Notice of Letting

Letting Date:

FEDERAL HELP FRAUD &

INFORMATION HOTLINE

Transportation Bulletin Illinois Department of Transportation 2300 South Dirksen Parkway, Springfield, Illinois 62764

STATE OF ILLINOIS Department of Transportation 2300 South Dirksen Parkway Springfield, Illinois 62764

The Transportation Bulletin is the official Illinois Procurement Bulletin for the Illinois Department of Transportation as authorized by Section 15-1 of the Illinois Procurement Code, 30 ILCS 500/15-1. It is available on the IDOT Web Site and through the IDOT Subscription Service.

Three versions of the Transportation Bulletin are currently published.

Transportation Procurement Bulletin

Professional Transportation Bulletin

Invitation for Bids

Questions concerning file downloads and/or subscription service information should be directed to Tim Garman at 217-524-1642 or email [email protected].

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016

Transportation Procurement Bulletin

Formerly published as the Transportation Bulletin – Weekly Procurement, this bulletin is now located on the IDOT Web Site. It features procurement information for the construction and consulting industry, and the general public. Postings include Invitations to Bid and Request for Proposals from a variety of Bureaus within the Department of Transportation. The site also features important procurement information and links to contract award notices for construction and engineering, sole source procurements, emergency purchases, change orders which exceed $30,200, land acquisitions over $25,000, and renewal notices.

Questions concerning this Bulletin should be directed to:

Tim Garman or E-mail [email protected] 2300 South Dirksen Parkway Room 330 Springfield, IL 62764 217-524-1642

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016

Professional Transportation Bulletin Contains information pertaining to the advertisement for offers of interest for professional services for Department of Transportation projects.

Questions concerning this Bulletin should be directed to:

Carrie Kowalski or E-mail [email protected] 2300 South Dirksen Parkway Room 330 Springfield, IL 62764

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016

Invitation For Bids

Contains information pertaining to the advertisement for bidding of Highways, Aeronautics and Department of Natural Resources.

Questions concerning this Bulletin should be directed to:

Jim Layden Rm 326 (217) 782-7806 [email protected] Ted Walschleger Rm 330 (217) 782-4894 [email protected]

2300 South Dirksen Parkway Springfield, IL 62764

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016

Illinois Department of Transportation

INVITATION FOR BIDS

Volume 19 Springfield, Illinois, March 18, 2016 No. 12

This invitation is the official advertisement and solicitation for bids issued by the Illinois Department of Transportation to secure the performance of highway work by contract, airport work by contract and contract work solicited by the Illinois Department of Natural Resources. The Invitation for Bids is published in this Transportation Bulletin and is available on the Department’s Website and through electronic subscription. Questions concerning this invitation should be directed to:

Mr. Jim Layden Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217)782-7806 Fax: (217)785-1141 TDD: (217)524-4875 [email protected]

NOTICE OF LETTING – April 22, 2016

1. LETTING DUE DATE AND TIME FOR SUBMISSION AND OPENING OF BIDS. The Department of Transportation is requesting offers in the form of sealed bids from responsible contractors to fill the State’s needs as described in this invitation. Sealed, paper-based bids are to be submitted to the Chief Procurement Officer for the Department of Transportation in care of the Chief Contracts Official at the above address. Electronic bids are to be submitted to the electronic bidding system (iCX – Integrated Contractors Exchange).

All bids and bidding documents are to be received by the department prior to 10:00 a.m., prevailing local time, April 22, 2016, at which time the bids will be publicly opened. The department will not open bids received after the stated opening date and time.

Electronically submitted bids for a Joint Venture must include the signed and uploaded Proposal Signature Sheet. An electronically submitted bid for a Joint Venture missing the signed Proposal Signature Sheet will be rejected by the department as being non-responsive.

If you submit a paper bid and an electronic bid the electronic bid will take precedence. Please see CPO Notice 2013.1

The department or the Chief Procurement Officer (CPO) for the Illinois Department of Transportation reserve the right to postpone the bid opening in the event of circumstances beyond the reasonable control of the department, such as but not limited to a cataclysmic event or extraordinary conditions of weather. If the department or CPO postpones the bid opening and/or bid delivery, the department will take all reasonable steps to notify potential bidders. All subscribers to the Electronic Subscription Service/Contractors Packet will be notified first, when possible.

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 2. RULES GOVERNING LETTING. This letting is subject to and governed by the rules of the Department adopted at 44 Illinois Administrative Code Part 650 and Part 6, and by the provisions of this invitation. Copies of the rules are available by contacting the above address of the Chief Contracts Official.

3. INSTRUCTIONS TO BIDDERS. Read the following instructions carefully before submitting any bid. Failure to follow these instructions and the rules may result in the rejection of your bid. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid.

(a) CONTRACT ITEM DESCRIPTIONS. A summary description of each contract item advertised in this invitation is given following these instructions by item numbers. Bids shall be submitted by item number. A contract number appears after the item number. The contract number will also be shown on the contract documents for the contract that the item number represents. The summary description provided for the proposed work, quantities and time for completion for each item are for information only and are subject to the terms published in the contract documents for bidding.

(b) CONTRACT DOCUMENTS FOR BIDDING. Contract documents for bidding include a Notice to Bidders, Specifications, Proposal, Contract and Contract Bond document and a set of Plan documents. These documents may be separate or combined into one document. Contract documents for bidding applicable to each item number advertised in this invitation may be examined at the above address of the Chief Contracts Official. In addition, contract documents for bidding highway work may be examined at the respective District Offices in which the prospective work is located. The names and addresses of the District Engineers are as follows:

REGION DISTRICT ENGINEER ADDRESS Phone

1 1 J. A. Fortmann 201 West Center Court, Schaumburg, IL 60196-1096 (847) 705-4000 2 2 P. A. Loete 819 Depot Avenue, Dixon, IL 61021-3546 (815) 284-2271 2 3 P. A. Loete 700 East Norris Drive, PO Box 697, Ottawa, IL 61350-0697 (815) 434-6131 3 4 K. A. Garnett 401 Main Street, Peoria, IL 61602-1111 (309) 671-3333 3 5 K. A. Garnett 13473 IL Hwy 133, PO Box 610, Paris, IL 61944-0610 (217) 465-4181 4 6 J. M. South 126 East Ash Street, Springfield, IL 62704-4792 (217) 782-7301 4 7 J. M. South 400 West Wabash, Effingham, IL 62401-2699 (217) 342-3951 5 8 J. L. Keirn 1102 Eastport Plaza Dr., Collinsville, IL 62234-6198 (618) 346-3100 State Transportation Building 5 9 J. L. Keirn (618) 549-2171 PO Box 100, Carbondale, IL 62901-0100

Contract documents for bidding will not be loaned to prospective bidders. Electronic plans and proposals may be downloaded from the Department’s Web Site.

(c) PREQUALIFICATION. Any contractor desiring to submit a bid shall be prequalified in accordance with the rules of the Department, adopted at 44 Illinois Administrative Code Section 650, prior to being granted authorization to bid. Prequalification may be waived for particular contract items. In such cases, the manner of determining bidder responsibility will be stated in the contract documents for bidding. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor’s Statement of Experience and Financial Condition no later than 4:30 p.m. prevailing local time, April 1, 2016. A contractor will not be

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 prequalified for this letting unless the statement is received before the time and day established.

(d) AUTHORIZATION TO BID. Contractors planning to submit a bid MUST request authorization to bid. Requests for authorization to bid must be received prior to 4:30 p.m. prevailing local time April 19, 2016 at the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764. The Request for Authorization to Bid/or Not For Bid Status” (BDE 124) can be downloaded from the Department’s Website

(e) AFFIDAVIT OF AVAILABILITY. In addition to the authorization to bid, prospective bidders shall submit an Affidavit of Availability prior to 4:30 p.m. prevailing time April 19, 2016. The Affidavit must include all uncompleted contracts awarded to them and all low bids pending award for all public and private work using the prescribed format. The sworn statement relative to contracts and pending awards must be in complete detail, be properly signed and be notarized. Facsimiles of the sworn statement will be accepted for analysis, but Authorization to Bid will be issued only upon receipt of a signed and properly completed original Affidavit of Availability. Any omission or misstatement of fact in the sworn statement will be considered as sufficient grounds for the disqualification of the bidder and the rejection of bids. Prospective bidders shall notify the Department within two working days of any low bids pending award or contracts awarded which might occur between the date of submission of the sworn statement and the date of letting. The Affidavit of Availability can be downloaded from the Department’s Website.

(f) JOINT VENTURES. Prequalified contractors desiring to bid as a joint venture must submit the properly completed documentation no later than 4:30 p.m. prevailing local time on April 15, 2016. The required forms for the joint venture are: • “Affidavit of Availability” (BC 57) from each of the joint venture entities, • “Certificate of Joint Venture” (BC 2267), • “Request for Authorization to Bid/or Not for Bid Status” (BDE 124). The Certificate of Joint Venture and the Request for Authorization to Bid/or Not for Bid Status forms must be in the name of the Joint Venture. The original, signed and notarized Certificate of Joint Venture and Affidavits of Availability must be received before consideration will be given for the Joint Venture request.

(g) EXAMINATION OF CONTRACT DOCUMENTS AND SITE OF THE WORK. The bidder shall, before submitting a bid on any contract item, carefully examine the provisions of the contract documents for bidding and all contract documents referenced therein that comprise the contract as defined in Article 101.09 of the Standard Specifications for Road and Bridge Construction. The bidder shall inspect in detail the site of the proposed work, investigate and become familiar with all the local conditions affecting the contract and the detailed requirements for construction.

If the Department has made a sub-surface examination of the site of the work, the borings, test pits, or other information pertaining thereto are available for examination by all bidders by written request to the office of the District Engineer of the district in which the work is to be performed. The availability of subsurface information from the Department is solely for the convenience and information of the bidder and shall not relieve the bidder of the duty to make, and the risk of making, examinations and investigations as required to assess conditions affecting the work. Any data furnished in the contract plans is for information only and does not constitute a part of the contract. The Department makes no representation or warranty, expressed or implied, as to the information conveyed or as to any interpretations made from the data.

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 Submission of a bid shall be a conclusive assurance and warranty the bidder has made these examinations and the bidder understands all requirements for the performance of the work. If the bid is accepted, the bidder will be responsible for all errors in the proposal resulting from a failure or neglect to comply with these instructions. The Department will not be responsible for any costs, expenses, losses, or change in anticipated profits resulting from such failure or neglect of the bidder to make these examinations.

The bidder shall take no advantage of any error or omission in the proposal and advertised contract. Any prospective bidder who desires an explanation or interpretation of the plans, specifications, or any of the contract documents, shall request such in writing from the Central Bureau of Design and Environment at the above address of the Chief Contracts Official. The request should be made in sufficient time to allow a written reply by the Department that can reach all prospective bidders before submission of their bids. Any reply given a prospective bidder concerning any of the contract documents, plans, and specifications will be furnished to all prospective bidders in the form determined by the Department including, but not limited to, an addendum, if the information is deemed by the Department to be necessary in submitting bids or if the Department concludes the information would aid competition. Oral explanations, interpretations, or instructions given before the submission of bids unless at a pre-bid conference will not be binding on the Department.

(h) ADDITIONAL INSTRUCTIONS. The Notice to Bidders, Specifications, Proposal, Contract and Contract Bond document for each contract item includes specific and additional information and instructions pertaining to submission of bids. That information should be carefully read and the instructions followed by the bidder.

4. IMPORTANT DATES FOR BIDDERS. All due dates published in this invitation are summarized for convenient reference by potential bidders on the page entitled “Important Dates for Bidders”. Bidders are cautioned that all due dates are strictly enforced.

5. PART OF THE CONTRACT. This invitation is made part of the contract by operation of Article 101.09 of the Standard Specifications for Road and Bridge Construction.

This invitation issued under the authority of the Department of Transportation, State of Illinois.

Randall S. Blankenhorn, Secretary of Transportation

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016

IMPORTANT DATES FOR BIDDERS

April 22, 2016 Bid Opening

PREQUALIFICATION

Any contractor who desires to become prequalified to bid on work advertised by IDOT must submit the properly completed prequalification forms to the Bureau of Construction no later than 4:30 p.m. prevailing time twenty-one days prior to the letting of interest. This prequalification requirement applies to first time contractors, contractors renewing expired ratings, contractors maintaining continuous prequalification or contractors requesting revised ratings

The prequalification cut-off date is 4:30 p.m. prevailing time April 1, 2016 . To be eligible to bid, existing prequalification ratings must be effective through the date of letting.

JOINT VENTURES

Prequalified contractors wishing to combine bidding capacity and bid items as joint ventures must submit the appropriate properly completed forms no later than 4:30 p.m. prevailing time, seven (7) days prior to the letting date. The required joint venture forms are the “Request for Authorization to Bid/or Not for Bid Status” (BDE 124), the ORIGINAL “Affidavit of Availability” (BC 57) and the ORIGINAL “Certificate of Joint Venture” (BC 2267).

The Joint venture cut-off date is 4:30 p.m. prevailing time April 15, 2016 .

REQUESTS FOR AUTHORIZATION TO BID

Contractors wanting to bid on items included in a particular letting must submit the properly completed “Request for Authorization to Bid/or Not for Bid Status” (BDE 124) and the properly completed ORIGINAL “Affidavit of Availability” (BC 57) to the proper office no later than 4:30 p.m. prevailing time, three (3) days prior to the letting date.

The Authorization to Bid request cut-off date is 4:30 p.m. prevailing time April 19, 2016 .

SUBMITTAL OF BIDS

The time and place of letting is always listed in the Transportation Bulletin. Most lettings are held at 10:00 a.m. prevailing time in the Auditorium of the IDOT Harry R. Hanley Building located at 2300 South Dirksen Parkway, Springfield, Illinois.

No bid will be accepted unless delivered prior to the time specified in the Transportation Bulletin. Bidders submitting bids by U.S. Mail or courier are cautioned to allow sufficient time for delivery.

DBE UTILIZATION PLANS

Projects with DBE participation require low bidders to submit a DBE Utilization Plan in accordance with the DBE special provision.

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 IDOT LETTING SCHEDULE 2015 - 2018

Transportation Pre-Qualification Joint Venture Bid Authorization DBE Utilization Plan Letting Day (SBE 2025 and SBE 2026) Bulletin "Cut Off" "Cut Off" "Cut Off" LOW BIDS ONLY

3/18/2016 4/1/2016 4/15/2016 4/19/2016 4/22/2016 4/27/2016

5/6/2016 5/20/2016 6/3/2016 6/7/2016 6/10/2016 6/15/2016

6/24/2016 7/8/2016 7/22/2016 7/26/2016 7/29/2016 8/3/2016

8/12/2016 8/26/2016 9/9/2016 9/13/2016 9/16/2016 9/21/2016

9/30/2016 10/14/2016 10/28/2016 11/1/2016 11/4/2016 11/9/2016

12/9/2016 12/30/2016 1/13/2017 1/17/2017 1/20/2017 1/25/2017

2/3/2017 2/17/2017 3/3/2017 3/7/2017 3/10/2017 3/15/2017

3/24/2017 4/7/2017 4/21/2017 4/25/2017 4/28/2017 5/3/2017

5/12/2017 5/26/2017 6/9/2017 6/13/2017 6/16/2017 6/21/2017

6/30/2017 7/14/2017 7/28/2017 8/1/2017 8/4/2017 8/9/2017

8/18/2017 9/1/2017 9/15/2017 9/19/2017 9/22/2017 9/27/2017

10/13/2017 10/27/2017 11/13/2017 11/14/2017 11/17/2017 11/22/2017

12/15/2017 12/9/2017 1/12/2018 1/16/2018 1/19/2018 1/24/2018

2/2/2018 2/16/2018 3/2/2018 3/6/2018 3/9/2018 3/14/2018

3/23/2018 4/6/2018 4/20/2018 4/24/2018 4/27/2018 5/2/2018

5/11/2018 5/25/2018 6/8/2018 6/12/2018 6/15/2018 6/20/2018

6/29/2018 7/13/2018 7/27/2018 7/31/2018 8/3/2018 8/8/2018

8/17/2018 8/31/2018 9/14/2018 9/18/2018 9/21/2018 9/26/2018

10/5/2018 10/19/2018 11/2/2018 11/6/2018 11/9/2018 11/14/2018

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 “““LETTING“LETTINGLETTINGLETTING YOUYOUYOU KNOWKNOWKNOW”KNOW”””

The Illinois Department of Transportation (IDOT) is interested in maintaining close communications with industry. This newsletter highlights subjects that we believe will be of interest to you.

No. 160 March 2016

FABRICATION OF The Illinois Department of Transportation has recently updated the HIGHWAY SIGNS Fabrication of Highway Signs Policy which is referenced in the Standard POLICY Specifications for Road and Bridge Construction. This version of the policy, dated February 1, 2016, lists the specific types of retroreflective sheeting required to be used in the fabrication of highway signs.

A significant revision to the policy involves the inclusion of work zone signing. The 2012 and earlier editions of the Standard Specifications for Road and Bridge Construction contained a specific table of minimum retroreflective values in Article 1106.01 that work zone sign sheeting was required to meet. For the 2016 Standard Specifications for Road and Bridge Construction, this table has been removed and the required type of work zone sign sheeting to be used is now listed in the updated Fabrication of Highway Signs Policy similar to permanent highway signs.

Please note the following language in the last paragraph of the Introduction section of the updated Fabrication of Highway Signs Policy:

To allow contractors and local agencies time to refurbish or fabricate new work zone signs in accordance with this policy, existing stock of work zone signs may be used for contracts let prior to January 1, 2017 and existing stock of fluorescent orange work zone signs fabricated with type ZZ sheeting may be used until the end of their service life.

The Department believes these updated requirements for work zone signs will improve their quality and visibility and help improve safety within work zones.

EXECUTIVE ORDER The Illinois Department of Transportation (IDOT) will implement the 15-12 REPORTING reporting requirements for EO 15-12 with revised form SBE 956 for Equal Employment Opportunity Workforce Analysis. In addition to the customary reporting requirements, IDOT added data fields for veteran reporting. Any questions concerning the report should be directed to district EEO/Contract Compliance Officers. Executive Order 15-12: http://www.illinois.gov/Government/ExecOrders/Pages/2015_12.aspx

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016

PROFILE EQUIPMENT The 2016 Profile Equipment Verification (PEV) program will be VERIFICATION (PEV) conducted by Applied Pavement Technology, Inc. this spring on behalf PROGRAM of the Bureau of Materials and Physical Research. The PEV program is required for any Contractor or Subcontractor conducting surface profile testing using the 0.00-inch blanking band. These projects include any of the following: • contracts let after January 1, 2013 including work under Articles 407.09 or 420.10 of the Standard Specifications for Road and Bridge Construction, • contracts including the Special Provision for Surface Testing of Pavements, or • contracts including the Special Provision for Surface Testing of Hot-Mix Asphalt Overlays. The 2016 PEV program is tentatively scheduled for the weeks of April 25, May 2, and May 9, 2015. Participants in last year's program will need to have their profile equipment re-verified (this is an annual program). If you or a Subcontractor has profile equipment to be verified, please contact either of the following individuals.

NOTE: No walk-ins will be allowed.

Phil Weber Applied Pavement Technology, Inc. (217) 398-3977 [email protected]

Dustin Pulleyblank Applied Pavement Technology, Inc. (217) 398-3977 [email protected]

If you have any questions about the PEV program, please contact the following individual at the Bureau of Materials and Physical Research.

LaDonna Rowden Illinois Department of Transportation Bureau of Materials and Physical Research (217) 782-8582 [email protected]

STAY INFORMED! Keep in touch with your representative on the IDOT/Industry Policy Committee and the IDOT/Industry Joint Co-op Committee.

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 Bureau of Design and Environment Contractor Publications Electronic Subscription Service

To receive construction contractor related publications and reports through the free subscription service, please follow the instructions to subscribe. The information will be automatically emailed to the subscriber on the publish date. The following publications and reports are currently available for subscription: To subscribe to the list, click on “SUBSCRIBE” and send the blank email that opens (Don’t add anything to the subject line or to the body of the email). Directions for unsubscribing are included with each email notification.

IDOT Contractor’s Packet SUBSCRIBE PLEASE NOTE: The IDOT Contractor’s Packet automatically subscribes the requestor to all of the following publications and reports. Those not wishing to receive all of the following lists can subscribe to the desired lists individually

IDOT Addendum/Revision Checklist SUBSCRIBE A list showing Letting items that have changed as a result of a revision or an addendum. The contractors should use this checklist to ensure they have incorporated into their plans and proposals all addenda that have been issued for each particular letting item. The checklist also identifies withdrawn and deleted items. The checklist is published regularly whenever addenda are processed.

IDOT Aeronautics Unit Price Tabulation of Bids SUBSCRIBE A listing of all unit price bids on awarded jobs for the letting, sorted by letting item. The listing identifies the actual bidders, the as-read bid amounts, the corrected bid amounts (if applicable) and the low bidders. The listing is not published until jobs are awarded. Typically, Unit Price Tabulation of Bids listings begin to be published four to eight weeks after the letting, excluding the federal discretionary seeking projects placed on the March and August lettings. These may take several months before funds are secured and the projects awarded.

IDOT As Read Tabulation of Bids SUBSCRIBE A listing of all bids as they were read at the bid opening. The bid amounts are not checked at the time this listing is produced. This listing also includes a page which identifies all letting items for which the as read low bid was, prior to a post letting review, within a reasonable approximation of the Engineer’s estimate. The listing is usually published by 4:30 p.m. of the day of the letting.

IDOT Price Indices SUBSCRIBE A monthly posting of the average price of Bituminous, Steel and Fuel; used in determining cost adjustments on contracts containing the special provision.

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 IDOT CBID Files SUBSCRIBE The CBID files contain the pay items and quantities for a contract, as well as macros to prepare and print a bid. These files are in Microsoft Excel format (xls). CBID files are put on the Website as they become available. It is your responsibility to determine which, if any, addenda pertains to any project you may be bidding. Failure to incorporate all relevant addenda may cause your bid to be declared unacceptable. Note that the CBID filename is the same as the IDOT Contract Number. Please refer to the Transportation Bulletin – Notice of Letting for the correct contract number.

IDOT Construction Contractor’s Transportation Bulletin – Notice of Letting SUBSCRIBE This is the official publication and invitation for construction bids by the Illinois Department of Transportation’s Division of Highways, IDOT Division of Aeronautics and the Illinois Department of Natural Resources. The bulletin also contains information pertaining to pre- bid meetings, the DBE program and other current information. The bulletin will be published on the advertised publish date for each regularly scheduled letting. Special lettings will have applicable bulletins published at least 14 days prior to the letting on an as-needed basis.

IDOT Corrected Tabulation of Bids SUBSCRIBE A report that lists of all bids for the letting, sorted by letting item. All bids have been recalculated and checked before this listing is produced. The report identifies the eligible bidders, the actual bidders, the as-read bid amounts, the corrected bid amounts (if applicable) and the low bidders for the letting. The listing is usually published within 14 days after the letting.

IDOT Federal Wage Rates Listing SUBSCRIBE Identifies the current federal wage rates to be used by contractors for preparing bids whenever the construction activities are federally participating. The federal wage rates will be published 10 days prior to the letting date.

IDOT For Bid List of Bidders SUBSCRIBE The IDOT For Bid List of Bidders is a compilation of all potential bidders who have been authorized to bid on each letting item for each letting. A separate list is compiled for each letting and the list is sorted by letting item. The list will be published several times with the last time being one day prior to the letting.

IDOT Local Roads Contractors Bulletin SUBSCRIBE The Contractors Bulletin is a weekly publication advertising locally let and "material only, bids" for local agencies, counties, cities/villages, and road districts throughout the state. The bulletin is in three parts: (1) previous advertisements for two weeks, (2) new advertisements with a description of the job, the date and time of letting, description of the material needed for bidding and any other information, and (3) awarded projects identifying the successful bidder and the dollar amount.

IDOT News Flash from BDE SUBSCRIBE A News Flash is important information released by the IDOT Bureau of Design and Environment which all contractors should read. This is information that becomes available after publication of the Notice of Letting Bulletin.

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 IDOT Not For Bid List of Bidders SUBSCRIBE A compilation of companies interested in participating in a construction project as a sub- contractor or as a supplier. A separate list is compiled for each letting and the list is sorted by letting item. The list will be published several times prior to the Letting and a final list will be published the day before the Letting.

IDOT Pay Item Report SUBSCRIBE A report showing all the pay items on the letting. For each pay item, the listing identifies the quantity, letting item number, contract number, county, IDOT district office and the unit of measure. The Pay Item Report will be published after all proposals have been posted to the Web Site.

IDOT Pay Item Report with Awarded Prices SUBSCRIBE A listing of all pay items on a letting. For each pay item, the listing identifies the quantity, letting item number, contract number, county, IDOT district office and the unit of measure. This report has an added column which is the awarded unit price of each item. The Pay Item Report with Awarded Prices will be published after the last item on the letting is awarded.

IDOT Unit Price Tabulation of Bids SUBSCRIBE A listing of all unit price bids on awarded jobs for the letting, sorted by letting item. Whereas the As Read Tabulation of Bids and the Corrected Tabulation of Bids provide the sum total amount bid for each letting item, the Unit Price Tabulation of Bids provides the break down of all bids per line item unit price, and it is only provided for awarded jobs. The listing identifies the actual bidders, the as-read bid amounts, the corrected bid amounts (if applicable) and the low bidders. The listing is not published until jobs are awarded. Typically, Unit Price Tabulation of Bids listings begin to be published within three weeks after the letting and may continue for up to 60 days. Jobs through the Division of Aeronautics and the Department of Natural Resources are not included.

IDOT Transportation Procurement Bulletin SUBSCRIBE The Transportation Procurement Bulletin Web Page features procurement information for the construction and consulting industry, and the general public. Postings include Invitations to Bid and Request for Proposals from a variety of Bureaus within the Department of Transportation. The site also features important procurement information and links to contract award notices including sole source procurements, emergency purchases, change orders which exceed $30,000, and renewal notices. Subscribers will receive notification when new procurement opportunities are posted to the Web page.

If you have questions, contact Tim Garman at (217)524-1642 or [email protected]

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 Electronic Subscription Service

Bureau of Design and Environment Manual and Procedure Memorandum Updates

Bureau of Design and Environment Manual The Bureau of Design and Environment Manual (BDE Manual) has been prepared to provide uniform policies and procedures for the Department and consultant personnel preparing Phase I studies and reports and contract plans for Department. The BDE Manual presents most of the information normally required for location, design and environmental evaluation of highway construction projects on the state highway system. Download the BDE Manual.

BDE Procedure Memorandums The BDE Procedure Memorandums are used as a means to implement changes in procedures, policies, directives, and/or criteria in the interim between issuance of updates to the BDE Manual. The designer should refer to these when using the BDE Manual until such time as they are superseded or incorporated into an updated edition of the BDE Manual. Download the BDE Procedure Memorandums

To receive updates related to the BDE Manual and BDE Procedure Memorandums through the free subscription service, click on the link below and send the blank email that pops up. (Do not add anything to the subject line or to the body of the email). Directions for unsubscribing are included with each email notification.

SUBSCRIBE to the BDE Manual and Procedure Memorandum Updates subscription list

If you have questions, contact Tim Garman at (217)524-1642 or [email protected]

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 Electronic Subscription Service

Highway Standards

Highway Standards are drawings that show the details of various construction items and are considered part of the plans. The Highway Standards applicable to a particular contract are referenced on the cover sheet of the plans.

The Highway Standards are only available on the Department’s Web Site

To receive updates related to the Highway Standards through the free subscription service, click on the link below and send the blank email that pops up. (Do not add anything to the subject line or to the body of the email). Directions for unsubscribing are included with each email notification.

SUBSCRIBE to the Highway Standards subscription list

If you have questions, contact Tim Garman at (217)524-1642 or at [email protected]

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 NOTICE TO ALL BIDDERS

TO REPORT BID RIGGING, BIDDER COLLUSION OR OTHER FRAUDULENT ACTIVITIES

The U.S. Department of Transportation (USDOT) maintains a Hotline Complaint Center and operates a toll-free “hotline” Monday through Friday, 8:00 a.m. to 5:00 p.m., eastern time. Anyone with knowledge of possible bid rigging, bidder collusion, DBE fraud or other fraudulent activities should use the following hotline number or address to report such activities:

Hotline Number:

(202) 755-1855 or 800-424-9071

Hotline Address:

Office of Inspector General P. O. Box 23178 L’Enfant Plaza Station Washington, D.C. 20024-0178

The hotline is part of USDOT’s continuing effort to identify and investigate highway construction contract fraud and abuse and is operated under the direction of USDOT’s Inspector General. All information will be treated confidentially and caller anonymity will be respected.

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016

SPECIAL NOTICE

ELECTRONIC BID DISPUTE RESOLUTION

If you believe your electronically submitted bid is in error and not what you submitted to the iCX SecureVault please submit a request to the department on company letterhead identifying the letting date, contract number, and iCX bid submittal confirmation number to:

Illinois Department of Transportation Contracts Office, Room 326 2300 South Dirksen Parkway Springfield, IL 62764 Attn: Jim Layden

The department will contact ExeVision, LC to release the available data directly to your firm.

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 Special Notice Regarding IDOT Proposals and Authorization To Bid.

ABOUT IDOT PROPOSALS

All proposals issued by IDOT are potential bidding proposals. Each proposal contains all Certifications and Affidavits, a proposal signature sheet and a Proposal Bid Bond required for a Prime Contractor to submit a bid after written AUTHORIZATION TO BID has been issued by IDOT. A Proposal Bid Bond is not required on items designated as Small Business Set-Asides.

ABOUT AUTHORIZATION TO BID

WHO CAN BID? Bids will be accepted from only those companies that request and receive written Authorization to Bid from IDOT. To request authorization, a potential bidder must complete and submit Part A of the Request for Authorization to Bid/or Not For Bid Status for (BDE 124).

WHAT CONSTITUTES AUTHORIZATION TO BID? When a prospective prime bidder submits a BDE 124 and the Affidavit of Availability (BC 57), he/she must indicate at that time which items are being requested for bidding purposes. Only those items requested For Bidding will be analyzed. After the request has been analyzed, the bidder will be issued an Authorization To Bid or Not For Bid Report that indicates which items have been approved for bidding. If Authorization to Bid cannot be approved, the Authorization To Bid or Not For Bid Report will indicate the reason for denial.

FIRMS UNSURE AS TO AUTHORIZATION STATUS? Firms that have not received an authorization form within a reasonable time of complete and correct original document submittal should contact the department as to status. This is critical in the week before the letting. These documents must be received by three days before the letting date. Firms unsure as to authorization status should call the Prequalification Section of the Bureau of Construction at 217/782-3413.

NOTICE

NO AUTHORIZATION TO BID WILL BE ISSUED UNTIL A COMPLETED PART A OF FORM BDE 124 AND THE ORIGINAL AFFIDAVIT OF AVAILABILITY HAS BEEN FILED WITH THE CENTRAL BUREAU OF CONSTRUCTION.

FOR SMALL BUSINESS SET-ASIDES, THE AFFIDAVIT OF AVAILABILITY (BC 57) IS NOT REQUIRED.

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 SPECIAL NOTICE

Highway Construction Careers Training Program (HCCTP)

The Department strongly encourages the prime contractor and their approved sub-contractors to hire minority, women and disadvantaged individuals from its federally funded Highway Construction Careers Training Program (HCCTP) to help meet workforce and trainee goals. This program is training minorities, women and disadvantaged individuals in highway construction-related skills, e.g., math for the trades, job readiness, technical skills coursework (carpentry, concrete flatwork, blueprint reading, site plans, site work, tools use, etc.) and OSHA 10 hour certification, to prepare them for a career in the highway construction trades. Graduates are well- trained and ready to become productive entry-level construction workers. Contact the appropriate district EEO officer to learn more about the program and for assistance in meeting workforce and trainee goals.

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 SPECIAL NOTICE

Please discontinue faxing your Affidavit of Availability with your Request for Authorization to Bid/or Not For Bid Status request.

We are required to use only the Original Affidavit of Availability to determine a contractor’s authorization to bid. This document has a notarized signature and we must have the original signature prior to processing your request. The faxed copies are not being looked at and are just generating excess paper that we have to destroy.

Thank you for your cooperation in this matter.

If you have questions please contact Jim Layden at (217) 782-7806 or [email protected].

