Pedestrian Connectivity Facilities

Consultation Digest

December 2014 Projectj Information

Anderson Road Quarry “ARQ” is located at the southwestern ridge of Tai Sheung Tok Hill in East . The development platform covers an area of about 40ha. It will provide land for residential housing development, commercial uses, supporting community facilities, a quarry park, open spaces and amenity areas, starting from 2019/2010.

Projectj Scopep

ClearCl Water W Bay B Road R d Road Improvement Works Junction improvement at Clear Water Bay Road/On Sau Road Road Improvement Works Site Formation & Widening of New Clear Infrastructural Work Water Bay Road Shun On Estate

Jordan Valley Tai Sheung Tok Shun Tin Anderson Road Quarry Estate Development at Anderson (ARQ) Road (DAR)

Ngau Tau Kok Road Improvement Works Estate Junction Improvement at Lin Tak Road/Sau Mau Tsui Ping Sau Mau Ping Ping Road and Proposed South Estate North Bus-bus Interchange Estate at Toll Plaza TKO Tunnel Toll Plaza Pedestrian Connectivity Facilities Construction of footbridges, escalatorsescalators aandnd lliftsifts

Purpose of Consultation

This consultation digest aims to introduce the pedestrian connectivity facilities linking ARQ development area, those housing estates in the vicinity and Kwun Tong Town Centre.

1 Objectives and Benefi ts of Pedestrian Connectivity Facilities

We target to enhance the pedestrian connectivity among ARQ Development Area, those housing estates and community services facilities in the vicinity by  Constructing footbridges, lifts or escalators to enable residents to travel conveniently among the ARQ Development Area, Sau Mau Ping, Kwun Tong Town Centre and Kwun Tong MTR Station;  Connecting existing pedestrian routes in the district for the conveniencence of residents;  Providing access to the bus-bus interchange station at Toll Plaza being proposed under this ARQ development project, and  Aiming thereby to reduce the demand for short vehicular trips to relieveve the pressure on the existing road network.

Proposed Routes for Pedestrian Connectivity

Legend : Existing Footpath

Proposed Pedestrian Pedestrian Facilities Connectivity Route 1 Anderson Road Quarry

Development at Anderson Road

Sau Mau Ping Hiu Lai Shopping Centre Court Pedestrian Pedestrian Connectivity Route 2 Connectivity Route 3

Sau Mau Ping Estate Po TatTat EstateEstate

TKOTK Tunnel Toll Plaza

Tsui Ping Sau Mau Ping North Estate South Estate Pedestrian Connectivity Route 4 Hong Wahah Court

n O Tsui Ping Proposed Bus-bus South Estate Kwun Tong Tseung Kwan InterchangeO Road at Toll Plaza MTR Station

2 Proposed Pedestrian Connectivity Route 1 & 2

Proposed Escalators DAR ARQ Hiu Kwong Street Sau Mau Ping Road

Hiu Ming Street

Sau Mau Ping Estate

Sau Mau Ping Shopping Centre

Hiu Lai Proposed Lift with Court Footbridge and Subway ARQ

Hiu Kwong Street

Hiu Ming Street

DARDAR

Sau Mau Ping Tsui Ping Road Memorial Park Proposed Lift with Footbridge

Tsui Yeung House

Hiu Kwong Street Tsui Ping North Estate Tsui Ping Bus Terminus Hiu Ming Street

Tsui To House (Wet Market)

Legend : Existing Footpath

Proposed Pedestrian Facilities Kwun Tong MTR Station School

Recreational Facilities

Community Centre

3 Proposed Pedestrian Connectivity Route 3

Legend : Proposed Lift with Footbridge Existing Footpath

Sau Ming House Proposed Pedestrian ARQ Facilities School

Hiu Kwong Street Recreational Facilities

Community Centre

Proposed Escalators DAR Hiu Yuk Path

Please refer to P.5

Hiu Ming Street Sau Mau Ping Road

Sau Mau Ping Bus Terminus Shoppinghopping CCeCentrentre Sau Mau Proposed Escalators Ping Estate Hiu Ming Street Po Tat Estate Near Tsui Yung House

Sau Ming House Hiu KwongKwon Street n HHiHiu Ming g u MingMi Street SauSau Mau Pingng t ((South)South) EstateE ate

Tsui Ping North Estate

Tsui Yungung House

Proposed Escalators ProposedProposProopo e EscalatorsEscalatoEscscalatatoorsors Existing FootbridgeExisting Footbridge Sau Mau Ping Sau Mau Ping (South) Estate Road

Kwun Tong MTR Station

4 Proposed Pedestrian Connectivity Route 4

Legend : ARQ Existing Footpath DAR Proposed Pedestrian Facilities

Proposed Lift, Escalators, Footbridge and Subway ARQ

DAR

Po Lamm RoaRoadd Proposed Lift with Footbridge

Proposed Bus-bus Interchange

Po Tat Estate Po Tat Estate Sau Mau Ping Road

Proposed Lift with Footbridge

Sau Mau Ping Road Sau Mau Ping Road a u Slip Road MaM

R oa a TKO Tunnel d Toll Plaza

Proposed Lift with Footbridge Proposed Lift with Footbridge Sau Mau Sau Mau Ping Road Ping Road

Footpath along Tseung Kwan O Footpath along Tseung Kwan O Tunnel Toll Plaza Tunnel Toll Plaza

Public Consultation and Your Views

We welcome your views and suggestions Please forward your written comments by 31 JJanuaryanuary 20120155 totto:: on our proposed Pedestrian Connectivity Facilities for the development of ARQ in East Development Offi ce the public consultation conducted from Civil Engineering and Development Department mid-December 2014 to January 2015. Suite 1213 Chinachem Golden Plaza 77 Mody Road, Tsim Sha Tsui Kowloon; or We shall undertake to refi ne and optimize our pedestrian connectivity design with By Fax at 2739 0076 the benefi ts of your views. By Email at [email protected]

For enquiry, please feel free to call at 2301 1374.

5