ffir*f6{ aa eRgrqo, furq=erra gcfr, Boqo,dfdt qllO ,s'33 /33-tl ffi6' uio- : q-flfr, 3o . 2o21 tqT t, Tq a-{ {irfi6/+sd qfforfl. g0Y0 dEFi\F I frsq:- Proposed protected forest rand to be diverted for Entry/Exit approach to Bpcl Retail Outlet on Ba beru--Su merpu r Road (SH-134), tn Km No. 4, (CH No. 3.153 to 3.188 RHS), At Khasra No. - 291, Vi[age: - Mirgahani, Tehsir: - Banda, District: - Banda (u.p). Regarding permission for non-forestry use and without feling of trees in proposed 0.218504 ha. protected forest Land. q

Status of Compliance

Legal status ofthe forest land shall As pe r compliance I, Bharat p-rolerm aorporation Limited, Tenitory hereby undedakei that as per Forest (Protection) Act, 19g0 legal status of the forest land will not be chansed. Compensatory aflorestation shall be As per compliance 2, Bharat Fet.ol"um Co.poration taken up by the Forest Department Limited, Territory Kanpur hereby under.takes lor plantation 218 that the of rrees in cost incurred in plantation of2lg trees by the Forest (Mungus Forest Area in Tindwari Depaltmenl has been submimed lo lhe Foresl Range. Banda Forest Division, Department by the BpCL. District Banda) at the cost of user agency. As far as practicable a rnixlure of local indigenous species will be planred and monoculruie of a species has to be avoided. Revised CA scheme for Plantation of 21 g plants shall be submitted to this office and cost for the same shall be

Thc cost of Compensatory As per compliance:, gn;.at pet.oGum Corporation afforestation at the prevailing wage Limited, Territory Kanpur hereby undertakes that the rates as per com pensatory cost of compensatory afforestation at the prevailing alForestalion scheme and the cosr wage of rates as per compensatorl aflorestation has survey, demarcation been and erection of submitred ro CAMPA Fund by the BpCL permanent pillars and challan if required on the copy fbr the same has been attached. CA land shall be deposited in advance. with the Foresl Depanment by the project authority. The CA will be maintained for l0 years. The scheme ma; include appropriare provision for anticipated cost increase for works scheduled for 4 The State Government shall charge As per compliance 4, Bharat Petroleutn-orporation the Net Present Value Q,,trPV) for the Limited has been subrnitted the payment for the Net 0.218504 ha. Forest area to be Present Value (NPV) of the diverted forest land at the diverted under proposal this from the rates approved by the ministry and challan copy user agency as per the orders of the receipt for the same has been attached. Hon'ble Suprerne Couft of dated 3011012002, 0l/08/2003, 28/0312008, 2410412008 and 09/05/2008 in IA No. 566 in Wp (C) Nq. 20211995 and as pcr guidelines issued b1 lhe Minisrry vide letters No. 5-l/1998-FC (pt. ) dated 1810912003 as well as letter No. 5-2l2006-FC dated 03/10/2006 and 5-312007-FC dated 0510212009 in this regard. 5 Additional amount of the NpV of the per petroteu* ] As compliance 5. Bharat Corporarion direned lorest land. iian1. becoming I L;mirea. Terrirorl Kanpur. herebl undenakes rl)at rhe due after finalization of the same by additional amorrnt of rhe NPV of the direned loresr the Hon'ble Supreme Court of India ] land. il an1. becoming due after finalization of rhe on receipt of the report from the lsame by rhe Hon'ble Supreme Coun ol India on Expert Committee, shall be charged receipt ofrhe repon from the Expert Conrrrittee, *ill by State Government flrom the User be paid to the Srare Covernmenr b1 rhe Bp( L. Agency. The User Agency shall furnish an undertaking to this effect. I 6 Greenery will be maintained by user ] As pcr compliance o. Bharat FaroG*n Corporalion agency around Periphery petrol (2npx1 of I Limit'-'d. Territorr hereby undenakes thal the pump. greenerl r,r ill be rnaintained b1 BpCL around ] Periphery of petrol pump. 7 The complete compliance of the FRA, 2006 shall be ensured by way ]FRA. 2006 uill be subrnined in prescribed lorrnar of prescribed certificate from the belore final approrat ofproposat. concerned District Collector. I ] 8 User Agency shall use the land iA between entry and exit for plantation I Limired. Terrirory Kanprrr hereby undenakes rhar ir and conservation of trees the same *ill use the land berrieen entrl and plantarion | exir lor I shall be demarcated by 2 feet wall. land conserration ofrrees the same will "-be dimarcared-- - *'* by 2 feet uall. I 9 Plantation shall also be done along l^' mm (.,rooration the inside boundary olFuel Starion. Limitcd. Terrilorl Kanpur.her.ebl ] undenakes rhar rhe i plantation I will also be done along lhe inside boundarv' of Fuel Starion. I 10 No violalion of FCA certificate from 'iA A concerned DFO shall be provided. certificate has beer anached i II Certificate of DFO certifying that the I-\s pcr cornprrance ffi.r, proposed RO is not in close Officer cerril-ying rlral rhe proposed rerail outler is nor I proximity of any exiting RO in in close proximiti of any eriring rerail ouller is ] accordance with MORTH guidelines auachcd. dated 24-07 -2013 has to be provided. I 12 The boundary of the diverted fore"st Aspercomffi land shall be suitably demarcated on Limited. TerritorS Kanpur hereby undenakes lhal rhe ground at the project cost, as per the boundarl of lhe direned loresr land will be suirablv I directions of concerned the demarcated on ground at lhe projecl cost, as pe, th'e Divisional Forest Offi cer. .r]irections of the concerned Dir isional Forcsr O_L1icg1 l3 The period of diversion under this pel pEroteLun i As compliance 13, Bharat Corporation l approval shall be co-terminus with Limited, Territory Kanpui hereby undertakes that the the period of lease to be granted in period of diversion under this approval will be co_ lavour o[ lhe user agenc) or the terminus with the period of lease to be granted in pro.lect life, whichever is less. lavour of rhe BPCL or rhe project lile, wh]cherer is less. Any other condition that the Ministrv As per compliance 14, Bharat petroGum Corporation of Environment, Forests Climate & Limited, Territory Kanpur hereby undertakes that to Change may stipulate from time to follow any other condition that the Ministrv of time in the interest of conservation, Environment, Forests Climate protection & Change may and development of stipulate from time to time in the in;rest forests & wildlife. ;f conservation, protection and development of forests & wildlile. All the funds received from the User As per compliance I5, Bharat petroieum Co.po.atlon Agency under the project shall be Limited, Territory Kanpur hereby undeftakes that the transferred/deposit to CAMpA fund only entire amount has been submitted to cAMpA fund thorough e-po(al thorough e-portal (http://parivesh.nic.inl) and challan lor the same has been attached. The compliance report shall be As per compliance I6, AII the uploaded on compliancelepor.t will e-portal be uploaded on only thorough e_portal

