All data in this document has been validated by developers and is based on the best available Offshore information at the time of publication regarding their respective projects. As such, this information should be regarded as indicative and subject to change over time. The aim of publishing this information is to provide an Wind insight (as of September 2020) into the timelines of Project offshore wind projects in the UK out to 2030. Timelines

September 2020 V1 (Data valid at time of publication) Current Capacity Acknowledgements

Wind Projects Currently in Operation With thanks to developers, the Offshore Wind

Foundation* Industry Council, The Crown Estate, The Crown

10.415GW 3.69GW Estate and La Tene Maps.

Reference Round Project Current Phase MW Number of Turbines Monopile Jacket Gravity Grid Connection operating wind farms under

1 1 North Hoyle Operational 60 30 • HVAC wind farms construction 2 1 Scroby Sands Operational 60 30 • HVAC 3 1 Kentish Flats 1 Operational 90 30 • HVAC 4 1 Barrow Operational 90 30 • HVAC 5 1 Burbo Bank Operational 90 25 • HVAC 6 1 Lynn & Inner Dowsing Operational 194 54 • HVAC 7 1 Operational 90 25 • HVAC

• 5.9GW 11.09 GW 8 1 Gunfleet Sands 1 Operational 108 30 HVAC 9 2 Gunfleet Sands 2 Operational 65 18 • HVAC wind farms wind farms 10 1 Robin Rigg A&B Operational 174 60 • HVAC 11 2 Thanet Operational 300 100 • HVAC in the planning with planning 12 2 Walney (Phase 1 & Phase 2) Operational 367 102 • HVAC 13 1 Ormonde Operational 150 30 • HVAC process permission 14 Demo Gunfleet 3 Operational 12 2 • HVAC 15 2 Greater Gabbard Operational 504 140 • HVAC 16 2 Sheringham Shoal Operational 317 88 • HVAC 17 2 (Phase 1) Operational 630 175 • HVAC

18 1 Teesside Operational 62 27 • HVAC 19 2 Lincs Operational 270 75 • HVAC 9.62GW 1GW 20 2 Gwynt y Môr Operational 576 160 • HVAC wind farms in powers 940,888 21 2 West of Duddon Sands Operational 389 108 • HVAC 22 2 Westermost Rough Operational 210 35 • HVAC development homes per annum 23 2 Humber Gateway Operational 219 73 • HVAC 24 Demo Levenmouth Turbine Operational 7 1 • (at least) 25 Extn Burbo Bank Extension Operational 258 32 • HVAC

26 Extn Kentish Flats Extension Operational 50 15 • HVAC

27 2 Race Bank Operational 573 91 • HVAC

28 2 Dudgeon Operational 402 67 • HVAC

29 Extn Galloper Operational 353 56 • HVAC

30 3 Rampion Operational 400 116 • HVAC 31 Demo Hywind Operational 30 5

32 Demo Blyth Offshore Wind Operational 41.5 5 •

33 STW Beatrice Operational 588 84 • HVAC

34 3 East Anglia One Operational 714 102 • HVAC Phases of Offshore Development

35 Extn Walney Extension Operational 659 87 • HVAC

36 Demo Aberdeen Bay (EOWDC) Operational 93.2 11 • Development Pre-Construction CfD Eligible Data Unavailable at this Time Please note that this data should be considered as indicative and Consent Application Under Construction CfD Secured Financial Investment Decision 37 3 Hornsea—Project 1 Operational 1218 174 • HVAC is likely to change over time. 38 Demo Kincardine Phase 1 Operational 714 102 • HVAC Consent Evaluation In Full Operation Invitation to Tender

Wind Projects Currently in Development 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

Foundation*

Reference Round Project Current Phase MW Number of Turbines Monopile Jacket Gravity Grid Connection Avg Water Depth (m) Distance to Shore (km) Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

