Item # 6

Ward #1 File: B007/13

Applicant: MOONSEREY MANAGEMENT INC.

Address: 11801 & 11880

Agent: CATERINA FACCIOLO Brattys LLP

Adjournment Status:

Notes: No engineering or planning comments were received at the time agenda was printed. Comments/Conditions:

Commenting Condition of Comment Department Approval Building Standards   Development Planning   Engineering   TRCA   PowerStream   Other – Real Estate   Other – Fire   Other – York Region   Other – Finance   Legend:  - Positive Comment  - Negative Comment

Prepared By: Mark Chiovitti COMMITTEE OF ADJUSTMENT 2141 Major Mackenzie Drive, , , L6A 1T1 Tel [905] 832-8585 Fax [905] 832-8535

NOTICE OF APPLICATION CONSENTS

FILE NUMBER: B007/13

APPLICANT: MOONSEREY MANAGEMENT INC.

PROPERTY: Lot 32333 Concession 3 (Municipally known as 11801 Keele Street & 11880 Dufferin Street, Maple)

ZONING: The subject lands are zoned, ORM, Oak Ridges Moraine Zone and OS5, Open Space Environmental Protection Zone, under By-law 1-88, as amended.

PURPOSE: The purpose of this application is to request the consent of the Committee of Adjustment to convey the parcel of land for the CREATION of a NEW LOT for residential purposes, together with all required easements and right-of-ways, if required, and retain land for residential purposes.

A sketch is attached illustrating the request.

This application will be heard by the Committee of Adjustment on the date and time shown below.

DATE: THURSDAY, APRIL 11, 2013

TIME: 6:00 PM

LOCATION: COMMITTEE ROOM 242/243 (2nd Floor) VAUGHAN CITY HALL 2141 MAJOR MACKENZIE DRIVE VAUGHAN, ONTARIO L6A 1T1

You are invited to attend this public hearing in person to express your views about this application or you may be represented by counsel for that purpose. If you do not attend at the hearing it may proceed in your absence and, except as otherwise provided in the Planning Act, you will not be entitled to any further notice of the proceedings. If you wish to be notified of the decision of the Committee of Adjustment with respect to this application, you must complete the attached “Request for Decision” form and submit it to the Secretary-Treasurer.

Additional information is available from the Committee of Adjustment staff between 8:30 a.m. and 4:30 p.m. Monday to Friday at the Committee of Adjustment, Clerks Department: Tel:(905) 832-8585/Fax: (905) 832-8535. If you wish to make written comments on this application they may be forwarded to the Secretary - Treasurer of the Committee of Adjustment PRIOR TO THE MEETING.

Your comments are collected under the legal authority of the Planning Act, R.S.O. 1990,Chapter c. P.13, as amended. Your comments in respect to this application becomes the property of the City of Vaughan and will become part of the decision making process of the application as noted on this form. Pursuant to Section 27 of the Municipal Freedom of Information and Protection of Privacy Act, R.S.O. 1990, c. M.56, as amended, public feedback to planning proposals is considered to be a public record and may be disclosed to any individual upon request in accordance with Section 27 of the Municipal Freedom of Information and Protection Privacy Act, R.S.O. 1990, c. M.56, as amended. Questions about this collection should be directed to the Secretary-Treasurer, Vaughan Committee of Adjustment, Clerk’s Department, 2141 Major Mackenzie Drive, Vaughan, Ontario; L6A 1T1 (905) 832-8585 x.8332.

DATED THIS 27TH, DAY OF MARCH, 2013. Todd Coles, BES, MCIP, RPP Manager of Development Services and Secretary-Treasurer to Committee of Adjustment

Agenda packages will be available prior to hearing at: http://bit.ly/VaughanCofA

Form 9 Revised March 19, 2013

COMMITTEE OF ADJUSTMENT 2141 Major Mackenzie Drive, Vaughan, ON L6A 1T1 Phone: (905)832-8585 Fax: (905)832-8535

FILE NUMBER: B007/13 APPLICANT: MOONSEREY MANAGEMENT INC. Subject Area Municipally known as 11801 Keele Street & 11880 Dufferin Street

Revised March 19, 2013

RECEIVED March 19, 2013 VAUGHAN COMMITTEE OF ADJUSTMENT

To: Committee of Adjustment From: Susan Okom, Building Standards Department Date: March 19, 2013 Name of Owner: Moonserey Management Inc. Location: Concession 3 Part of Lots 32 and 33 11801 Keele Street and 11880 Dufferin Street File No. B007/13

Zoning Classification:

The subject lands are zoned, ORM, Oak Ridges Moraine Zone and OS5, Open Space Environmental Protection Zone, under By-law 1-88, as amended.