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 SPECIAL NOTICE

Subcontractor Registration

Subcontractors interested in participating on contracts are required to register with the Department. Prequalified contractors, consultants, material suppliers and trucking companies are NOT required to register. Subcontractors can register electronically on the Department’s Web Site. Under the Construction Services header, click on the Subcontractors tab, then, Subcontractor Registration.

The registration form requires minimal information and can be completed in minutes. Confirmation, along with a registration number, will be received by e-mail in 1-2 days. Registration is valid for one year and will then require renewal. Questions may be addressed to the Prequalification Section, Bureau of Construction.

Phone: (217) 782-3413 E-mail: [email protected]

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016

SPECIAL NOTICE

IMPORTANT NOTICE FOR ALL ILLINOIS CONTRACTORS/CONSULTANTS

The Procurement Communication Reporting requirements of Public Act 96-0795 and Public Act 96-0920 (Senate Bill 51 and Senate Bill 3576) became effective on January 1, 2011. The new law requires the following communications to be reported to the Procurement Policy Board (PPB):

• Communication pertaining to the substance of a procurement matter. • Communication that suggests a change or asks for a change to be made to a procurement matter. • Communication regarding a change order, contract renewal or extension, and contract awards for a procurement matter initiated by a vendor.

In addition, a vendor is prohibited from bidding on or entering into a contract if the vendor:

• Assisted the agency in determining a need for a contract (except as part of a public Request for Information). • Assisted the agency by reviewing, drafting or preparing an invitation for bid, RFI or RFP, etc. (except as part of public opportunity).

Please note that the following communications need not be reported:

• Statements made by a person in a public forum such as a trade show or public meeting. • Statements made regarding a matter of practice or procedure. • Statements initiated by a state employee about products, services, or industry best practices. • Statements initiated by a vendor concerning general information about products, services, or industry best practices -- so long as they are not specific to a current or potential procurement matter. • Communications initiated by a vendor regarding construction or construction-related contracts resulting in a contract modification of less than $250,000.

In order to conform to these new requirements, please note that IDOT intends to fully report the substance of any reportable procurement communications to the PPB through a web application developed by Central Management Services. The law requires the PPB to post all communications received on their website within 7 days of receipt of the report.

It is important to understand that all communications received by IDOT employees from vendors will be handled in compliance with the new law. This means that any phone calls, face-to-face conversations, e-mails, or other types of communications that trigger reporting will be fully reported to the PPB in accordance with the law and will ultimately be made public on the PPB Internet Site.

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 SPECIAL NOTICE

PAY ITEMS SUBMITTED WITH BIDS

• Please refer to paragraph 7 in the proposal referring to the Schedule of Prices when submitting bids.

• Unit prices are to be submitted in U. S. dollars and cents.

• Fractions of a cent will be rounded down to the next whole number.

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 SPECIAL NOTICE

BID SUBMISSIONS FOR LETTINGS

 Please use the provided Cover Page (page 4 of the proposal package) as the first page of your submitted bid.  Please remember to staple your bid together.  Proposals should be printed one-sided. (double side copies create problems processing the bid).

Thank you for your cooperation.

If you have questions please contact Jim Layden at (217) 782-7806 or [email protected]

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 SPECIAL NOTICE

SMALL BUSINESS SET-ASIDES

Several items on this Letting are designated as small business set-asides. In accordance with Section 45-45 of the Illinois Procurement Code and the rules of the Department, only bids from qualified small businesses will be considered for award. No construction business is a small business if its annual sales and receipts exceed $14,000,000.

To encourage maximum competition, these Small Business Set-Asides are open bidding items. In accordance with the rules of the Department, prequalification is waived for these items. All bidders, including those correctly prequalified by the Department, are required to submit with the bids a Qualification and Equipment Inventory Certification Form. The form is included with the proposal and bidding documents (pages 11a – 11h).

You will find a current list of Set-Asides on the following page of this bulletin. There will be Small Business Set-Asides on future Lettings as well.

All bidders planning to bid on a designated Small Business Set-Aside MUST submit a Request For Authorization To Bid/or Not For Bid Status form (BDE 124) to the Plans & Contracts Office by 4:30 pm, the Tuesday prior to the letting. Bidders submitting bids on designated Small Business Set-Aside projects are NOT required to be prequalified by the department, and therefore NOT required to submit an Affidavit of Availability (BC 57).

If you have any questions please contact Jim Layden at 217-782-7806 or send an email to [email protected] .

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 SMALL PROJECTS LISTING

04/22/2016

Small Business Initiative Projects

The following items are designated as Small Business Set-Asides. In accordance with Section 45-45 of the Illinois Procurement Code and the rules of the Department, only bids from qualified small businesses will be considered for award. No construction business is a small business if its annual sales and receipts exceed $14,000,000.

To encourage maximum competition, these Small Business Set-Aside projects are open bidding items. All bidders are required to submit with the bids a Qualification and Equipment Inventory Certification Form. The form is included with the proposal and bidding documents.

13 14 21 22 23 33 51 69

Hot-Mix Asphalt Projects (less than 3000 Ton)

The following items are small HMA projects designated to encourage the participation of prequalified small businesses and or prequalified Disadvantaged Business Enterprises. These items have up to 3,000 tons of bituminous products; however, the ownership of a bituminous plant is not required in accordance with 44 Illinois Administrative Code 650.70. These designated projects are open for bidding by any pre-qualified contractor with a Hot-Mix Asphalt (HMA) Paving work rating or a Hot-Mix Asphalt (HMA) Plant Mix work rating. All other prequalification requirements are unchanged.

8 9 24 64 80 111 112 114 115 117 140 143 146 151 158

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 SPECIAL NOTICE

RULE FOR SUBMITTAL OF DBE UTILIZATION PLANS

All prime contractors please note that a complete DBE Utilization Plan includes forms SBE 2025 and SBE 2026.

Both forms are required to be submitted in accordance with the DBE special provision on all construction contracts that contain a specified goal in the special provision for Disadvantaged Business Enterprise Participation.

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - SPECIAL NOTICE REGARDING DISADVANTAGED BUSINESS ENTERPRISE PARTICIPATION -

1. Disadvantaged Business Enterprise (DBE) Utilization Plan For proposals that contain a Special Provision for Disadvantaged Business Enterprise Participation it is the responsibility of each bidder to submit a DBE Utilization Plan (Plan) (Form SBE 2026 and Form SBE 2025) as required by the Special Provision. Forms for the submittal of the Plan are available on the IDOT Web Site, in each district’s Bureau of Construction office or by calling IDOT’s Bureau of Small Business Enterprises at (217) 782-5490.

DBE Plan submittal - As detailed in the Special Provision entitled “DISADVANTAGED BUSINESS ENTERPRISE PARTICIPATION (BDE)”; all bidders must submit Form SBE 2026 and Form SBE 2025 in accordance with the DBE special provision.

SEE THE SPECIAL PROVISIONS WITHIN THE PROPOSALS FOR SPECIFIC DBE GOAL PERCENTAGES

2. Illinois Unified Certification Program DBE Directory Pursuant to the requirements of the federal regulations, all state transportation agencies that receive federal-aid funds are required to implement a “one-stop” certification process for DBEs. As a result of this requirement, IDOT, together with the City of Chicago, CTA, Metra and Pace, has established the Illinois Unified Certification Program (IL UCP).

The IL UCP maintains a DBE Directory to provide a reference source to assist bidders/proposers in meeting DBE contract goals. The DBE Directory lists the DBE-certified firms in alphabetical order with their address, contact information and specialty of work. It is the responsibility of the prime contractor/consultant to make his/her own determination regarding the capability of a DBE firm. Only those firms certified as of the letting date/bid opening may be utilized in meeting a DBE contract goal.

3. Supportive Services Consultants IDOT’s Office of Business and Workforce Diversity’s Bureau of Small Business Enterprises administers the federal Disadvantaged Business Enterprise (DBE) program. The goal of IDOT’s DBE Supportive Services program is to provide assistance that fosters opportunities for DBE firms to participate in IDOT’s transportation-related contracts.

IDOT contracts with outside consultants to provide its DBE firms with management and technical supportive services assistance. This assistance is provided at no cost to IDOT’s DBE firms, to those firms seeking IDOT DBE program certification, to IL UCP DBE-certified firms who hold (or are bidding on) IDOT contracts, and to prime contractors doing business with IDOT.

Management assistance includes, but is not limited to, assistance with cash flow, bonding and financing, obtaining work/equipment/other resources, obtaining payments for work completed, preparation of business plans, computer technology, certification/prequalification application assistance, assessment of management/accounting/computer systems, assistance with loan package preparation, development of web site/marketing materials/safety plans, and IDOT DBE workshops on various topics.

Districts 1 - 3 Districts 4, 5, 6, 7, 8, 9 Mr. Theo Joyner, Project Director Mr. Mark Vaughn, Project Director Ralph G. Moore & Associates Franklin & Vaughn, LLC 401 South LaSalle, Suite 1401 1 Sunset Hills Professional Center, Suite D Chicago, IL 60605 Edwardsville, IL 62025 Phone: 312/419-7260 Fax: 312/419-1918 Phone: 618/614-3194 Fax: 618/675-4426 Email: [email protected] Email: [email protected]

Technical Assistance includes, but is not limited to, assistance with estimating, bidding, negotiations, technical tasks, reading specifications and plans, developing production schedules, preparing required reporting forms and documentation, reviewing IDOT contract-related documents/reports, assistance with IDOT project site inspections/meetings and contract troubleshooting, and IDOT DBE workshops on various topics.

Districts 1, 2, 3, 4, 5, 6, 7, 8, 9 Districts 1, 2, 3, 4, 5, 6, 7, 8, 9 André O. Williams, Organizational Development Specialist Kevin Hayes, District 1 Lead Contact Person Millennia Professional Services ESI Consultants, Ltd. 850 North Main Street 208 South LaSalle Street, Suite 1705 Morton, IL 61550 Chicago, IL 60604 Phone: 309/222-0787 Phone: 312/277-1700 Fax: 309/321-8142 Fax: 312/735-6741 E-mail: [email protected] E-mail: [email protected]

Districts 1, 2, 3, 4, 5, 6, 7, 8, 9 District 6 Ramon Dela Cruz, P.E., Vice President Rich Nowack, Project Director Millennia Professional Services Quigg Engineering, Inc. 2600 Warrenville Road, Suite 203 2000 South Main Street, Suite A Downers Grove, IL 62650 Jacksonville, Illinois 62650 Phone: 630/742-1000 Fax: 630/839-2566 Phone: 217/245-5375 Fax: 217/245-5398 E-mail: [email protected]@mps-il.com E-mail: [email protected]

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 4. FDIC Definition of Minority Depository Institution Section 308 of the Financial Institutions Reform, Recovery, and Enforcement Act of 1989 ("FIRREA") requires the Secretary of the Treasury to consult with the Director of the Office of Thrift Supervision and the Chairperson of the FDIC Board of Directors to determine the best methods for preserving and encouraging minority ownership of depository institutions. Section 308 of FIRREA defines the term "minority depository institution" as any depository institution where 51 percent or more of the stock is owned by one or more "socially and economically disadvantaged individuals."

Given the ambiguous nature of the phrase "socially and economically disadvantaged individuals," the FDIC's Policy Statement defines "minority depository institution" as any Federally insured depository institution where 51 percent or more of the voting stock is owned by minority individuals. "Minority" as defined by Section 308 of FIRREA means any "Black American, Asian American, Hispanic American, or Native American." The voting stock must be held by U.S. citizens or permanent legal U.S. residents to be counted in determining minority ownership.

In addition to institutions that meet the ownership test, institutions will be considered minority depository institutions if a majority of the Board of Directors is minority and the community that the institution serves is predominantly minority. Institutions that are not already identified as minority depository institutions can request to be designated as such by certifying that they meet the above definition. Institutions interested in self-certification should contact the National Coordinator of the FDIC's Minority Depository Institutions Program.

Minority Depository Institutions in Illinois

AMERICAN METRO BANK CHICAGO, IL AMERICAN METRO BANK , 667 N CASS AVE OFF WESTMONT, IL AMERICAN METRO BANK , CHINATOWN BRANCH CHICAGO, IL ILLINOIS-SERVICE FS&LA CHICAGO, IL ILLINOIS-SERVICE FS&LA , CHATAM BRANCH CHICAGO, IL INTERNATIONAL BANK CHICAGO CHICAGO, IL INTERNATIONAL BANK CHICAGO , BELLWOOD BRANCH BELLWOOD, IL INTERNATIONAL BANK CHICAGO , SOUTH CHINATOWN BRANCH CHICAGO, IL INTERNATIONAL BANK CHICAGO , STONE PARK BRANCH STONE PARK, IL MILLENNIUM BANK DES PLAINES, IL NATIONAL REPUBLIC BANK OF CHICAGO CHICAGO, IL PACIFIC GLOBAL BANK CHICAGO, IL PACIFIC GLOBAL BANK , 3233 S ASHLAND OFFICE CHICAGO, IL PACIFIC GLOBAL BANK , SOUTH ARCHER BRANCH CHICAGO, IL SEAWAY BANK & TRUST COMPANY CHICAGO, IL SEAWAY BANK & TRUST COMPANY , BROADVIEW BANKING CTR FACILITY BROADVIEW, IL SEAWAY BANK & TRUST COMPANY , BONZEVILLE FACILITY CHICAGO, IL SEAWAY BANK & TRUST COMPANY , CHATHAM RIDGE FACILITY CHICAGO, IL SEAWAY BANK & TRUST COMPANY , CRESTWOOD BRANCH CRESTWOOD, IL SEAWAY BANK & TRUST COMPANY , DRIVE-IN FACILITY CHICAGO, IL SEAWAY BANK & TRUST COMPANY , MAYWOOD BRANCH MAYWOOD, IL SEAWAY BANK & TRUST COMPANY , MICHIGAN AVE FACILITY CHICAGO, IL SEAWAY BANK & TRUST COMPANY , MIDWAY FACILITY CHICAGO, IL SEAWAY BANK & TRUST COMPANY , OHARE FACILITY BRANCH CHICAGO, IL SEAWAY BANK & TRUST COMPANY , WAUKEGAN FACILITY WAUKEGAN, IL URBAN PARTNERSHIP BANK CHICAGO, IL

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016

SPECIAL NOTICE

TITLE VI NOTICE—USDOT 1050.2A, Appendix A

The Illinois Department of Transportation, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. §§ 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

During the performance of this contract, the contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the “contractor”) agrees as follows:

1. Compliance with the regulations: The contractor (hereinafter includes consultants) will comply with the Acts and the Regulations relative to Non-discrimination in Federally-assisted programs of the U.S. Department of Transportation, FHWA, as they may be amended from time to time, which are herein incorporated by reference and made part of this contract. 2. Non-discrimination: The contractor, with regard to the work performed by it during the contract, will not discriminate on the grounds of race, color, or national origin in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The contractor will not participate directly or indirectly in the discrimination prohibited by the Acts and the Regulations, including employment practices when the contract covers any activity, project, or program set forth in Appendix B of 49 CFR Part 21, including FHWA Form 1273. 3. Solicitations for Subcontracts, Including Procurements of Materials and Equipment: In all solicitations, either by competitive bidding, or negotiation made by the contractor for work to be performed under a subcontract, including procurements of materials, or leases of equipment, each potential subcontractor or supplier will be notified by the contractor of the contractor’s obligations under this contract and the Acts and Regulations relative to Non- discrimination on the grounds of race, color, or national origin, including FHWA Form 1273. 4. Information and Reports: The contractor will provide all information and reports required by the Acts, the Regulations, and directives issued pursuant thereto and will permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the Recipient or the FHWA to be pertinent to ascertain compliance with such Acts, possession of another who fails or refuses to furnish the information, the contractor will so certify to the Recipient or the FHWA, as appropriate, and will set forth what efforts it has made to obtain the information. 5. Sanctions for Noncompliance: In the event of a contractor’s noncompliance with the Non-discrimination provisions of this contract as it or the FHWA may determine to be appropriate, including, but not limited to: a. Withholding payments to the contractor under the contract until the contractor complies; and/or b. Canceling, terminating, or suspending a contract, in whole or in part. 6. Incorporation of Provisions: The contractor will include the provisions of paragraphs one through six in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Acts, the Regulations and directives issues pursuant thereto. The contractor will take action with respect to any subcontract or procurement as the Recipient or the FHWA may direct as a means of enforcing such provisions including sanctions for noncompliance. Provided, that if a contractor becomes involved in, or is threatened with litigation by a subcontractor, or supplier, because of such direction, the contractor may request the Recipients to enter into any litigation to protect the interests of the Recipient. In addition, the contractor may request the United States to enter into the litigation to protect the interests of the United States.

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016

USDOT 1050.2A APPENDIX E

During the performance of this contract, the contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the "contractor") agrees to comply with the following non- discrimination statutes and authorities; including but not limited to:

Pertinent Non-Discrimination Authorities;

 Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), (prohibits discrimination on the basis of race, color, national origin); and 49 CFR Part 21.  The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42U.S.C. §460 I), (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal-aid programs and projects);  Federal-Aid Highway Act of 1973, (23 U.S.C. § 324 et seq.), (prohibits discrimination on the basis of sex);  Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 et seq.), as amended, (prohibits discrimination on the basis of disability); and 49 CFR Part 27; The Age Discrimination Act of 1975, as amended, (42 U.S.C. § 6101 et seq.), (prohibits discrimination on the basis of age);  Airport and Airway Improvement Act of 1982, (49 USC § 471, Section 47123), as amended, (prohibits discrimination based on race, creed, color, national origin, or sex); The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage and applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms "programs or activities" to include all of the programs or activities of the Federal-aid recipients, sub- recipients and contractors, whether such programs or activities are Federally funded or not); Titles II and III of the Americans with Disabilities Act, which prohibit discrimination on the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing entities (42 U.S.C. §§ 12131- 12189) as implemented by Department of Transportation regulations at 49 C.P.R. parts 37 and 38; The Federal Aviation Administration's Non-discrimination statute (49 U.S.C. § 47123) (prohibits discrimination on the basis of race, color, national origin, and sex); Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations, which ensures discrimination against minority populations by discouraging programs, policies, and activities with disproportionately high and adverse human health or environmental effects on minority and low-income populations; Executive Order 13166, Improving Access to Services for Persons with Limited English Proficiency, and resulting agency guidance, national origin discrimination includes discrimination because of limited English proficiency (LEP). To ensure compliance with Title VI, you must take reasonable steps to ensure that LEP persons have meaningful access to your programs (70 Fed. Reg. at 74087 to 74100);  Title IX of the Education Amendments of 1972, as amended, which prohibits you from discriminating because of sex in education programs or activities (20 U.S.C. 1681 et seq).

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 April 22, 2016 Letting Index Listing

PAVEMENT

106. Adams 14-00065-01-RS FAS 1598 CH 27 29. Bureau (17RS-4)I FAU 5605 US 6 24. Carroll 107SR FAP 308 IL 84 147. Cass 15-00078-00-PV FAU 7776 MAIN STREET 53. Champaign-Vermilion D5 CM PATCHING 2016-7 FAI 74 I-74 51. Champaign-Vermilion D5 CRACK & JOINT SEAL 2016-1 VARIOUS 59. Champaign D5 REST AREA REPAIR 2016-1 FAI 57 I-57 83. Clinton 113RS-6,14-16Z-RS-1 FAP 42/327 IL 127/US 50 156. Clinton 13-00100-00-RS FAS 778 ST. ROSE ROAD 120. Coles 14-00266-01-PV FAU 7676 MARSHALL AVENUE 114. Cook 14-00097-00-RS FAU 2403 KOSTNER AVENUE 158. Cook 14-00098-00-RS FAU 2796 122ND STREET 112. Cook 15-00030-00-RS FAU 1069 144TH STREET 111. Cook 15-00031-00-RS FAU 1070 149TH STREET 162. Cook 15-00083-00-PV FAP 343 IL 68 5. Cook 15-00094-00-RS FAU 1102 & FAU 2556 152. Cook 15-00098-00-RS FAU 1394 DIVISION STREET 145. Cook 15-00120-00-RS FAU 2562 & FAU 2582 SPRINGINSGUTH & WILEY DR. 30. DeKalb (125,H)I FAP 17 IL 64 100. DeKalb 13-00237-00-RS FAS 174 CH 6 117. DeKalb 14-00244-00-RS FAU 5369 CH 15 58. DeWitt D5 CM PATCHING 2016-4 FAP 708,FAP 71 BUS US 51,IL 54 54. Douglas-Champaign D5 CM PATCHING 2016-1 FAP 749,FAS 533 IL 133, MARKET STREET 140. DuPage 11-00044-00-RS FAU 2678 GARFIELD STREET 128. DuPage 14-00051-00-RS FAU 2625 MILL ROAD 115. DuPage 15-00011-00-RS FAU 1368 ARMY TRAIL ROAD 143. DuPage 15-00071-00-RS FAU 2584 WOODRIDGE DRIVE 124. DuPage 15-00072-00-RS FAU 1551 83RD STREET 157. DuPage 15-07126-00-RS FAU 1369 SCHICK ROAD 161. Edgar 14-00070-00-SP FAP 332 US 150 & IL 1 93. Franklin D9 PAVT PRESERVATION 2016-1 FAI 57 I-57 79. Greene 501,502RS-6 FAS 739 ELDRED ROAD 64. Hancock (28)RS-8,PP-2 FAP 315 US 136 148. Hancock 14-00125-01-PP FAS 428 CH 11 109. Jackson 12-00169-00-RS FAS 1918 AVA ROAD 139. Jefferson 14-00136-00-RS FAU 8715 FAIRFIELD ROAD 94. Jefferson D9 RUMBLE STRIP 2016-1 FAP 726/FAS 2826 IL 37/IL 148 1. JoDaviess PARK ROADS 2016-02 PARK ROADS 108. Johnson 13-00069-00-RS FAS 927 TUNNEL HILL ROAD 9. Kane 14-00029-00-RS DENNY ROAD 8. Kane 15-00085-00-RS FAU 1441 WILSON STREET 116. Kane 16-00107-00-RS FAU 2287 RED GATE ROAD 42. Knox (44,45)RS-3;46RS-4 FAS 380 IL 8 123. Lake 11-00033-00-SW MULTI-USE PATH 11. Lake 14-00030-00-RS FAU 160 BECK ROAD 4. Lake 15-00100-00-PV FAU 3714 NORTH AVENUE 7. Lake 15-00114-00-RS VARIOUS 34. LaSalle-Grundy D3 CRACK SEALING 2016 FAI 80 I-80 97. Lee 15-00330-00-RS FAU 5494 LOWELL PARK ROAD 31. Livingston-Grundy (32-2,3)I-1,(53-1,2)I FAI 55 I-55 99. Livingston 08-00144-04-RS FAS 343 CH 3 72. Macon (13X)RS-1 FAP 323 US 36 61. Macoupin D6 2015-HSRR FAP 662 IL 4 138. Madison 12-00048-00-RS FAU 9003 SHAMROCK STREET 151. Madison 15-00066-02-BT FAU 8841 TROXLER AVENUE 78. Madison DIST 8 SEAL COAT 2016-1 VARIOUS 70. Mason (1Z)PP FAP 315 US 136/IL 97 45. McDonough 33-PP FAP 315 US 136/IL 41 142. McHenry 14-00011-00-BT FAU 12 & FAU 3702 W WEGNER RD.& DARRELL RD. 113. McHenry 14-00078-00-CH FAU 3860 BULL VALLEY ROAD 13. McHenry 2015-009I FAP 305 US 14 46. McLean (57-20,57-1)RS&56RS-3 FAP 730,FAP 322 US 51, BUS US 51 55. McLean D5 CM PATCHING 2016-2 FAP 730 BUS US 51 38. Mercer 125RS-5 FAP 639 IL 17 66. Montgomery (68-2)RS-7,I-4 FAS 1768 FR I-55 EAST 68. Montgomery (68-2)WS-6 FAI 55 I-55 105. Morgan 15-00121-03-PV FAU 8190 NORTH MAIN STREET 60. Morgan 23BR,RS6,TS-5;33BR-1,RS4,TS-2 FAP 310A/753 I-72BL/IL 104/MORTON AVE 75. Moultrie-Coles D7 PAVT PRSV 2016-2 FAS 659, FAU 7620 CADWELL ROAD, OLD IL 316 98. Ogle 13-00297-00-RS FAS 52 MONTAGUE ROAD 48. Piatt 3RS-4&(4,5)RS-2 FAP 758 IL 32 56. Piatt D5 CM PATCHING 2016-3 FAP 721 IL 10 57. Piatt D5 CM PATCHING 2016-6 FAP 760,FAS 1531 IL 32,OLD IL 47 - 1 -

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 PAVEMENT (continued)

52. Piatt D5 CRACK & JOINT SEAL 2016-2 FAI 72 I-72 65. Sangamon (S)RS-5,I&(W)RS-8,I-2 FAP 67 IL 97 103. Sangamon 12-00467-01-PV FAU 7997 STANFORD AVENUE 164. Sangamon 15-HSRT2-00-RR TR 7 WEST MONTGOMERY ROAD 163. Sangamon 15-HSRT3-00-RR FAU 7969 RIDGELY AVENUE 67. Sangamon D6 2015-1A HSRR GOLDENROD DRIVE 74. Shelby-Cumberland D7 HMA SAFETY SHLD 2017-1 FAS 1652 US 45 80. St. Clair 117,118RS-1 FAP 592 IL 157 81. St. Clair 32-1RS-1 FAP 592 IL 157 26. Various (17,109)RS-5 & 104SFY VARIOUS 47. Vermilion 47(X-4RS-2,Z-2RS-4)RS-13 FAP 332 US 150/IL 1 102. Warren 14-00079-00-PV FAU 6874 NORTH 6TH STREET 118. Washington 12-00091-00-RS FAS 835 CH 21 107. White 12-00121-00-RS FAS 884 CH 1 144. Will 11-00047-00-FP FAU 1634 STEGER ROAD 110. Williamson 15-00144-00-RS FAS 1900 GRASSY ROAD 90. Williamson 1R-1,1N-1 FAS 909 OLD IL 13 25. Winnebago-Ogle 115RS-3 & 3SFY FAP 505,FAS 90 IL 75,RIVER ROAD 95. Winnebago 13-00599-00-SP FAU 5089 SANDY HOLLOW ROAD 130. Winnebago 14-00076-00-BT WILLOW CREEK TRAIL 146. Winnebago 14-00571-00-RS FAU 5146 FOREST HILLS ROAD

BRIDGES

69. Brown (9)CR FAP 550 IL 99 28. Bureau (R4)CR-3 FAS 1252 IL 29 50. Champaign (14HB-3)I FAU 7077 LINCOLN AVENUE 129. Cook 13-00185-00-BR FAU 1352 CHESTNUT AVENUE 14. Cook 2015-073I VARIOUS VARIOUS 141. DuPage 10-00154-00-BR FAU 1431 HILL AVENUE 159. Fulton (123B)I-1 FAP 687 IL 95 21. Henry D2 DECK SEALING 2016-1 VARIOUS 135. Jasper 14-04125-00-BR TR 85 155. Jo Daviess 10-00046-00-BT GALENA RIVER TRAIL 35. Knox 42-(B,B-1)BR-1 FAP 626 IL 97 33. LaSalle D3 BRIDGE DECK SEALING 2016-2 FAI 39 I-39 96. Lee 14-00328-00-BR FAS 182 ASHTON ROAD 134. Logan 14-00083-01-BR FAS 561 CH 9 137. Macon 13-00325-00-BR FAU 7359 MOUND ROAD 49. McLean (57-17)BDR,I FAI 74 I-74 43. Peoria-Knox D4 BRIDGE PAINTING 2016 VARIOUS 44. Peoria D-4 BRIDGE METALIZING 2016 VARIOUS 22. Rock Island D2 DECK SEALING 2016-2 VARIOUS 91. Saline 2B-3 FAP 778 IL 34 62. Sangamon (102)I-5 FAP 658 IL 29 71. Sangamon (110)BDR FAP 7998 EAST LAKE SHORE DRIVE 133. Sangamon 10-P4002-00-BR TR 1028 RING ROAD 63. Sangamon D6 BDGE PAINTING 2016-3 FAI 72 I-72 149. Shelby 12-19117-00-BR TR 60 82. St. Clair 125BR-3 FAP 805 IL 161 23. Various D2 DECK SEALING 2016-3 VARIOUS 136. Wabash 14-01114-00-BR TR 87 19. Whiteside (110BR)M FAS 1198 US 30 16. Winnebago (T-1-15D)M FAS 38 HARRISON ROAD 18. Winnebago D2 JOINT REPAIR 2016-1 FAP 734 IL 2

- 2 -

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 ELECTRICAL

3. Cook (32-3-R&305-302K)TS&N-3 FAP 341 IL 72 27. Various D2 ITS 2016 VARIOUS 37. Various D4 ELECTRICAL 2016 VARIOUS 92. Williamson D9 TRAFFIC SIGNAL 2016-1 FAU 9637 IL 37 17. Winnebago (1,1-1)TS-1 FAP 303 IL 251

MISCELLANEOUS

131. Bureau 10-00051-00-LT VARIOUS 121. Clark 10-00052-00-SP FAS 688 6TH STREET 150. Clark 12-00004-00-SW VARIOUS 15. Cook-DuPage 2015-086DM FAP 345 IL 390/ELGIN O'HARE EXPWY 10. Cook 12-00181-00-SW SPRINGDALE AVENUE 153. Cook 12-B2706-00-SW VARIOUS 6. Cook 13-B3514-00-SW VARIOUS 127. Cook 15-00040-00-SW 180TH STREET 88. Jersey 129-R-2-DM FAP 10A IL 111 40. Knox-Tazewell D4 ACCESS CNTRL FENCE 2016 FAI 74,FAP 673,FAP 399 I-74,US 150,IL 116 160. Livingston 13-00052-00-HP N/A 86. Madison-Greene 56BR-I,52-1BI-1 FAP 789,FAP 310 IL 143,US 67 119. Madison 15-00231-01-SW FAU 8961 COLLEGE AVENUE 101. Peoria 14-00038-00-SW VARIOUS 20. Rock Island (81-1)DM-4 FAI 74 I-74 104. Sangamon 12-00016-00-SP VARIOUS 154. Stephenson 09-00024-00-SW FREMONT STREET 36. Tazewell (101)I-2 FAP 673 IL 116/US 24/US 150 32. Various D3 TRAFFIC CONTROL 2016-1 VARIOUS 122. Various D4 & D7 RPM SPECIFIC SITES 16-34 VARIOUS 41. Various D4 GUARDRAIL REPAIRS 2016-MCHD VARIOUS 39. Various D4 PAVEMENT MARKING 2016 VARIOUS 73. Various D7 GUARDRAIL 2016-1 VARIOUS 77. Various DIST 8 SCOUR MITIGATION 2016-1 VARIOUS 125. Will 14-00018-00-SG VARIOUS

AERONAUTICS

2A. Bond GREENVILLE 5A. Lee DIXON MUNICIPAL 1A. Macon DECATUR 6A. Marshall MARSHALL COUNTY 4A. Perry PINCKNEYVILLE - DUQUOIN 3A. Will LEWIS UNIVERSITY

- 3 -

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 1 -

APRIL 22, 2016 LETTING ITEM DESCRIPTIONS

1. Contract No. 46403 Jo Daviess County District 2 Section PARK ROADS 2016-02 PARK ROADS This project consists of pipe culvert repair and access road resurfacing at the Apple River Historic Site in Elizabeth. Includes; 62 ton aggregate base; 43 ton HMA binder; 42 ton HMA surface; 181 sq yd aggregate shoulders; 20 ft pipe culverts; 33 cu yd earth excavation; mobilization. (15 Working Days) (Job No. C-30-005-16) (0-01632-2002) (See the Special Provisions for the DBE Percentage)