tidrro :- sqi-ffTTsri ({o os cfut 0 r q-{Aq, VJb" (\'{o*e-m.1 q;I stffiF, &ryzsm fm..fiEr YET6-{ scl[_r______/3rlH,q ft{i6 | Y7 qfrftfr- q,qT,flq {rTffi, d-fl T{ eqr,T, d-q] ol c+d ssfl r{

(g+odo frs) S;T frqEro, fr-d-o"zttto Tf,. d-qT orddq guafrq & qiei qa gtrdr, 6riGr q=[r6 ?ad\ /zz-l ftqio': eiEr: wrqfr ,2021 Hqt t, )t T{ g{EtiD, fuf,qeulqEd, qr{

BEq, Proposed protected forest Iand to be diverted for Entry/Exit approach to BpcL Retail outlet on Baberu-Tindwari-sumerpur Road (sH-13a), rn Km No.4, (cH No.3.153 to 3.188 RHS), At Khasra No. - 291, Village: - Mirgahani, Tehsil: - Banda, District: - Banda (U.p). Regarding permission for non-forestry use and without felling of trees in proposed 0.21g504 ha. Protected forest Land. Ministry of Environment, Forest & climate change lntegrated Regional office Luckno'a-, L:r,.ief No. 8B/U P/06/164/ 2O?o / FC/ ro9z, dated-16.12.2020. q-drc. lqt-qf, T{Etr-d q+ gm y5qcr q:sa1 q,lflIi-d flq{6 $ ii q.{ Tft d nr qrn-a u-q}q qi e-,Erfu'+ sryft n sFrd prdT qr-nRr portal d f$-tq* ergcrfir tg ffileo G-payment g er;=1 1.- :-qr r$-e (3rm-tqrf.l cft) \q ?ETq-ddT cr q qa ai rmia-fto 04_04 q,?d rir. ^or)q 1a r \\'''nrfl lrrc'6{ 3Eq cI{ sxgr d €6q Or q++et G sTrq{{6 6;ffi FE ffiC i _

Sr. No. Conditions Status of Compliance 1 Legalstatus ofthe forest land shall remain m".. unchanged. Corporation Limited, Territory Kanpui. ncie.-.. undertakes that as per Forest (Proieciion ) jr,, i 1980 legal status of the forest lanci wiii lrot i., changed.

