Kurnool and Nandyal -Irrigation
Total Page:16
File Type:pdf, Size:1020Kb
Proposed Action plan with action-wise implementing agency, estimated cost and timeline for completion pertaining to Irrigation Circle, Kurnool MI (w) Division Kurnool Proposed Action plan with action-wise implementing agency, estimated cost and timeline for completion pertaining to MI(W) Division, Kurnool Proposed Action Plans will be implemented : Soon after receipt of funds from the Government, the 1 remaining water bodies 289 n o.s Tanks will be taken up for restoration. Implementing agency : Executive Engineer, M.I.W Divsion, Kurnool. Sanctioned Estimate cost : Rs. 2947.20 Lakhs ( 21 water bodies ) Timeline for Completion : 2 Years Existing Proposed Implementing Total sewage Sewage Gap in Sewage Proposed No. sewage agency, Estimated Status of sewage inflow into the Treatment Treatment (in of Treatment treatment cost and Time Management in water body (in 2 Capacity ( in MLD) Facilities capacity lines for the catchment MLD) area MLD) ( in MLD) completion. - - - - - - Existing Implementing Status of Total Industrial Industrial Gap in Industrial Proposed Proposed No. agency, Estimated Industrial Effluent Effluent inflow Effluent Effluent treatment of Treatment cost and Time 3 Management in into the water Treatment Treatment (in capacity ( Facilities lines for the Catchment body (in MLD) Capacity(both MLD) in MLD) completion. area capative and - - - - - - Quantity of No. of Treatment Gap in Proposed Implementing waste and Disposal Treatment No. of agency, Estimated Type of waste generation in Facilities and and Disposal facilities cost and Time Waste the catchment Capacity in the of Waste in and their ( lines for Management in area (TPD) Catchment area the catchment in TPD) completion. 4 the catchment MSW - - - - - area of the water HW - - - - - body BMW - - - - - C&D - - - - - Plastic - - - - - Additional Strengthening of Earthen embankment surrounding to pond or lake (with stone revetment or Measures ( Pl. 5 pitching ). In-situ measures ( like Desilting, de-weeding), Training and Awareness Programme; indicate action- Public Participation for Cleaning of surroundings. wise MI (w) Division Nandyal. Proposed Action plan with action-wise implementing agency, estimated cost and timeline for completion pertaining to MI(W) Division,Nandyal. 1 Proposed Action Plans will be implemented : Soon after receipt of funds from the Government, the remaining water bodies 224 Tanks will be taken up for restoration. Implementing agency : Executive Engineer, M.I.W Divsion,Nandyal Existing Proposed Implementing Total sewage Status of sewage Sewage Gap in Sewage Proposed No. sewage agency, Estimated inflow into the Management in Treatment Treatment (in of Treatment treatment cost and Time 2 water body (in the catchment Capacity ( in MLD) Facilities capacity lines for MLD) area MLD) ( in MLD) completion. - - - - - - Existing Industrial Implementing Status of Total Industrial Effluent Gap in Industrial Proposed Proposed No. agency, Estimated Industrial Effluent Effluent inflow Treatment Effluent treatment of Treatment cost and Time 3 Management in into the water Capacity(both Treatment (in capacity ( Facilities lines for the Catchment body (in MLD) capative and MLD) in MLD) completion. area CETPs) ( in MLD) - - - - - - No. of Treatment Gap in Quantity of Proposed Implementing and Disposal Treatment waste No. of agency, Estimated Facilities and and Disposal Type of waste generation in facilities cost and Time Waste Capacity in the of Waste in the catchment and their ( lines for Management in Catchment area the catchment area (TPD) in TPD) completion. 4 the catchment ( in TPD) area ( in TPD) area of the water body MSW - - - - - HW - - - - - BMW - - - - - C&D - - - - - Plastic - - - - - Additional Strengthinh of Earthen embankment surrounding to pond or lake (with stone revetment or Measures ( Pl. 5 pitching ). In-situ measures ( like Desilting, de-weeding), Training and Awareness Programme; indicate action- Public Participation for Cleaning of surroundings. wise Sd/- P.Sreeramachandra Murty Superintending Engineer,m Irrigation Circle, Kurnool. FORMAT FOR SUBMISSION OF INFORMATION ON PROPOSED ACTION PLANS FOR "RESTORATION OF POLLUTED WATER BODIES (LAKES AND PONDS)" IN COMPLIANCE TO HON'BLE NGT ORDERS DATED 10-05-2019 & 25-02-2020 IN O.A NO. 325/2015 Pertaining to Irrigation Circle Kurnool. MI (w) Division Kurnool S.No Content Name of the State / UT Andhra Pradesh Name of the Name of the 1 State / UT Contact Tel.No Mobile No. E-mail Contact Details Nodal Officer (Department Wise) Department Andhra Pradesh G.Sreenivasulu - 9440907049 [email protected] Status On-going Restoration of water Bodies with Ownership of Identified Water Bodies financial support from NRCD / MoJS/ with own ( Indicate No. of