2. DELETED FROM THE LETTING

3. Contract No. 60Y73 Cook County District 1 Section (32-3-R&305-302K)TS&N-3 W FAP Route 341 (IL 72) Project ACHSIP-341(60) This project consists of pavement widening, resurfacing, sidewalks, lighting relocation and traffic signal modernization at various intersections on IL 72 from Lexington Drive to I-290 E. Frontage Road and at I-290 E/W Frontage Roads at Woodfield Road. Includes 4,845 cu yd earth excavation; 11,133 sq yd topsoil; 1,457 ft grading and shaping ditches; 2.3 acres seeding; 3,631 ft perimeter erosion barrier; 7,173 sq yd aggregate subgrade; 3,895 sq yd aggregate base; 5,773 sq yd HMA base; 10,256 lb bituminous prime; 2,385 ton polymerized leveling binder; 4,467 ton polymerized HMA surface; 436 ton HMA replacement over patches; 358 ton HMA surface; 732 sq yd PCC pavement; 6,406 sq ft PCC sidewalk; 43,319 sq yd HMA surface removal; 6,145 ft combination curb and gutter removal; 7,267 sq ft sidewalk removal; 8,271 sq ft median removal; 4,526 sq ft paved shoulder removal; 2,831 sq yd class D patches; 6,148 ft saw cutting; 126 ton aggregate wedge shoulders; 444 ft storm sewers; 2,370 ft pipe underdrains; 4 catch basins; 3,444 ft combination concrete curb and gutter; 5,439 sq ft concrete median surface; 3,183 sq ft concrete median; 2,070 cu yd non-special waste disposal; 1,036 sq ft sign panel; 5,420 lb structural steel sign support; 256 ft telescoping steel sign support; 35 ft overhead sign structure; 12.6 cu yd drilled shaft concrete foundations; 1,898 sq ft thermoplastic pavement marking; 30,072 ft thermoplastic pavement marking; 3,440 ft polyurea pavement marking; 508 raised reflective pavement markers; 8,019 ft underground galvanized steel conduit; 1,970 ft unit duct; 7 maintenance of existing traffic signal installations; 44,305 ft electric cable in conduit; 16 traffic signal posts; 15 steel mast arm assemblies and poles; 288 ft concrete foundations; 95 LED signal heads; 14 pedestrian signal heads; 4,509 ft loop detectors; 5,233 ft fiber optic cable in conduit; 12 shade trees; mobilization; traffic control and protection; federally funded. (95 Working Days) (Job No. C-91-011-15) (1-77880-0000) (See the Special Provisions for the DBE Percentage) PREVIOUSLY ADVERTISED: March 4, 2016 (Item 8)

4. Contract No. 61C40 Lake County District 1 Section 15-00100-00-PV (DEERFIELD) FAU Route 3714 (NORTH AVENUE) Project M-4003(515) Project consists of pavement removal, curb and gutter removal, storm sewer removal, HMA full-depth pavement, curb and gutter, storm sewer, water main, sanitary sewer lining and all other incidental items to complete the work on FAU Route 3714 (North Avenue) from Wilmot Road to Telegraph Road in the Village of Deerfield. Includes 920 unit tree removal; 1,050 ft temporary fence; 2,550 cu yd earth excavation; 535 cu yd removal and disposal of unsuitable material; 3,275 cu yd trench backfill; 2,500 sq yd geotechnical fabric for ground stabilization; 7,000 sq yd topsoil furnish and place; 7,000 sq yd sodding, salt tolerant; 105 unit supplemental watering; 3,200 ft perimeter erosion barrier; 25 inlet filters; 10,100 sq yd aggregate subgrade improvement; 790 sq yd aggregate base course; 11,880 lb bituminous materials (tack coat); 8,800 sq yd HMA pavement (full depth); 8,400 sq yd pavement removal; 1,400 ft combination curb and gutter removal; 4,245 ft storm sewers; 3,215 ft storm sewer removal; 3,235 ft ductile iron water main; 300 ft pipe underdrains; 16 manholes; 30 inlets; 6,450 ft combination concrete curb and gutter; 259 ft thermoplastic pavement marking line; 39 trees; 1,820 ft cured- in-place pipe liner; 20 structures to be adjusted; test holes; traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (Completion Date: November 11, 2016) (Job No. C-91-323-15) (1-21856-0000) (See the Special Provisions for the DBE Percentage)

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 2 - 5. Contract No. 61C46 Cook County District 1 Section 15-00094-00-RS (HOFFMAN ESTATES) FAU Route 1102 & FAU 2556 Project M-4003(628) Project consists of roadway resurfacing, curb and gutter removal and replacement, sidewalk removal and replacement, pavement patching, striping, signage, storm sewer replacement, landscaping and all other incidental items to complete the work on FAU Route 1102 (Hillcrest Boulevard) from Jones Road to Roselle Road and on FAU Route 2556 (Moon Lake Boulevard) from Golf Road to Higgins Road in the Village of Hoffman Estates; 115 tree root pruning; 309 cu yd removal and disposal of unsuitable material; 11,138 sq yd topsoil furnish and place; 2,301 sq yd erosion control blanket; 8,837 sq yd sodding; 27 unit supplemental watering; 93 inlet filters; 165 ton aggregate for temporary access; 29,359 lb bituminous materials (prime coat); 1,890 ton leveling binder (machine method); 45,380 sq yd HMA surface removal; 624 sq yd temporary ramp; 3,779 ton HMA surface course; 1,156 sq ft detectable warnings; 1,510 sq yd driveway pavement removal; 4,513 ft combination curb and gutter removal; 62,299 sq ft sidewalk removal; 555 sq yd Class D patches; 85 manholes to be adjusted; 17 frames and grates; 3,980 ft short term pavement marking; 1,327 sq ft short term pavement marking removal; 31,380 ft modified urethane pavement marking line; 16 curb reflectors; 609 ft detector loop replacement; 71,631 sq ft PCC sidewalk; 4,533 ft combination concrete curb and gutter; traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (Completion Date: October 07, 2016 Plus 10 Working Days) (Job No. C-91-146-16) (1-21861-0000) (See the Special Provisions for the DBE Percentage)

6. Contract No. 61C49 Cook County District 1 Section 13-B3514-00-SW (CHICAGO) Various Routes Project SRTS-4009(252) This project consists of the construction of pedestrian refuge islands and replacing existing sidewalks with PCC sidewalks and ADA ramps on Chicago Avenue from Central Avenue to Cicero Avenue and Madison Street from Central Avenue to Cicero Avenue in the City of Chicago; 80 ton HMA surface course, Mix "D", N70; 3,100 ft pavement marking blackout tape, 4"; 11,425 ft thermoplastic pavement markings; 3,750 sq ft pavement marking removal; 2 remove and salvage sign panel; 1,550 sq ft PCC sidewalk 5 inch, special; 388 sq ft detectable warnings; 670 sq yd HMA surface removal, variable depth; 520 sq ft median removal (special); 630 sq yd pavement removal (special); 1,680 sq ft sidewalk removal (special); 1,420 ft concrete curb, Type B (special); 3,830 sq ft concrete median surface, 8"; 1,470 sq ft PCC ADA ramps; Federally Funded; (A Special Provision for this contract requires insurance that names additional insureds). (35 Working Days) (Job No. C-88-043-13) (0-01687-1031) (See the Special Provisions for the DBE Percentage)

7. Contract No. 61C54 Lake County District 1 Section 15-00114-00-RS (LIBERTYVILLE) Various Routes Project M-4003(548) Project consists of HMA surface removal and replacement, combination concrete curb and gutter removal and replacement, polymerized leveling binder, sidewalk curb ramps, detectable warnings, crosswalk pavement markings, signing and all other incidental items to complete the work on Various Routes in the Village of Libertyville; 680 ft temporary fence; 94 tree pruning; 359 cu yd earth excavation; 886 sq yd topsoil furnish and place; 38 inlet filters; 636 cu yd aggregate base course; 91 ton aggregate for temporary access; 16,867 lb bituminous materials (tack coat); 1,395 ton polymerized leveling binder (machine method); 443 sq yd HMA surface removal; 2,788 ton HMA surface course; 4,334 sq ft PCC sidewalk; 4,037 sq ft sidewalk removal; 3,735 sq yd Class D patches; 30,920 ft crack routing (pavement); 4,744 ft short term pavement marking;_1,033 sq yd protective coat: 11,052 ft temporary pavement marking line; 20,182 ft thermoplastic pavement marking line; 1,865 ft combination concrete curb and gutter removal and replacement; 11 drainage and utility structures to be adjusted; 25,192 sq ud HMA surface removal, special; 13 frames and lids to be adjusted (special); traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (45 Working Days) (Job No. C-91-416-15) (1-21866-0000) (See the Special Provisions for the DBE Percentage)

8. Contract No. 61C55 Kane County District 1 Section 15-00085-00-RS (BATAVIA) FAU Route 1441 (WILSON STREET) Project M-4003(607) Project consists of concrete curb and gutter removal and replacement, pavement milling, driveway removal and replacement, sidewalk removal and replacement, pavement resurfacing, detector loop replacement and all other incidental items to complete the work on FAU Route 1441 (Wilson Street) from Raddant Road to Kirk Road in the City of Batavia; 471 sq yd topsoil furnish and place; 9,504 lb bituminous materials (tack coat); 788 ton polymerized leveling binder (machine method); 1,577 ton HMA surface course; 1,831 sq ft PCC sidewalk; 14,079 sq yd HMA surface removal; 1,292 ft combination curb and gutter removal and replacement; 1,773 sq ft sidewalk removal; 350 sq yd Class D patches; 13 inlets to be adjusted; 1,955 ft short term pavement marking; 19,550 ft temporary pavement marking line; 10,153 ft thermoplastic pavement marking line; 13 frames and lids to be adjusted (special); traffic control and protection; Federally Funded; (A Special Provision for this contract requires insurance that names additional insureds). (25 Working Days) (Job No. C-91-104-16) (1-21865-0000) (See the Special Provisions for the DBE Percentage)

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 3 - 9. Contract No. 61C62 Kane County District 1 Section 14-00029-00-RS (SUGAR GROVE) DENNY ROAD Project M-4003(657) Project consists of HMA surface course removal, pavement patching, polymerized leveling binder, HMA surface course, pavement markings, sidewalk, curb and gutter removal and replacement, landscaping and all other incidental items to complete the work on Denny Road from Bliss Road to East Village Limits in the Village of Sugar Creek; 115 ft grading and shaping ditches; 2,880 sq yd erosion control blanket; 6,895 lb bituminous materials (tack coat); 561 ton polymerized leveling binder (machine method); 1,122 ton HMA surface course; 500 sq ft PCC sidewalk; 10,000 sq yd HMA surface removal; 1,000 sq yd Class D patches; 280 ton aggregate wedge shoulders; 930 ft short term pavement marking; 12,375 ft thermoplastic pavement marking line; 29 removal and replacement of raised reflective pavement markers; 436 ft combination concrete curb and gutter removal and replacement; traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (20 Working Days) (Job No. C-91-194-16) (1-21870-0000) (See the Special Provisions for the DBE Percentage)

10. Contract No. 61C65 Cook County District 1 Section 12-00181-00-SW (GLENVIEW) SPRINGDALE AVENUE Project SRTS-4009(350) This project consists of sidewalk removal, sidewalk construction, storm sewer repairs, pavement markings and parkway restoration on Springdale Avenue from Pfingsten Road to Rugen Road in the Village of Glenview; 1,900 sq yd topsoil furnish and place, 4"; 1,900 sq yd sodding; 562 sq yd aggregate base courses; 65 sq yd PCC driveway pavement, 6 inch; 4,200 sq ft PCC sidewalks; 131 sq yd driveway pavement removal; 150 sq ft sidewalk removal; 260 ft thermoplastic pavement markings; 30 sq yd HMA driveway pavement, 3"; 392 ft storm sewers (water main requirements); 950 sq ft remove and reinstall brick pavers; Federally Funded; (A Special Provision for this contract requires insurance that names additional insureds). (15 Working Days) (Job No. C-91-182-16) (0-01687-1027) (See the Special Provisions for the DBE Percentage)

11. Contract No. 61C68 Lake County District 1 Section 14-00030-00-RS (LINDENHURST) FAU Route 160 (BECK ROAD) Project M-4003(646) This project consists of 1.97 miles of road reconstruction, curb and gutter, sidewalks and storm sewers on Beck Road from Grass Lake Road to Sand Lake Road in the Village of Lindenhurst; 812 units tree removal; 2,050 cu yd earth excavation; 19,686 sq yd geotechnical fabric for ground stabilization; 2,390 cu yd topsoil excavation and placement; 11,974 ft perimeter erosion barrier; 19,686 sq yd aggregate subgrade improvement; 9,122 sq yd aggregate base course, Type B 4"; 30,207 sq yd preparation of base; 5,059 ton HMA binder course, IL-19/0, N50; 3,373 ton HMA surface course, Mix "D", N50; 1,427 sq yd PCC driveway pavement, 7 inch; 56,917 sq ft PCC sidewalks; 26,782 sq yd sidewalk removal; 3,757 sq yd HMA surface removal, 5"; 3,636 sq yd driveway pavement removal; 9,800 sq ft sidewalk removal; 3,465 ft storm sewers; 11,748 ft pipe underdrains; 13,160 ft combination concrete curb and gutter; 20,289 ft thermoplastic pavement markings; 1,371 sq yd HMA driveway pavement; Federally Funded; (A Special Provision for this contract requires insurance that names additional insureds). (110 Working Days) (Job No. C-91-170-16) (1-21871-0000) (See the Special Provisions for the DBE Percentage)

12. DELETED FROM THE LETTING

Small Business Set-Aside. 13. Contract No. 62A63 McHenry County District 1 Section 2015-009I FAP Route 305 (US 14) This project consists of removing the existing culvert carrying US 14 over a ditch 0.4 miles east of IL 23, south of the City of Harvard, and replacing it with a 24 inch reinforced concrete pipe (SN 056-0267); includes 700 cu yd earth excavation; 140 cu yd topsoil excavation and placement; 800 ft grading and shaping ditches; 365 cu yd granular backfill for structures; 1,060 sq yd grading and shaping foreslopes; 815 ft perimeter erosion barrier; 148 sq yd HMA pavement (full depth); removal of existing structure; 90 ft 24" pipe culvert; 375 ft guardrail removal; 204 ft thermoplastic pavement marking; maintenance of existing traffic signal installation; mobilization; traffic control and protection. (15 Working Days) (Job No. C-91-276-15) (1-79851-0000) (See the Special Provisions for the DBE Percentage)

Small Business Set-Aside. 14. Contract No. 62B57 Cook County District 1 Section 2015-073I Various Routes (VARIOUS) This project consists of bridge deck sealing of various structures at various locations in the cities of Blue Island, Calumet City and Chicago and the villages of Chicago Ridge, Lansing, South Holland and Thornton; 509,031 sq ft bridge deck concrete sealer; mobilization; traffic control and protection. (25 Working Days) (Job No. C-91-058-16) (0-01286-1003) (See the Special Provisions for the DBE Percentage)

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 4 - 15. Contract No. 62B88 Cook-DuPage Counties District 1 Section 2015-086DM FAP Route 345 (IL 390/ELGIN O'HARE EXPWY) Project ACNRS-345(63) This project consists of demolishing two industrial buildings and clean up of two sites in the village of Bensenville; includes 44,208 sq yd topsoil furnish and place; 3,135 ft perimeter erosion barrier; 18,462 sq yd driveway pavement removal; 1,972 ft combination curb and gutter removal; 857 sq ft sidewalk removal; 2 each underground storage tank removal; 2 l sum building removal; 1,777 ft fence removal; 2 l sum removal and disposal of non-friable asbestos; mobilization; federally funded. (60 Working Days) (Job No. C-91-173-16) (1-77611-0900) (See the Special Provisions for the DBE Percentage)

16. Contract No. 64K78 Winnebago County District 2 Section (T-1-15D)M FAS Route 38 (HARRISON ROAD) This project consists of installing scour countermeasures on SN 101-0085 carrying Harrison Road over the Sugar River, 0.6 miles north of IL 75; includes 139 cu yd earth excavation; 273 cu yd channel excavation; 618 ton riprap; 386 sq yd filter fabric; mobilization; traffic control and protection. (15 Working Days) (Job No. C-92-066-15) (0-02002-2000) (See the Special Provisions for the DBE Percentage)

17. Contract No. 64K86 Winnebago County District 2 Section (1,1-1)TS-1 FAP Route 303 (IL 251) This project consists of modernization of traffic signals and equipment on IL 251 at the intersection with Ethel Avenue and "Y" Boulevard in Rockford; includes 404 sq ft PCC sidewalk; 387 sq ft sidewalk removal; 244 ft thermoplastic pavement marking; 2 full-actuated controller and cabinet; 4 16' traffic signal posts; 13 LED signal heads; 2 LED pedestrian signal heads; 2 remove existing traffic signal equipment; mobilization; traffic control and protection. (30 Working Days) (Job No. C-92-077-15) (2-51001-0100) (See the Special Provisions for the DBE Percentage)

18. Contract No. 64L04 Winnebago County District 2 Section D2 JOINT REPAIR 2016-1 FAP Route 734 (IL 2) This project consists of expansion joint replacement and deck patching on the structures carrying IL 2 over the SOO Line Railroad and Old River Road in Stockton (SN 101-0127 and SN 101-0128); includes 22.6 cu yd concrete removal; 22.6 cu yd concrete superstructure; 3,030 lb rebar; 48 bar splicers; 164 ft preformed joint strip seal; 5,740 ft paint pavement marking; mobilization; traffic control and protection. (35 Working Days) (Job No. C-92-009-16) (0-01622-2021) (See the Special Provisions for the DBE Percentage)

19. Contract No. 64L09 Whiteside County District 2 Section (110BR)M FAS Route 1198 (US 30) This project consists of deck patching, expansion joint replacement and wearing surface on the structure carrying US 30 over the Rock River west of Rock Falls (SN 098-0034); includes 28 ton leveling binder; 59 ton HMA surface; 200 sq yd HMA surface removal; 27.5 cu yd concrete removal; 30 cu yd concrete superstructure; 425 sq ft structural repair of concrete; 302 sq yd deck slab repair; 178 sq yd PCC surface removal 1"; 4,617 sq yd bridge deck grooving; 1 cleaning and painting structural steel; 3,940 lb rebar; 1 containment and disposal of non-lead paint cleaning residues; 86 ft preformed joint strip seal; 40 ft finger plate expansion joint; 4,815 sq yd bridge deck scarification; 2,923 sq ft concrete sealer; 4,815 sq yd bridge deck latex concrete overlay; 763 ft epoxy crack injection; 4 traffic barrier terminals; 238 ft guardrail removal; 3,681 ft modified urethane pavement marking; mobilization; traffic control and protection. (50 Working Days) (Job No. C-92-025-16) (2-20102-0100) (See the Special Provisions for the DBE Percentage)

20. Contract No. 64L10 Rock Island County District 2 Section (81-1)DM-4 FAI Route 74 (I-74) Project ACNCII-7-4(310) This project consists of demolition and removal of one building adjacent to I-74 in Moline for the I-74 reconstruction project; includes removal of one water service; removal of one building; removal and disposal of non-friable asbestos from one building; mobilization; federally funded. (30 Calendar Days) (Job No. C-92-033-16) (2-10660-0330) (See the Special Provisions for the DBE Percentage)

Small Business Set-Aside. 21. Contract No. 64L22 Henry County District 2 Section D2 DECK SEALING 2016-1 Various Routes This project consists of concrete sealer applied to bridge decks at various locations in Henry County; includes 215,236 sq ft concrete sealer; mobilization; traffic control and protection. (35 Working Days) (Job No. C-92-044-16) (2-93002-0200) (See the Special Provisions for the DBE Percentage)

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 5 - Small Business Set-Aside. 22. Contract No. 64L23 Rock Island County District 2 Section D2 DECK SEALING 2016-2 Various Routes This project consists of concrete sealer applied to bridge decks at various locations in Rock Island County; includes 763,443 sq ft concrete sealer; mobilization; traffic control and protection. (35 Working Days) (Job No. C-92-045-16) (2-93002-0300) (See the Special Provisions for the DBE Percentage)

Small Business Set-Aside. 23. Contract No. 64L24 Various Counties District 2 Section D2 DECK SEALING 2016-3 Various Routes This project consists of concrete sealer applied to bridge decks at various locations throughout District 2; includes 613,590 sq ft concrete sealer; mobilization; traffic control and protection. (35 Working Days) (Job No. C-92-046-16) (2-93002-0100) (See the Special Provisions for the DBE Percentage)

24. Contract No. 64L29 Carroll County District 2 Section 107SR FAP Route 308 (IL 84) Project ACHSIP-308(46) This project consists of constructing HMA shoulders along IL 84 from the Whiteside County line to Lucas Avenue in Thomson; 158 units excavating and grading existing shoulders; 3,144 lb bituminous tack coat; 587 ton HMA surface; 6,983 sq yd HMA shoulders; 15,859 ft shoulder rumble strips; 32,780 ft paint pavement marking; mobilization; traffic control and protection; federally funded. (15 Working Days) (Job No. C-92-048-16) (2-20205-0100) (See the Special Provisions for the DBE Percentage)

25. Contract No. 64L32 Winnebago-Ogle Counties District 2 Section 115RS-3 & 3SFY FAP Route 505,FAS 90 (IL 75,RIVER ROAD) Project ACHSIP-000V(52) This project consists of centerline rumble strip placement on River Road from Park Road to Mix Lane and 1.75 miles of resurfacing and centerline rumble strips on IL 75 between Wagon Wheel and Gummow Roads; 5 ton mixture for cracks, joints and flangeways; 47,786 sq yd high friction surface treatment; 697 ton aggregate wedge shoulder; 19,707 ft centerline rumble strips; 101,681 ft paint pavement marking; 291 raised reflective pavement markers; mobilization; traffic control and protection; federally funded. (25 Working Days) (Job No. C-92-067-16) (2-20111-0100, 2-54302-0100, 0-00889-2001) (See the Special Provisions for DBE Percentage)

26. Contract No. 64L33 Various Counties District 2 Section (17,109)RS-5 & 104SFY Various Routes Project ACHSIP-000V(53) This project consists of centerline resurfacing and centerline rumble strips on IL 84 from Whitton Road to Crazy Hollow Road; skid resistant resurfacing and centerline rumble strips on IL 78 from Argo Fay Road to 0.4 miles north of Vinegar Hill Road; skid resistant resurfacing and centerline rumble strips on US 30 from Millard Road to Acker Road; 100 ton aggregate base; 964 lb bituminous (tack coat); 216 ton HMA surface course; 10 ton mixture for cracks, joints and flangeways; 45,966 sq yd high friction surface treatment; 331 ton aggregate wedge shoulder; 23,881 ft centerline rumble strips; 1,960 ft steel plate beam guardrail; 162 ft long-span guardrail over culvert; 6 traffic barrier terminals; 1,330 ft guardrail removal; 160,843 ft paint pavement marking; 299 raised reflective pavement markers; mobilization; traffic control and protection; federally funded. (45 Working Days) (Job No. C-92-068-16) (2-54301-0100) (See the Special Provisions for the DBE Percentage)

27. Contract No. 64L36 Various Counties District 2 Section D2 ITS 2016 Various Routes This project consists of maintaining and servicing the Intelligent Transportation System Equipment located in Districts 2 and 3; 250 hour journeyman electrician; 250 hour apprentice electrician; 250 hour pick-up truck; 250 hour bucket truck (less than 35'); 250 hour bucket truck (35' to 65'); 450 cal mo cellular accounts. (Completion Date: June 30, 2018) (Job No. C-92-069-16) (0-01106-2001) (See the Special Provisions for the DBE Percentage)

28. Contract No. 66E91 Bureau County District 3 Section (R4)CR-3 FAS Route 1252 (IL 29) This project consists of the removal of an existing 5'x4' concrete box culvert (SN 006-2539) and replacing it with a 6'x5' cast-in-place concrete box culvert (SN 006-2595) carrying IL 29 over a drainage ditch just west of Depue Road; 50 cu yd furnished excavation; 300 ft perimeter erosion barrier; 72 sq yd slope mattress; 213 sq yd subbase granular material; 107 sq yd class B patches; 30 ton aggregate shoulders; 456 sq yd HMA shoulders; removal of existing structures; 330 cu yd structure excavation; 230 cu yd granular backfill for structures; 50 cu yd rock fill; 7,400 rebar; 40 cu yd concrete box culverts; 150 ft remove and re-erect steel plate beam guardrail; 4 remove and re-erect traffic barrier terminals; 2,314 ft modified urethane pavement marking; mobilization; traffic control and protection. (40 Working Days) (Job No. C-93-123-15) (3-64720-1602) (See the Special Provisions for the DBE Percentage)

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 6 - 29. Contract No. 66F04 Bureau County District 3 Section (17RS-4)I FAU Route 5605 (US 6) Project ACHSIP-5605(2) This project consists of 0.5 miles of milling and resurfacing on US 6 just east of Spring Valley; 6,980 lb bituminous prime; 4.6 ton mixture for cracks, joints and flangeways; 131.08 ton leveling binder; 15,510 sq yd HMA surface removal; 50 lb crack filling; 1,647 ft preformed plastic pavement marking; 31.2 sq ft modified urethane pavement marking letters and symbols; 12,626 ft modified urethane pavement marking; 1,647 ft grooving for recessed pavement marking; mobilization; traffic control and protection; federally funded. (20 Working Days) (Job No. C-93-009-16) (3-47470-1601) (See the Special Provisions for the DBE Percentage)

30. Contract No. 66F05 DeKalb County District 3 Section (125,H)I FAP Route 17 (IL 64) Project ACHSIP-17(133) This project consists of 6.2 miles of shoulder widening and rumble strips on IL 64 from Clare Road to approximately 1,100 ft west of Peace Road near Sycamore; includes 641 unit excavating and grading existing shoulder; 13,055 lb bituminous prime; 58.3 ton incidental HMA surfacing; 520 sq yd HMA surface removal; 28,489 sq yd HMA shoulders; 64,100 ft shoulder rumble strips; 128,200 ft paint pavement marking; 28,489 sq yd shoulder removal; mobilization; traffic control and protection; federally funded. (20 Working Days) (Job No. C-93-010-16) (3-47470-1602) (See the Special Provisions for the DBE Percentage)

31. Contract No. 66F06 Livingston-Grundy Counties District 3 Section (32-2,3)I-1,(53-1,2)I FAI Route 55 (I-55) Project ACHSIP-5-5(451) This project consists of approximately 2.2 miles of pavement grooving on I-55 to be installed along three separate curved highway segments around Dwight; 48,845 sq yd pavement grooving; mobilization; traffic control and protection; federally funded. (15 Working Days) (Job No. C-93-011-16) (3-47470-1603) (See the Special Provisions for the DBE Percentage)

32. Contract No. 66F14 Various Counties District 3 Section D3 TRAFFIC CONTROL 2016-1 Various Routes Project ACHSIP-000V(54) This project consists of using ITS - Smart Work Zone Technology Traffic Management in various counties of District 3 to monitor traffic backups on the interstates and provide this information to the drivers; 36 week real-time traffic control system; 108 week real-time traffic control sensor unit; 200 week changeable message sign, special; 36 week smart traffic monitoring system; 108 week smart traffic monitoring device; federally funded. (Completion Date: March 09, 2019) (Job No. C-93-025-16) (0-00889-3001) (See the Special Provisions for the DBE Percentage)

Small Business Set-Aside. 33. Contract No. 66F19 LaSalle County District 3 Section D3 BRIDGE DECK SEALING 2016-2 FAI Route 39 (I-39) This project consists of sealing the deck and parapets on the Abraham Lincoln Bridge (SN 050-0191) carrying I-39 over the Illinois River; 727,119 sq ft bridge deck concrete sealer; mobilization; traffic control and protection. (15 Working Days) (Job No. C-93-030-16) (3-27357-1601) (See the Special Provisions for the DBE Percentage)

34. Contract No. 66F21 LaSalle-Grundy Counties District 3 Section D3 CRACK SEALING 2016 FAI Route 80 (I-80) This project consists of centerline crack routing and sealing on I-80 from 0.5 miles west of IL 178 to the Fox River Bridge north of Ottawa and from 0.5 miles west of the CH 15 interchange north of Marseilles to east of the Seneca inter- change; 221,169 ft crack routing; 77,406 lb crack filling; mobilization; traffic control and protection. (15 Working Days) (Job No. C-93-033-16) (0-02021-3002) (See the Special Provisions for the DBE Percentage)

35. Contract No. 68754 Knox County District 4 Section 42-(B,B-1)BR-1 FAP Route 626 (IL 97) Project ACF-626(10) This project consists of replacing SN 048-0014 carrying IL 97 over Haw Creek Tributary and SN 048-0015 carrying IL 97 over Little Haw Creek, both northwest of Maquon; includes 124 unit tree removal; 1,443 cu yd earth excavation; 1,247 cu yd furnished excavation; 3,204 sq yd topsoil; 1 acre seeding; 1,665 ft perimeter erosion barrier; 2,811 sq yd riprap; 1,268 sq yd base course widening; 35 ton aggregate surface; 1,104 ton HMA binder; 491 ton HMA surface; 4,805 sq yd HMA surface removal; 178 ton HMA shoulders; removal of 2 existing structures; 376 cu yd structure excavation; 261 cu yd granular backfill for structures; 133 cu yd concrete structures; 447 cu yd concrete superstructures; 93.9 cu yd internally cured concrete superstructure; 456 ft precast prestressed 42 inch concrete I-beams; 87,830 lb structural steel; 115,030 lb rebar; 435 ft steel piles; 274 ft storm sewer; 307 ft concrete gutter; 1,177 ft steel plate beam guardrail; 17 traffic barrier terminals; 1,576 ft guardrail removal; 8,992 ft modified urethane pavement marking; mobilization; traffic control and protection; federally funded. (110 Working Days) (Job No. C-94-133-07) (4-00097-0100, 4-00097-0000) (See the Special Provisions for the DBE Percentage) PREVIOUSLY ADVERTISED: March 4, 2016 (Item 107)

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 7 - 36. Contract No. 68C24 Tazewell County District 4 Section (101)I-2 FAP Route 673 (IL 116/US 24/US 150) This project consists of 520' of slope repair near Dixon's ponds along IL 116/US 24/US 150 at 0.4 miles north of Highview Road/Access Road #4 in East Peoria; includes 172 cu yd earth excavation; 190 cu yd furnished excavation; 59 ton porous granular embankment; 456 cu yd earth excavation (rock fill); 933 ton rock fill; 1,762 sq yd topsoil; 1,762 sq yd erosion control blanket; 13 ft pipe culverts; 39 ft insertion culvert liner; 750 ft steel plate beam guardrail; 1 traffic barrier terminal; 760 ft guardrail removal; 1,620 ft modified urethane pavement marking; mobilization; traffic control and protection. (20 Working Days) (Job No. C-94-007-15) (0-01622-4008) (See the Special Provisions for the DBE Percentage)

37. Contract No. 68C47 Various Counties District 4 Section D4 ELECTRICAL 2016 Various Routes This project consists of electrical maintenance for lighting, traffic signals, and ITS within District 4; 2,000 hour journeyman electrician; 140 hour apprentice electrician; 140 hour journeyman electrician (weekly overtime rate); 60 hour journeyman electrician (Sunday and holiday overtime rate); 30 hour apprentice electrician (weekly overtime rate); 30 hour apprentice electrician (Sunday and holiday overtime rate); 1,350 hour pick-up truck; 520 hour bucket truck (length less than 35 ft); 145 hour bucket truck (length 35 to 65 ft); 90 hour digger derrick. (Completion Date: June 30, 2018) (Job No. C-94-059-15) (0-01106-4001, 0-01622-4018) (D4 Operations) (See the Special Provisions for DBE Percentage)

38. Contract No. 68C60 Mercer County District 4 Section 125RS-5 FAP Route 639 (IL 17) Project ACSTP-639(20) This project consists of resurfacing of IL 17 from west of 19th Avenue to 220th Street in Aledo; 87,775 lb polymerized bituminous prime; 2,025 ton polymerized leveling binder; 4,138 ton polymerized HMA surface; 86,079 sq yd HMA surface removal; 1,166 sq yd class D patches; 867 ton aggregate wedge shoulder; 4,870 ton HMA shoulders; 41,254 ft modified urethane pavement marking; 221 raised reflective pavement marker; 989 sq yd HMA surface removal (special); 35,614 ft longitudinal joint sealant; mobilization; traffic control and protection; federally funded. (35 Working Days) (Job No. C-94-079-15) (4-00011-0200) (See the Special Provisions for the DBE Percentage)

39. Contract No. 68C72 Various Counties District 4 Section D4 PAVEMENT MARKING 2016 Various Routes This project consists of installing pavement markings on various routes in various counties throughout District 4; includes 10,902,524 ft paint pavement marking; mobilization. (70 Working Days) (Job No. C-94-094-15) (0-01622-4004) (See the Special Provisions for the DBE Percentage)

40. Contract No. 68C74 Knox-Tazewell Counties District 4 Section D4 ACCESS CNTRL FENCE 2016 FAI Route 74,FAP 673,FAP 399 (I-74,US 150,IL 116) This project consists of access control fence repairs along I-74 from IL 97 to CH 9 (Knoxville Interchange) in Knox County and IL 116/IL 8/US 150 (Main Street) from I-74 to Camp Street in Tazewell County; 101 units tree removal; 4,437 ft woven wire fence; 3,643 ft woven wire fence removal; mobilization. (15 Working Days) (Job No. C-94-096-15) (0-01622-4006) (See the Special Provisions for the DBE Percentage)