2 Compensatory afforestation shall be taken up As per compliance 2, Bharat petroleum by the Forest.Department for plantation of 21g Corporation Limited, Territory (anpur h€rebv trees (Mungus in Forest Area in Tindwari undertakes that the cost incurred in planrat;c" Range, Banda Forest Division, District Banda) of 218 trees by the Forest Depaitraenr hes at the cost of user agency. practicable fu far as been submitted to the Foresi Depl(.T:ri L,, a mixture of local indigenous species will be the BPCL. planted 3nd monoculture of a spe.ies has to be avoided. Revised CA scheme for plantation of 218 plants shall be submitted to this office and cost for the same shall be borne by the User Agency.

3 The cost of Compensatory afforestation at the As per compliance 3, Bharat petroie,_:n prevailing wage rates as per compensatory Corpcration Limited, Territcry Kanpur tere:ril afforestation scheme and the ctst of survey, undertakes that the cost of compensetc.y demarcation and erection of permanent pillars afforestation at the pr€vailing wage r3t:s ar if required on the CA land shall be deposited in per compensatory afforestarion has 1.r..: advance with the Forest Department by the submitted to cAMpA Fund by the Bpci ari project arjthority. The CA will be mainiained challan copy for the same has beei atta.hec for 10 years. The scheme may inclucie appropriate provision for arrticip.,uO.o*anticipated cost i I , iincreaseforworksscheduledforsubsequent ,- -- i"u^ l

l-i:\DFO Ba.da 2020-21\M.noj r.JiSam\Bando S.st\prapos:i\i{ir8ai,ni\saidh?ntik 5wik6ti ki A.irparep *t.ri Mi:Eahna.Cci.i 4 The State Government shall ch-drge the flet As per compliance 4, Bharat petro,eum Present Value (NpV) for the 0.218504 ha. Corporation Limited has been submitieci the Forest area to be diverted under this.proposal payment for the Net present Value (NpV) of from the user agericy as per the orders of the the diverted forest land at the rates approveo llon'ble Supreme Court of lndia dated by the ministry l and challan copy receipt for the 30 2ooz, ho / 01 lo8 /2OO3, 28 / 03 / 2oO8, same has been attached. 24/O4/2O}S and 09 /OS/2OOa in lA No. s66in I WP (C) No. 20211995 and as per guidelines I issued by the Ministry vide letters No. 5- l 1/1998-FC (ft.1t) darcd rs/OglZOO3 as we as _ Ietter No.5-212006-FC dated O3l10/2006 and s.3/2007-Fc dated os/02l2009 in this regard. ]

I 5 ffi As per compliance 5, Bharat petroleum forest land, if any, becoming due after I Corporation Limited, Territory Kanpur herebv finalization ofthe same by the Hon,ble I undertakes that the additional amount cf the Supreme Coun of lndia on receipt of the ] NPV of the diverted forest land, if any, report from the Expert Commiftee, shall be i becoming due after finalization of th€ same charged b.)- by State Government from ] the Ljser the Hon'ble Supreme Court of lndia on receior Agency. The User Agency shall furnish i an ofthe report from the Expert Committee, wili undertaking to this effect. be paid ] to the State 6overnment by the BpCL. I 6 @ around Periphery of petrol pump. ffi- I Corporation Limited, Territory Kanpur herebi, undertakes that the greenery wiil be maintained by BPCL around periphery of petroj pump.

7 The complete comptiance ofthe FRA,2006 fu per compliance 7, The complete complianlJ shall be ensured by way of prescribed of the FR& 2006 wi be submitted in certificate from the concerned District prescribed format before final approvai of Collector proposal. 8 User Agency shall use the land betwGn ent[- and exit for plantation and conservation m,. of Corporation Limited, Territory Kanpur hereb.,, trees the same shall be demarcated by 2 feet undertakes that it will use the land wall. between entry and exit for plantation and conservation oftrees the same will be demarcated by 2 feei wall.

9 Plantation shall also be done-lon! the inside qs per compliance 9, Bharat petroleum boundary of Fuel Station :orporation Limited, Territory Kanpur hereby .mdertakes that the plantation will also be - lone along the inside boundary of Fuel Staiio,.r

LU No vtotation of FCA certificate from concerned DFO shall.be provided. fficA :ertificate has been attached.