39 Demo Kincardine Phase 2 Construction 48 5 70 15

40 3 Moray Firth—East Construction 950 100 • HVAC 42 22

41 STW Neart na Goithe Construction 448 54 • HVAC 50 18

42 2 Construction 857 90 • HVAC 18 42

43 3 Hornsea—Project 2 Construction 1386 165 • HVAC 36 89

44 3 Seagreen Consented 1075 114 • HVAC 51.7 42

45 3 Dogger Bank A Consented 1200 95 • HVDC 27 150

46 3 Dogger Bank B Consented 1200 95 • HVDC 27 150

47 3 Dogger Bank C Consented 1200 TBC • HVDC 27 215

48 3 Sofia Consented 1400 100–130 • HVDC 29 214

49 Demo Forthwind Consented 12 2 • HVDC 12 1.5 Data unavailable at this time

50 3 East Anglia Three Consented 1400 <121 • HVDC 39 75

51 STW Inch Cape Consented 1000 72 • HVAC 50 20 52 3 Norfolk Vanguard Consented 1800 <158 HVDC 35 75 53 3 Moray Firth—West Consented 800 <85 HVAC 43 25 CfD Eligible—To be determined by developer

54 3 Hornsea—Project 3 Planning <2400 <231 30–40 130

55 3 East Anglia One North Planning 800 <67 • HVAC 46 48

56 3 East Anglia Two Planning 900 <75 • HVAC 45 38 57 3 Norfolk Boreas Planning 1800 <158 HVDC 35 90

58 3 Berwick Bank Development <2300 TBC 55 40 59 3 Marr Bank Development <1850 TBC 55 40 60 3 Hornsea Project Four Development <2600 TBC 49 70 To be determined by developer 61 Demo Erebus Floating Wind Demo Development 96 7–10 HVAC 70-75 45 62 Extn Awel y Mor Development TBC TBC 30 14.2 63 Extn Rampion 2 Development 800–1200 50–80 HVAC 40 13 64 Extn Five Estuaries Development 353 TBC 32 36 65 Extn North Falls Development 504 TBC 30.4 42.5

66 Extn Dudgeon Extension Development 402 TBC 27 34 To be determined by developer

67 Extn Sheringham Shoal Extension Development 317 TBC 18 20 To be determined by developer

* Where multiple foundation types are indicated, a mixture of foundation types may be considered, or a decision is pending This document shows that the UK’s offshore sector continues to grow rapidly. There is now 10.415GW of offshore wind capacity Offshore operational across 38 offshore wind sites. Since the publication of the 2018 edition of the Timelines, 3.26GW of Offshore

new generation capacity has come on-line. Beyond this sits a longer-

term deployment pipeline out to 2030. Wind Wind

The UK Government has set a target of 40GW by 2030, with offshore Project wind set to become the backbone of our system. Meeting Projects this target - alongside our wider Sector Deal ambitions — will secure Timelines

tens of billions of pounds of new investment, support thousands of

new jobs and create opportunities to export to global markets. 2020

September 2020 V1 (Data valid at time of publication)

This map shows the geographical location, project

name, developer and capacity of the UK’s offshore

wind farm developments. 2020

The chart overleaf shows the current expected Timelines

delivery timeline for every offshore wind project in development in the UK. Project

Wind

Offshore

SSE Renewables SDIC Copenhagen Infrastructure Partners 588MW Beatrice 33

Ocean Winds 800MW Moray Firth West 53

Diamond Generating Europe 950MW Moray Firth Eastern Development Area 1 40 © September 2020 RenewableUK RUK20-000-01 Ocean Winds

Equinor, Masdar 30MW Hywind 31

Vattenfall 92.4MW Aberdeen Bay (EOWDC) 36

38 Kincardine Phase 1 2MW KOWL 39 Kincardine Phase 2 48MW

SDIC 1000MW Inch Cape 51

44 Seagreen 1075MW Total, SSE Renewables EDF Renewables, ESB 448MW 41 58 Berwick Bank <2300MW SSE Renewables Cierco 12MW Forthwind 49 59 Marr Bank <1850MW