water bodies) resources of the state / UT Type of water Total No. of water Total No. of body bodies identified Total No. of water water Total No. of water Information on water Government Private bodies selected for bodies bodies presently 2 bodies such as Lakes & Restoration restored so under restoration Ponds far Lakes - - - - - Work is in Ponds 310 Government - 21 21 Progress Whether water bodies are geo-tagged provided 3 with Unique Yes Identification Number (UIN) Major causes of pollution 4 in identified water Plastic waste bodies Other problems 5 associated with the Silting, Weeding identified water bodies No. of water Bodies complying to Water Quality Type of water Total No. of water No. of water Quality Compliance Status of body bodies identified Minitioring Stations 6 Primary water Drinking water Quality Water Quality Criteria for Identified lakes, and Quality Criteria criteria after Agriculture / Fishing / Any ponds in the state / UT for Bathing convential treatment other criteria Lakes - - - - - Ponds 310 - 1 4 19 Proposed Water Body wise, Action Plans for restoration of prioritised 7 Attached in Annexure- I water bodies with timelines and implementing agencies Any other relevant 8 - information MI (w) Division Nandyal S.No Content Name of the State / UT Andhra Pradesh Name of the Name of the 1 State / UT Contact Tel.No Mobile No. E-mail Contact Details Nodal Officer (Department Wise) Department Andhra Pradesh M.J.Raja Sekhar - 9701376001 [email protected] Status On-going Restoration of water Bodies with Ownership of Identified Water Bodies financial support from NRCD / MoJS/ with own ( Indicate No. of water bodies) resources of the state / UT Type of water Total No. of water body bodies identified Information on water 2 bodies such as Lakes & Total No. of Ponds Total No. of water water Total No. of water Government Private bodies selected for bodies bodies presently Restoration restored so under restoration far Lakes - - - - - Work is in Ponds 264 Government - 40 34 Progress Whether water bodies are geo-tagged provided 3 with Unique Yes Identification Number (UIN) Major causes of pollution 4 in identified water No such cases of pollution as the Tanks are in remote areas bodies Other problems 5 associated with the Silting, Weeding, Encroachments identified water bodies No. of water Bodies complying to Water Quality Type of water Total No. of water No. of water Quality Compliance Status of body bodies identified Minitioring Stations 6 Primary water Drinking water Quality Water Quality Criteria for Identified lakes, and Quality Criteria criteria after Agriculture / Fishing / Any ponds in the state / UT for Bathing convential treatment other criteria Lakes - - - - - Ponds 264 - 128 10 200 Proposed Water Body wise, Action Plans for restoration of prioritised 7 Attached in Annexure- I water bodies with timelines and implementing agencies Any other relevant 8 - information Sd/- P.Sreeramachandra Murty Superintending Engineer,m Irrigation Circle, Kurnool. KURNOOL DISTRICT- LIST OF TANKS PERTAINING TO MINOR IRRIGATION-KURNOOL Restoration Action Water of water plan for Spread Pollution Capacity Ayacut Longitud Water Quality Restorat Custodian of Water S.No MI Tank Name -MI Tank ID District Mandal Panchayat area at Latitude Source if in M.Cft in Acres e Quality activities ion of Body Tank FTL any under water in Acres taken quality Yearra Cheruvu Of Basarakodu- 1 4.34 MI017167 Kurnool Adoni Basarakodu 0.62 9.15 15.5827 77.3677 Good No - - EE/MI/Kurnool 2 Bhairava Kunta-MI017168 Kurnool Adoni Isvi 1.20 5.05 10 15.6605 77.2449 Good No - - EE/MI/Kurnool 3 Kanavi Cheruvu-MI017170 Kurnool Adoni Isvi 0.60 4.20 8 15.658 77.2458 Good No - - EE/MI/Kurnool Peddacheruvu Mi Tank Isvi- 4 89.69 MI041442 Kurnool Adoni Isvi 30.36 106 15.6618 77.2431 Good No - - EE/MI/Kurnool Naganathana 5 440.65 Garjivanka Mi Tank-MI041438 Kurnool Adoni Halli 62.95 543 15.5485 77.258 Good No - - EE/MI/Kurnool 6 Chinna Cheruvu-MI017171 Kurnool Adoni Pandavagallu 1.13 4.75 9 15.7215 77.2245 Good No - - EE/MI/Kurnool Moolakunta Of Parvathapuram- 7 57.91 MI017174 Kurnool Adoni Parvathapuram 5.45 0.8 15.6505 77.2562 Good No - - EE/MI/Kurnool 8 341.04 Saranalavanka Mi Tank-MI041448 Kurnool Adoni Pedda Harivanam 48.72 250 15.5868 77.105 Good No - - EE/MI/Kurnool 9 10.80 Karana Cheruvu-MI050765 Kurnool Adoni Pesalabanda 1.71 74 15.6693 77.3026 Good No - - EE/MI/Kurnool Kondapuram Cheruvu (katari 10 11.83 Cheruvu)-MI017166 Kurnool Adoni S.kondapuram 1.69 20.02 15.6493 77.3228 Good No - - EE/MI/Kurnool No No action 11 Bhavanasi & Utlavagu -MI017024 Kurnool Allagadda Ahobilam 375.06 303.9997 4000 15.1061 78.6773 Good Nil action EE/MI/Nandyal required required No No action 12 Pothuraju Cheuvu -MI017175 Kurnool Allagadda Ahobilam 12.61 19.95 79.99 15.1427 78.6637 Good Nil action EE/MI/Nandyal