H:\DFo Eanda 2o2o 21\Manoj Nitam\B.ndo sast\pGposa t\MiEahii\6aidhantik 5wik.ati ki Anupatan Akhy. MiGahni.d@ 2, 11 Certificate of DFO certifying that the proposed As per compliance 11, Certificate cf Divisionet RO is not in close proximity of any exiting RO in Forest Officer certiiying that the proposed accordance with MORTH guidelines dated 24- retail outlet is not in close proximity of any 07-2013 has to be provided. exiting retailoutlet is attached.

t2 The boundary of the diverted forest land shall As per compliance 12, Bharat Peiroleum be suitably demarcated on ground at the Corporation Limited, Territory Kanpur herebV project cost, as per the directions of the undertakes that the boundary of the dive.te. concerned Divisional Forest Off icer. forest land will be suitably demarcated ofl ground at the projed cost, as per the directions ofthe concerned Divisionai Forest officer.

13 The period of diversion under this approval As per compliance 13, Bharat Petroleurn shall be co-terminus with the period of lease to Corporation Limited, Territory Kanpur herebv be granted in favour of the user agency or the undertakes that the period of diversion undei project life, whichever is less. this approval will be co-terminus with ihe period of lease to be granted in favour of the BPCL or the proiect life, whichever is less.

L4 Any other condition that the Ministry of As per compliance 14, Bharat Petroleum Environmeni, Forests & Climate Change may Corporation Limited, Territory Kanpur hereo stipulate from time to time in the interest of undertakes that to follow any other con.iir:c;l conservation, protection and development of that the Ministry of Environment, Forests & forests & wildlife. Climate Change mav stipulate from time tc time in the interest of conservation, prctecion and development of forests & wildlife-

15 All the funds received from the User Agency As per compliance L5, Bharat Petroleum under the project shall be transferred/deposit Corporation Limited, Territory (anpur herebg to CAMPA fund only thorough e-portal undertakes that the entire amount has been (http://parivesh.nic.inl). submitted to CAMPA fund thorough e-portal (http://parivesh.nic.in/) and challan copy ior the same has been attached-

16 The compliance report shall be uploaded on e- As per compliance 16, All the compliance portal (https://parivesh.nic.in/). report will be uploaded on only ihoiough e- portal (http://parivesh.aic.in/).

TiiiGr?F :_ sT+ffrfgR I

Ffa-q. L, Gisq Grfqia) c'cT.hq {irFmrft qi

H,\0FO 8:nd: 202G21\Ma.oj NIgam\8ando Bast\pEposa!\lViGrhnt\sajdhannk swjlcati ki Anupatan A$ya MiEahn,.do.-3, To, Divisional Forest Officer Forest Division Banda

Subject: proposed protected forest land to be diverted for Entry/Exit approach to BPCL Retail Outlet on Ba beru-Tindwari-sumerpur Road (sH-134), ln Km No.4, (CH No. 3.153 to 3.188 RHS), At Khasra No. - 291, Village: - Mirgahani, Tehsil: - Banda, District: - Banda (U.P). Regarding permission for non-forestry use and without felling of trees in proposed 0.218504 ha. Protected forest Land.

Reference: Ministry of Environment, Forest & Climate Change lntegrated Regional office Lucknow Letter No. 8B/U P/06/16 4 / Zo2o / FC I Lo92, dated'!6.L2.2020.