41. Contract No. 68C77 Various Counties District 4 Section D4 GUARDRAIL REPAIRS 2016-MCHD Various Routes This project consists of repairing guardrail and fence damaged by motorists at various locations throughout District 4; includes 62 traffic barrier terminal; 12 impact attenuators; 407 ft chain link fence; 500 ft woven wire fence; 802 ft repair high tension cable; 150 ft repair cable road guard; 100 repair hairpins; 400 ft vertical adjustment of guardrail; 200 ft tubular thrie beam; 20 emergency work call out; 69 repair traffic barrier terminal. (Completion Date: June 30, 2017) (Job No. C-94-099-15) (0-01622-4007, 0-01846-4001) (MCHD) (See the Special Provisions for the DBE Percentage)

42. Contract No. 68C80 Knox County District 4 Section (44,45)RS-3;46RS-4 FAS Route 380 (IL 8) This project consists of 8.5 miles of cape seal on IL 8 from IL 97 to IL 78; 135,385 ft temporary pavement marking; 135,385 ft modified urethane pavement marking; 565 each raised reflective pavement marker; 360 each raised reflective pavement marker removal; 35 each bump removal; 2,261 each temporary raised pavement marker; 130,607 sq yd cape seal; mobilization; traffic control and protection. (15 Working Days) (Job No. C-94-102-15) (0-02021-4002, 0-01622-4015) (See the Special Provisions for the DBE Percentage)

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 8 - Pursuant to the Rules for Prequalification of Contractors and Issuance of Plans and Proposals, 44 Illinois Administrative Code 650.70,…”This contract requires, in addition to the normal IDOT pre-qualifications requirements, that the Contractor be SSPC-QP1 and QP2 certified. Evidence of certification must be provided prior to receiving authorization to bid.” Contractors are required to submit copies of current certificates for each Letting. These certificates must be submitted along with the contractors’ original BC 57 Affidavit of Availability. 43. Contract No. 68C82 Peoria-Knox Counties District 4 Section D4 BRIDGE PAINTING 2016 Various Routes This project consists of cleaning and painting bridges at 9 locations: (S.N. 048-0059) CH 7 over I-74, (S.N. 048-0058) Knox Street over I-74, (S.N. 048-0053) TR 253 over I-74, (S.N. 072-0071) Heinz Road over I-74, (S.N. 072-0070) Gilles Road over I-74, (S.N. 072-0069) TR 124 over I-74, (S.N. 072-0032) IL Route 78 over I-74, (S.N. 048-0060) TR 121 over I- 74, (S.N. 048-0062) TR 89 over I-74; cleaning and painting 9 steel structures; containment and disposal of lead paint cleaning residues from 9 structures; 319 ft portable temporary barrier system; 7,943 ft relocate portable temporary barrier system; mobilization; traffic control and protection. (80 Working Days) (Job No. C-94-104-15) (0-01512-4001) (See the Special Provisions for the DBE Percentage)

Pursuant to the Rules for Prequalification of Contractors and Issuance of Plans and Proposals, 44 Illinois Administrative Code 650.70,…”This contract requires, in addition to the normal IDOT pre-qualifications requirements, that the Contractor be SSPC-QP1 and QP2 certified. Evidence of certification must be provided prior to receiving authorization to bid.” Contractors are required to submit copies of current certificates for each Letting. These certificates must be submitted along with the contractors’ original BC 57 Affidavit of Availability. 44. Contract No. 68C91 Peoria County District 4 D-4 BRIDGE METALIZING 2016 Various Routes This project consists of metalizing beam ends at 4 locations: (SN 072-0123) Closen Road over I-474 in Bellevue, (SN 072-0110) Roadway OA over Eastbound I-74 west of Sterling Avenue in Peoria, (SN 072-0148) Mossville Raod / County Highway 31 over IL 6 west of IL 29, (SN 072-0149) IL 29 Spur over IL 6 northwest of Mossville; and painting the beam ends at (SN 072-0111) I-474 over Roadway OA; field thermal spraying (metalizing) 4 steel structures; cleaning and painting structural steel at one structure; mobilization; traffic control and protection. (40 Working Days) (Job No. C-94-113-15) (0-01622-4009) (See the Special Provisions for the DBE Percentage)

45. Contract No. 68D08 McDonough County District 4 Section 33-PP FAP Route 315 (US 136/IL 41) This project consists of concrete patching at the intersection of IL 41 and US 136, east of Macomb; includes 130 cu yd earth excavation; 267 ton aggregate subgrade improvement; 780 sq yd geotechnical fabric for ground stabilization; 780 sq yd welded wire reinforcement; 780 sq yd class B patches; 1,698 ft saw cuts; 1,914 ft temporary pavement marking; 31.2 sq ft modified urethane pavement marking letters and symbols; 4,268 ft modified urethane pavement marking; mobilization; traffic control and protection. (30 Working Days) (Job No. C-94-039-16) (0-01622-4017) (See the Special Provisions for the DBE Percentage)

46. Contract No. 70767 McLean County District 5 Section (57-20,57-1)RS&56RS-3 FAP Route 730,FAP 322 (US 51, BUS US 51) Project ACNHPP-000V(48) This project consists of 2.92 miles of resurfacing with guardrail upgrades on US 51 and US Business 51 from Woodridge Road in Bloomington to Country Acres Road; 1,482 sq yd partial depth removal; 312 ton partial depth patching; 8,340 sq yd concrete pavement scarification; 106,877 lb bituminous (tack); 49 ton seal coat aggregate; 1,466 gal bituminous (cover and seal coat); 5,503 ton polymerized leveling binder; 8,575 ton polymerized HMA surface; 39,107 sq yd HMA surface removal; 2,303 sq yd class D patches; 865 ton aggregate shoulders; 4,110 ton HMA shoulders; 43 inlets to be adjusted; 1,311 ft steel plate beam guardrail; 16 traffic barrier terminals; 2,952 ft guardrail removal; 29,110 ft shoulder rumble strips; 1,118 sq ft modified urethane pavement marking; 75,148 ft modified urethane pavement marking; 75,080 ft grooving for recessed pavement marking; 925 raised reflective pavement markers; 1,199 ft detector loop; mobilization; traffic control and protection; federally funded. (65 Working Days) (Job No. C-95-024-09) (5-53909-0000) (See the Special Provisions for the DBE Percentage)

47. Contract No. 70899 Vermilion County District 5 Section 47(X-4RS-2,Z-2RS-4)RS-13 FAP Route 332 (US 150/IL 1) Project ACNHPP-332(125) This project consists of 4.294 miles of resurfacing and ADA improvements on US 150 / IL 1 from the south corporate limits of Georgetown to the north corporate limits of Ridgefarm; 37,401 lb bituminous prime; 5,078 ton HMA surface; 78,592 sq yd HMA surface removal; 274 sq yd class B patches; 728 ton aggregate wedge shoulder; 1,504 ton HMA shoulders; 287.5 ft steel plate beam guardrail; 57,493 ft paint pavement marking; 22,670 ft longitudinal joint sealant; mobilization; traffic control and protection; federally funded. (55 Working Days) (Job No. C-95-027-11) (5-52956-0000) (See the Special Provisions for the DBE Percentage)

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 9 - 48. Contract No. 70993 Piatt County District 5 Section 3RS-4&(4,5)RS-2 FAP Route 758 (IL 32) Project ACSTP-758(14) This project consists of 4 miles of milling and resurfacing on IL 32 starting at US 36 and proceeding northerly to the IL 105 intersection with recovery of survey monuments, striping and incidental resurfacing of entrances and side- roads; 42,707 lb bituminous prime; 2,580 ton leveling binder; 5,160 ton HMA surface course; 220 ton incidental HMA surfacing; 61,421 sq yd HMA surface removal; 87 ton HMA shoulders; 275 ft steel plate beam guardrail; 290 ft thermoplastic pavement marking; 52,274 ft paint pavement marking; 282 raised reflective pavement marker; 290 ft grooving for recessed pavement marking; mobilization; traffic control and protection; federally funded. (40 Working Days) (Job No. C-95-051-12) ( 5-53002-0000) (See the Special Provisions for the DBE Percentage)

49. Contract No. 70B33 McLean County District 5 Section (57-17)BDR,I FAI Route 74 (I-74) Project ACNHPP-7-4(305) This project consists of bridge deck repairs and guardrail upgrades to structure 057-0102 carrying CH 53 over I-74 and guardrail upgrades on structure 057-0113 carrying TR 76 over I-74; both near Carlock; 35 cu yd earth excavation; 22 sq yd riprap; 110 ton HMA surface; 315 sq yd HMA surface removal; 902 sq yd HMA surface removal (deck); 228 sq yd paved shoulder removal; 10 cu ft polymer concrete; 4.8 cu yd concrete superstructure; 720 lb structural steel removal; 2,710 lb structural steel; 150 sq yd deck slab repair; 12 elastomeric bearing assemblies; 910 sq yd waterproofing membrane; 1,300 ft steel plate beam guardrail; 16 traffic barrier terminals; 1,905 ft guardrail removal; mobilization; traffic control and protection; federally funded. (55 Working Days) (Job No. C-95-033-15) (5-53099-0000) (See the Special Provisions for the DBE Percentage)

50. Contract No. 70B43 Champaign County District 5 Section (14HB-3)I FAU Route 7077 (LINCOLN AVENUE) This project consists of maintenance type structure repairs with new elastomeric bearings at the abutments for SN 010- 0158 carrying Lincoln Avenue over I-74 in Urbana; 3,510 lb structural steel; 30 elastomeric bearing assemblies; 60 anchor bolts; mobilization; traffic control and protection. (25 Working Days) (Job No. C-95-043-15) (0-01622-5014) (See the Special Provisions for the DBE Percentage)

Small Business Set-Aside. 51. Contract No. 70B55 Champaign-Vermilion Counties District 5 Section D5 CRACK & JOINT SEAL 2016-1 Various Routes This project consists of crack & joint sealing at various locations in Champaign and Vermilion counties; 52,932 lb crack filling; mobilization; traffic control and protection. (15 Working Days) (Job No. C-95-054-15) (0-01622-5005) (See the Special Provisions for the DBE Percentage)

52. Contract No. 70B56 Piatt County District 5 Section D5 CRACK & JOINT SEAL 2016-2 FAI Route 72 (I-72) This project consists of crack and joint sealing on I-72 westbound and eastbound mainline in Piatt county; 113,425 lb crack filling; mobilization; traffic control and protection. (30 Working Days) (Job No. C-95-055-15) (0-01622-5006) (See the Special Provisions for the DBE Percentage)

53. Contract No. 70B58 Champaign-Vermilion Counties District 5 Section D5 CM PATCHING 2016-7 FAI Route 74 (I-74) This project consists of pavement patching on I-74 in Champaign and Vermilion counties; 586 sq yd welded wire reinforcement; 771 sq yd class B patches; 890 dowel bars; 2,450 ft saw cuts; 202 tie bars; mobilization; traffic control and protection. (15 Working Days) (Job No. C-95-057-15) (0-01622-5008) (See the Special Provisions for the DBE Percentage)

54. Contract No. 70B59 Douglas-Champaign Counties District 5 Section D5 CM PATCHING 2016-1 FAP Route 749,FAS 533 (IL 133, MARKET STREET) This project consists of patching on IL 133 at I-57 in Arcola and Market Street from north of I-57 to Ford Harris Road north of Champaign; 213 sq yd class A patches; 61 sq yd class B patches; 515 sq yd class C patches; 1,035 ft saw cuts; 115 tie bars; mobilization; traffic control and protection. (15 Working Days) (Job No. C-95-058-15) (0-01622-5009) (See the Special Provisions for the DBE Percentage)

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 10 - 55. Contract No. 70B60 McLean County District 5 Section D5 CM PATCHING 2016-2 FAP Route 730 (BUS US 51) This project consists of 1.3 miles of pavement patching on BUS US 51 from north of Northtown Road to Raab Road north of Normal; 326 sq yd welded wire reinforcement; 694 sq yd class B patches; 1,176 each dowel bars; 190 each tie bars; mobilization; traffic control and protection. (15 Working Days) (Job No. C-95-059-15) (0-01622-5010) (See the Special Provisions for the DBE Percentage)

56. Contract No. 70B61 Piatt County District 5 Section D5 CM PATCHING 2016-3 FAP Route 721 (IL 10) This project consists of 0.3 miles of pavement patching on IL 10 from North Street to West of Lodge Road in Lodge; 78 sq yd welded wire reinforcement; 671 sq yd class B patches; 1,510 each dowel bars; 20 each tie bars; mobilization; traffic control and protection. (15 Working Days) (Job No. C-95-060-15) (0-01622-5011) (See the Special Provisions for the DBE Percentage)

57. Contract No. 70B62 Piatt County District 5 Section D5 CM PATCHING 2016-6 FAP Route 760,FAS 1531 (IL 32,OLD IL 47) This project consists of 6.4 miles of class B patching on IL 32 and Old IL 47 from North of Sangamon River Bridge to 1 mile south of the Sangamon River Bridge and Cisco to west of Monticello; 76 sq yd welded wire reinforcement; 500 sq yd class B patches; 1,090 each dowel bars; 15 each tie bars; mobilization; traffic control and protection. (15 Working Days) (Job No. C-95-061-15) (0-01622-5012) (See the Special Provisions for the DBE Percentage)

58. Contract No. 70B63 DeWitt County District 5 Section D5 CM PATCHING 2016-4 FAP Route 708,FAP 71 (BUS US 51,IL 54) This project consists of 0.1 miles of class B patching of US 51 BUS from US 51 Bypass North to US 51 Bypass South in Clinton and 0.5 miles class D patching on IL 54 at I-74 north of Farmer City; 44 sq yd welded wire reinforcement; 453 sq yd class B patches; 1,177 each dowel bars; 242 sq yd class D patches; mobilization; traffic control and protection. (20 Working Days) (Job No. C-95-062-15) (0-01622-5013) (See the Special Provisions for the DBE Percentage)

59. Contract No. 70B76 Champaign County District 5 Section D5 REST AREA REPAIR 2016-1 FAI Route 57 (I-57) This project consists of pavement and sidewalk repairs at the Illini Prairie Rest Area; 15 cu yd earth excavation; 128 sq yd subbase granular material; 4 ton aggregate surface course; 10 sq yd PCC driveway; 1,333.50 sq ft PCC sidewalk; 1,122 sq ft sidewalk removal; 752 sq yd welded wire reinforcement; 1,137 sq yd class B patches; 1,546 each dowel rods; 782 each tie bars; 17 ft combination concrete curb and gutter; mobilization; traffic control and protection. (25 Working Days) (Job No. C-95-014-16) (0-01786-5002) (See the Special Provisions for the DBE Percentage)

60. Contract No. 72D21 Morgan County District 6 Section 23BR,RS6,TS-5;33BR-1,RS4,TS-2 FAP Route 310A/753 (I-72BL/IL 104/MORTON AVE) Project ACNHPP-ACHSIP-000V(51) This project consists of 3.76 miles of resurfacing, traffic signal modernization, culvert extensions, bridge repairs, concrete curb and gutter and ADA improvements on I-72 Business Loop/IL 104 from east of Mound Road to east of Hardin Avenue in Jacksonville; includes 128 units supplemental watering; 465 cu yd earth excavation; 341 cu yd furnished excavation; 1 acre seeding; 2,810 sq yd sod; 211 ton subbase granular material; 94,477 lb bituminous prime; 9,905 ton leveling binder; 11,468 ton polymerized HMA surface; 136,578 sq yd HMA surface removal; 23,960 sq ft PCC sidewalk; 2,647 sq yd driveway pavement removal; 19,403 sq ft sidewalk removal; 4,241 sq ft combination concrete curb and gutter; 560 sq yd class C patches; 266 ton aggregate wedge shoulder; 14.5 cu yd concrete superstructure; 1,790 lb structural steel; 2,390 lb rebar; 2 manholes; 239 sq yd bridge deck microsilica concrete overlay; 109 sq yd deck slab repair; 25 manholes to be adjusted; 19 inlets to be adjusted; 4,405 ft combination concrete curb and gutter; 1,515 sq ft concrete median surface; 1,050 cu yd non-special waste disposal; 1,348 sq ft sign panel; 729 sq ft remove sign panel; 78,146 ft thermoplastic pavement marking; 3,327 sq ft preformed plastic pavement marking; 1,983 ft preformed plastic pavement marking; 1,267 raised reflective pavement markers; 20,628 ft underground conduit; 8,395 ft electric cable in conduit; 36 sodium vapor luminaires; 13 uninterruptable power supply; 18,911 ft fiber optic cable in conduit; 82,019 ft electric cable in conduit; 47 traffic signal posts; 12 steel mast arm assemblies and poles; 36 steel combination mast arm assemblies and poles; 993 ft concrete foundation; 173 LED polycarbonate signal heads; 79 pedestrian signal heads; 535 remove existing traffic signal equipment; mobilization; traffic control and protection; federally funded. (160 Working Days) (Job No. C-96-144-10) (6-04572-0000, 6-04572-0100, 6-04572-0200, 6-04572-0300, 6-04574-0000) (See the Special Provisions for the DBE Percentage)

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 11 - The time limit to award this item has been changed from 45 days to 60 days after the scheduled letting. 61. Contract No. 72G94 Macoupin County District 6 Section D6 2015-HSRR FAP Route 662 (IL 4) Project HSR-662(69) This project consists of 0.45 miles of pavement removal, realignment, earthwork and drainage improvements at the intersection of IL 4 and Old Route 4 south of the City of Girard; includes 2,095 cu yd earth excavation; 210 cu yd removal and disposal of unsuitable material; 3,513 cu yd furnished excavation; 11,770 sq yd topsoil; 2.4 acres seeding; 4,808 ft perimeter erosion barrier; 2,781 sq yd aggregate base; 1,531 sq yd HMA base course widening; 452 ton aggregate surface course; 5,710 lb bituminous tack; 2,046 ton HMA binder; 529 ton HMA surface; 1,689 sq yd pavement removal; 3,296 sq yd HMA surface removal; 474 ton HMA shoulders; 499 ft pipe culverts; 2,637 ft shoulder rumble strips; 157 sq ft sign panel; 7,141 ft modified urethane pavement marking; mobilization; traffic control and protection; federally funded. (Completion Date: November 01, 2016 Plus 15 Working Days) (Job No. C-96-065-14) (6-00284-0000) (See the Special Provisions for the DBE Percentage)PREVIOUSLY ADVERTISED: January 15, 2016 (Item 21) PREVIOUSLY ADVERTISED: March 4, 2016 (Item 48)

62. Contract No. 72H61 Sangamon County District 6 Section (102)I-5 FAP Route 658 (IL 29) This project consists of removing the existing steel handrail on the bridge parapet for SN 084-0168 and 084-0169 on IL 29 south of IL 4 and replacing it with concrete; 26.2 cu yd concrete superstructure; 4,500 lb rebar; mobilization; traffic control and protection. (25 Working Days) (Job No. C-96-036-15) (6-00598-0000) (See the Special Provisions for the DBE Percentage)

Pursuant to the Rules for Prequalification of Contractors and Issuance of Plans and Proposals, 44 Illinois Administrative Code 650.70,…”This contract requires, in addition to the normal IDOT pre-qualifications requirements, that the Contractor be SSPC-QP1 and QP2 certified. Evidence of certification must be provided prior to receiving authorization to bid.” Contractors are required to submit copies of current certificates for each Letting. These certificates must be submitted along with the contractors’ original BC 57 Affidavit of Availability. 63. Contract No. 72H90 Sangamon County District 6 Section D6 BDGE PAINTING 2016-3 FAI Route 72 (I-72) This project consists of cleaning and painting portions of 3 bridges on I-72 in eastern Sangamon County (SN 084-0152, 084-0153 & 084-0160); cleaning and painting 3 steel bridges; containment and disposal of lead paint cleaning residues from 3 structures; 500 ft temporary water filled barrier; mobilization; traffic control and protection. (55 Working Days) (Job No. C-96-067-15) (0-01512-6004) (See the Special Provisions for the DBE Percentage)

64. Contract No. 72H93 Hancock County District 6 Section (28)RS-8,PP-2 FAP Route 315 (US 136) This project consists of resurfacing on US 136 starting approximately 1.1 mile west of the US 136/IL 94 intersection and continuing east for 1 mile; includes 920 sq yd HMA base; 9,059 lb bituminous prime; 1,291 ton HMA surface; 920 sq yd pavement removal; 20,139 sq yd HMA surface removal; 535 sq yd pavement patching; 162 ton aggregate wedge shoulder; 401 ton HMA shoulders; 4,020 ft thermoplastic pavement marking; 10,180 ft paint pavement marking; 219 sq ft preformed plastic pavement marking letters and symbols; 130 each raised reflective pavement markers; mobilization; traffic control and protection. (15 Working Days) (Job No. C-96-070-15) (0-01622-6005) (See the Special Provisions for the DBE Percentage)

65. Contract No. 72H94 Sangamon County District 6 Section (S)RS-5,I&(W)RS-8,I-2 FAP Route 67 (IL 97) Project ACNHPP-ACSTP-67(85) This project consists of 4.13 miles of resurfacing with shoulder reconstruction on IL 97 from the IL 97/IL 125 junction to Koke Mill Road in Springfield; includes 3,050 cu yd earth excavation; 205 cu yd furnished excavation; 7 acres seeding; 118 ton riprap; 2,255 sq yd preparation of base; 65,988 sq yd HMA surface removal; 45,555 lb bituminous prime; 8,295 ton HMA binder; 2,668 ton HMA surface; 2,433 ton polymerized HMA surface; 2,522 sq yd paved shoulder removal; 300 sq yd pavement patching; 967 ton aggregate wedge shoulder; 1,275 ton HMA shoulders; 24.7 cu yd concrete removal; 6.3 cu ft polymer concrete; 1,100 ft steel plate beam guardrail; 8 traffic barrier terminals; 1,119 ft preformed plastic pavement marking; 360 raised reflective pavement markers; mobilization; traffic control and protection; federally funded. (15 Working Days) (Job No. C-96-001-16) (6-00683-0000, 6-00683-0100) (See the Special Provisions for the DBE Percentage)

66. Contract No. 72I02 Montgomery County District 6 Section (68-2)RS-7,I-4 FAS Route 1768 (FR I-55 EAST) This project consists of resurfacing the east Frontage Road of I-55 north of Litchfield; includes 5,280 lb bituminous prime; 330 ton leveling binder; 658 ton HMA surface; 200 ton aggregate wedge shoulder; 14,080 ft paint pavement marking; mobilization; traffic control and protection. (15 Working Days) (Job No. C-96-009-16) (0-01622-6009) (See the Special Provisions for the DBE Percentage)

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 12 - The time limit to award this item has been changed from 45 days to 60 days after the scheduled letting. 67. Contract No. 72I11 Sangamon County District 6 Section D6 2015-1A HSRR (GOLDENROD DRIVE) Project HSR-000V(55) This project consists of pavement and rail crossing (Union Pacific Railroad) reconstruction on Goldenrod Drive between IL 4 and Main Street Drive in Chatham; includes 114 units tree removal; 2,916 cu yd earth excavation; 269 cu yd trench backfill; 9,570 sq yd topsoil; 2 acres seeding; 538 ft perimeter erosion barrier; 5,019 sq yd subbase granular material; 117 ton aggregate surface; 9,850 lb bituminous prime; 1,397 ton HMA binder; 185 ton HMA surface; 308 ton polymerized HMA surface; 5,993 sq ft PCC sidewalk; 1,722 sq yd pavement removal; 2,346 sq ft sidewalk removal; 1,260 ft storm sewer; 687 ft storm sewer removal; 9 manholes; 16 inlets; 206 ft steel casing pipe in trench; 1,188 ft combination concrete curb and gutter; 125 sq ft sign panel; 1,032 ft thermoplastic pavement marking; 184 sq ft preformed plastic pavement marking; 337 ft preformed plastic pavement marking; 26 raised reflective pavement markers; mobilization; traffic control and protection; federally funded. (Completion Date: May 10, 2017 Plus 15 Working Days) (Job No. C-96-024-16) (6-00284-0200, 6-00284-0900) (See the Special Provisions for the DBE Percentage)

68. Contract No. 72I14 Montgomery County District 6 Section (68-2)WS-6 FAI Route 55 (I-55) This project consists of reconstructing the pavement at the Litchfield Weigh Station's inspection building; 1,067 cu yd earth excavation; 1,322 sq yd subbase granular material and stabilized subbase; 1,087 sq yd jointed PCC pavement; 147 sq yd jointed PCC shoulders; 50 ton aggregate shoulders; relocate 2 existing lighting units; mobilization; traffic control and protection. (30 Working Days) (Job No. C-96-027-16) (0-01532-6001) (See the Special Provisions for the DBE Percentage)

Small Business Set-Aside. 69. Contract No. 72I20 Brown County District 6 Section (9)CR FAP Route 550 (IL 99) This project consists of culvert headwall repairs to SN 005-7007 on IL 99 just north of Mt. Sterling; 1 cu yd concrete removal; 180 lb rebar; 1 cu yd concrete box culvert; 75 ft remove and re-erect steel plate beam guardrail; mobilization; traffic control and protection. (20 Working Days) (Job No. C-96-033-16) (6-00989-0000) (See the Special Provisions for the DBE Percentage)

70. Contract No. 72I21 Mason County District 6 Section (1Z)PP FAP Route 315 (US 136/IL 97) This project consists of class C patching on US 136 / IL 97 in the city of Havana; 400 sq yd class C patches; mobilization; traffic control and protection. (15 Working Days) (Job No. C-96-034-16) (6-00992-0000) (See the Special Provisions for the DBE Percentage)

71. Contract No. 72I22 Sangamon County District 6 Section (110)BDR FAP Route 7998 (EAST LAKE SHORE DRIVE) This project consists of bridge deck patching on SN 084-0209 carrying East Lakeshore Drive over Lake Springfield Slough, 0.5 miles east of I-55 near Springfield; 124 sq yd deck slab repair (partial); mobilization; traffic control and protection. (30 Working Days) (Job No. C-96-035-16) (0-01622-6013) (See the Special Provisions for the DBE Percentage)

72. Contract No. 74543 Macon County District 7 Section (13X)RS-1 FAP Route 323 (US 36) Project ACNHPP-0323(034) This project consists of 2.9 miles of HMA resurfacing on US 36 from 0.2 miles east of Harristown Boulevard to the IL 48 overpass in Decatur; 80,344 lb bituminous prime; 3,842 ton leveling binder; 7,702 ton polymerized HMA surface course; 132,906 sq yd HMA surface removal; 310 sq yd class D patches; 3,530 ton HMA shoulders; 50,470 ft shoulder rumble strips; 640 sq ft thermoplastic pavement marking letters and symbols; 76,348 ft thermoplastic pavement marking; 549 raised reflective pavement marker; 1,914 ft remove electric cable from conduit; 640 sq ft grooving for recessed pavement marking letters, numbers and symbols; 76,348 ft grooving for recessed pavement marking; mobilization; traffic control and protection; federally funded. (60 Working Days) (Job No. C-97-008-12) (7-50264-0000) (See the Special Provisions for the DBE Percentage)

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 13 - 73. Contract No. 74728 Various Counties District 7 Section D7 GUARDRAIL 2016-1 Various Routes This project consists of repairing or replacing existing damaged steel plate beam guardrail and traffic barrier terminals on a work order basis throughout District 7; 290 ft steel plate beam guardrail; 25 traffic barrier terminals; 201 ft remove and re-erect steel plate beam guardrail; 138 steel posts; 51 repair traffic barrier terminals; 100 ft single strand cable road guard; 1,550 ft woven wire fence; 130 ft chain link fence; 14 remove and replace impact attenuator sand modules; 2,075 sq yd grading and shaping special; mobilization. (Completion Date: June 30, 2017) (Job No. C-97-082-15) (0-01622-7005, 7-50994-0000) (MCHD) (See the Special Provisions for the DBE Percentage)

74. Contract No. 74742 Shelby-Cumberland Counties District 7 Section D7 HMA SAFETY SHLD 2017-1 FAS Route 1652 (US 45) Project ACHSIP-1652(50) This project consists of placing a 3' HMA shoulder with rumble strips and a 2' aggregate shoulder on US 45 from the Effingham / Shelby county line to 11th Street north of Neoga; 748 unit excavating and grading existing shoulder; 1,870 ton aggregate wedge shoulder; 24,958 sq yd HMA shoulders; 74,277 ft shoulder rumble strips; mobilization; traffic control and protection; federally funded. (30 Working Days) (Job No. C-97-007-16) (7-76910-8702) (See the Special Provisions for the DBE Percentage)

75. Contract No. 74745 Moultrie-Coles Counties District 7 Section D7 PAVT PRSV 2016-2 FAS Route 659, FAU 7620 (CADWELL ROAD, OLD IL 316) This project consists of 9.9 miles of bituminous surface treatment on Cadwell Road between IL 121 and IL 133 and on Old IL 316 between IL 130 and IL 16 east of Charlestown; 90 ton bituminous prime; 261 ton cover coat aggregate; 261 ton seal coat aggregate; 6,000 ft short term pavement marking; 114 sq ft thermoplastic pavement marking letters and symbols; 2,386 ft thermoplastic pavement marking; 126,481 ft paint pavement marking; 118,978 sq yd bituminous surface treatment; mobilization; traffic control and protection. (30 Working Days) (Job No. C-97-016-16) (0-02021-7002) (See the Special Provisions for the DBE Percentage)

76. DELETED FROM THE LETTING

77. Contract No. 76H87 Various Counties District 8 Section DIST 8 SCOUR MITIGATION 2016-1 Various Routes This project consists of scour mitigation for various structures at various locations in District 8, (SN 003-0030) IL 127 over Beaver Creek, 0.26 miles south of US 40; (SN 014-0024) IL 161 over Lost Creek, 1.7 miles east of IL 127; (SN 060-0087) IL 157/IL 162 over Judy's Branch Creek at JCT 157-162; (SN 079- 0032) IL 155 over stream in Prairie Du Rocher; 155 cu yd channel excavation; 3,235 sq yd stone riprap; 2,870 sq yd filter fabric; 75 cu yd non-special waste disposal; mobilization; traffic control and protection. (45 Working Days) (Job No. C-98-060-15) (0-02002-8001) i (See the Special Provisions for the DBE Percentage)

78. Contract No. 76H93 Madison County District 8 Section DIST 8 SEAL COAT 2016-1 Various Routes This project consists of 3.8 miles of oil and chip on Old Edwardsville Road from Thomas Avenue to IL 111; Schipkowski Road from Pin Oak Road to IL 143; Williamson Avenue from Sievers Road to Washington Street in Williamson and the Mitchell Yard; includes 135.2 ton bituminous prime; 463 ton cover coat aggregate; 463 ton seal coat aggregate; 31,852 ft paint pavement marking; 262 raised reflective pavement marker protection; mobilization; traffic control and protection. (15 Working Days) (Job No. C-98-043-15) (0-01622-8006) (See the Special Provisions for the DBE Percentage)

79. Contract No. 76H94 Greene County District 8 Section 501,502RS-6 FAS Route 739 (ELDRED ROAD) This project consiss of 5.2 miles of oil and chip on Eldred Road from Hillview, north end of north approach pavement of SN 031-0006, to the Greene/Scott county line; includes 208 ton bituminous prime; 712 ton cover coat aggregate; 712 ton seal coat aggregate; 21,437 ft paint pavement marking; mobilization; traffic control and protection. (15 Working Days) (Job No. C-98-044-15) (0-01622-8007) (See the Special Provisions for the DBE Percentage)

80. Contract No. 76H95 St. Clair County District 8 Section 117,118RS-1 FAP Route 592 (IL 157) This project consists of 1 mile of resurfacing on IL 157 from Conrail Railroad to the Madison County line; includes 7,652 lb bituminous prime; 1,459 ton HMA surface; 17,363 sq yd HMA surface removal; 6,805 sq ft pavement marking removal; 10,122 ft strip reflective crack control treatment; 47 sq ft thermoplastic pavement marking letters and symbols; 19,397 ft thermoplastic pavement marking; 97 each raised reflective pavement marker; 120 ft locating underground cable; 1,439 ft detector loop replacement; mobilization; traffic control and protection. (15 Working Days) (Job No. C-98-045-15) (0-01622-8008) (See the Special Provisions for the DBE Percentage)

