - K0117 + 026 Engineering Office / Batangas 1st District Engineering Office P00400296LZ-EAO 850,000 Batangas 1st District Engineering Office / Batangas 1st District Engineering Office 11. P00400297LZ 310202100464000 54,504,000 Nasugbu-Lian-Calatagan Rd - K0111 + 707.5 - K0112 + 344, K0112 + 364 - K0112 + 780 P00400297LZ-CW1 Road Widening - at Specific Road Widening Lane Km 2.101 52,596,360 Central Office / Locations along Batangas 1st Nasugbu-Lian-Calatagan Rd District (S05012LZ) K0111 + 707.5 - K0112 Engineering Office + 780 P00400297LZ-EAO 1,907,640 Central Office / Batangas 1st District Engineering Office 12. P00400298LZ 310202100463000 97,596,000 Nasugbu-Lian-Calatagan Rd - K0100 + 500 - K0101 + 244, K0101 + 268 - K0102 + 000 P00400298LZ-CW1 Road Widening - at Specific Road Widening Lane Km 2.920 94,180,140 Central Office / Locations along Batangas 1st Nasugbu-Lian-Calatagan Rd District (S05012LZ) K0100 + 500 - K0102 + Engineering Office 000 P00400298LZ-EAO 3,415,860 Central Office / Batangas 1st District Engineering Office 13. P00400299LZ 310202100465000 72,056,000 Nasugbu-Lian-Calatagan Rd - K0122 + 000 - K0124 + 746 P00400299LZ-CW1 Road Widening - along Road Widening Lane Km 2.745 69,534,040 Central Office / Nasugbu-Lian-Calatagan Rd Batangas 1st (S05012LZ) K0122 + 000 - K0124 + District 746 Engineering Office P00400299LZ-EAO 2,521,960 Central Office / Batangas 1st District Engineering Office 14. P00400300LZ 310202100471000 63,250,000 Tagaytay-Nasugbu Rd - K0084 + 800 - K0085 + 000, K0099 + 000 - K0100 + 068 MYPS: 03/03/2020 02:21:52 pm Page 4 of 718 IO Report FY 2020 ANNUAL INFRASTRUCTURE PROGRAM Based on General Appropriations Act UACS / Sub Program Project Component Description Type of Work Target Physical Target Amount Operating Unit / Project Component ID Unit (PHP) Implementing Office P00400300LZ-CW1 Road Widening - at Specific Road Widening Lane Km 2.530 61,036,250 Central Office / Locations along Tagaytay-Nasugbu Batangas 1st Rd (S05790LZ) K0084 + 800 - K0100 District + 068 Engineering Office P00400300LZ-EAO 2,213,750 Central Office / Batangas 1st District Engineering Office 15. P00400301LZ 310202100460000 29,735,000 Diokno Highway - K0072 + (-995) - K0072 + (-658), K0073 + 440 - K0073 + 720 P00400301LZ-CW1 Road Widening - at Specific Road Widening Lane Km 1.234 28,694,275 Central Office / Locations along Diokno Highway Region IV-A (S05796LZ) K0072 + (-995) - K0073 + 720 P00400301LZ-EAO 1,040,725 Central Office / Region IV-A Network Development - Construction of Missing Links/ New Roads 120,000,000 16. P00402127LZ 310205100389000 120,000,000 General Aguinaldo-Magallanes-Nasugbu Road (East-West Road), Nasugbu Section, Batangas P00402127LZ-CW1 Construction of Concrete Road - Construction of Lane Km 1.393 19,300,000 Central Office / General Concrete Road Region IV-A Aguinaldo-Magallanes-Nasugbu Road (East-West Road), Nasugbu Section, Batangas P00402127LZ-CW2 Construction of Road Slope Construction of Square 5,511.020 96,500,000 Protection Structure - General Road Slope meters Aguinaldo-Magallanes-Nasugbu Protection Road (East-West Road), Nasugbu Structure Section, Batangas P00402127LZ-EAO 4,200,000 Central Office / Region IV-A Network Development - Off-Carriageway