Sr. No. conditions Status of Compliance L Legal status of the forest land shall remain As per compliance 1, Bharat Petroleum unchanged. Corporation Limited, Territory Kanpur hereby undertakes that as per Forest (Protection) Act, 1980 legal status of the forest land will not be chansed. 2 Compensatory afforestation shall be taken As per compliance 2, Bharat Petroleum up by the Forest Department for plantation Corporation Limited, Territory Kanpur hereby of 218 trees in (Mungus Forest Area in undertakes that the cost incurred in plantation Tindwari Range, Banda Forest Division, of 218 trees by the Forest Department has District Banda) at the cost of user agency. been submitted to the Forest Department by As far as practicable a mixture of local the BPCL. indigenous species will be planted and monoculture of a species has to be avoided. Revised CA scheme for Plantation of 218 plants shatl be submitted to this office and cost for the same shall be borne by the User Agency. 3 The cost of Compensatory afforestation at As per compliance 3, Bharat Petroleum the prevailing wage rates as per Corporation Limited, Territory Kanpur hereby compensatory afforestation scheme and undertakes that the cost of compensatory survey, demarcation and the cost of afforestation at the prevailing wage rates as erection of permanent pillars if required on per compensatory afforestation has been the cA land shall be deposited in advance Fund by BPCL and with the Forest Department by the project submitted to CAMPA the authority. The CA will be maintained for 10 challan copy for the same has been attached. years. The scheme may include appropriate provision for anticipated cost increase for works scheduled for subsequent years. 4 The State Government shall charge the Net As per compliance 4, Bharat Petroleum Present Value (NPV) for the 0.218504 ha. Corporation Limited has been submitted the Forest area to be diverted under this payment for the Net Present Value (NPV) of proposal from the user agency as per the the diverted forest lap$ at the rates approved orders of the Hon'ble Supreme Court of by the ministry and /c\allapr copy receipt for rndia dated 3oll1l2ooz, ot/0812o03, the same has been atfaCr,'ed l gtfltftqAE-qftr6r \.dil q'I ct{Tr, sisl 28/03/2008, 24104/2008 and 09/0sl2008 in lA No.556 in WP (C) No. 202/L995 and as per guidelines issued bY the Ministry vide letters No. 5-1l1998-FC (Pt.ll) dated 18/09/2003 as well as letter No. 5-2/2O06-FC dated 03/10/2005 and 5- 3/2007-FC dated 05/OZ|2OO9 in this rega rd. Petroleum 5 Additional amount of the NPV of the As per compliance 5, Bharat diverted forest land, if any, becoming due Corporation Limited, Territory Kanpur hereby after finalization of the same by the undertakes that the additional amount of the Hon'ble Supreme Court of lndia on receipt NPV of the diverted forest land, if any, of the report from the Expert Committee, becoming due after finalization of the same by shall be charged by State Government the Hon'ble Supreme Court of lndia on receipt from the User Agency. The User Agency of the report from the Expert Committee, will shall furnish an undertaking to this effect. be paid to the State Government byllE 9B!!.- Petroleum 5 Greenery will be maintained by user As per compliance 5, Bharat hereby agency around Periphery of petrol pump Corporation Limited, Territory Kanpur undertakes that the greenery will be maintained by BPCL around Periphery of petrol pump. the FRA, 2005 As per compliance 7, The complete compliance z I rne complete compliance of prescribed the FRA, 2006 will be submitted in I shall be ensured by way of of I certificate from the concerned District prescribed format before final approval of lcotlector. proposal. 8 User Agency shall use the land between As per compliance 8, Bharat Petroleum entry and exit for Plantation and Corporation Limited, Territory Kanpur hereby conservation of trees the same shall be undertakes that it will use the land between demarcated by 2 feet wall. entry and exit for plantation and conservation of trees the same will be demarcated by 2 feet wall. 9 Plantation shall also be done along the As per compliance 9, Bharat Petroleum inside boundary of Fuel Station. Corporation Limited, Territory Kanpur hereby undertakes that the plantation will also be done along the inside boundary of Fuel Station. 10 No violation of FCA certificate from As per Compliance 10, No violation of FCA concerned DFO shall be Provided. certificate from concerned DFo will be provided. Divisional TL Certificate of DFO certifying that the As per compliance 11, Certificate of proposed RO is not in close proximity of Forest Officer certifying that the proposed any exiting RO in accordance with MORTH retail outlet is not in close proximity of any guidelines dated 24-07-2013 has to be exiting retail outlet. provided. 1',) Petroleum L2 The boundary of the diverted forest land As per compliance Bharat hereby shall be suitably demarcated on ground at Corporation Limited, Te ry Kanpur the project cost, as per the directions of undertakes that the bou diverted the concerned Divisional Forest Officer. forest land will be su ed on ground at the p roject the ,'t'ft.h#* hdaq'{ qqP1, dr directions of the concerned Divisional Forest Officer. 13 The period of diversion under this approval As per compliance 13, Bharat Petroleum shall be co-terminus with the period of Corporation Limited, Territory Kanpur hereby lease to be granted in favour of the user undertakes that the period of diversion under agency or the project life, whichever is this approval will be co-terminus with the less. period of lease to be granted in favour of the BPCL or the Droiect life, whichever is less. L4 Any other condition that the Ministry of As per compliance 14, Bharat Petroleum Environment, Forests & Climate Change Corporation Limited, Territory Kanpur hereby may stipulate from time to time in the undertakes that to follow any other condition interest of conservation, protection and that the Ministry of Environment, Forests & development of forests & wildlife. Climate Change may stipulate from time to time in the interest of conservation, protection and development of forests & wildlife. 15 All the funds received from the User As per compliance 15, Bharat Petroleum Agency under the project shall be Corporation Limited, Territory Kanpur hereby tra nsferred/deposit to CAMPA fund only undertakes that the entire amount has been thorough e-portal (http://parivesh.nic.inl). submitted to CAMPA fund thorough e-portal (http://parivesh.nic.inl) and challan copy for the same has been attached. 16 The comptiance report shall be uploaded As per compliance L6, All the compliance on e-portal (https://parivesh.nic.inl). report will be uploaded on only thorough e- portal (http://pa rivesh. n ic.in/). L, slnrsrfr ccr,frc 6{ (Authori aa cqTr, del @[n