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 14 - 81. Contract No. 76H96 St. Clair County District 8 Section 32-1RS-1 FAP Route 592 (IL 157) This project consists of 0.06 miles of resurfacing and patching on IL 157 at the intersection of Main Street and State Street in East St. Louis; includes 2,454 lb bituminous prime; 104 ton leveling binder; 297 sq yd HMA surface removal; 578 sq yd PCC surface removal; 344 ton polymerized HMA surface; 620 sq yd class B patches; 2,327 ft saw cuts; 2,360 ft thermoplastic pavement marking; 93.6 sq ft thermoplastic pavement marking letters and symbols; 24 each raised reflective pavement marker; 140 ft locating underground cable; 3,088 ft detector loop replacement; mobilization; traffic control and protection. (15 Working Days) (Job No. C-98-046-15) (0-01622-8009) (See the Special Provisions for the DBE Percentage)

82. Contract No. 76H99 St. Clair County District 8 Section 125BR-3 FAP Route 805 (IL 161) This project consists of bridge repairs to SN 082-0094 carrying IL 161 over the Silver Creek Overflow, 1.8 miles east of IL 158; includes 16 ton HMA shoulders; 10.7 cu yd concrete superstructure; 5,097 sq ft bridge deck concrete sealer; 434 sq yd bridge deck scarification and microsilica concrete overlay; 1,820 lb structural steel; 1,130 lb rebar; 10 elastomeric bearing assemblies; 884 ft modified urethane pavement marking; mobilization; traffic control and protection. (40 Working Days) (Job No. C-98-049-15) (0-01622-8013) (See the Special Provisions for the DBE Percentage)

83. Contract No. 76J06 Clinton County District 8 Section 113RS-6,14-16Z-RS-1 FAP Route 42/327 (IL 127/US 50) Project ACSTP-327(61) This project consists of patching, milling, resurfacing and ADA ramp improvements on IL 127 / US 50 from 0.2 miles north of Williams Road to 11th Street in Carlyle; 30,138 lb bituminous prime; 2,605 ton leveling binder; 3,770 ton HMA surface course; 2,079 sq ft PCC sidewalk; 39,976 sq yd HMA surface removal; 767 sq yd class B patches; 3,008 ft saw cuts; 31,098 ft strip reflective crack control treatment; 258 ton aggregate wedge shoulder; 1,046 ton HMA shoulders; 390 ft combination curb and gutter; 125 ft steel plate beam guardrail; 2,196 sq ft thermoplastic pavement marking letters and symbols; 33,556 ft thermoplastic pavement marking; 3,102 ft detector loop replacement; 283 ft electrical cable in conduit; 283 ft remove and reinstall electric cable; mobilization; traffic control and protection; federally funded. (60 Working Days) (Job No. C-98-056-15) (8-00391-0000) (See the Special Provisions for the DBE Percentage)

84. DELETED FROM THE LETTING

85. DELETED FROM THE LETTING

86. Contract No. 76J37 Madison-Greene Counties District 8 Section 56BR-I,52-1BI-1 FAP Route 789,FAP 310 (IL 143,US 67) This project consists of scour mitigation on SN 060-0188 carrying IL 143 over Mooney Creek and SN 031-0031 carrying US 67 over Apple Creek Overflow; 2,355 sq yd stone riprap; 1,875 sq yd filter fabric; mobilization; traffic control and protection. (20 Working Days) (Job No. C-98-025-16) (0-02002-8002) (See the Special Provisions for the DBE Percentage)

87. DELETED FROM THE LETTING

The time limit to award this item has been changed from 45 days to 60 days after the scheduled letting. 88. Contract No. 76J48 Jersey County District 8 Section 129-R-2-DM FAP Route 10A (IL 111) Project HSR-010A(1) This project consists of the removal of buildings, shrubs and trees to make room for utility relocations and IL 111 realignment; 515 unit tree removal; 12 l sum building removals; 12 l sum removal and disposal of friable asbestos; 12 l sum removal and disposal of non-friable asbestos; mobilization; federally funded. (40 Calendar Days) (Job No. C-98-022-16) (8-00525-1000) (See the Special Provisions for the DBE Percentage)

89. DELETED FROM THE LETTING

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 15 - 90. Contract No. 78257 Williamson County District 9 Section 1R-1,1N-1 FAS Route 909 (OLD IL 13) Project ACSTP-FLTP-909(1) This project consists of grade correction to improve sight distance at the Old 13/Wolf Creek intersection; includes 140 unit tree removal; 13,352 cu yd earth excavation; 4.7 acres seeding; 227 cu yd porous granular embankment; 4,811 sq yd erosion control blanket; 825 ft perimeter erosion barrier; 212 sq yd riprap; 7,237 sq yd processing modified soil; 219 ton limestone; 128 cu yd subbase granular material; 170 ton aggregate surface course; 104 ton leveling binder; 142 ton HMA binder; 309 ton HMA surface; 3,033 ton material transfer device; 120 sq yd PCC pavement; 5,398 sq yd pavement removal; 3,673 sq yd HMA surface removal; 3,906 sq yd HMA shoulders; removal of 3 structures; 3,230 lb rebar; 25 cu yd concrete box culverts; 612 ft steel plate beam guardrail; 4 traffic barrier terminals; 10,055 ft paint pavement marking; 33 raised reflective pavement markers; mobilization; traffic control and protection; federally funded. (40 Working Days) (Job No. C-99-045-11) (9-00426-0100, 9-00476-0000) (See the Special Provisions for the DBE Percentage)

91. Contract No. 78364 Saline County District 9 Section 2B-3 FAP Route 778 (IL 34) Project ACSTP-778(11) This project consists of the replacement of SN 083-0022 carrying IL 34 over Spring Valley Creek with a single span wide flange bridge and traffic will be managed by staged construction; 250 unit tree removal; 644 cu yd earth excavation; 1,393 cu yd channel excavation; 942 cu yd furnished excavation; 1,794 sq yd heavy duty erosion control blanket; 378 ft perimeter erosion barrier; 1,412 sq yd riprap; 559 sq yd PCC base course widening; 84 ton HMA binder course; 86 ton HMA surface course; 24 ton HMA shoulders; removal of existing structure; 280 cu yd structure excavation; 77 cu yd concrete structures; 118 cu yd concrete superstructures; 119 cu yd concrete superstructure (approach slab); 72,540 lb structural steel; 62,280 lb rebar; 462 ft steel piles; 150 ft steel plate beam guardrail; 4 traffic barrier terminals; 1,595 ft paint pavement marking; 1 uninterruptable power supply; mobilization; traffic control and protection; federally funded. (120 Working Days) (Job No. C-99-034-13) (9-97360-0000) (See the Special Provisions for the DBE Percentage)

92. Contract No. 78482 Williamson County District 9 Section D9 TRAFFIC SIGNAL 2016-1 FAU Route 9637 (IL 37) This project consists of the addition of radar detection to the traffic signals at the intersection of IL 37 and Boyton Street in Marion; 1 full-actuated controller and cabinet; 1 radar vehicle detection system; 8 inductive loop detector; mobilization; traffic control and protection. (15 Working Days) (Job No. C-99-050-15) (9-91480-1602) (See the Special Provisions for the DBE Percentage)

93. Contract No. 78515 Franklin County District 9 Section D9 PAVT PRESERVATION 2016-1 FAI Route 57 (I-57) This project consists of filling holes or cracks greater than 1/2", filling small cracks and joints, priming and placement of microsurfacing on I-57 northbound from Yellow Banks Road to 1.5 miles north of IL 154 at Whittington; 59,944 lb bituminous tack coat; 24 ton mixture for cracks, joints and flangeways; 174,510 ft fiber-modified asphalt crack sealing; 134,475 sq yd micro-surfacing; mobilization; traffic control and protection. (15 Working Days) (Job No. C-99-017-16) (0-02021-9002) (See the Special Provisions for the DBE Percentage)

94. Contract No. 78519 Jefferson County District 9 Section D9 RUMBLE STRIP 2016-1 FAP Route 726/FAS 2826 (IL 37/IL 148) Project ACHSIP-726(66) This project consists of 33 miles of safety improvements including shoulder upgrades, bituminous materials, earth excavation, shoulder rumble strips and guardrail; 10,316 cu yd earth excavation; 10,445 lb bituminous tack coat; 46,423 sq yd HMA shoulders; 625 ft steel plate beam guardrail; 4 traffic barrier terminals; 104,093 ft shoulder rumble strips; mobilization; traffic control and protection; federally funded. (25 Working Days) (Job No. C-99-021-16) (9-02200-2603, 9-02200-2604 & 9-02200-2605) (See the Special Provisions for the DBE Percentage)

95. Contract No. 85629 Winnebago County District 2 Section 13-00599-00-SP (ROCKFORD) FAU Route 5089 (SANDY HOLLOW ROAD) Project HSIP-5099(116) This project consists of 1.59 miles of resurfacing, patching, curb and gutter replacement and pavement markings on Sandy Hollow Road from 20th Street to Alpine Road in the City of Rockford; 609 sq yd aggregate base course, Type A 4"; 609 sq yd PCC base course 7"; 21,750 lb bituminous materials (tack coat); 4,260 ton HMA surface course, Mix "D", N50; 939 sq yd pavement removal; 533.5 sq yd Class B patches; 38,020 sq yd fiber glass fabric repair system; 327 ft combination concrete curb and gutter; 22,880 ft thermoplastic pavement markings; 1,179 ft epoxy pavement markings; 21,445 sq yd PCC surface removal (variable depth); 2,939 sq ft concrete median Type SM-6.24 (special); Federally Funded; (A Special Provision for this contract requires insurance that names additional insureds). (Completion Date: September 30, 2016 Plus 05 Working Days) (Job No. C-92-073-15) (0-01667-2002) (See the Special Provisions for the DBE Percentage)

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 16 - 96. Contract No. 85633 Lee County District 2 Section 14-00328-00-BR FAS Route 182 (ASHTON ROAD) Project BRS-182(103) Project consists of the removal of the existing single span structure and replacement with a single span precast prestressed concrete deck beam bridge (17" depth), related HMA roadway, aggregate shoulder and guardrail over Beach Creek, located 1 mile south of Ashton; 180 ton porous granular embankment; 2,700 sq yd erosion control blanket; 120 ton stone dumped riprap; 962 ton aggregate base course; 80 ton aggregate surface course; 320 lbs bituminous materials (prime coat); 300 ton incidental HMA surfacing; 180 ton aggregate shoulders; 1 removal of existing structures; 42.5 cu yd concrete structures; 110 sq yd bridge deck grooving; 1,365 sq yd protective coat; 1,006 sq ft precast prestressed concrete deck beams (17"depth); 5,280 lbs reinforcement bars, epoxy coated; 540 ft furnishing and driving piles; 150 ft steel pile beam guardrail; 288 ft guardrail removal; 620 cu yd earth excavation; 118.2 sq yd concrete wearing surface; traffic control and protection, special; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (40 Working Days) (Job No. C-92-053-16) (2-10512-0000) (See the Special Provisions for DBE Percentage)

97. Contract No. 85634 Lee County District 2 Section 15-00330-00-RS FAU Route 5494 (LOWELL PARK ROAD) Project M-5018(19) This project consists of 2.87 miles of Cold-In-Place Recycling, HMA overlay and aggregate shoulders on Lowell Park Road from the Ogle County line to IL 26; 70 ton Portland cement; 8,670 lb bituminous materials (tack coat); 4,075 ton HMA surface course, Mix "C", N50; 837 ton aggregate shoulder, Type B; 155 ton CIR-FDR foamed asphalt; 38,613 sq yd Cold-In-Place recycling, 3"; 38,613 sq yd surface profile milling; Federally Funded; (A Special Provision for this contract requires insurance that names additional insureds). (25 Working Days) (Job No. C-92-054-16) (2-10513-0000) (See the Special Provisions for the DBE Percentage)

98. Contract No. 85635 Ogle County District 2 Section 13-00297-00-RS FAS Route 52 (MONTAGUE ROAD) Project RS-52(110) Project consists of 1.5 inch HMA surface course with construction of an adjacent 4 inch HMA shoulder, an aggregate shoulder wedge, striping and all other incidental items to complete the work on FAS Route 52 (Montague Rd) from Rock City Road to Winnebago County Line; 23,963 lb bituminous materials (prime coat); 22,100 lb bituminous materials (tack coat); 647 sq yd HMA surface removal-butt joint; 6,938 ton HMA surface course; 157 ton incidental HMA surfacing; 1,994 tpm HMA shoulder, special; 2,580 ft short term pavement marking; 82,904 ft modified urethane pavement marking line; traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (15 Working Days) (Job No. C-92-058-16) (2-10487-0000) (See the Special Provisions for the DBE Percentage)

99. Contract No. 87608 Livingston County District 3 Section 08-00144-04-RS FAS Route 343 (CH 3) Project RS-343(109) This project consists of 10.08 miles of HMA resurfacing and aggregate shoulders on CH 3 from 2700 N Road to IL 116; 58,926 lb bituminous materials (tack coat); 9,093 ton leveling binder (machine method), IL-9.5FG, N50; 11,072 ton HMA surface course, Mix "C", N50; 1,523 lb bituminous materials (prime coat); 389 ton incidental HMA surfacing; 129,636 sq yd HMA surface removal, 1 1/2"; 5,389 ton aggregate wedge shoulder, Type B; 24,415 ft paint pavement markings - Line 4"; 888 sq yd HMA surface removal, variable depth; Federally Funded; (A Special Provision for this contract requires insurance that names additional insureds). (40 Working Days) (Job No. C-93-028-15) (3-10474-0000) (See the Special Provisions for the DBE Percentage)

100. Contract No. 87616 DeKalb County District 3 Section 13-00237-00-RS FAS Route 174 (CH 6) Project RS-174(120) This project consists of 12.34 miles of HMA resurfacing and HMA shoulders on CH 6 from Malta City Limits to US 30; 140,302 lb bituminous materials (tack coat); 8,856 ton leveling binder (machine method), IL9.5FG,N50; 2,494 sq yd HMA surface removal-butt joint; 14,741 ton HMA surface course, Mix "C", N50; 659 ton incidental HMA surfacing; 76 sq ft PCC sidewalks, 5 inch; 76.5 sq ft sidewalk removal; 1,800 ton aggregate shoulders, Type B; 216,676 ft thermoplastic pavement markings; 6,397 ton HMA shoulders, special; Federally Funded; (A Special Provision for this contract requires insurance that names additional insureds). (Completion Date: September 09, 2016) (Job No. C-93-065-15) (3-10516- 0000) (See the Special Provisions for the DBE Percentage)

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 17 - 101. Contract No. 89684 Peoria County District 4 Section 14-00038-00-SW (CHILLICOTHE) Various Routes Project SRTS-4009(315) Project consists of sidewalk removal, PCC sidewalk, PCC driveway, aggregate driveway, grading, topsoil, seeding and all other incidental items to complete the work on Sycamore Street from Hushaw Avenue to 6th Street, Hickory Street from Benedict Avenue to 6th Street and on Benedict Avenue from Sycamore Street to Hickory Street in the City of Chillicothe; 114 unit tree removal; 716 sq yd topsoil furnish and place; 1,405 sq yd aggregate base course; 12 ton incidental HMA surfacing; 12,641 sq ft PCC sidewalk; 240 sq ft detectable warnings; 32 ton aggregate surface course; 127 sq yd driveway pavement removal; 1,021 sq ft sidewalk removal; 59 ft combination concrete curb and gutter; traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (25 Working Days) (Job No. C-94-042-15) (0-01687-4003) (See the Special Provisions for the DBE Percentage)

102. Contract No. 89690 Warren County District 4 Section 14-00079-00-PV (MONMOUTH) FAU Route 6874 (NORTH 6TH STREET) Project M-5046(9) This project consists of patching and the removal and replacement of PCC pavement on North 6th Street from North of the intersection with US Route 34 to south of Hastings Way in the City of Monmouth; 610 cu yd earth excavation; 3,000 sq yd geotechnical fabric for ground stabilization; 1,732 ft perimeter erosion barrier; 2,304 sq yd aggregate base courses; 21 sq yd aggregate surface course, Type A 6"; 31.5 ton HMA surface course Mix "C", N50; 2,050 sq yd PCC pavement, 10" (jointed); 47 sq yd PCC driveway pavement, 8 inch; 83 sq yd driveway pavement removal; 191.7 sq yd Class B patches, Type II, 10 inch; 732 sq yd aggregate shoulder, Type A 6"; 256 sq yd HMA surface removal, variable depth; Federally Funded; (A Special Provision for this contract requires insurance that names additional insureds). (45 Working Days) (Job No. C-94-052-15) 4-10541-0000) (See the Special Provisions for the DBE Percentage)

103. Contract No. 93658 Sangamon County District 6 Section 12-00467-01-PV (SPRINGFIELD) FAU Route 7997 (STANFORD AVENUE) Project M-5146(86) This project consists of constructing the Stanford Avenue extension from Fox Bridge Road to Taylor Avenue in the City of Springfield. Full depth HMA pavement, curb and gutter, sidewalks, pedestrian path, storm sewer, culverts, traffic signals and pavement markings; includes 2.75 acre tree removal, acres; 16,135 cu yd earth excavation; 1,805 cu yd furnished excavation; 3,183 cu yd topsoil excavation and placement; 3.5 acre seeding, Class 1A; 2,079 sq yd erosion control blanket; 3,879 ft perimeter erosion barrier; 17,388 sq yd aggregate subgrade improvement 12"; 3,984 sq yd aggregate base course, Type A 6"; 382 ton HMA binder course, IL-19.0, N50; 107 ton HMA surface course, Mix "D", N50; 14,845 sq yd HMA pavement (full depth); 1,492 sq yd PCC driveway pavement, 6 inch; 25,944.5 sq ft PCC sidewalk 4"; 1,266 sq yd HMA surface removal, 1 1/2"; 372 sq yd driveway pavement removal; 1,906 sq ft sidewalk removal; 20 cu yd structure excavation; 3,402 ft storm sewers, Class A; 1,214 ft pipe underdrains; 6,773 ft combination concrete curb and gutter, Type B-6.18; 13,283 ft epoxy pavement markings; 480 ft underground conduit; 6,382 ft electric cable in conduit; 16 signal heads, polycarbonate, LED; 1,378 sq yd concrete removal (special) 10,020 ton material transfer device; federally funded. (150 Working Days) (Job No. C-96-229-12) (6-10524-0000) (See the Special Provisions for the DBE Percentage) PREVIOUSLY ADVERTISED: November 6, 2015 (Item 68)

104. Contract No. 93669 Sangamon County District 6 Section 12-00016-00-SP (SHERMAN) Various Routes Project HSIP-167(71) This project consists of sign upgrades on Various Routes within the Village/ City limits of Curran, Grandview, Jerome, Leland Grove, Riverton, Rochester, Sherman, Southern View and Spaulding; 6,784.8 sq ft sign panel-Type 1; 6,241.9 sq ft remove sign panel-Type 1; 10,231 ft telescoping steel sign support; 1,716 ft metal post-Type A; 2,247.5 ft wood sign support;_Federally Funded; (A Special Provision for this contract requires insurance that names additional insureds). (90 Working Days) (Job No. C-96-209-13) (0-01667-6001) (See the Special Provisions for the DBE Percentage)

105. Contract No. 93670 Morgan County District 6 Section 15-00121-03-PV (JACKSONVILLE) FAU Route 8190 (NORTH MAIN STREET) Project M-5032(30) This project consists of 0.50 mile of milling, resurfacing with HMA, curb and gutter, sidewalks and lighting on North Main Street from the Norfolk and Southern Railroad to Walnut Street in the City of Jacksonville; 1,325 cu yd earth excavation; 2,453 sq yd subbase granular material, Type A 4"; 1,419 sq yd aggregate base course, Type A 8"; 62 ton aggregate surface course, Type B; 3,192 lb bituminous materials (prime coat); 6,135 lb bituminous materials (tack coat); 179 ton polymerized HMA binder course, IL-19.0, N50; 1,145 ton polymerized HMA surface course, Mix "D", N50; 208 sq yd PCC driveway pavement, 8 inch; 22,114 sq ft PCC sidewalk 4 inch; 564 sq yd driveway pavement removal; 13,015 sq ft sidewalk removal; 3,423 ft combination concrete curb and gutter, Type B-6.12; 1,014 sq ft concrete median surface, 4 inch; 4,486 ft thermoplastic pavement markings; 2,605 ft underground conduit, PVC; 2,764 ft electric cable in conduit; 10,246 sq yd HMA surface removal, variable depth; 12 street lighting assembly, complete Type F1; Federally Funded; (A Special Provision for this contract requires insurance that names additional insureds). (110 Working Days) (Job No. C-96-210-15) (6-10713-0000) (See the Special Provisions for the DBE Percentage)

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 18 - 106. Contract No. 93677 Adams County District 6 Section 14-00065-01-RS FAS Route 1598 (CH 27) Project RS-1598(102) This project consists of 2.16 miles of bituminous overlay with pavement markings on CH 27 from US 24 to Ellington Road; 137 cu yd earth excavation; 297 ton aggregate base course, Type B; 19,075 lb bituminous materials (tack coat); 1,205 ton leveling binder (machine method); 2,000 ton polymerized HMA surface course, Mix "C", N50; 430 ton aggregate wedge shoulders, Type B; 5,903 ft paint pavement markings; Federally Funded; (A Special Provision for this contract requires insurance that names additional insureds). (15 Working Days) (Job No. C-96-218-15) (6-10683-0000) (See the Special Provisions for the DBE Percentage)

107. Contract No. 99549 White County District 9 Section 12-00121-00-RS FAS Route 884 (CH 1) Project RS-884(106) Project consists of 2.35 miles of HMA resurfacing with aggregate shoulder replacement and all other incidental items to complete the work on FAS Route 884 (CH 1) from Shipley Street North to 1700N Road; 695 ton stone dumped riprap; 27,686 lb bituminous materials (tack coat); 5,907 ton HMA binder course; 3,039 ton HMA surface course; 1,986 ton aggregate shoulders; 72 ft pipe culverts; 4,984 ft short term pavement marking; 49,515 ft paint pavement marking line; 31,437 sq yd HMA surface removal; 1,245 ft short term pavement marking removal; 254 ton pavement removal and replacement (special); traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (30 Working Days) (Job No. C-99-519-13) (9-10474-0000) (See the Special Provisions for the DBE Percentage)

108. Contract No. 99557 Johnson County District 9 Section 13-00069-00-RS FAS Route 927 (TUNNEL HILL ROAD) Project RS-927(113) This project consists of 3.6 miles of HMA resurfacing with aggregate shoulders on Tunnel Hill Road from US 45 to Larkins Creek Road; 40 ton aggregate surface course, Type B; 35,050 lb bituminous materials (tack coat); 3,370 ton leveling binder (machine method), N70; 1,630 ton HMA binder course, IL-19.0,N70; 4,450 ton HMA surface course, Mix "C", N70; 6,670 ton aggregate shoulders, Type B; 65,310 ft paint pavement markings - Line 4"; Federally Funded; (A Special Provision for this contract requires insurance that names additional insureds). (40 Working Days) (Job No. C-99-521-14) (9-10489-0000) (See the Special Provisions for the DBE Percentage)

109. Contract No. 99563 Jackson County District 9 Section 12-00169-00-RS FAS Route 1918 (AVA ROAD) Project RS-1918(117) This project consists of 1.67 miles of HMA resurfacing and HMA shoulders on Ava Road from McLaughlin Road to IL 127; 15,000 lb bituminous materials (tack coat); 2,306.6 sq yd HMA surface removal-butt joint; 3,000 ton HMA surface course, Mix "C", N70; 2,000 ton HMA shoulders; 5,409 ft thermoplastic pavement markings; 25,577 ft paint pavement markings - Line 4"; 197 raised reflective pavement markers; Federally Funded; (A Special Provision for this contract requires insurance that names additional insureds). (20 Working Days) (Job No. C-99-511-13) (9-10476-0000) (See the Special Provisions for the DBE Percentage)

110. Contract No. 99564 Williamson County District 9 Section 15-00144-00-RS FAS Route 1900 (GRASSY ROAD) Project FLAP-FLAP(5) This project consists of 3.94 miles of HMA resurfacing with aggregate shoulders on Grassy Road from Spillway to the Jackson County Line; 23,100 lb bituminous materials (tack coat); 6,257 ton HMA surface course, Mix "C", N70; 2,380 ton aggregate shoulders, Type A; 66,220 ft paint pavement marking line 4"; 268 raised reflective pavement markers; 7 traffic barrier terminals; 350 ft guardrail removal; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (30 Working Days) (Job No. C-99-502-16) (9-10530-0000) (See the Special Provisions for the DBE Percentage)

111. Contract No. 61C33 Cook County District 1 Section 15-00031-00-RS (MIDLOTHIAN) FAU Route 1070 (149TH STREET) Project M-4003(596) Resurfacing, patching, curb and gutter replacement, sidewalk replacement and pavement markings from Cicero Avenue to Pulaski Road in the Village of Midlothian; includes 14,117 sq yd HMA surface removal; 210 sq yd patching; 611 ton polymerized leveling binder; 1,222 ton HMA surface course; 1,844 ft combination curb and gutter removal; 4,455 sq ft sidewalk removal; 56 ton aggregate shoulders; 4,455 sq ft PCC sidewalk; 1,844 ft combination curb and gutter; 118 sq yd PCC driveway pavement; 300 ft thermoplastic pavement marking line; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (25 Working Days) (Job No. C-91-089-16) (1-21845-0000) (See the Special Provisions for the DBE Percentage)

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 19 - 112. Contract No. 61C34 Cook County District 1 Section 15-00030-00-RS (MIDLOTHIAN) FAU Route 1069 (144TH STREET) Project M-4003(594) Project consists of resurfacing with leveling binder and surface courses, curb and gutter repair, Class D HMA patches, pavement marking and all other incidental items to complete the work on FAU Route 1069 (144th Street) from Cicero Avenue to Pulaski Road in the Village of Midlothian; 10,087 lbs bituminous materials (prime coat); 628 ton polymerized leveling binder (machine method); 14,966 sq yd HMA surface removal; 1,256 ton HMA surface course; 4,388 sq ft PCC sidewalk removal and replacement; 931 ft combination curb and gutter removal and replacement; 257 sq yd Class D patches; 210 ft thermoplastic pavement marking line; 806 sq yd sodding, special; 86 sq yd HMA driveway pavement; traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (25 Working Days) (Job No. C-91-078-16) (1-21846-0000) (See the Special Provisions for the DBE Percentage)

113. Contract No. 61C45 McHenry County District 1 Section 14-00078-00-CH (CITY OF MCHENRY) FAU Route 3860 (BULL VALLEY ROAD) Project M-4003(630) This project consists of pavement widening, resurfacing and traffic signals on Bull Valley Road at Curran Road in the City of McHenry; includes 7,826 cu yd removal and disposal of unsuitable materials; 3,081 cu yd furnished excavation; 7,850 sq yd topsoil furnish and place, 6"; 1,540 cu yd aggregate subgrade improvement; 2,834 sq yd subbase granular material, Type B 6"; 805 sq yd PCC base course widening 10"; 2,670 sq yd HMA base course, 6"; 11,098 lb bituminous materials (tack coat); 1,085 ton HMA binder course, IL-19.0, N70; 1,985 ton HMA surface course, Mix "D", N70; 12,889 sq yd HMA surface removal; 111 sq yd driveway pavement removal; 290 ton aggregate shoulders, Type B; 1,990 sq yd aggregate shoulders, Type B 6"; 18,573 ft thermoplastic pavement markings; 1,231 ft underground conduit, galvanized steel; 5,305 ft electric cables in conduit; 12 signal heads, LED, 1-FACE; 3,543 sq yd triaxial geogrid reinforcement, Type 1; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (Completion Date: October 30, 2016 Plus 10 Working Days) (Job No. C-91-149-16) (1-21855-0000) (See the Special Provisions for the DBE Percentage)

114. Contract No. 61C51 Cook County District 1 Section 14-00097-00-RS (ALSIP) FAU Route 2403 (KOSTNER AVENUE) Project M-4003(426) Project consists of HMA leveling binder and surface courses, concrete curb and gutter removal and replacement, HMA patches, HMA driveway removal and replacement, concrete driveway removal and replacement, sidewalk removal and replacement, drainage adjustments, raised reflective pavement marker removal and replacement, pavement markings and all other incidental items to complete the work on FAU Route 2403 (Kostner Ave) from 127th Street to 119th Street in the Village of Alsip; 968 sq yd topsoil furnish and place; 9,018 lb bituminous materials (tack coat); 562 ton polymerized leveling binder (machine method); 1,229 ton HMA surface course; 4,499 sq ft PCC sidewalk; 18,066 sq yd HMA surface removal; 1,885 ft combination curb and gutter removal; 4,373 sq ft sidewalk removal; 11 manholes to be adjusted; 1,260 ft combination concrete curb and gutter; 1,345 ft short term pavement marking; 255 ft metal post; 14,303 ft thermoplastic pavement marking line; 158 raised reflective pavement marker removal and replacement; 1 maintenance of existing traffic signal installation; 179 ft detector loop; 625 ft combination concrete curb and gutter; traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (40 Working Days) (Job No. C-91-145-15) (1-21734-0000) (See the Special Provisions for the DBE Percentage)

115. Contract No. 61C57 DuPage County District 1 Section 15-00011-00-RS (WAYNE) FAU Route 1368 (ARMY TRAIL ROAD) Project M-4003(609) Project consists of HMA surface removal and replacement, leveling binder course, strip reflective crack control, HMA surface course, thermoplastic pavement marking and all other incidental items to complete the work on FAU Route 1368 (Army Trail Road) from the UP Railroad to the CN Railroad in the Village of Wayne; 6,850 lb bituminous materials (tack coat); 500 ton leveling binder (machine method); 9,100 sq yd HMA surface removal; 1,000 ton HMA surface course; 120 sq ft PCC sidewalk; 8,600 sq yd Class D patches; 3,400 ft strip reflective crack control treatment; 600 sq yd aggregate shoulders; 500 ft short term pavement marking; 12,222 ft thermoplastic pavement marking line; traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (Completion Date: August 12, 2016 Plus 05 Working Days) (Job No. C-91-106-16) (1-21872-0000) (See the Special Provisions for the DBE Percentage)

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 20 - 116. Contract No. 61C75 Kane County District 1 Section 16-00107-00-RS (ST. CHARLES) FAU Route 2287 (RED GATE ROAD) Project M-4003(658) This project consists of 0.46 mile of resurfacing with HMA, patching, sidewalk replacement, curb and gutter replacement and pavement markings on Red Gate Road from the west corporate limits to Meadow View Drive in the City of St. Charles; 6,725 lb bituminous materials (tack coat); 970 ton HMA surface courses; 910 ft PCC sidewalk 5 inch; 8,436 sq yd HMA surface removal, 2 1/2"; 215 sq ft sidewalk removal; 435 sq yd Class D patches; 8,436 sq yd area reflective crack control treatment; 4,590 ft shoulder removal and replacement; 9,647 ft thermoplastic pavement markings; 290 sq ft brick sidewalk removal; 80 ft combination concrete curb and gutter removal and replacement; Federally Funded; (A Special Provision for this contract requires insurance that names additional insureds). (Completion Date: August 12, 2016 Plus 05 Working Days) (Job No. C-91-193-16) (1-21869-0000) (See the Special Provisions for the DBE Percentage)

117. Contract No. 87617 DeKalb County District 3 Section 14-00244-00-RS FAU Route 5369 (CH 15) Project M-5017(51) This project consists of 0.82 miles of resurfacing with HMA overlay, HMA shoulders, patching and aggregate shoulders on CH 15 from Lindgren Road to IL 23; 12,664 lb bituminous materials (tack coat); 1,276 sq yd HMA surface removal - butt joint; 1,625 ton HMA surface course, Mix "C", N50; 1,586.6 sq yd Class D patches, Type IV, 2 inch; 938 ton aggregate shoulders, Type B; 24,630 ft thermoplastic pavement markings; 410 ton HMA shoulders, special; Federally Funded; (A Special Provision for this contract requires insurance that names additional insureds). (Completion Date: July 29, 2016) (Job No. C-93-066-15) (3-10539-0000) (See the Special Provisions for the DBE Percentage)