By-Law Requirements:

The conveyed lands have the required lot frontage and have the required lot area.

The retained lands have the required lot frontage and have the required lot area.

Stop Work Orders and Orders to Comply:

None

Building Permits Issued:

Building Permits 09-1377/R1/R2 have been issued for a single family dwelling for 11801 Keele Street.

Building Permits 09-3629/R1/R2 have been issued for a single family dwelling for 11880 Dufferin Street.

Comments:

None

Conditions of Approval:

None

Please note: These comments are based on a review of the documentation supplied with this application. Upon submission of detailed drawings for building/site plan approval, additional variances may be identified.

Chiovitti, Mark

Subject: FW: B007/13 Moonserey Management

From: Liuni, Terry Sent: Wednesday, April 03, 2013 9:07 AM To: Attwala, Pravina; Chiovitti, Mark; Coles, Todd; Providence, Lenore Subject: B007/13 Moonserey Management

Conditions:

3A - Tree Fee 25 - Payment of Taxes - certified cheque

P1 - Payment of Regional Development Charge P2 - Payment of City Development Charge P3 - Payment of Education Development Charge P4 - Payment of Special Area Development Charge

Terry Liuni Development Finance Supervisor ▪ Development Finance and Investments ▪ City of Vaughan ▪ T (905) 832-8585 X8354▪ F (905) 832- 8509

1

Chiovitti, Mark

Subject: FW: Request for Comments B007/13 (Committee of Adjustment City of Vaughan)

From: Caruso, John Sent: Friday, March 22, 2013 9:12 AM To: Chiovitti, Mark Subject: RE: Request for Comments B007/13 (Committee of Adjustment City of Vaughan)

No comments John

1 Chiovitti, Mark

Subject: FW: Consent B007/13

From: Spencer, Robert [mailto:[email protected]] Sent: Friday, March 22, 2013 4:06 PM To: Chiovitti, Mark Cc: Bilkhu, Vick Subject: Consent B007/13

Hi Mark,

The Transportation Services Department has reviewed the applications for consent and has no objections to its approval subject to the following conditions:

1. The application is subject to payment of the development review fee identified in Regional By-law No. A-0380- 2006-049. The owner shall forward a certified cheque or bank draft in the amount of $750.00 payable to "The Regional Municipality of York" to the attention of Vick Bilkhu, Development Approvals Coordinator.

.

1. Prior to final approval of the consent application, Development Approvals shall certify to the Committee of Adjustment that Condition 1has been satisfied.

Regards,

Robert Spencer Transportation and Community Planning 905-895-2744 x5752

1 Date: April 2, 2013 RECEIVED Attention: Mark Chiovitti April 3, 2013 RE: Request for Comments VAUGHAN COMMITTEE File No. B007/13 OF ADJUSTMENT Related Files:

Applicant: Moonserey Management Inc. Location: 11801 Keele St and 11880 Dufferin St, Maple

COMMENTS: (BY E-MAIL ONLY)

We have reviewed the proposed Consent Application and have no comments or objections to its approval.

X We have reviewed the proposed Consent Application and have no objections to its approval, subject to the following comments (attached below).

We have reviewed the proposed Consent Application and have the following concerns (attached below).

PowerStream has received and reviewed the proposed Consent Application. This review, however, does not imply any approval of the project or plan.

All proposed billboards, signs, and other structures associated with the project or plan must maintain minimum clearances to the existing overhead or underground electrical distribution system as specified by the applicable standards, codes and acts referenced.

In the event that construction commences, and the clearance between any component of the work/structure and the adjacent existing overhead and underground electrical distribution system violates the Occupational Health and Safety Act, the customer will be responsible for 100% of the costs associated with PowerStream making the work area safe. All construction work will be required to stop until the safe limits of approach can be established.

In the event construction is completed, and the clearance between the constructed structure and the adjacent existing overhead and underground electrical distribution system violates the any of applicable standards, acts or codes referenced, the customer will be responsible for 100% of PowerStream’s cost for any relocation work.

References:

• Ontario Electrical Safety Code, latest edition (Clearance of Conductors from Buildings) • Ontario Health and Safety Act, latest edition (Construction Protection) • Ontario Building Code, latest edition (Clearance to Buildings) • PowerStream (Construction Standard 03-4), attached • Canadian Standards Association, latest edition (Basic Clearances)

If more information is required, please contact either of the following:

Mr. Barry N. Stephens Mr. Stephen Cranley Commercial & Industrial Services Supervisor Supervisor, Subdivisions & New Services Phone: 905-417-6900 ext. 5920 705-722-7244 ext. 31297 Fax: 905-532-4401 705-722-9040 E-mail: [email protected] [email protected]