Bharat Limited AGENCY COPY BANK COPY NEFT / RTGS cHALLAN for Ad-HOc cAMPA NEFT/ RTGS CHALLAN for Ad.HOC CAMPA Date:13-01-2021 Date:'13-0t-202'l

Agency Name. BHARAT PETROLEUM Agency Name. BHARAT PETROLEUM CORPORATION LIMITED CORPORATION LIMITED TERRITORY KAN TERRITORY K,AN @ Application No. 704A7107s6 Application No. 70487'10756 Yo MoEFISG File No, EB.tUP tO6h64t2020 MoEF/SG File No. 8B/UP/06/,164/2020 4 3l Location. Location. UTTAR PRADESH ll ? :(l Add.ess. BPCL Depot Bhaunti,Kalpi Address: BPCL Depot Bhaunti,Kalpi 4 1r Road KanpurKanpur Nagar Road Kanpur Kanpur Nagar :I Amount(in Rs) 335384/- Amount(in Rs) 33538,1/- g" 4 frb Amount in Words :Three Lakh Thirty-Five Tholsand Three Amount in Words rThree Lakh Thirty-Five Thousand Three * Hundred and Eighly-Four Rupees Only Hundred and Eighiy-Four Rupees Only

NEFT/RTGS to be made as per following NEFT/RTGS to be made as per following details; details;

Beneficiary Name: UTTAR PRADESH CAMPA

IFSC Code: coRP000037t

Pay to Account No. 150907048710756 Valid only Jor this challan amount.

Co.poration Bank Bank Name & Corporation Bank Lodhi Complex Branch, Address: LodhiComplex Branch, Block 1't,cco complex, Block 11,CGO Complex, Phase l, Lodhi Road, New Phase l, Lodhi Road, New Delhi -{10003 Delhi -110003

This Challan is strictly to be used 60r making This Challan is strictly to be used for making to CAMPA by NEFT/RTGS only payment lo GAMPA by NEFT/RTGS only

fter making successful payment, User Agencies may send a line of confirmation through Email: [email protected] JfR No IDTBR sz oL\o\\ 3Lng3 Llq q Condition No. 1

UNDERTAKING

Proposed protected forest land to be diverted for Entry/Exit approach to BPCL

Retail Outlet on Baberu-Tindwari-Sumerpur Road (SH-134), ln Km No. 4, (CH No. 3.153 to 3.188 RHS), At Khasra No. - 291, Village: - Mirgahani, Tehsil: - Banda, District: - Banda (U.P). As per compliance 1, Bharat Petroleum Corporation Limited, hereby undertakes that Forest (Protection) Act, 1980 legal status of the forest land will not be changed. L-D gCrfic an qnr€rt * rcrr, dur Bharat Limited M* r

), ftg Condition No. 2. 3 & 4

UNDERTAKING

Proposed protected forest land to be diverted for Entry/Exit approach to BPCL Retail Outlet on Baberu-Tindwari-Sumerpur Road (SH-134), ln Km No.4, (CH No. 3.153 to 3.188 RHS), At Khasra No. - 291, Village: - Mirgahani, Tehsil: - Banda, District: - Banda (U.P). As per compliance 2, 3 & 4, Bharat Petroleum Corporation Limited hereby undertakes that Net Present Value (NPV) Compensatory Afforestation amount and other permissible bills, reimbursement of plantation fund management and planning authority has been deposited in CAMPA fund by e-challan and challan copy for the same has been attached.

Types of Sr. Description/lte m (in Amount Fund Date UTR No. No. Rupee) Tra nsfer

1 2 3 4 5 6

t. As per Condition No. 2 & 3, Plantation of 218 trees & Maintenance for 10 years/(CA) t98600/-

2. As per Condition No.4, NPV of tDt8R52021011 N EFT L3.OL.2021 the proposed protected forest 321993444 land 0.218504 ha. (At the rate 736784/- 5.26 lakh as per ha.)/(NPV)