118. Contract No. 97612 Washington County District 8 Section 12-00091-00-RS FAS Route 835 (CH 21) Project RS-784(104) Project consists of milling, HMA resurfacing, HMA paved shoulder, aggregate wedge shoulder, guardrail improvements, patching, strip reflective crack control, curbing and drainage improvements on FAS Route 835 (CH 21) from Oakdale Blacktop to Illinois Route 15; includes 768 unit excavating and grading existing shoulder; 235 sq yd temporary ramp; 751 cu yd furnished excavation; 4,037 sq yd erosion control blanket; 441 ton aggregate surface course; 675 lb bituminous materials (prime coat); 73,514 lb bituminous materials (tack coat); 9,538 ton HMA surface course; 4,717 ton leveling binder (machine method); 235 ton incidental HMA surfacing; 116,672 ft strip reflective crack control treatment; 1,302 sq yd HMA surface removal; 126 sq yd Class C patches; 4,824 sq yd area reflective crack control treatment; 3,287 ton aggregate wedge shoulder; 17,060 sq yd HMA shoulders; 1 concrete headwall removal; 2,875 ft steel plate beam guardrail; 4,050 ft guardrail removal; 11,726 ft short term pavement marking; 3,909 sq ft short term pavement marking removal; 27,146 ft temporary pavement marking line; 105,057 ft thermoplastic pavement marking line; 9,150 sq ft pavement marking removal; 94,766 sq yd HMA surface removal, variable depth; traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (80 Working Days) (Job No. C-98-307-13) (8-10506-0000) (See the Special Provisions for the DBE Percentage)

119. Contract No. 97614 Madison County District 8 Section 15-00231-01-SW (ALTON) FAU Route 8961 (COLLEGE AVENUE) Project TE-D8(206) Remove existing sidewalk and the construction of new sidewalk adjacent to College Avenue from Holman Street to Rock Springs Drive in the City of Alton; includes 396 unit tree removal; 4,271 cu yd earth excavation; 10 cu yd removal and disposal of unsuitable material; 2,282 sq yd erosion control blanket; 2,640 ft perimeter erosion barrier; 12,920 sq ft PCC sidewalk 4 inch; 2,745 sq ft sidewalk removal; 3,635 lb reinforcement bars; 10,484 sq ft brick sidewalk removal; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (Completion Date: August 18, 2016 Plus 04 Working Days) (Job No. C-98-301-15) (0-01726-8011) (See the Special Provisions for the DBE Percentage)

120. Contract No. 95782 Coles County District 7 Section 14-00266-01-PV (MATTOON) FAU Route 7676 (MARSHALL AVENUE) Project M-5042(20) Pavement reconstruction consisting of PCC concrete, subbase granular material, curb and gutter, inlets, storm sewers, sidewalk ramps and driveways and all other incidental items to complete the work on FAU Route 7676 (Marshall Avenue) from 9th Street to 6th Street in the City of Mattoon; includes 887 cu yd earth excavation; 1,172 ton subbase granular material; 300 ton aggregate base course; 1,105 lb bituminous materials (prime coat); 174 lb bituminous materials (tack coat); 100 ton HMA surface course; 4,579 sq yd welded wire reinforcement; 5,384 sq ft PCC sidewalk; 280 sq ft detectable warnings; 3,824 sq yd pavement removal; 2,344 ft combination curb and gutter removal; 5,013 sq ft sidewalk removal; 1,380 ft storm sewers; 2,443 ft combination curb and gutter; 841 ft thermoplastic pavement marking line; 371 cu yd trench backfill; 4,579 sq yd PCC pavement; 60 ton temporary aggregate; traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (130 Working Days) (Job No. C-97-017-16) (7-10747-0000) (See the Special Provisions for the DBE Percentage)

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 21 - 121. Contract No. 95785 Clark County District 7 Section 10-00052-00-SP (MARSHALL) FAS Route 688 (6TH STREET) Project SRTS-4009(77) Project consists of the removal and replacement of combination concrete curb and gutter, the removal and replacement of sidewalks, new sidewalk construction, ADA ramps, raised crosswalk crossing, pipe culverts and all other incidental items to complete the work on FAS Route 688 (6th Street) from Mulberry Street to North School Driveway in the City of Marshall; includes 66.7 cu yd porous granular backfill; 51.2 ton aggregate base course; 15 ton aggregate surface course; 9,087 sq ft PCC sidewalk; 112.7 sq ft detectable warnings; 128 sq yd pavement removal; 147 ft combination curb and gutter removal; 5,859 sq ft sidewalk removal; 141 ft concrete curb; 148 ft combination concrete curb and gutter; 162.4 sq ft paint pavement marking - letters and symbols; 559 ft paint pavement marking line; 128 sq yd PCC pavement; traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (35 Working Days) (Job No. C-40-090-09) (0-01687-7003) (See the Special Provisions for DBE Percentage)

122. Contract No. 46392 Various Counties District 4 Section D4 & D7 RPM SPECIFIC SITES 16-34 Various Routes This project consists of removing and replacing raised pavement marker reflectors, and removing and replacing raised pavement marker castings at various locations within District 4 and District 7; 760 raised reflective pavement markers; 760 raised reflective pavement marker removal; mobilization; traffic control and protection. (Completion Date: October 30, 2016) (Job No. C-60-034-16) (0-01592-0001) (See the Special Provisions for the DBE Percentage) PREVIOUSLY ADVERTISED: March 4, 2016 Letting (Item 1)

123. Contract No. 61B74 Lake County District 1 Section 11-00033-00-SW (LAKE BLUFF) MULTI-USE PATH Project TE-D1(882) This project consists of the construction of an HMA multi-use path, sidewalk removal and replacement, curb and gutter removal and replacement and pavement markings between Sheridan Road and Scranton Avenue and at East Sheridan Place in the Village of Bluff Lake; includes 245 cu yd earth excavation; 650 sq yd topsoil furnish and place, 4"; 650 sq yd erosion control blanket; 767 sq yd aggregate base course, Type B; 105 ton HMA surface course, Mix "D", N50; 500 sq ft PCC sidewalk 8 inch; 105 sq ft sidewalk removal; 102 ft combination concrete curb and gutter; 230 cu yd non-special waste disposal; 882 ft thermoplastic pavement markings; 380 sq ft remove and reinstall modular concrete pavers; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (15 Working Days) (Job No. C-91-643-11) (0-01726-1025, 1-21860-0000) (See the Special Provisions for the DBE Percentage)

124. Contract No. 61C53 DuPage County District 1 Section 15-00072-00-RS (WOODRIDGE) FAU Route 1551 (83RD STREET) Project M-4003(641) This project consists of 1.45 miles of milling and HMA resurfacing, sidewalks, curb and gutter removal and replacement and pavement markings on 83rd Street from Janes Avenue to Lemont Road in the Village of Woodridge; include 26,197 lb bituminous materials (tack coat); 3,261 ton HMA surface course, Mix "D", N70; 4,797 sq ft PCC sidewalk, 5 inch; 32,131 sq yd HMA surface removal, 2 1/4"; 4,797 sq ft sidewalk removal; 968 sq yd Class D patches; 2,522 ft combination concrete curb and gutter; 33,607 ft thermoplastic pavement markings; 357 sq yd removal and reinstall brick pavers; 1,626 sq yd PCC surface removal (cold milling) variable depth; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (45 Working Days) (Job No. C-91-158-16) (1-21874-0000) (See the Special Provisions for the DBE Percentage)

125. Contract No. 61C56 Will County District 1 Section 14-00018-00-SG (BEECHER) Various Routes Project SRTS-4009(348) Project consists of curb and gutter, sidewalks, installation of signage and flashing beacons, pavement marking, parkway restoration and all other incidental items to complete the work on various routes in the Village of Beecher; includes 51 sq yd sodding; 124 sq yd aggregate base course; 125 sq yd protective coat; 1,112 sq ft PCC sidewalk; 132 sq ft detectable warnings; 409 sq ft sign panel; 932 sq ft sidewalk removal; 240 ft telescoping steel sign support; 366 ft thermoplastic pavement marking line; 366 sq ft pavement marking removal; 118 ft combination concrete curb and gutter removal and replacement; 182 sq ft temporary information signing; 6 flashing beacons, poles mounted; traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (15 Working Days) (Job No. C-91-120-16) (0-01687-1029) (See the Special Provisions for the DBE Percentage)

126. DELETED FROM THE LETTING

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 22 - 127. Contract No. 61C59 Cook County District 1 Section 15-00040-00-SW (COUNTRY CLUB HILLS) 180TH STREET Project SRTS-4009(358) Sidewalk construction curb and gutter replacement, ditch grading, signage, pavement marking, parkway restoration and all other incidental items to complete the work on 180th Street from Kostner Avenue to Ravisioe Terrance in the City of Country Club Hills; includes 130 ft temporary fence; 189 cu yd earth excavation; 499 sq ft sidewalk removal; 336 cu yd removal and disposal of unsuitable material; 2,177 sq yd topsoil furnish and place; 2,177 sq yd sodding; 1,576 sq yd aggregate base course; 270 sq yd HMA base course; 24 ton HMA surface course; 1,224 sq yd protective coat; 10,577 sq ft PCC sidewalk; 390 sq yd driveway pavement removal; 39 ton aggregate shoulders; 188 ft pipe culvert removal; 216 ft pipe culverts; 15 metal end sections; 264 sq ft sign panel; 384 ft telescoping steel sign support; 156 sq ft temporary information signing; 496 ft thermoplastic pavement marking line; 1,072 units grading and shaping shoulders (special); 137 ft combination concrete curb and gutter removal and replacement; traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (20 Working Days) (Job No. C-91-264-16) (0-01687-1033) (See the Special Provisions for the DBE Percentage)

128. Contract No. 61C61 DuPage County District 1 Section 14-00051-00-RS (WOOD DALE) FAU Route 2625 (MILL ROAD) Project M-4003(303) This project consists of resurfacing Mill Road from East George Street to I-290 Bridge; Victoria Lane from Mill Road to Prospect Avenue and Mary Jane Lane from Mill Road to Prospect Avenue in the City of Wood Dale; includes 197 cu yd removal and disposal of unsuitable material; 1,200 sq yd aggregate base course; 104 ton aggregate base repair; 23,170 lb bituminous materials (tack coat); 8,300 sq ft PCC sidewalks; 1,140 ton leveling binder (machine method); 23,430 sq yd HMA surface removal; 531 ton HMA binder course, IL-19.0, N50; 276 sq yd driveway pavement removal; 2,479 ton HMA surface course, Mix "D", N50; 8,800 sq ft sidewalk removal; 63 sq yd PCC driveway pavement, 7 inch; 3,010 sq yd Class D patches; 4,925 ft thermoplastic pavement markings; 213 sq yd HMA driveway pavement, 3"; 2,710 ft combination concrete curb and gutter removal and replacement; 4 speed hump removal and replacement; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (25 Working Days) (Job No. C-91-260-14) (1-21725-0000) (See the Special Provisions for the DBE Percentage)

129. Contract No. 61C77 Cook County District 1 Section 13-00185-00-BR (GLENVIEW) FAU Route 1352 (CHESTNUT AVENUE) Project BHM-4003(246) Remove the superstructure, drilled shafts and piers, construct superstructure and approach roadway improvements, to the structure carrying Chestnut Avenue over the North Branch of the Chicago River in the Village of Glenview; includes 72 cu yd excavation; 671 cu yd removal and disposal of unsuitable material; 99 sq yd HMA base course widening, 6"; 95 ton HMA surface course, Mix "D", N70; 171 lb bituminous materials (tack coat); 1,749 sq ft PCC sidewalk, 5 inch; 56 ton HMA binder course, IL-19.0, N70; 163 sq yd pavement removal; 510 sq yd HMA surface removal, 1 1/2"; 1,560 sq ft sidewalk removal; 1 removal of the existing superstructure; 118 cu yd concrete structure; 54 cu yd concrete superstructure; 3,562 sq ft PPC deck beams (27" depth); 67 cu yd concrete superstructure (approach slab); 35,920 lb reinforcement bars; 41,950 lb reinforcement bars, epoxy coated; 1,643 ft thermoplastic pavement markings; 221 cu yd drilled shafts in soil; 660 sq ft form liner textured surface; 806 ft PCC mortar fairing course; 456 ft combination curb and gutter; 84 ft parapet railing; 263 sq ft structure repair concrete; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (115 Working Days) (Job No. C-91-092-14) (1-21526-0000) (See the Special Provisions for the DBE Percentage)

130. Contract No. 85628 Winnebago County District 2 Section 14-00076-00-BT (LOVES PARK) WILLOW CREEK TRAIL Project TE-D2(160) This project consists of the construction of sidewalk along Zenith Parkway from Zenith Cutter Campus East to Woodward Way and the construction of a shared-use path from north of Zenith Parkway towards the Willow Creek Path and the construction of a box culvert over Willow Creek, located in the City of Loves Park; includes 58 unit tree removal; 3,431 sq yd topsoil furnish and place, 4"; 3,431 sq yd sodding; 1,468 sq yd aggregate base course, Type B 10"; 55 ton HMA binder course, IL-19.0, N50; 193 ton HMA surface course, Mix "C", N50; 172 sq yd PCC driveway pavement, 8 inch; 5,659 sq ft PCC sidewalk 5 inch; 145 sq yd pavement removal; 60 ft precast concrete box culverts 10' X 6'; 552 ft combination concrete curb and gutter, Type M-6.18; 522 ft thermoplastic pavement markings; 1,520 ft underground conduit, coilable nonmetallic; 7,298 ft electric cable in conduit, 600V; 31 trees; 4 park benches; 9 lighting units; federally funded; (LRSP). (Completion Date: September 30, 2016 Plus 10 Working Days) (Job No. C-92-028-16) (0-01726-2007) (See the Special Provisions for the DBE Percentage)

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 23 - 131. Contract No. 87540 Bureau County District 3 Section 10-00051-00-LT (SPRING VALLEY) Various Routes Project SRTS-4009(187) Project consists of the removal and replacement of sidewalks, curb and gutter, installation of rapid flashing beacons and all other incidental items to complete the work on Various Routes in the City of Spring Valley; includes 206 sq yd erosion control blanket; 5,471 sq ft PCC sidewalk; 243 sq ft detectable warnings; 4,335 sq ft sidewalk removal; 226 ft combination concrete curb and gutter removal and replacement; 44 sq ft sign panel; 170 ft thermoplastic pavement marking line; 2 flashing beacons; 30 sq yd class D patches; traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (20 Working Days) (Job No. C-40-070-09) (0-01687-3003, 3-10601-0000) (See the Special Provisions for the DBE Percentage)

132. DELETED FROM THE LETTING

133. Contract No. 93673 Sangamon County District 6 Section 10-P4002-00-BR TR 1028 (RING ROAD) Project BROS-167(74) Project consists of the removal of the two existing cast in place concrete deck bridges on steel stringers and concrete weir spillway and construction of two single span, three sided precast concrete structures and new weir spillway dam, an 8ft PCC multi-use path, channel excavation, structure excavation, concrete structures, trench backfill, full depth HMA and all other incidental items to complete the work on TR 1028 (Ring Road) over Jacksonville Branch Lagoon and over Jacksonville Branch Spillway in Washington Park, City of Springfield; includes 29 lb temporary erosion control seeding; 3,285 ft perimeter erosion barrier; 1,061 sq yd stone riprap; 1,114 sq yd filter fabric; 4 cofferdams; 2,177 sq yd subbase granular material; 341 ton HMA binder course; 2,082 lb bituminous materials (prime coat); 345 stud shears connectors; 416 lb bituminous materials (tack coat); 78 ton polymerized HMA surface course; 9,702 sq ft PCC sidewalk; 640 sq yd pavement removal; 3 removal of existing structures; 1,430 cu yd cofferdam excavation; 7,000 lb reinforcement bars, epoxy coated; 598 ft furnishing and driving steel piles; 897 sq ft temporary sheet piling; 2,368 sq ft permanent sheet piling; 370 ft unit duct, 660V; 450 ft thermoplastic pavement marking line; 174 ft pipe handrail special; 1,464 cu yd granular backfill for structures; 739 ft concrete gutter; 530 sq yd welded wire fabric; 30.2 ft three sided precast concrete structures; 165 cu yd concrete structures; 362 sq yd slope wall; traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (80 Working Days) (Job No. C-96-229-13) (6-10511-0000) (See the Special Provisions for the DBE Percentage)

134. Contract No. 93675 Logan County District 6 Section 14-00083-01-BR FAS Route 561 (CH 9) Project BHS-561(107) This project consists of repairs to the existing structure carrying CH 9 over Salt Creek; deck repairs, expansion joints, bearings, beams, substructure repairs and cleaning and painting; includes 85 cu yd furnished excavation; 123 ft preformed joint strip seal; 227 ton stone dumped riprap, Class A4; 24 ton HMA surface course, Mix "C", N50; 8 traffic barrier terminals; 24.5 cu yd concrete removal; 24.5 cu yd concrete superstructure; 6,180 lb reinforcement bars, epoxy coated; 5,550 lb furnishing and erecting structural steel; 12 sq ft structural repair of concrete; 71 sq yd deck slab repairs; 1 l sum cleaning and painting structure; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (35 Working Days) (Job No. C-96-212-15) (6-10695-0000) (See the Special Provisions for the DBE Percentage)

135. Contract No. 95776 Jasper County District 7 Section 14-04125-00-BR TR 85 Project BROS-79(153) Remove the existing I-Beam bridge and the construction of a one span PPC deck beam bridge, located 1 mile South of Gila over Mint Creek; includes 357 cu yd earth excavation; 115 cu yd channel excavation; 27 cu yd concrete structures; 1,419 sq ft PPC deck beams; 2,840 lbs reinforcement bars, epoxy coated; 120 ft furnish and drive steel piles; 104 ft steel railing; 4 traffic barrier terminals; 334 ton aggregate base course; 180 ton stone dumped riprap; 100 ton porous granular embankment; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (35 Working Days) (Job No. C-97-048-15) (7-10752-0000) (See the Special Provisions for the DBE Percentage)

136. Contract No. 95783 Wabash County District 7 Section 14-01114-00-BR TR 87 Project BROS-185(38) This project consists of removal of the existing structure and construction of a new single span PPC deck beam bridge and aggregate surface, located 1.5 miles Northwest of Patton over the Crawfish Creek; includes 150 units tree removal; 2,700 cu yd furnished excavation; 600 ton aggregate surface course, Type B; 1 removal of the existing structure; 29.4 cu yd concrete structure; 2,280 sq ft PPC deck beams (42" depth); 4,340 lb reinforcement bars, epoxy coated; 186 ft steel railing, Type S1; 300 ft furnishing steel piles HP12X53; 130 ft pipe culverts; 101 ton stone lined ditch; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (40 Working Days) (Job No. C-97-057-15) (7-10749-0000) (See the Special Provisions for the DBE Percentage)

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 24 - 137. Contract No. 95784 Macon County District 7 Section 13-00325-00-BR (DECATUR) FAU Route 7359 (MOUND ROAD) Project M-5169(53) This project consists of superstructure replacement, PPC deck beams, concrete wearing surface and new abutment backwalls to the structure carrying Mound Road over Spring Creek in Decatur; includes 291 sq yd pavement connector (PCC) for bridge approach slab; 326 sq ft PCC sidewalk 5 inch; 611 sq yd pavement removal; 234 sq ft sidewalk removal; 1 removal of existing superstructure; 40.1 cu yd concrete structure; 199.9 cu yd concrete superstructure; 7,556 sq ft PPC deck Beams (17" depth); 842 sq yd concrete wearing surface, 5"; 60,000 lb reinforcement bars, epoxy coated; 141 ft parapet railing; 7,024 ft paint pavement markings - Line 4"; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (Completion Date: October 07, 2016 Plus 15 Working Days) (Job No. C-97-051-15) (7-10735-0000) (See the Special Provisions for the DBE Percentage)

138. Contract No. 97616 Madison County District 8 Section 12-00048-00-RS (EAST ALTON) FAU Route 9003 (SHAMROCK STREET) Project M-5011(386) This project consists of 0.5 mile of resurfacing on Shamrock Street, 0.7 miles North of Olin Industrial Drive to St. Louis Avenue and traffic signal upgrades at the intersection of St. Louis Avenue, located in the City of East Alton; includes 4,921 lb polymerized bituminous materials (tack coat); 919 ton polymerized HMA surface course, Mix "D", N70; 12 sq yd PCC driveway pavement, 8 inch; 3,456 sq ft PCC sidewalk 4 inch; 10,935 sq yd HMA surface removal, 1 1/2"; 13 sq yd driveway pavement removal; 3,391 sq ft sidewalk removal; 646 ft concrete curb, Type B; 8,255 ft thermoplastic pavement markings; 294 ft detector loop replacement; 100 ft underground conduit; 132 ft electric cable in conduit; 8 pedestrian signal heads, LED; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (45 Working Days) (Job No. C-98-360-12) (8-10501-0000) (See the Special Provisions for DBE Percentage)

139. Contract No. 99555 Jefferson County District 9 Section 14-00136-00-RS (MT. VERNON) FAU Route 8715 (FAIRFIELD ROAD) Project M-5049(24) This project consists of 1.53 miles of milling, resurfacing, shoulder repairs, sidewalks and pavement markings on Fairfield Road from IL 15 to Stinson Drive in the City of Mt. Vernon; includes 78 ton aggregate surface course, Type B; 1,726 lb bituminous materials (prime coat); 10,690 lb bituminous materials (tack coat); 3,212 ton leveling binder (machine method), IL-9.5FG, N70; 1,783 ton HMA surface course, Mix "D", N70; 341 ton incidental HMA surfacing; 26 sq yd PCC driveway pavement, 6 inch; 843 sq ft PCC sidewalk 4 inch; 459 sq yd pavement removal; 24,513 sq yd HMA surface removal; 154 sq yd driveway pavement removal; 927 sq ft sidewalk removal; 1,356 ton aggregate wedge shoulder, Type B; 467 ton HMA shoulders; 72 ft concrete curb, Type B; 54 ft combination concrete curb and gutter; 153 sq ft concrete median surface, 6 inch; 12,624 ft thermoplastic pavement markings; 245 ft concrete gutter, Type A (special); 26 ft remove and replace steel plate beam guardrail, special; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (45 Working Days) (Job No. C-99-527-14) (9-10518-0000) (See the Special Provisions for the DBE Percentage)

140. Contract No. 61A04 DuPage County District 1 Section 11-00044-00-RS (BURR RIDGE) FAU Route 2678 (GARFIELD STREET) Project M-9003(870) Resurfacing 0.52 miles of Garfield Street from 59th Street to 63rd Street in the Village of Burr Ridge; includes 8,100 sq yd HMA surface removal; 443 sq yd Class D patches; 595 sq yd HMA base course widening; 375 ton polymerized leveling binder; 735 ton HMA surface course; 2,270 sq ft sidewalk removal and replacement; 364 ft combination concrete curb and gutter; 95 cu yd non-special waste disposal; 1 special waste plans and reports; 300 sq ft segmental concrete block wall; 8,635 ft thermoplastic pavement marking line; 1,225 sq yd sodding; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (20 Working Days) (Job No. C-91-102-12) (1-21244-0000) (See the Special Provisions for the DBE Percentage)

141. Contract No. 61C22 DuPage County District 1 Section 10-00154-00-BR (LOMBARD) FAU Route 1431 (HILL AVENUE) Project BRM-9003(698) Replace the bridge carrying Hill Avenue over the East Branch of the DuPage River and the reconstruction of the approaches, located in the Village of Lombard; includes 100 cu yd concrete structures; 312 cu yd concrete superstructure; 16 cu yd concrete encasement; 99,800 lbs reinforcement bars, epoxy coated; 1,533 ft furnish steel piles; 1,065 ft drive steel piles; 6 setting piles in rock; 71 sq yd slope wall removal; 140 ft parapet railing; 540 cu yd channel excavation; 558 cu yd earth excavation; 653 cu yd furnished excavation; 1,855 sq yd pavement removal; 2,458 sq yd aggregate subgrade improvement; 2,464 sq yd HMA base course; 305 ton HMA binder course; 307 ton HMA surface course; 54 sq yd pavement connector (HMA) for bridge approach; 293 sq yd HMA shoulders; 108 sq yd aggregate shoulders; 639 ft storm sewer; 696 ft combination concrete curb and gutter; 50 ft steel plate beam guardrail; 3,376 ft thermoplastic pavement marking line; 50 raised reflective pavement markers; 1,466 sq yd sodding; 0.50 acre seeding; 2,313 sq yd erosion control blanket; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (Completion Date: November 23, 2016 Plus 05 Working Days) (Job No. C-91-752-10) (1-21057-0000) (See the Special Provisions for the DBE Percentage)

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 25 - 142. Contract No. 61C28 McHenry County District 1 Section 14-00011-00-BT (LAKEMOOR) FAU Route 12 & FAU 3702 (W WEGNER RD. & DARRELL RD.) Project TE-D1(997) This project consists of the construction of a HMA bike and pedestrian path, drainage and striping on West Wegner Road from Lily Lake Road to Darrell Road and Darrell Road from Wegner Road to Illinois 120 in the Village of Lakemoor. Project will also consist of installing pedestrian signals at the intersection of IL 120 and Darrell Road; includes 138 units tree removal; 1,450 cu yd earth excavation; 1,284 ton subbase granular material, Type B; 703 ton aggregate base course, Type B; 22,088 lb bituminous materials (tack coat); 458 ton HMA binder course, IL-19.0, N50; 458 ton HMA surface course, Mix "C", N50; 600 sq ft PCC sidewalks 5 inch; 410 sq yd driveway pavement removal; 16 sq ft sidewalk removal; 175 ft storm sewers; 907 ft pipe underdrains; 10,004 ft thermoplastic pavement markings; 8,241 ft paint pavement marking lines; 440 sq yd HMA driveway pavement, 3"; 30 ft underground conduit; 2,013 ft electric cable in conduit; 1 traffic signal post; 4 pedestrian signal heads; 4 pedestrian push buttons; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (Completion Date: November 23, 2016 Plus 05 Working Days) (Job No. C-91-209-15) (0-01726-1040) (See the Special Provisions for the DBE Percentage)

143. Contract No. 61C63 DuPage County District 1 Section 15-00071-00-RS (WOODRIDGE) FAU Route 2584 (WOODRIDGE DRIVE) Project M-4003(622) Resurfacing 0.61 miles of Woodridge Drive from Center Drive to 75th Street in the Village of Woodridge. Project also includes curb and gutter replacement, sidewalk replacement and patching; includes 12,531 sq yd HMA surface removal; 163 sq yd HMA base course; 534 ton polymerized leveling binder; 1,436 ton HMA surface course; 1,371 sq ft sidewalk removal; 1,263 ft combination curb and gutter removal; 552 sq yd Class D patches; 1,394 sq ft PCC sidewalk; 816 ft combination concrete curb and gutter; 8,299 ft thermoplastic pavement marking line; 40 ft detector loop replacement; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (50 Working Days) (Job No. C-91-135-16) (1-21873-0000) (See the Special Provisions for the DBE Percentage)

144. Contract No. 61C70 Will County District 1 Section 11-00047-00-FP (FRANKFORT) FAU Route 1634 (STEGER ROAD) Project BRM-M-9003(840) Pavement reconstruction to include pavement widening and resurfacing, sidewalk replacement, combination curb and gutter, storm sewer, water main and the construction of a multi-cell box culvert with cast in place headwalls, between Scheer Road and US 45 in the Village of Frankfort; includes 9,211 sq yd pavement removal; 13,519 sq yd HMA surface removal; 13,261 cu yd earth excavation; 2,099 cu yd furnished excavation;; 15,131 sq yd aggregate subgrade improvement; 17,816 sq yd HMA base course; 2,275 ton HMA binder course; 2,722 ton HMA surface course; 4,281 sq ft sidewalk removal; 422 ft combination curb and gutter removal; 4,833 sq ft PCC sidewalk; 3,286 ft combination concrete curb and gutter; 1 remove existing structure; 2,919 sq yd aggregate shoulders; 2,137 cu yd structure excavation; 315 ft precast concrete box culvert 12' X 10'; 2 box culvert end sections; 3,608 ft storm sewer; 500 ft water main; 880 lb ductile iron water main fittings; 313 ft steel plate beam guardrail; 4 traffic barrier terminals; 30,337 ft thermoplastic pavement marking line; 4 trees; 24,117 sq yd topsoil furnish and place; 5.05 acres seeding; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (Completion Date: October 28, 2016 Plus 05 Working Days) (Job No. C-91-600-11) (1-21238-0000) (See the Special Provisions for the DBE Percentage)

145. Contract No. 61C72 Cook County District 1 Section 15-00120-00-RS (SCHAUMBURG) FAU Route 2562 & FAU 2582 (SPRINGINSGUTH & WILEY DR.) Project M-4003(688) Resurface Springinsguth Road from the METRA Station entrance to Irving Park Road and the resurfacing of Wiley Road from Plum Grove Road to Tower Road, all located in the Village of Schaumburg; includes 3,716 sq yd pavement removal; 33,323 sq yd HMA surface removal; 4,146 sq yd aggregate subgrade improvement; 516 sq yd aggregate base course; 5,821 ton HMA binder course; 4,130 ton HMA surface course; 1,312 sq yd PCC pavement; 2,237 sq ft sidewalk removal; 3,762 ft combination curb and gutter removal; 919 sq yd Class D patches; 3,028 sq ft PCC sidewalk; 3,722 ft combination concrete curb and gutter; 20,799 ft thermoplastic pavement marking line; 1,403 ft polyurea pavement marking; 643 ft detector loop replacement; 10 cu yd non-special waste disposal; 1 special waste plans and reports; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (110 Working Days) (Job No. C-91-221-16) (1-21868-0000) (See the Special Provisions for the DBE Percentage)

146. Contract No. 85636 Winnebago County District 2 Section 14-00571-00-RS FAU Route 5146 (FOREST HILLS ROAD) Project HSIP-5099(117) Resurfacing from south of Rive Lane/Pepper Drive to north of Taft Street. Project also consists of the installation of new traffic signals at the intersection of Forest Hills Road and River Lane/Pepper Drive; includes 104 sq yd HMA surface removal; 4,220 sq ft corrugated median removal; 1,193 ton HMA binder course; 542 ton HMA surface course; 468 sq ft PCC sidewalk; 78 ft combination concrete curb and gutter; 14 cu yd special waste disposal; 1 special waste plans and reports; 6,300 ft thermoplastic pavement marking line; 1 video vehicle detection; 98 raised reflective pavement markers; 373 ft underground conduit; 3,880 ft electric cable in conduit; 2 traffic signal posts; 13 signal heads; 4 steel mast arm assemblies and poles; 2 pedestrian signal heads; 1 emergency vehicle priority system; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (Completion Date: July 29, 2016 Plus 20 Working Days) (Job No. C-92-026-16) (0-01667-2006) (See the Special Provisions for the DBE Percentage)

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 26 - 147. Contract No. 93676 Cass County District 6 Section 15-00078-00-PV (BEARDSTOWN) FAU Route 7776 (MAIN STREET) Project ER-500-2(22) Pavement reconstruction, curb and gutter replacement, sidewalk replacement, storm sewer, water main and pavement markings from State Street to Edwards Street in the City of Beardstown; includes 1,935 cu yd earth excavation; 6,075 sq yd subbase granular material; 5,707 sq yd pavement removal; 2,417 ft combination curb and gutter removal; 6,147 sq ft sidewalk removal; 928 ft storm sewer; 1,400 ft water main; 485 ft water service line; 100 ft adjusting sanitary sewer; 634 cu yd controlled low-strength material; 8,015 sq ft PCC sidewalk; 417 sq yd PCC driveway pavement; 2,524 ft combination concrete curb and gutter; 3,220 ft cured-in-place pipe lines; 1,651 ft paint pavement marking line. ALTERNATE "A" (HMA) 12,040 lbs bituminous materials (prime coat); 1,204 lbs bituminous materials (tack coat); 1,648 ton polymerized HMA binder course; 1,837 sq yd protective coat; 600 ton polymerized HMA surface course; 232 sq yd temporary ramp; ALTERNATE "B" (PCC) 6,075 sq yd geotechnical fabric for ground stabilization; 5,349 sq yd PCC pavement 7 1/2" (jointed); 7,186 sq yd protective coat; federally funded;

(A Special Provision for this contract requires insurance that names additional insureds). (110 Working Days) (Job No. C-96-208-16) (0-99916-6001, 0-01736-6002) (See the Special Provisions for the DBE Percentage)

148. Contract No. 93681 Hancock County District 6 Section 14-00125-01-PP FAS Route 428 (CH 11) Project RS-428(108) Microsurfacing, single pass, Type II, Mixture C to be placed on 3.79 miles of CH 11 from the East City limits of Basco to IL 336; includes 48,916 sq yd microsurfacing, single pass, Type 2, Mix C; traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (15 Working Days) (Job No. C-96-212-16) (6-10707-0000) (See the Special Provisions for the DBE Percentage)

