The Gotthard Base Tunnel The world’s longest railway tunnel Ambros Zgraggen Head of Communication AlpTransit Gotthard Ltd
1 The Gotthard Base Tunnel
• concept • challenges • key success factors 591976 - LZ
2 The Gotthard Base Tunnel concept: freight corridor 1 Rotterdam - Genoa 591976 - LZ
3 The Gotthard Base Tunnel concept: transalpine goods traffic 591976 - LZ
4 The Gotthard Base Tunnel concept: connections to the european high-speed rail network 591976 - LZ
5 The Gotthard Base Tunnel concept: flat route through the Alps 591976 - LZ
6 The Gotthard Base Tunnel concept: tunnel system 591976 - LZ
7 The Gotthard Base Tunnel
• concept • challenges • key success factors 591976 - LZ
8 The Gotthard Base Tunnel challenge: political process
• 1992 approval to the concept by the Swiss People
• 1998 approval to the financing by the Swiss People 591976 -
LZ
9
The Gotthard Base Tunnel challenge: financing of the project
NRLA (45%) Heavy road vehicle New Rail Link through the Alps tax (64%)
Rail 2000 Phase 1 and ZEB (44%) ZEB: Future Development of the Railway Infrastructure Fund for the Oil tax financing of (23%) public transport HSR (4%) European High-Speed Rail Network
Value added tax Noise mitigation (VAT) (13%) (7%) 591976 - LZ
10 The Gotthard Base Tunnel challenge: financing of the project
c. Gotthard route 13 157 591976 - LZ
Total 19 100 11 The Gotthard Base Tunnel challenge: financing of the project 591976 - LZ
12 The Gotthard Base Tunnel challenge: geology 591976 - LZ
13 The Gotthard Base Tunnel challenge: technics 591976 - LZ
14 The Gotthard Base Tunnel challenge: spoil management 591976 - LZ
15 The Gotthard Base Tunnel challenge: procurement and contracts 591976 - LZ
16 The Gotthard Base Tunnel challenge: environment and ecology
591976 - LZ
17 The Gotthard Base Tunnel
• concept • challenges • key success factors 591976 - LZ
18 The Gotthard Base Tunnel key success factor: business model 591976 - LZ
19 The Gotthard Base Tunnel key succcess factor: focus on project management 591976 - LZ
20 The Gotthard Base Tunnel key success factor: internal cost and risk control
Entwicklung mutmassliche Endkosten (MME) und Risikopotenziale (RP) (Gefahren – Chancen), 591976 auf CHF 100 Mio. gerundet (Stand 30.06.2017) - LZ
21 The Gotthard Base Tunnel key success factor: external project control
• politically: by a special commission of the Swiss Parliament
• legally: by approvals of the Federal Authorities
• technically: by independent experts
• financially: by audits
• in quality: by ISO certification 591976 - LZ
22 The Gotthard Base Tunnel key success factor: transparency and communication 591976 - LZ
23 The Gotthard Base Tunnel key success factor: people 591976 - LZ
24 The Gotthard Base Tunnel key success factor: commissioning December 2016 591976 - LZ
25 The Gotthard Base Tunnel next step: Ceneri Base Tunnel 2020
• Commissioning Ceneri Base Tunnel: December 2020 591976 - LZ
26 The Gotthard Base Tunnel
591976 - LZ
27 The Gotthard Base Tunnel 591976 - LZ