Total 33s384/-

mfl*ffi** [ai< ul sq{' silT

#* Condition No.5

UNDERTAKING

Proposed protected forest rand to be diverted for Entry/Exit approach to Bpcl Retail outlet on Baberu-Tindwari-sumerpur Road (sH-134), rn Km No. 4, (cH No. 3.153 to 3.L88 RHS), At Khasra No. - 291, Village: - Mirgahani, Tehsil: _ Banda, District: - Banda (u.p). As per compriance 5, Bharat petroreum corporation Limited hereby undertakes that he additional amount of the NpV of the diverted forest land, any, if becoming due after finarization of the same by the Hon,bre supreme court of rndia on receipt of the report from the Expert committee, will be paid to the State Government by the BpCL. LD F""rli, T-i rrrft.ffritl W,r.,,l,rrT'-i-

Territory Bharat Petroleum Limited Condition No.5

UNDERTAKING

Proposed protected forest land to be diverted for Entry/Exit approach to BPCL

Retail Outlet on Baberu-Tindwari-Sumerpur Road (SH-134), ln Km No. 4, (CH No. 3.153 to 3.188 RHS), At Khasra No. - 291, Village: - Mirgahani, Tehsil: - Banda, District: - Banda (U.P). As per compliance 6, Bharat Petroleum Corporation

Limited hereby undertakes that the greenery will be majntained by BPCL around

Periphery of petrol pump.

$TFfrq {r sTftrdrt $foarcfirr, dsr Limited Condition No.7

UNDERTAKING

Proposed protected forest land to be diverted for Entry/Exit approach to BPCL

Retail Outlet on Baberu-Tindwari-sumerpur Road (SH-134), ln Km No. 4, (CH No. 3.153 to 3.188 RHS), At Khasra No. - 291, Village: - Mirgahani, Tehsil: - Banda, District: - Banda (U.P). As per compliance 7, the complete compliance of the FRA,

2006 will be submitted in prescribed format before fi I of proposal. **"kG* pfau

irr ('()lllI)lii:utcc of tlrc I\,linistry of InvironmenI Foresl &. (,limaLe: t.lr.rngc (N,lOIjF&CCJ Govcrnment of India's Letter No.11-09/9il- FC i.irtl dated z8th October 2A14, It is to certify that 0.218504 Ha oi Irrotectcd forest land is proposed to be diverted in favour of Bharat Petroleum Corporation Limited, Retail Territory Kanpur entry,./Exit approach to BPCL Retail Outlet on Baberu-Tindwari-

Sunrerpur Road [SI.i-134J, in Itm No. 4, ICH No. 3.153 to 3.188 RHSJ, At Khasra No. - 291, Village: - Mirgahani, Tehsil: - Banda, District: - Banda tU.P.j. It is to further certify that the forest land proposed ro be diverted is Protected Forest which was notified as "forest" less than 75 years priorto the 13tr, day of September 2005 and is located in the Villages having no recorded population of Scheduled Tribes, Primitive Tribai Groups and Pre Agricultural Communities as per the censtls-

2AA1 and the census -2AL1.

Divisirrm*f'ek#Arcer \;fa a-a rwT, ei'a Forcst i)ivisiolr Banda Birntlir

Cl^^.^.^^l ---:d- r: ^.^^ o ^^.^.^ ^- Condition No.8

UNDERTAKING

Proposed protected forest land to be diverted for Entry/Exit approach to BPCL

Retail Outlet on Baberu-Tindwari-Sumerpur Road (SH-134), ln Km No.4, (CH No. 3.153 to 3.188 RHS), At Khasra No. - 291, Village: - Mirgahani, Tehsil: - Banda, District: - Banda (U.P). As per compliance 8, Bharat Petroleum Corporation

Limited hereby undertakes that it will use the land n entry and exit for plantation and conservation of trees the same will be de 2 feet wall.

ffiq+-trmr fuda r cvrq, da UNDERTAKING

proposed protected forest land to be diverted for Entry/Exit approach to BPCL

Retail outlet on Baberu-Tindwari-sumerpur Road (SH-134), ln Km No. 4, (CH No. 3.153 to 3.188 RHS), At Khasra No. - 291, Village: - Mirgahani, Tehsil: - Banda, District: - Banda (u.P). As per compliance 9, Bharat Petroleum corporation Limited hereby undertakes that the plantation will also be done along the inside boundary of Fuel Station.