149. Contract No. 95762 Shelby County District 7 Section 12-19117-00-BR TR 60 Project BROS-173(186) Replace the bridge carrying TR 60 over Lake Fork Branch, located 2.9 miles S.E. of Assumption; includes 1,643 cu yd earth excavation; 1,320 cu yd channel excavation; 3,394 cu yd furnished excavation; 43 cu yd concrete structures; 26 cu yd concrete encasement; 3,528 sq ft precast prestressed concrete deck beams; 5,670 lb reinforcement bars, epoxy coated; 540 ft furnish and drive steel piles; 295 ft steel railing; 1,010 ton aggregate surface course; 167 ton aggregate ditch; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (40 Working Days) (Job No. C-97-069-15) (7-10719-0000) (See the Special Provisions for the DBE Percentage)

150. Contract No. 95786 Clark County District 7 Section 12-00004-00-SW (MARTINSVILLE) Various Routes Project SRTS-4009(230) Remove and replace sidewalks, new sidewalk construction and the installation of solar-powered flashing beacon assemblies at various locations in Martinsville; includes 4,439 sq ft sidewalk removal; 57 ton subbase granular material; 12,441 sq ft PCC sidewalk; 550 cu yd earth excavation; 68 ft pipe culvert; 2 solar-powered flashing beacon assemblies; 160 cu yd porous granular backfill; 172 sq ft sign panel; 1.1 acre seeding; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (45 Working Days) (Job No. C-97-010-13) (0-01687-7005) (See the Special Provisions for the DBE Percentage)

151. Contract No. 97618 Madison County District 8 Section 15-00066-02-BT (HIGHLAND) FAU Route 8841 (TROXLER AVENUE) Project TE-D8(208) Construction of a pedestrian path adjacent to Troxler Avenue from IL 143 to IL 160 in the City of Highland; includes 965 cu yd earth excavation; 236 sq yd paved shoulder removal; 8,995 sq ft sidewalk removal; 2,962 sq yd aggregate base course; 920 sq yd subbase granular material; 2,696 sq yd HMA surface course (special); 212 sq yd HMA shoulders; 1,252 sq ft PCC sidewalk; 500 ft concrete curb; 2,030 ft storm sewer; 430 cu yd non-special waste disposal; 1 special waste plans and reports; 1,143 ft paint pavement marking line; 1,126 ft electric cable in conduit; 2 pedestrian signal heads; 800 ft remove and reinstall electric cable from conduit; 2 pedestrian push-buttons; 1 acre seeding; 4,610 sq yd topsoil furnish and place; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (Completion Date: August 10, 2016) (Job No. C-98-308-15) (0-01726-8014, 8-10609-0000) (See the Special Provisions for the DBE Percentage)

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 27 - 152. Contract No. 61C47 Cook County District 1 Section 15-00098-00-RS (RIVER FOREST) FAU Route 1394 (DIVISION STREET) Project M-4003(623) Project consists of HMA surface removal and replacement, sidewalk and ADA ramp improvements, concrete curb and gutter removal and replacement, pavement patching, frame and lid adjustments, pavement marking placement and all other incidental items to complete the work on FAU Route 1394 (Division Street) from Thatcher Avenue to Harlem Avenue in the Village of River Forest; includes 246 sq yd topsoil furnish and place; 45 inlet filters; 980 sq yd aggregate base course; 23,027 lb bituminous materials (tack coat); 1,075 ton leveling binder (machine method); 2,149 ton HMA surface course; 1,218 sq yd protective coat; 8,815 sq ft PCC sidewalk; 803 sq ft detectable warnings; 25,304 sq yd HMA surface removal; 1,074 ft combination curb and gutter removal; 8,659 sq ft sidewalk removal; 2,560 sq yd Class D patches; 16,647 ft strip reflective crack control treatment; 1,074 ft combination concrete curb and gutter; 4,400 ft short term pavement marking; 22,508 ft temporary pavement marking line; 11,822 ft thermoplastic pavement marking line; 565 sq ft temporary information signing; traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (Completion Date: August 26, 2016 Plus 05 Working Days) (Job No. C-91-141-16) (1-21867-0000) (See the Special Provisions for the DBE Percentage)

153. Contract No. 61C50 Cook County District 1 Section 12-B2706-00-SW (CHICAGO) Various Routes Project M-6000(494) Project consists of ADA ramp improvements, sidewalk removal and replacement, concrete curb and gutter removal and replacement, HMA surface removal, PCC base course, pavement removal and replacement, detectable warnings, HMA surface course, structure adjustments, pavement marking, sign relocation and all other incidental items to complete the work on various routes in the City of Chicago; includes 1,660 cu yd earth excavation; 4,631 sq yd topsoil furnish and place; 4,631 sq yd sodding; 71,428 sq yd subbase granular material; 11,109 sq yd PCC base course; 1,274 ton leveling binder; 1,551 ton HMA surface course; 95,845 lb bituminous materials (tack coat); 30,174 sq yd protective coat; 125,358 sq ft PCC sidewalk; 11,109 sq yd pavement removal; 9,826 ft curb removal; 29,123 ft combination curb and gutter removal; 271,493 sq ft sidewalk removal; 22,749 lb crack filling; 75 catch basins to be adjusted; 52 manholes to be adjusted; 10,935 ft thermoplastic pavement marking line; 9,551 sq ft remove and relocate sign panel and pile assembly; 18,723 sq ft detectable warnings (special); 9,782 ft concrete curb (special); 29,119 ft combination concrete curb and gutter; 148,072 sq ft PCC ADA ramp; traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (140 Working Days) (Job No. C-88-003-16) (1-21884-0000) (See the Special Provisions for the DBE Percentage)

154. Contract No. 85522 Stephenson County District 2 Section 09-00024-00-SW (LENA) FREMONT STREET Project SRTS-4009(53) Project consists of sidewalk removal, curb and gutter removal, driveway pavement removal and the construction of sidewalks, curb and gutter, driveways, incidental HMA and pavement markings from the School Entrance to Lena Street in the Village of Lena; includes 8,751 sq ft sidewalk removal; 1,098 ft combination curb and gutter removal; 499 sq yd driveway pavement removal; 10,103 sq ft PCC sidewalk; 1,063 ft combination concrete curb and gutter; 437 sq yd PCC driveway pavement; 988 cu yd earth excavation; 337 sq yd pavement replacement; 737 ft epoxy pavement marking line; 2,904 sq yd sodding; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (Completion Date: July 29, 2016 Plus 10 Working Days) (Job No. C-40-044-09) (0-01687-2006) (See the Special Provisions for the DBE Percentage) PREVIOUSLY ADVERTISED: April 27, 2012 (Item 47)

155. Contract No. 85581 Jo Daviess County District 2 Section 10-00046-00-BT (GALENA) GALENA RIVER TRAIL Project TE-D2(141) Project consists of a granular shared-use path with embankment, precast modular block walls, concrete pier and abutment supports for prefabricated deck units, chain link fence, corrugated metal pipe culverts and barbed wire fencing on Galena River Trail from Galena Junction to the Village of Aiken; includes 1.75 acre tree removal; 520 cu yd earth excavation; 1,467 ton porous granular embankment; 1,288 cu yd topsoil excavation and placement; 1,728 sq yd erosion control blanket; 1,231 sq yd turf reinforcement mat; 2,271 ft perimeter erosion barrier; 65 ton stone dumped riprap; 240 ton subbase granular material; 855 ton aggregate base course; 338 ton aggregate surface course; 1,192 cu yd structure excavation; 245 cu yd rock excavation for structures; 139.7 cu yd concrete structures; 20,139 lb reinforcement bars, epoxy coated; 5,933 sq ft precast modular retaining wall block; 740 ft pipe underdrains; 495 ft chain link fence; 450 ft fence (special); 5,146 sq ft pedestrian truss superstructure; 1,266 ft pedestrian rail (special); 698 ft pipe underdrains for structures; traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (100 Working Days) (Job No. C-92-060-11) (0-01726-2011) (See the Special Provisions for the DBE Percentage)

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 28 - 156. Contract No. 97621 Clinton County District 8 Section 13-00100-00-RS FAS Route 778 (ST. ROSE ROAD) Project RS-27(47) Project consists of 4.77 miles of resurfacing from Old Route 50 north to Blue Mound Drive (TR 71B); includes 2,346 cu yd earth excavation widening; 50,000 lb bituminous materials (tack coat); 2,700 ton leveling binder (machine method); 6,300 ton HMA surface course; 573 ton incidental HMA surfacing; 10,007 sq yd HMA surface removal; 540 ton aggregate wedge shoulder; 10,506 sq yd HMA shoulders; 4,816 ft short-term pavement marking; 795 sq ft short-term pavement marking removal; 65,681 ft paint pavement marking line; 66 raised reflective pavement marker removal and replacement; traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (30 Working Days) (Job No. C-98-325-14) (8-10530-0000) (See the Special Provisions for the DBE Percentage)

157. Contract No. 61C04 DuPage County District 1 Section 15-07126-00-RS FAU Route 1369 (SCHICK ROAD) Project M-4003(544) Project consists of HMA variable depth pavement milling, HMA polymerized leveling binder, HMA surface course, Class D patches, aggregate shoulder replacement, driveway replacement, thermoplastic pavement markings and all other incidental items to complete the work on FAU Route 1369 (Schick Road) from Far Hills Drive to Petersdorf Road; includes 323 cu yd removal and disposal of unsuitable material; 912 sq yd topsoil furnish and place; 912 sq yd erosion control blanket; 6 inlet filters; 549 sq yd preparation of base; 3,694 lb bituminous materials (prime coat); 25 ton mixture for cracks, joints and flangeways; 301 ton polymerized leveling binder (machine method); 613 ton HMA surface course; 544 sq yd Class D patches; 128 ton aggregate shoulders; 1,770 ft short term pavement marking; 17,700 ft temporary pavement marking line; 6,514 sq ft pavement marking removal; 8,850 ft thermoplastic pavement marking line; 5,472 sq yd HMA surface removal; 96 sq yd HMA driveway pavement; traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (Completion Date: August 15, 2016 Plus 05 Working Days) (Job No. C-91-412-15) (1-21829-0000) (See the Special Provisions for the DBE Percentage) PREVIOUSLY ADVERTISED: January 15, 2015 (Item 108)

158. Contract No. 61C52 Cook County District 1 Section 14-00098-00-RS (ALSIP) FAU Route 2796 (122ND STREET) Project M-4003(428) Project consists of resurfacing with HMA leveling binder and surface courses, concrete curb and gutter removal and replacement, HMA patches, HMA driveway removal and replacement, concrete driveway removal and replacement, sidewalk removal and replacement, drainage adjustments, restoration, pavement marking and all incidental items to complete the work on FAU Route 2796 (122nd Street) from Central Avenue to Cicero Avenue in the Village of Alsip; includes 726 sq yd topsoil furnish and place; 937 ton polymerized leveling binder (machine method); 1,874 ton HMA surface course; 2,465 sq ft PCC sidewalk; 22,309 sq yd HMA surface removal; 100,369 lb bituminous materials (prime coat); 2,068 ft combination curb and gutter removal; 282 sq yd class D patches; 1,150 ft short term pavement marking; 10,849 ft thermoplastic pavement marking line; 2,068 ft combination concrete curb and gutter; traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (40 Working Days) (Job No. C-91-146-15) (1-21735-0000) (See the Special Provisions for the DBE Percentage)

159. Contract No. 68C75 Fulton County District 4 Section (123B)I-1 FAP Route 687 (IL 95) This project consists of substructure repair to SN 029-0025 carrying IL 95 over the Spoon River approximately 2 miles west of Smithfield; 392 sq ft structural repair of concrete (depth equal to or less than 5 inches); mobilization; traffic control and protection. (15 Working Days) (Job No. C-94-097-15) (0-01622-4012) (See the Special Provisions for the DBE Percentage) PREVIOUSLY ADVERTISED: March 4, 2016 (Item 38)

NOTICE – PRE-QUALIFICATION WAIVER Pre-qualification of bidder with the Department of Transportation is not required on this item; however, prospective bidders must comply with Paragraph 3d of the Invitation For Bid in the Transportation Bulletin. 160. Contract No. 87571 Livingston County District 3 Section 13-00052-00-HP (DWIGHT) N/A Project TE-D3(81) Project consists of removing the existing 3 tab asphalt shingles, gutters and flashing and the installation of slate shingles, copper gutters and flashing on the Dwight Regional Transportation Center/Depot, located at 119 W. Main Street, Dwight, Illinois 60420; 425 ft temporary fence; 1 l sum roof replacement (8,079 sq ft) 1 l sum railroad protective liability insurance; Federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (Completion Date: October 01, 2016) (Job No. C-93-099-13) (0-01726-3006) (See the Special Provisions for the DBE Percentage) PREVIOUSLY ADVERTISED: March 4, 2016 (Item 123)

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 29 - 161. Contract No. 91534 Edgar County District 5 Section 14-00070-00-SP (PARIS) FAP Route 332 (US 150 & IL 1) Project M-5054(10) Project consists of roadway widening and resurfacing, HMA binder and surface courses, combination concrete curb and gutter, HMA shoulder, pavement marking and all other incidental items to complete the work at the intersection of FAP Route 332 (US 150/IL 1) and E. 1200th Road (High School Road) in the City of Paris; includes 5,530 cu yd earth excavation; 1,200 sq yd erosion control blanket; 1,620 ft perimeter erosion barrier; 575 ton aggregate base course; 160 ton aggregate surface course; 4,008 lb bituminous materials (tack coat); 1,024 ton HMA binder course; 374 ton polymerized HMA surface course; 4,447 sq yd HMA surface removal; 1,036 sq yd paved shoulder removal; 1,170 sq yd aggregate shoulder; 941 sq yd HMA shoulders; 389 ft combination concrete curb and gutter; 2,200 ft shoulder rumble strips; 1,413 sq ft short term pavement marking removal; 8,476 ft temporary pavement marking line; 3,142 ft polyurea pavement marking line; 93 raised reflective pavement markers; 6,878 ft thermoplastic pavement marking line; 2,122 sq yd PCC pavement; traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (50 Working Days) (Job No. C-95-324-15) (5-10422-0000, 0-01736-5004, 5-91196-5001) (See the Special Provisions for the DBE Percentage)

162. Contract No. 61C26 Cook County District 1 Section 15-00083-00-PV (WHEELING) FAP Route 343 (IL 68) Project M-4003(579) Project consists of pavement widening, traffic signal installation, curb and gutter, sidewalk, HMA resurfacing, HMA pavement, driveways, adjustment and installation of drainage and utility structures, parkway restoration, pavement marking and all other incidental items to complete the work on FAP Route 343 (IL 68) at Community Boulevard in the Village of Wheeling; includes 242 unit tree removal; 1,654 cu yd earth excavation; 1,646 cu yd removal and disposal of unsuitable material; 1,074 sq yd geotechnical fabric for ground stabilization; 5,187 sq yd topsoil furnish and place; 3,735 sq yd sodding, salt tolerant; 40 unit supplemental watering; 2,475 ft perimeter erosion barrier; 32 inlet filters; 5,187 sq yd temporary erosion control blanket; 4,052 sq yd aggregate subgrade improvement; 1,563 sq yd aggregate base course; 1,315 sq yd HMA base course widening; 13,249 lb bituminous materials (tack coat); 572 ton polymerized leveling binder (machine method); 758 ton HMA binder course; 293 ton HMA surface course; 1,090 ton polymerized HMA surface course; 2,511 sq yd protective coat; 13,732 sq ft PCC sidewalk; 8,250 sq yd HMA surface removal; 2,033 ft combination curb and gutter removal; 7,575 sq ft sidewalk removal; 372 sq yd Class D patches; 13 catch basins; 2,739 ft combination concrete curb and gutter; 620 gal special waste groundwater disposal; 14,370 ft temporary pavement marking line; 7,185 ft thermoplastic pavement marking line; 159 raised reflective pavement markers; 130 raised reflective pavement marker removal; 2,407 ft underground conduit, galvanized steel; 3,110 ft electric cable in conduit, tracer; 7,602 ft electric cable in conduit, signal; 16 signal heads, LED; 3,050 ft remove electric cable from conduit; 18 trees; 2,717 ft rod and clean existing conduit; 3,110 ft fiber optic cable in conduit; traffic control and protection; federally funded; (A Special Provision for this contract requires insurance that names additional insureds). (60 Working Days) (Job No. C-91-032-16) (1-21847-0000) (See the Special Provisions for the DBE Percentage)

The time limit to award this item has been changed from 45 days to 60 days after the scheduled letting. 163. Contract No. 93637 Sangamon County District 6 Section 15-HSRT3-00-RR (SPRINGFIELD) FAU Route 7969 (RIDGELY AVENUE) Project HSR-5146(93) Project consists of the realignment and reconstruction of the intersection of Ridgley Ave., North 11th St., and Factory St. at the Union Pacific Railroad crossing 294 289C in the City of Springfield; includes 6,451 sq yd pavement removal; 7,453 sq yd aggregate subgrade improvement; 1,584 ton HMA binder course; 433 ton polymerized HMA surface course; 2,720 sq yd PCC pavement; 3,493 sq yd driveway pavement removal; 8,499 sq ft sidewalk removal; 2,149 ft combination curb and gutter removal; 11,866 sq ft PCC sidewalk; 356 sq yd PCC driveway pavement; 2,736 ft combination curb and gutter; 1,300 cu yd non-special waste disposal; 1 special waste plans and reports; 1,727 ft storm sewer; 104 ft sanitary sewer; 490 ft combined sewer removal; 22 buildings to be removed; 22 removal and disposal of friable asbestos (22 buildings); 22 removal and disposal of non-friable asbestos (22 buildings); 1,089 ft fence removal; 3.25 acre mulch; 3,052 sq yd sodding; 183 ft preformed plastic pavement marking line; 1,834 ft modified urethane pavement marking line; High Speed Rail; (A Special Provision for this contract requires insurance that names additional insureds). (Completion Date: May 10, 2017 Plus 15 Working Days) (Job No. C-96-224-15) (6-10726-0000) (See the Special Provisions for the DBE Percentage)

The time limit to award this item has been changed from 45 days to 60 days after the scheduled letting. 164. Contract No. 93647 Sangamon County District 6 Section 15-HSRT2-00-RR TR 7 (WEST MONTGOMERY ROAD) Project HSR-167(85) Project consists of raising the grade, pavement removal, HMA binder and surface courses, aggregate shoulders, pipe culvert replacement and pavement markings, located 0.50 miles north of Virden on the Sangamon and Macoupin County line at the Union Pacific Railroad crossing 294 359P; includes 541 cu yd earth excavation; 685 cu yd furnished excavation; 1,063 ton aggregate base course; 285 ton HMA binder course; 196 ton HMA surface course; 226 ton aggregate shoulder; 170 ft pipe culverts; 2,908 ft preformed thermoplastic pavement marking line; 1,818 sq yd topsoil furnish and place; 0.50 acre seeding; High Speed Rail; (A Special Provision for this contract requires insurance that names additional insureds). (40 Working Days) (Job No. C-96-234-15) (6-10725-0000) (See the Special Provisions for the DBE Percentage)

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 1 -

ILLINOIS DEPARTMENT OF TRANSPORTATION DIVISION OF AERONAUTICS April 22, 2016 LETTING

NOTE: AWARD OF AERONAUTIC CONTRACTS. AWARD CRITERIA AND REJECTION OF BIDS. This contract will be awarded within 60 calendar days to the lowest responsive and responsible bidder considering conformity with the terms and conditions established by the Department in the proposal and contract documents. The issuance of plans and proposal forms for bidding based upon a prequalification rating shall not be the sole determinant of responsibility. The Department reserves the right to determine responsibility at the time of award, to reject any or all proposals, to re-advertise the proposed improvement, and to waive technicalities.

1A Contract No. DE076 Macon County Decatur Airport Decatur, Illinois Illinois Project No. DEC-4430 Federal Project No. 3-17-SBGP-111/120 Project consists of Construct Final Length of Class E Fence in Frontal Area, with Gates – which includes the following major work items: 1 Each Electrical Handhole; 1 L.S. Mobilization; 2 Each Clearing Trees 0-2.5’ Butt Dia.; 2 Each Class E Manual Slide Gate; 1,239 L.F. Class E Fence 10’; 3 Each Electric Gate; 1,258 L.F. Remove Class E Fence; 3 Each Remove Electric Gate; 3 Each Upgrade Card Reader; 5 Each Snow Brush and Blade Kit; Federally Funded; (See the Proposal Document for the DBE Percentage) Pre-Bid meeting: N/A Previous Letting: July 31, 2015 (Item 1A)

2A Contract No. GR007 Bond County Greenville Airport Greenville, Illinois Illinois Project No. GRE-4523 Federal Project No. 3-17-SBGP-111/120 Project consists of Apron Rehabilitation of TH-2 – which includes the following major work items: 1 L.S. Mobilization; 365 Ton Bituminous Surface Course-Method I Superpave; 3,000 S.Y. Bituminous Pavement Milling; 365 Ton Bituminous Base Course-Method I Superpave; 56 S.Y. 7” PCC Pavement; 900 Gal. Bituminous Prime Coat; 1,060 L.F. 4” Perforated Underdrain; 1 Each Concrete Headwall for Underdrain; 2 Each Underdrain Inspection Hole; 300 S.Y. Remove and Replace Unsuitable Subgrade; Federally Funded; (See the Proposal Document for the DBE Percentage) Pre-Bid meeting: N/A

3A Contract No. LE049 Will County Lewis University Airport Romeoville, Illinois Illinois Project No. LOT-4425 Federal Project No. 3-17-SBGP-120 Project consists of Rehabilitate Taxiway N1, N2, R1 and portions of R – which includes the following major work items: 57 L.F. 2 Way Concrete Encased Duct; 61 L.F. Extend Duct; 1 L.S. Mobilization; 9,695 C.Y. Unclassified Excavation; 11,088 S.Y. Separation Fabric; 1 Each Class E Gate 6’; 11,088 S.Y. Crushed Agg. Base Course; 1,315 Ton Bituminous Surface Course-Method I, Superpave; 790 S.Y. Bituminous Pavement Milling; 1,960 L.F. Saw & Seal Bituminous Joints; 10,500 S.Y. Remove Bituminous Pavement; 2,361 Ton Bituminous Base Course-Method I, Superpave; 181 S.Y. Remove PCC Pavement; 3,232 Gal. Bituminous Prime Coat; 4,841 S.F. Pavement Marking-Waterborne; 760 L.F. RCP; 3,410 L.F. 6” Perforated Underdrain; 2,398 L.F. Remove Underdrain; 2 Each Inlet; 5 Each Manhole; 284 S.Y. PCC Patch; 3,050 C.Y. CA-6 Aggregate Backfill; 7,788 S.Y. Granular Drainage Subbase 6”; 3,300 S.Y. Granular Drainage Subbase 4”; 119 L.F. Class E Fence 10’ Barb w/2’ Bur. Galv.; 3 Acre Seeding & Mulching; 1,075 C.Y. Topsoiling (From on Site); Federally Funded; (See the Proposal Document for the DBE Percentage) Pre-Bid meeting: N/A Previous Letting: January 15, 2016 (Item 1A)

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 - 2 -

4A Contract No. PL015 Perry County Pinckneyville-DuQuoin Airport Pinckneyville, Illinois Illinois Project No. PJY-4448 Federal Project No. 3-17-SBGP-91/95 Project consists of Runway (GSB-88) Crack Sealing, Seal Coat and Re-Mark Runway and Taxiway – which includes the following major work items: 1 L.S. Mobilization; 8,000 L.F. Clean and Seal Bituminous Cracks; 31,000 S.Y. Existing Asphalt Surface Treatment; 19,000 S.F. Pavement Marking-Waterborne; 6,100 S.F. Pavement Marking-Black Border; Federally Funded; (See the Proposal Document for the DBE Percentage) Pre-Bid meeting: N/A

5A Contract No. DI028 Lee County Dixon Municipal Airport Dixon, Illinois Illinois Project No. C73-4284 Federal Project No. 3-17-SBGP-87/95 Project consists of Rehabilitate Runway 8/26 Lighting and Associated Electrical Items – which includes the following major work items: Base Bid: 10,600 L.F. UG Cable in UD; 446 L.F. 4” Directional Bore; 2 Each Electrical Handhole; 20 Each MITLs; 43 Each MIRLs; 12 Each MI Threshold Light; 1 Pair REILs; 71 Each Remove Mounted Light; 1 L.S. Mobilization; Add. Alt.1: 2,600 L.F. UG Cable in UD; 40 L.F. 4” Directional Bore; 6 Each Elevated Retroreflective Marker; Federally Funded; (See the Proposal Document for the DBE Percentage) Pre-Bid meeting: N/A

6A Contract No. MA028 Marshall County Marshall County Airport Lacon, Illinois Illinois Project No. C75-4346 Federal Project No. 3-17-SBGP-99/100/105 Project consists of Install Permanent Erosion Control – which includes the following major work items: 1 L.S. Mobilization; 1,400 C.Y. On Site Borrow; 929 C.Y. Offsite Topsoil; 5,069 S.Y. Erosion Control Blanket; 519 S.Y. Rip-rap Gradation No. 4; 120 L.F. 8” CMP; 300 L.F. 8” Perforated Underdrain; 8,300 L.F. Regrade Ditch; 11,361 S.Y. Turf Reinforcement Mat, Type 1; 3,957 S.Y. Turf Reinforcement Mat, Type 2; 1 L.S. Remove Concrete; 6 Acre Seeding; Federally Funded; (See the Proposal Document for the DBE Percentage) Pre-Bid meeting: N/A

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 REVISIONS TO THE ILLINOIS PREVAILING WAGE RATES

The Prevailing rates of wages are included in the Contract proposals which are subject to Check Sheet #5 of the Supplemental Specifications and Recurring Special Provisions. The rates have been ascertained and certified by the Illinois Department of Labor for the locality in which the work is to be performed and for each craft or type of work or mechanic needed to execute the work of the Contract. As required by Prevailing Wage Act (820 ILCS 130/0.01, et seq.) and Check Sheet #5 of the Contract, not less than the rates of wages ascertained by the Illinois Department of Labor and as revised during the performance of a Contract shall be paid to all laborers, workers and mechanics performing work under the Contract. Post the scale of wages in a prominent and easily accessible place at the site of work.

If the Illinois Department of Labor revises the prevailing rates of wages to be paid as listed in the specification of rates, the contractor shall post the revised rates of wages and shall pay not less than the revised rates of wages. Current wage rate information shall be obtained by visiting the Illinois Department of Labor web site at http://www.state.il.us/agency/idol/ or by calling 312-793-2814. It is the responsibility of the contractor to review the rates applicable to the work of the contract at regular intervals in order to insure the timely payment of current rates. Provision of this information to the contractor by means of the Illinois Department of Labor web site satisfies the notification of revisions by the Department to the contractor pursuant to the Act, and the contractor agrees that no additional notice is required. The contractor shall notify each of its subcontractors of the revised rates of wages.

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 CONTRACTS AWARDED ------THE FOLLOWING AWARDS HAVE BEEN MADE SINCE THE PREVIOUS TRANSPORTATION BULLETIN: ------JULY 31, 2015 LETTING

DESCRIPTION CONTRACTOR ------ITEM NO. 012A MCCARTHY IMPROVEMENT COMPANY CONTRACT NO. QU020 5401 VICTORIA AVE., SUITE 700 COUNTY(S) ROCK ISLAND DAVENPORT, IA 52807-2991 SECTION QUAD CITY INTERNATIONAL PROJECT(S) 317SBGPXX-MLI /448/2 ROUTE DISTRICT 02 AWARDED DATE 02/26/2016 AWARDED AMOUNT $726,619.75 2 UNSUCCESSFUL BIDDERS

------NOVEMBER 06, 2015 LETTING

DESCRIPTION CONTRACTOR ------ITEM NO. 093 LAJOBIE MOSLEY D/B/A CONTRACT NO. 62B53 LION CONSTRUCTION 1 LLC COUNTY(S) VARIOUS 2598 S. 14000 E RD. SECTION 2015-070I PEMBROKE, IL 60958 PROJECT(S) ROUTE VARIOUS DISTRICT 01 AWARDED DATE 02/03/2016 AWARDED AMOUNT $286,836.00 2 UNSUCCESSFUL BIDDERS

------JANUARY 15, 2016 LETTING

DESCRIPTION CONTRACTOR ------ITEM NO. 001 ALLIANCE CONTRACTORS, INC. CONTRACT NO. 60V97 1166 LAKE AVENUE COUNTY(S) COOK WOODSTOCK, IL 60098 SECTION 3041N-3(12) PROJECT(S) ACCM-0343/028/000 ROUTE FAP 343 DISTRICT 01 AWARDED DATE 02/10/2016 AWARDED AMOUNT $1,105,680.29 6 UNSUCCESSFUL BIDDERS

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 ITEM NO. 001X BENCHMARK CONSTRUCTION CO., INC. CONTRACT NO. 85612 2260 SOUTHWIND BLVD. COUNTY(S) WINNEBAGO BARTLETT, IL 60103 SECTION 01-00509-00-RP PROJECT(S) M-5099/071/000 ROUTE FAP 525 DISTRICT 02 AWARDED DATE 02/10/2016 AWARDED AMOUNT $22,848,150.79 3 UNSUCCESSFUL BIDDERS

ITEM NO. 002 J. A. JOHNSON PAVING COMPANY CONTRACT NO. 61C05 1025 EAST ADDISON COURT COUNTY(S) COOK ARLINGTON HEIGHTS, IL 60005 SECTION 13-00033-00-RS PROJECT(S) M-4003/188/000 ROUTE KENILWORTH AVENUE DISTRICT 01 AWARDED DATE 02/10/2016 AWARDED AMOUNT $697,376.20 5 UNSUCCESSFUL BIDDERS

ITEM NO. 004 ARROW ROAD CONSTRUCTION CO. CONTRACT NO. 62A68 3401 S. BUSSE ROAD COUNTY(S) COOK DUPAGE P.O. BOX 334 SECTION 2015-011I MT. PROSPECT, IL 60056-0334 PROJECT(S) ACHSIP-0290/203/000 ROUTE FAI 290 DISTRICT 01 AWARDED DATE 02/10/2016 AWARDED AMOUNT $525,175.50 3 UNSUCCESSFUL BIDDERS

ITEM NO. 006 CLEAN CUT TREE SERVICE, INC. CONTRACT NO. 66F02 31064 HWY. 83 COUNTY(S) LASALLE BUREAU GRAYSLAKE, IL 60030 SECTION 2016-1 TREE REM FOR EAB CONT PROJECT(S) ROUTE FAI 80 & FAP 46 DISTRICT 03 AWARDED DATE 02/18/2016 AWARDED AMOUNT $82,875.00 2 UNSUCCESSFUL BIDDERS

ITEM NO. 006A R. W. DUNTEMAN COMPANY CONTRACT NO. PA059 600 S. LOMBARD ROAD COUNTY(S) COOK ADDISON, IL 60101 SECTION CHICAGO EXECUTIVE P.O. BOX 1129 PROJECT(S) 317SBGP120-PWK /441/4 ADDISON, IL 60101-1129 ROUTE DISTRICT 01 AWARDED DATE 03/08/2016 AWARDED AMOUNT $4,596,127.79 3 UNSUCCESSFUL BIDDERS

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 ITEM NO. 007 CENTRAL LANDSCAPING, LP CONTRACT NO. 68C34 12512 WEST MENDELL ROAD COUNTY(S) PEORIA PRINCEVILLE, IL 61559-9801 SECTION (72-8)LS-7 PROJECT(S) ROUTE FAI 74 DISTRICT 04 AWARDED DATE 02/02/2016 AWARDED AMOUNT $103,811.11 3 UNSUCCESSFUL BIDDERS

ITEM NO. 008 LASER ELECTRIC, INC. CONTRACT NO. 68C67 3611 S.W. ADAMS ST. COUNTY(S) VARIOUS PEORIA, IL 61605 SECTION D4 TRAFFIC SIGNAL REPLACE 2016 P.O. BOX 5008 PROJECT(S) ACHSIP-000V/043/000 PEORIA, IL 61601-5008 ROUTE VARIOUS DISTRICT 04 AWARDED DATE 02/02/2016 AWARDED AMOUNT $206,155.60 2 UNSUCCESSFUL BIDDERS