Offshore Renewable Catapult 7MW Levenmouth Turbine 24

1200MW Dogger Bank A 45 SSE Renewables

EDF Energy 41.5MW Blyth Offshore Wind Demo 32 1200MW Dogger Bank B 46 1200MW Dogger Bank C 47 48 Sofia 1400MW RWE Renewables EDF Renewables 62MW Teesside 18 Dalmore Capital RWE Renewables 174MW Robin Rigg A&B 10 PIP 22 Westermost Rough 210MW Ørsted, Green Investment Group

60 Hornsea Project 4 <2600MW Ørsted 659MW Walney Extension 35 Ørsted 12 Walney 1&2 367MW Ørsted, SSE, PGGM PKA 43 Hornsea Project 2 1386MW Ørsted PFA 13 Ormonde 150MW Vattenfall, AMF 54 Hornsea Project 3 <2400MW Ørsted 4 Barrow 90MW Ørsted Ørsted 21 West of Duddon Sands 389MW Ørsted, ScottishPower Renewables 37 Hornsea Project 1 1218MW Global Infrastructure Partners

25 Burbo Bank Extension 258MW Ørsted, PKA, KIRKBI 23 Humber Gateway 219MW RWE Renewables RWE Renewables 576MW Gwynt y Môr 20 Green Investment Group 5 Burbo Bank 90MW Ørsted Green Investment Group 42 Triton Knoll 860MW RWE Renewables, J Power, Kansai Electric Power Stadtwerke München GmbH TBC Awel y Mor 62 Ørsted 270MW Lincs 19 27 Race Bank 573MW Ørsted, Macquarie Capital, Sumitomo 1 North Hoyle 60MW Greencoat UK Wind RWE Renewables 90MW Rhyl Flats 7 28 Dudgeon 402MW Green Investment Group Green Investment Group, Blackrock 194MW Lynn & Inner Dowsing 6 Equinor, Masdar, 1. Operational – The entire project is Greencoat UK Wind 66 Dudgeon Ext 402MW China Resources (Holdings) Company operational and generating power Equinor 317MW Sheringham Shoal 16 Green Investment Group 317MW Sheringham Shoal Extensions 67 TRIG <1800MW Norfolk Boreas 57 Equitix Ltd Vattenfall 2. Under Construction – Offshore <1800MW Norfolk Vanguard 52 construction has commenced but has not yet been commissioned RWE Renewables 60MW Scroby Sands 2 ScottishPower Renewables 3. Pre-Construction – Project has 50 East Anglia 3 1400MW received planning permission, but has not ScottishPower Renewables 900MW East Anglia 2 56 55 East Anglia 1 North 800MW entered into construction SSE Renewables, RWE Renewables 504MW Greater Gabbard 15 34 East Anglia 1 714MW 504MW North Falls 65 ScottishPower Renewables 4. CfD Secured – Projects that have Green Investment Group received a Contract for Difference (CfD) DBJ, Ørsted, JERA 173MW Gunfleet Sands 1&2 8, 9 but have yet to begin construction. 29 Galloper 553MW RWE Renewables Ørsted 12MW Gunfleet Sands 3 14 Green Investment Group 64 Five Estuaries 553MW ESB 5. CfD Eligible – Projects that are deemed Siemens Financial Services Vattenfall 90MW Kentish Flats 1 3 eligible to bid for a Contract for Difference Sumitomo (CfD) are those that have received planning Vattenfall 50MW Kentish Flats Extension 26 consent and that have a grid connection 17 London Array 630MW Ørsted date agreed with National Grid. Masdar La Caisse RWE Renewables 6. In Planning – Project has applied for planning consent and is being evaluated 11 Thanet 300MW Vattenfall

7. In Development – Development site/ area has been awarded to the developer by The Crown Estate 30 Rampion 400MW RWE Renewables Green Investment Group 63 Rampion 2 800–1200MW Enbridge INC

Round 4 Bidding Areas

ScotWind Bidding Areas www.RenewableUK.com The UK’s leading trade association