*-,ftkG,.tt fofa ea sqn, dzl Bharat Petroleum Condition No. 10

qq duTq oTEfuqq leao d urf+rqt 6 ffiIEl=T Hq{ft q+lrur t|-.t

qqFro fuqr qrcn' t fu qiEr A 3tf,'fd qrrd Bfrrqq furtcri fuo arcr qil6-M-Ei-rgs qFi, (vsogso r{o-rs+), d fuofro co*o+, (+iq do-315s t a.rsa) d qtu qifr qdfr c{, qs$ rio-zst, u-lq- fil, ilf,fid- eiEr. fuflI-qiET (aos cecD n rwrfud Sa vw $ 3rqrn< !7' .r$ .rgs qT.f ftqfuT tg yqfuo o.zresoa to r4qfl$o m qr :l'-{ il,|ffi qci-,T e ffcT ge{ qraq d qc \{{flor ertrfrql 1e80 oI s*iffi cfr foqT 'rvt t op'tl sqirfi Yrd 6I Wf Eq t qrac fuqr ut&Tl nffiqAffi6 {at-ffiflTHq,qffit Condition No. 11

UNDERTAKING

Proposed protected forest land to be diverted for Entry/Exit approach to BPCL

Retail Outlet on Baberu-Tindwari-sumerpur Road (SH-134), ln Km No. 4, (CH No. 3.153 to 3.188 RHS), At Khasra No. - 291, Village: - Mirgahani, Tehsil: - Banda, District: - Banda (U.P). As per compliance 11, certificate of Divisional Forest officer certifying that the proposed retail outlet is not in close proximity of any exiting reta il outlet.

(Autho

T *,*k#*tda Bharat Petroleum Sfiarmlmr, Condition No. 12

UNDERTAKING

Proposed protected forest land to be diverted for Entry/Exit approach to BPCL

Retail Outlet on Baberu-Tindwari-Sumerpur Road (SH-134), ln Km No. 4, (CH No. 3.153 to 3.188 RHS), At Khasra No. - 291, Village: - Mirgahani, Tehsil: - Banda, District: - Banda (U.P). As per compliance 12, Bharat Petroteum Corporation

Limited hereby undertakes that the boundary of the diverted forest land will be suitably demarcated on ground at the project cost, as per the directions of the concerned Divisional Forest Officer. *r"i,.H*t [f< aa qqrrl' ilaI Condition No. 13

UNDERTAKING

Proposed protected forest land to be diverted for Entry/Exit approach to BPCL Retail Outlet on Baberu-Tindwari-Sumerpur Road (SH-134), ln Km No. 4, (CH No. 3.153 to 3.188 RHS), At Khasra No. - 291, Village: - Mirgahani, Tehsil: - Banda, District: - Banda (U.P). As per compliance 13, Bharat Petroleum Corporation

Limited hereby undertakes that the period of diversion under this approval will be co-terminus with the period of lease to be granted in favorlof the BPCL or the project life, whichever is less. *,fr"k*,.lt [da w cr{FI, EYar Condition No. 14

UNDERTAKING

Proposed protected forest land to be diverted for Entry/Exit approach to BPCL

Retail Outlet on Baberu-Tindwari-sumerpur Road (SH-134), ln Km No. 4, (CH No. 3.153 to 3.188 RHS), At Khasra No. - 291, Village: - Mirgahani, Tehsil: - Banda,, District: - Banda (U.P). As per compliance 14, Bharat Petroleum Corporation Limited hereby undertakes that to follow any other condition that the Ministry of Environment, Forests & Climate Change may stipulate f time to time in the interest of conservation, protection and development of f

(Autho

Territory rF.,ffi"k+e*t Bharat Petroleum al ]:igtTzl'

UNDERTAKING

Proposed protected forest rand to be diverted for Entry/Exit approach to BpcL Retall outlet on Baberu-Tindwari-sumerpur Road (sH-134), rn Km No. 4, (cH No. 3.153 to 3.188 RHS), At Khasra _ No. 291, Village: - Mirgahanl, Tehsil: _ Banda, District: - Banda (u.p). As per compriance 15, Bharat petroreum corporation Limited hereby undertakes that the entire amount has been submitted to cAMpA fund thorough e-portar (http://parivesh.nic.in/) and cha[an copy for the same has been attached.

*r,ftki-#rt (Authorized Signatory) [faerccm, cief Territory Manager Bharat Petroleum Corporation Limited Retail Territory Kanpur UNDERTAKING

Proposed protected forest land to be diverted for Entry/Exit approach to

BPCL Retail Outlet on Baberu-Tindwari-Sumerpur Road (SH-134), ln Km No. 4, (CH No. 3.153 to 3.188 RHS), At Khasra No. - 291, Village: - Mirgahani, Tehsil: - Banda, District: - Banda (U.P). As per compliance 16, all the compliance report will be uploaded only thorough e-portal (http://parivesh.nic.in/). ,*ft-mrt fuda s-{cqn, dq qq riqg,r eTEft{q 1e8o + whqrql d wfqq gq{ft }FIIUI rt-t

qqFTfl fuqT qrar i-fu sqqE qiEr d er