WASTE MANAGEMENT CENTER BABINA GORA

Marija Tufeković , November 2019 WMC Babina gora

Company Information

Company name “Waste Management Center of County KODOS Ltd”

Date of establishment 20 October 2008

Adress J. Haulika 14, Karlovac

Capital 510.600 HRK

Ownership -Senj County -Moslavina County City of Karlovac City of City of City of City of

General Manager Marija Tufeković WMC Babina gora Project History

2005 • Landfill site selection study – the city of Karlovac” (IPZ Uniprojekt MCF, Zagreb, 2005)

2006 • Location Babina gora confirmed by the decision of the County assembly

2011 • Environmental Impact Study for the Waste Management Center at the Babina Gora • Environmental decision – issued by the Ministry of Environmental and Nature Protection

2012 • Conceptual design for the location permit for construction WMC Babina gora

2014 • Location permit for WMC Babina gora

2017 • National Waste Management Plan for the period 2017.-2022

• Screening Decision for WMC Babina gora issued by the Ministry of Environment and Energy • Feasibility study 2018 • Conceptual design for modifications and additions to the location permit • First Amendment of the location permit issued by the Ministry of Construction and Spatial planning • Location permits and Screening Decisions for Transfer Stations issued

• JASPERS Action Completion Note without significant outstanding issue 2019 • Project approved & contract for EU co-financing signed • Public tendering in process WMC Babina gora

Project area

• Karlovac County (5 Cities and 17 municipalities) • North-Eastern part of Lika-Senj County ( 1 City and 3 municipalities) • West part of Sisak-Moslavina County Project area ( 1 City and 2 municipalities)

2015 2023 2047 Population, Waste Production Rate, Produced Municipal Waste Total Permanent 150,980 146,738 135,291 Population Seasonal Population 2,336 2,349 2,957 Total Quantity of 59,929 56,833 52,781 produced Municipal Waste (t) Source separated Recyclable waste Recyclable waste Current situation/Year 2015 (t) 6,864 Future situation/Year 2023 (t) 24,550 Percentage of Recycling Current situation/Year 2015 (%) 15.26% Future situation/Year 2023 (%) 53.92% Source separated bio-waste Current situation/Year 2015 (t) 133 Future situation/Year 2023 (t) 7,765 2023 2047 Total waste that will be delivered to WMC (t) 30,348 28,192 WMC Babina gora Waste management system in Project area

• separate collection of dry recyclables, (sorting units planned in Karlovac, Ogulin) • separate collection of biowaste Waste (composting unit planned in WMC, Ogulin and collection ) TS Karlovac • residual municipal waste WMC Babina gora (+ separate collection of bulky waste)

• 3 TSs at Karlovac County: Ogulin, Slunj and Karlovac TS Ogulin • 1 TS at Northeastern part of Lika-Senj County: Waste Podum (Otočac) transport TS Slunj • direct transport to WMC

• mechanical treatment with recovery of TS Podum recyclables and RDF Waste • aerobic composting for CLO production treatment and disposal • landfill for the final disposal of residues and CLO WMC Babina gora Waste treatment and disposal

WMC common and basic infrastructure Capacity Mechanical treatment of mixed municipal waste with 29,290 t/y recovery of recyclables and RDF Aerobic composting of biological material extracted 15,187 t/year from residual municipal waste Aerobic composting of separately collected 5,513 t/year biodegradable waste and green waste Landfill for the final disposal of residues and CLO 504,000 m3 over 25 years 201,393 m3 (A PHASE) Landfill for inerts 57,612 m3 over 25 years Entrance-exit zone Infrastructure and roads Recycling yard Recycling yard for construction and demolition waste Transport centre Administrative building WMC Babina gora

WMC - Conceptual solution

WWTP

Non‐hazardous waste landfill

Inert waste landfill

C&D waste recycling area

MBT waste treatment

Transport centre

Entrance-exit zone

. The total area of the Project is about 30 ha WMC Babina gora

Infrastructure

• Land ownership - Centar za gospodarenje otpadom Karlovačke županije KODOS d.o.o

• Access road to WMC • MV electrical power network works in progress • Water supply WMC Babina gora

Funding sources

Project name: „Centar za gospodarenje otpadom Babina gora”

Estimated Value of the Project: 270.490.490 HRK Local contribution 10 % EPEEF contribution 17,66 % EU contribution 72,34 %

Fund: Operational Programme Competitiveness and Cohesion 2014 – 2020

Implementation time: 08.02.2018-31.12.2023.

Grant amount: HRK 195.672.384,43 WMC Babina gora Public Procurement plan

Activity Procedure Tender Launching (year)

Work contracts 1. Construction of County Waste International open tender 2019 Management Centre Babina Gora procedure “Design –Build type”

2. Construction of 4 Transfer Stations International open tender 2020 procedure

Service contracts 1. Supervision of Works –WMC 2019

2. Project Management Support 2019 International open tender (Technical Assistance of Works) procedure 3. Public Awareness services 2019

4. Supervision of Works - 4 Transfer 2020 Stations Supply contract International open tender 2020/2021 1. WMC and Transfer Station mobile procedure equipment WMC Babina gora

Thank you for attention !