ITEM NO. 009 MOTT EXCAVATING, INC. CONTRACT NO. 68C70 1210 LAKE AUTUMN LANE COUNTY(S) VARIOUS P.O. BOX 613 SECTION D4 WEED SPRAYING 2016 (OR) VIENNA, IL 62995 PROJECT(S) ROUTE VARIOUS DISTRICT 04 AWARDED DATE 02/02/2016 AWARDED AMOUNT $211,362.00 2 UNSUCCESSFUL BIDDERS

ITEM NO. 011 PHOENIX CORPORATION OF THE QUAD CITIES CONTRACT NO. 68C87 23821 66TH AVE N. COUNTY(S) PEORIA PORT BYRON, IL 61275 SECTION [8R-1;(6,5)R]DM P.O. BOX 129 PROJECT(S) PORT BYRON, IL 61275 ROUTE FAP 318 DISTRICT 04 AWARDED DATE 02/02/2016 AWARDED AMOUNT $104,955.00 1 UNSUCCESSFUL BIDDER

ITEM NO. 012 COUNTY CONTRACTORS, INC. CONTRACT NO. 70607 1228 E. 1350TH STREET COUNTY(S) EDGAR QUINCY, IL 62305 SECTION 117BR-1 P.O. BOX 3522 PROJECT(S) ACF-0836/032/000 QUINCY, IL 62305-3522 ROUTE FAP 836 DISTRICT 05 AWARDED DATE 02/10/2016 AWARDED AMOUNT $749,336.00 1 UNSUCCESSFUL BIDDER

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 ITEM NO. 013 STARK EXCAVATING, INC. CONTRACT NO. 70754 1805 WEST WASHINGTON ST. COUNTY(S) DEWITT BLOOMINGTON, IL 61701 SECTION 124CR PROJECT(S) ACF-0760/017/000 ROUTE FAP 760 DISTRICT 05 AWARDED DATE 02/10/2016 AWARDED AMOUNT $296,330.61 5 UNSUCCESSFUL BIDDERS

ITEM NO. 014 OPEN ROAD PAVING COMPANY LLC CONTRACT NO. 70785 1414 WEST ANTHONY DRIVE COUNTY(S) CHAMPAIGN URBANA, IL 61802 SECTION (24,23)RS-5 P.O. BOX 1700 PROJECT(S) ACF-0804/196/000 CHAMPAIGN, IL 61824-1700 ROUTE FAP 804 DISTRICT 05 AWARDED DATE 02/10/2016 AWARDED AMOUNT $1,797,538.64 1 UNSUCCESSFUL BIDDER

ITEM NO. 015 BODINE ELECTRIC OF DECATUR CONTRACT NO. 70B36 1845 N. 22ND STREET COUNTY(S) MCLEAN P.O. BOX 976 SECTION 03-00221-02-RP DECATUR, IL 62525 PROJECT(S) HSR-6405/001/000 ROUTE FAU 6405 DISTRICT 05 AWARDED DATE 02/08/2016 AWARDED AMOUNT $48,516.54 2 UNSUCCESSFUL BIDDERS

ITEM NO. 016 CLEAN CUT TREE SERVICE, INC. CONTRACT NO. 70B65 31064 HWY. 83 COUNTY(S) VARIOUS GRAYSLAKE, IL 60030 SECTION D5 EAB CONTROL 2016-1 PROJECT(S) ROUTE VARIOUS DISTRICT 05 AWARDED DATE 02/18/2016 AWARDED AMOUNT $138,108.20 1 UNSUCCESSFUL BIDDER

ITEM NO. 017 THE DALTONS INC. CONTRACT NO. 70B66 936 LITTLE EAGLE DRIVE COUNTY(S) VARIOUS WARSAW, IN 46580 SECTION D5 WEED SPRAYING 2016-1 P.O. BOX 1274 PROJECT(S) WARSAW, IN 46581-1274 ROUTE VARIOUS DISTRICT 05 AWARDED DATE 02/02/2016 AWARDED AMOUNT $253,754.50 1 UNSUCCESSFUL BIDDER

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 ITEM NO. 019 DIAMOND CONSTRUCTION COMPANY CONTRACT NO. 72C89 2000 NORTH 18TH STREET COUNTY(S) PIKE QUINCY, IL 62301 SECTION (107)RS-8, I-3 P.O. BOX 3486 PROJECT(S) ACNHPP-0321/016/000 QUINCY, IL 62305-3486 ROUTE FAP 321 DISTRICT 06 AWARDED DATE 02/10/2016 AWARDED AMOUNT $1,890,995.89 2 UNSUCCESSFUL BIDDERS

ITEM NO. 022 ILLINOIS VALLEY PAVING, A DIVISION OF CONTRACT NO. 72H14 UNITED CONTRACTORS MIDWEST, INC. COUNTY(S) LOGAN 3151 ROBBINS ROAD SECTION (134) RS-10, I-3, BJR SPRINGFIELD, IL 62704 PROJECT(S) ACNHPP-0320/040/000 P.O. BOX 13490 ROUTE FAP 320 SPRINGFIELD, IL 62791 DISTRICT 06 AWARDED DATE 02/10/2016 AWARDED AMOUNT $2,525,079.38 3 UNSUCCESSFUL BIDDERS

ITEM NO. 023 W. L. MILLER COMPANY CONTRACT NO. 72H38 750 EAST COUNTY ROAD 1220 COUNTY(S) HANCOCK HAMILTON, IL 62341 SECTION (125)RS-4 PROJECT(S) ACF-0506/014/000 ROUTE FAP 506 DISTRICT 06 AWARDED DATE 02/10/2016 AWARDED AMOUNT $1,383,926.38 0 UNSUCCESSFUL BIDDERS

ITEM NO. 024 FREESEN, A DIVISION OF CONTRACT NO. 72H49 UNITED CONTRACTORS MIDWEST, INC. COUNTY(S) SANGAMON 3151 ROBBINS ROAD SECTION (84-3) I-5, BJR SPRINGFIELD, IL 62704 PROJECT(S) ACNHPP-0055/476/000 P.O. BOX 13490 ROUTE FAI 55 SPRINGFIELD, IL 62791 DISTRICT 06 AWARDED DATE 02/10/2016 AWARDED AMOUNT $1,993,243.70 2 UNSUCCESSFUL BIDDERS

ITEM NO. 025 EGIZII ELECTRIC, INC., A DIVISION OF CONTRACT NO. 72H80 EEI HOLDING CORPORATION COUNTY(S) MACOUPIN 3009 SINGER AVENUE SECTION D6 2015-4 HSRR SPRINGFIELD, IL 62703 PROJECT(S) HSR-0765/010/000 ROUTE FAP 765 DISTRICT 06 AWARDED DATE 02/08/2016 AWARDED AMOUNT $97,247.22 2 UNSUCCESSFUL BIDDERS

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 ITEM NO. 026 INTERSTATE MAINTENANCE, INCORPORATED CONTRACT NO. 72H95 6176 LERNA ROAD COUNTY(S) ADAMS HANCOCK MATTOON, IL 61938 SECTION D6 BRIDGE CLEANING 2016 PROJECT(S) ROUTE FAP 63 & FAP 315 DISTRICT 06 AWARDED DATE 02/19/2016 AWARDED AMOUNT $58,270.00 1 UNSUCCESSFUL BIDDER

ITEM NO. 027 ALL STATES PAINTING, INC. CONTRACT NO. 72H98 507 EAST OLD ROUTE 36 COUNTY(S) ADAMS ALEXANDER, IL 62601 SECTION (1-ZB1) BDGE DK SEALING 2016 P.O. BOX 110 PROJECT(S) ACNHPP-0063/064/000 ALEXANDER, IL 62601 ROUTE FAP 63 DISTRICT 06 AWARDED DATE 02/10/2016 AWARDED AMOUNT $38,162.32 5 UNSUCCESSFUL BIDDERS

ITEM NO. 028 R. W. DUNTEMAN COMPANY CONTRACT NO. 74515 600 S. LOMBARD ROAD COUNTY(S) MACON ADDISON, IL 60101 SECTION 128N P.O. BOX 1129 PROJECT(S) ACHSIP-0714/021/000 ADDISON, IL 60101-1129 ROUTE FAP 714 DISTRICT 07 AWARDED DATE 02/10/2016 AWARDED AMOUNT $1,879,584.63 2 UNSUCCESSFUL BIDDERS

ITEM NO. 029 R. W. DUNTEMAN COMPANY CONTRACT NO. 74667 600 S. LOMBARD ROAD COUNTY(S) MACON ADDISON, IL 60101 SECTION (134,135)RS-3 P.O. BOX 1129 PROJECT(S) ACNHPP-0320/041/000 ADDISON, IL 60101-1129 ROUTE FAP 320 DISTRICT 07 AWARDED DATE 02/10/2016 AWARDED AMOUNT $3,645,653.41 1 UNSUCCESSFUL BIDDER

ITEM NO. 030 ERA-VALDIVIA CONTRACTORS, INC. CONTRACT NO. 74673 11909 SOUTH AVENUE O COUNTY(S) COLES CHICAGO, IL 60617 SECTION D7 BRIDGE REPAIRS 2016-3 PROJECT(S) ROUTE FAP 824 DISTRICT 07 AWARDED DATE 02/02/2016 AWARDED AMOUNT $191,962.92 2 UNSUCCESSFUL BIDDERS

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 ITEM NO. 031 HOWELL PAVING, INC. CONTRACT NO. 74704 1020 N. 13TH STREET COUNTY(S) CLAY MATTOON, IL 61938 SECTION (12,13,14)RS-3 P.O. BOX 1009 PROJECT(S) ACF-0327/066/000 MATTOON, IL 61938 ROUTE FAP 327 DISTRICT 07 AWARDED DATE 02/02/2016 AWARDED AMOUNT $1,643,064.96 0 UNSUCCESSFUL BIDDERS

ITEM NO. 032 NE-CO ASPHALT CO., INC. CONTRACT NO. 74712 812 ADKINS DRIVE COUNTY(S) COLES CHARLESTON, IL 61920 SECTION D7 HMA SAFETY SHLD 2016-2 P.O. BOX 25 PROJECT(S) ACHSIP-0820/014/000 CHARLESTON, IL 61920-0025 ROUTE FAP 820 DISTRICT 07 AWARDED DATE 02/18/2016 AWARDED AMOUNT $665,960.00 1 UNSUCCESSFUL BIDDER

ITEM NO. 033 NETTLE CREEK NURSERY, INC. CONTRACT NO. 74740 320 OTTAWA STREET COUNTY(S) CLARK MACON MORRIS, IL 60450 SECTION D7 ASH BORER CONTROL 2016 PROJECT(S) ROUTE FAI 70 & FAI 72 DISTRICT 07 AWARDED DATE 02/02/2016 AWARDED AMOUNT $97,300.00 4 UNSUCCESSFUL BIDDERS

ITEM NO. 034 MOTT EXCAVATING, INC. CONTRACT NO. 74741 1210 LAKE AUTUMN LANE COUNTY(S) VARIOUS P.O. BOX 613 SECTION D7 WEED CONTROL SPRAYING 2016 VIENNA, IL 62995 PROJECT(S) ROUTE VARIOUS DISTRICT 07 AWARDED DATE 02/02/2016 AWARDED AMOUNT $76,105.00 2 UNSUCCESSFUL BIDDERS

ITEM NO. 035 THE KILIAN CORPORATION CONTRACT NO. 76E86 608 SOUTH INDEPENDENCE STREET COUNTY(S) MADISON MASCOUTAH, IL 62258-0187 SECTION (65,66)RS-5 PROJECT(S) ACRS-ACM-000V/041/000 ROUTE FAS 770/FAU 8890 DISTRICT 08 AWARDED DATE 02/10/2016 AWARDED AMOUNT $3,691,969.06 2 UNSUCCESSFUL BIDDERS

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 ITEM NO. 037 HOWELL PAVING, INC. CONTRACT NO. 76H07 1020 N. 13TH STREET COUNTY(S) MARION MATTOON, IL 61938 SECTION (12,13,14)RS-1 P.O. BOX 1009 PROJECT(S) ACNHPP-0327/065/000 MATTOON, IL 61938 ROUTE FAP 327 A DISTRICT 08 AWARDED DATE 02/10/2016 AWARDED AMOUNT $2,581,448.18 1 UNSUCCESSFUL BIDDER

ITEM NO. 038 KEELEY & SONS, INC. CONTRACT NO. 76H97 6303 COLLINSVILLE ROAD COUNTY(S) MONROE EAST ST. LOUIS, IL 62201 SECTION 69RS-4 P.O. BOX 837 PROJECT(S) EAST ST. LOUIS, IL 62203 ROUTE FAU 9321 DISTRICT 08 AWARDED DATE 02/10/2016 AWARDED AMOUNT $348,378.63 2 UNSUCCESSFUL BIDDERS

ITEM NO. 039 CHRIST BROS. ASPHALT, INC. CONTRACT NO. 76J03 820 S. FRITZ STREET COUNTY(S) WASHINGTON LEBANON, IL 62254 SECTION 10-1 RS-2 P.O. BOX 158 PROJECT(S) LEBANON, IL 62254 ROUTE FAS 836 DISTRICT 08 AWARDED DATE 02/10/2016 AWARDED AMOUNT $310,820.00 1 UNSUCCESSFUL BIDDER

ITEM NO. 040 ELECTRICO, INC. CONTRACT NO. 76J20 7706 WAGNER ROAD COUNTY(S) VARIOUS MILLSTADT, IL 62260 SECTION DIST 8 TS 2016-1 PROJECT(S) ACHSIP-000V/042/000 ROUTE VARIOUS DISTRICT 08 AWARDED DATE 02/18/2016 AWARDED AMOUNT $246,681.63 1 UNSUCCESSFUL BIDDER

ITEM NO. 041 THE DALTONS INC. CONTRACT NO. 76J30 936 LITTLE EAGLE DRIVE COUNTY(S) VARIOUS WARSAW, IN 46580 SECTION DIST 8 WEED SPRAYING 2016-1 P.O. BOX 1274 PROJECT(S) WARSAW, IN 46581-1274 ROUTE VARIOUS DISTRICT 08 AWARDED DATE 02/08/2016 AWARDED AMOUNT $115,615.10 1 UNSUCCESSFUL BIDDER

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 ITEM NO. 042 KINNEY CONTRACTORS, INC. CONTRACT NO. 76J34 19342 E. FRONTAGE RD. COUNTY(S) WASHINGTON RAYMOND, IL 62560-5061 SECTION 95-(1,2,3,4,5,6)I-2 PROJECT(S) ROUTE FAI 64 DISTRICT 08 AWARDED DATE 02/10/2016 AWARDED AMOUNT $325,412.50 1 UNSUCCESSFUL BIDDER

ITEM NO. 043 E. T. SIMONDS CONSTRUCTION COMPANY CONTRACT NO. 78083 1500 NORTH OAKLAND AVENUE COUNTY(S) SALINE P.O. BOX 2107 SECTION 32B-1 CARBONDALE, IL 62902-2107 PROJECT(S) ACF-0881/020/000 ROUTE FAP 881 DISTRICT 09 AWARDED DATE 02/02/2016 AWARDED AMOUNT $1,511,061.53 1 UNSUCCESSFUL BIDDER

ITEM NO. 044 SOUTHERN ILLINOIS ASPHALT CO., INC. CONTRACT NO. 78437 5200 MEADOWLAND PARKWAY COUNTY(S) JEFFERSON MARION, IL 62959 SECTION (41-4,41-4-1)RS-2 PROJECT(S) ACNHPP-0057/311/000 ROUTE FAI 57 DISTRICT 09 AWARDED DATE 02/22/2016 AWARDED AMOUNT $7,475,617.37 0 UNSUCCESSFUL BIDDERS

ITEM NO. 045 E. T. SIMONDS CONSTRUCTION COMPANY CONTRACT NO. 78479 1500 NORTH OAKLAND AVENUE COUNTY(S) JACKSON P.O. BOX 2107 SECTION (114,115)RS-5 CARBONDALE, IL 62902-2107 PROJECT(S) ACF-0686/013/000 ROUTE FAP 686 DISTRICT 09 AWARDED DATE 02/02/2016 AWARDED AMOUNT $3,459,562.54 0 UNSUCCESSFUL BIDDERS

ITEM NO. 047 SOUTHERN ILLINOIS ASPHALT CO., INC. CONTRACT NO. 78490 5200 MEADOWLAND PARKWAY COUNTY(S) JEFFERSON MARION, IL 62959 SECTION 83RS-3 PROJECT(S) ACRS-4103/005/000 ROUTE OR 4103 DISTRICT 09 AWARDED DATE 02/10/2016 AWARDED AMOUNT $561,612.19 0 UNSUCCESSFUL BIDDERS

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 ITEM NO. 048 E. T. SIMONDS CONSTRUCTION COMPANY CONTRACT NO. 78491 1500 NORTH OAKLAND AVENUE COUNTY(S) JACKSON UNION P.O. BOX 2107 SECTION (10,10-2,11-1,12-1,13)RS-3 CARBONDALE, IL 62902-2107 PROJECT(S) ACNHPP-0322/113/000 ROUTE FAP 322 DISTRICT 09 AWARDED DATE 02/02/2016 AWARDED AMOUNT $3,595,477.38 0 UNSUCCESSFUL BIDDERS

ITEM NO. 050 SANGAMO CONSTRUCTION COMPANY CONTRACT NO. 90876 2100 E. MOFFAT AVENUE COUNTY(S) DEWITT SPRINGFIELD, IL 62702 SECTION 20-1(HVB,HB-1,VB-1,B,B-1)I PROJECT(S) ACNHPP-0074/317/000 ROUTE FAI 74 DISTRICT 05 AWARDED DATE 02/02/2016 AWARDED AMOUNT $4,500,547.90 4 UNSUCCESSFUL BIDDERS

ITEM NO. 051 A. J. WALKER CONSTRUCTION COMPANY CONTRACT NO. 91508 421 S. 21ST STREET COUNTY(S) EDGAR MATTOON, IL 61938 SECTION 11-14126-00-BR P.O. BOX 118 PROJECT(S) BROS-0045/053/000 MATTOON, IL 61938-0118 ROUTE TR 158 DISTRICT 05 AWARDED DATE 02/10/2016 AWARDED AMOUNT $1,053,352.42 1 UNSUCCESSFUL BIDDER

ITEM NO. 052 YAMNITZ, WILLIAM D/B/A CONTRACT NO. 93666 YAMNITZ & ASSOCIATES COUNTY(S) PIKE 22782 N. THIRD STREET SECTION 13-00092-00-BR FIELDON, IL 62031 PROJECT(S) BRS-0597/105/000 ROUTE FAS 597 DISTRICT 06 AWARDED DATE 02/18/2016 AWARDED AMOUNT $561,943.80 3 UNSUCCESSFUL BIDDERS

ITEM NO. 053 DEES, INC. CONTRACT NO. 99545 2045 WINERY ROAD COUNTY(S) FRANKLIN WEST FRANKFORT, IL 62896 SECTION 09-06130-00-BR PROJECT(S) BROS-0055/063/000 ROUTE TR 332 DISTRICT 09 AWARDED DATE 02/10/2016 AWARDED AMOUNT $209,520.00 3 UNSUCCESSFUL BIDDERS

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 ITEM NO. 054 MAINTENANCE COATINGS CO. CONTRACT NO. 61B19 543 WOODBURY STREET COUNTY(S) COOK SOUTH ELGIN, IL 60177 SECTION 13-00268-00-BT PROJECT(S) CMM-4003/494/000 ROUTE FAU 2840 DISTRICT 01 AWARDED DATE 02/10/2016 AWARDED AMOUNT $455,186.01 1 UNSUCCESSFUL BIDDER

ITEM NO. 056 H & H ELECTRIC CO. CONTRACT NO. 61C02 2830 COMMERCE STREET COUNTY(S) LAKE FRANKLIN PARK, IL 60131-2927 SECTION 12-00999-28-TL PROJECT(S) CMM-4003/543/000 ROUTE VARIOUS DISTRICT 01 AWARDED DATE 02/18/2016 AWARDED AMOUNT $607,472.60 2 UNSUCCESSFUL BIDDERS

ITEM NO. 057 MAINTENANCE COATINGS CO. CONTRACT NO. 61C07 543 WOODBURY STREET COUNTY(S) COOK SOUTH ELGIN, IL 60177 SECTION 13-00094-00-BT PROJECT(S) TE-00D1/017/000 ROUTE VARIOUS DISTRICT 01 AWARDED DATE 02/02/2016 AWARDED AMOUNT $175,401.70 1 UNSUCCESSFUL BIDDER

ITEM NO. 058 J. A. JOHNSON PAVING COMPANY CONTRACT NO. 61C13 1025 EAST ADDISON COURT COUNTY(S) COOK ARLINGTON HEIGHTS, IL 60005 SECTION 15-00113-00-RS PROJECT(S) M-4003/558/000 ROUTE FAU 1419 DISTRICT 01 AWARDED DATE 02/02/2016 AWARDED AMOUNT $749,336.70 7 UNSUCCESSFUL BIDDERS

ITEM NO. 059 KENNY CONSTRUCTION COMPANY CONTRACT NO. 61C15 2215 SANDERS ROAD,SUITE 400 COUNTY(S) COOK NORTHBROOK, IL 60062 SECTION 08-00178-01-BR PROJECT(S) M-4003/598/000 ROUTE CHATHAM STREET DISTRICT 01 AWARDED DATE 02/10/2016 AWARDED AMOUNT $4,120,000.00 4 UNSUCCESSFUL BIDDERS

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 ITEM NO. 060 PANAMERICAN CONSTRUCTION CONTRACT NO. 62A70 1517 S. KOLMAR AVE. COUNTY(S) COOK CHICAGO, IL 60623 SECTION 2015-015I PROJECT(S) ROUTE VARIOUS DISTRICT 01 AWARDED DATE 02/02/2016 AWARDED AMOUNT $171,480.84 9 UNSUCCESSFUL BIDDERS

ITEM NO. 061 BIGANE PAVING COMPANY CONTRACT NO. 62B05 935 W. CHESTNUT STREET, STE. 100 COUNTY(S) COOK CHICAGO, IL 60642 SECTION 2015-045RS PROJECT(S) ROUTE FAP 347 DISTRICT 01 AWARDED DATE 02/18/2016 AWARDED AMOUNT $1,247,447.70 4 UNSUCCESSFUL BIDDERS

ITEM NO. 062 LORIG CONSTRUCTION COMPANY & CONTRACT NO. 62B39 MIDWEST FENCE CORPORATION COUNTY(S) COOK 250 EAST TOUHY AVENUE SECTION 1515.3BR-1 DES PLAINES, IL 60018 PROJECT(S) ROUTE FAP 348 DISTRICT 01 AWARDED DATE 02/02/2016 AWARDED AMOUNT $480,486.60 0 UNSUCCESSFUL BIDDERS

ITEM NO. 063 MYS, INCORPORATED CONTRACT NO. 62B80 7801 W. DEERWOOD DRIVE COUNTY(S) LAKE PALOS PARK, IL 60464-2153 SECTION 2015-081-B PROJECT(S) ROUTE FAP 535 DISTRICT 01 AWARDED DATE 02/02/2016 AWARDED AMOUNT $106,955.00 5 UNSUCCESSFUL BIDDERS

ITEM NO. 064 VALLEY CONSTRUCTION CO. CONTRACT NO. 64K37 3610 78TH AVENUE, WEST COUNTY(S) HENRY ROCK ISLAND, IL 61201 SECTION D2 MRS 2016-6 P.O. BOX 2020 PROJECT(S) ROCK ISLAND, IL 61204-2020 ROUTE FAP 634 DISTRICT 02 AWARDED DATE 02/02/2016 AWARDED AMOUNT $368,888.00 3 UNSUCCESSFUL BIDDERS

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 ITEM NO. 065 NORTHERN CONTRACTING, INC. CONTRACT NO. 64K94 1851 COLTONVILLE RD. COUNTY(S) VARIOUS SYCAMORE, IL 60178 SECTION D2 MCHD (NORTH) 2016 PROJECT(S) ROUTE VARIOUS DISTRICT 02 AWARDED DATE 02/02/2016 AWARDED AMOUNT $280,280.50 0 UNSUCCESSFUL BIDDERS

ITEM NO. 066 WILLIAM CHARLES CONSTRUCTION COMPANY, LLC CONTRACT NO. 64K97 5290 NIMTZ ROAD COUNTY(S) WINNEBAGO LOVES PARK, IL 61111 SECTION D2 MRS 2016-1 P.O. BOX 2071 PROJECT(S) LOVES PARK, IL 61130 ROUTE FAU 5034 DISTRICT 02 AWARDED DATE 02/02/2016 AWARDED AMOUNT $246,342.96 1 UNSUCCESSFUL BIDDER

ITEM NO. 067 NORTHERN CONTRACTING, INC. CONTRACT NO. 64K95 1851 COLTONVILLE RD. COUNTY(S) VARIOUS SYCAMORE, IL 60178 SECTION D2 MCHD (SOUTH) 2016 PROJECT(S) ROUTE VARIOUS DISTRICT 02 AWARDED DATE 02/02/2016 AWARDED AMOUNT $338,812.50 0 UNSUCCESSFUL BIDDERS

ITEM NO. 068 CIVIL CONSTRUCTORS, INC. CONTRACT NO. 64K98 2283 BUSINESS HIGHWAY 20 EAST COUNTY(S) LEE FREEPORT, IL 61032 SECTION D2 MRS 2016-2 P.O. BOX 750 PROJECT(S) FREEPORT, IL 61032-0750 ROUTE FAU 5492 & FAS 2177 DISTRICT 02 AWARDED DATE 02/02/2016 AWARDED AMOUNT $248,489.37 1 UNSUCCESSFUL BIDDER

ITEM NO. 069 MARTIN & COMPANY EXCAVATING CONTRACT NO. 64K99 2456 EAST PLEASANT GROVE ROAD COUNTY(S) LEE P.O. BOX 443 SECTION D2 MRS 2016-3 OREGON, IL 61061 PROJECT(S) ROUTE TR 73 & TR 160 DISTRICT 02 AWARDED DATE 02/02/2016 AWARDED AMOUNT $96,668.40 1 UNSUCCESSFUL BIDDER

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 ITEM NO. 070 DUNN COMPANY CONTRACT NO. 64L00 (TYROLT INCORPORATED) COUNTY(S) JODAVIESS 724 NORTH MERCER STREET SECTION D2 MRS 2016-4 DECATUR, IL 62522-1699 PROJECT(S) ROUTE FAS 74 DISTRICT 02 AWARDED DATE 02/18/2016 AWARDED AMOUNT $476,412.09 0 UNSUCCESSFUL BIDDERS

ITEM NO. 071 TOBEY'S CONSTRUCTION & CARTAGE, INC. CONTRACT NO. 66994 104 PARK ROAD COUNTY(S) FORD P.O. BOX 588 SECTION (115)BR,BR-1C,BR-4 HERSCHER, IL 60941-0588 PROJECT(S) ACF-0071/068/000 ROUTE FAP 71 DISTRICT 03 AWARDED DATE 02/02/2016 AWARDED AMOUNT $2,274,079.56 2 UNSUCCESSFUL BIDDERS

ITEM NO. 072 CIVIL CONSTRUCTORS, INC. CONTRACT NO. 66A90 2283 BUSINESS HIGHWAY 20 EAST COUNTY(S) DEKALB FREEPORT, IL 61032 SECTION (116R-2BR)BR P.O. BOX 750 PROJECT(S) ACF-0573/312/000 FREEPORT, IL 61032-0750 ROUTE FAP 573 DISTRICT 03 AWARDED DATE 02/22/2016 AWARDED AMOUNT $1,270,480.32 4 UNSUCCESSFUL BIDDERS

ITEM NO. 073 STARK EXCAVATING, INC. CONTRACT NO. 66C03 1805 WEST WASHINGTON ST. COUNTY(S) FORD BLOOMINGTON, IL 61701 SECTION (107)CR-6 PROJECT(S) ACF-0798/007/000 ROUTE FAP 798 DISTRICT 03 AWARDED DATE 02/22/2016 AWARDED AMOUNT $419,628.00 4 UNSUCCESSFUL BIDDERS

ITEM NO. 074 H. J. EPPEL & CO. CONTRACT NO. 66C19 1400 TUESBURG COURT COUNTY(S) LIVINGSTON PONTIAC, IL 61764-1260 SECTION (113)CR PROJECT(S) ACF-0681/046/000 ROUTE FAP 681 DISTRICT 03 AWARDED DATE 02/10/2016 AWARDED AMOUNT $252,981.48 1 UNSUCCESSFUL BIDDER

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 ITEM NO. 075 THREE STAR PAINTING, INC. CONTRACT NO. 66E87 2880 E. 84TH PLACE COUNTY(S) LASALLE MERRILLVILLE, IN 46410 SECTION (50-3HB-3)BP PROJECT(S) ROUTE FAI 80 DISTRICT 03 AWARDED DATE 02/02/2016 AWARDED AMOUNT $278,256.00 3 UNSUCCESSFUL BIDDERS

ITEM NO. 076 THREE STAR PAINTING, INC. CONTRACT NO. 66E88 2880 E. 84TH PLACE COUNTY(S) LASALLE MERRILLVILLE, IN 46410 SECTION (50-2HB-3)BP PROJECT(S) ROUTE FAI 80 DISTRICT 03 AWARDED DATE 02/02/2016 AWARDED AMOUNT $280,000.00 3 UNSUCCESSFUL BIDDERS

ITEM NO. 079 OTTO BAUM COMPANY, INC. CONTRACT NO. 68B39 866 N. MAIN STREET COUNTY(S) PEORIA MORTON, IL 61550 SECTION [R]TS-1 PROJECT(S) ACM-6675/001/000 ROUTE FAU 6675 DISTRICT 04 AWARDED DATE 02/02/2016 AWARDED AMOUNT $1,716,824.92 2 UNSUCCESSFUL BIDDERS

ITEM NO. 080 G. M. SIPES CONSTRUCTION, INC. CONTRACT NO. 74731 503 EAST ADAMS STREET COUNTY(S) CLAY LAWRENCE RICHLAND RUSHVILLE, IL 62681 SECTION D7 PATCHING 2016-3 P.O. BOX 109 PROJECT(S) RUSHVILLE, IL 62681 ROUTE FAP 327 DISTRICT 07 AWARDED DATE 02/02/2016 AWARDED AMOUNT $469,631.81 5 UNSUCCESSFUL BIDDERS

ITEM NO. 081 KINNEY CONTRACTORS, INC. CONTRACT NO. 74735 19342 E. FRONTAGE RD. COUNTY(S) FAYETTE EFFINGHAM RAYMOND, IL 62560-5061 SECTION D7 PATCHING 2016-2 PROJECT(S) ROUTE FAI 70 DISTRICT 07 AWARDED DATE 02/02/2016 AWARDED AMOUNT $305,298.00 3 UNSUCCESSFUL BIDDERS

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 ITEM NO. 082 KEELEY & SONS, INC. CONTRACT NO. 76H98 6303 COLLINSVILLE ROAD COUNTY(S) ST CLAIR EAST ST. LOUIS, IL 62201 SECTION 54,55RS-3 P.O. BOX 837 PROJECT(S) EAST ST. LOUIS, IL 62203 ROUTE FAU 9237 DISTRICT 08 AWARDED DATE 02/17/2016 AWARDED AMOUNT $459,201.37 2 UNSUCCESSFUL BIDDERS

ITEM NO. 083 THE KILIAN CORPORATION CONTRACT NO. 76J05 608 SOUTH INDEPENDENCE STREET COUNTY(S) MADISON MASCOUTAH, IL 62258-0187 SECTION (M-LN)RS-5 PROJECT(S) ROUTE FAS 775 DISTRICT 08 AWARDED DATE 02/02/2016 AWARDED AMOUNT $194,164.04 2 UNSUCCESSFUL BIDDERS

ITEM NO. 084 HECKER AND COMPANY, INC. CONTRACT NO. 62B35 250 E. INDUSTRIAL LANE COUNTY(S) WILL WHEELING, IL 60090 SECTION D1HSRR2016-04 PROJECT(S) HSR-2320/002/000 ROUTE FAS 2320 DISTRICT 01 AWARDED DATE 02/08/2016 AWARDED AMOUNT $211,167.30 1 UNSUCCESSFUL BIDDER

ITEM NO. 085 NORTH AMERICAN COATINGS, LLC CONTRACT NO. 62B38 8450 W. 191ST STREET - UNIT #19 COUNTY(S) WILL MOKENA, IL 60448 SECTION (G-R)BP PROJECT(S) ROUTE FAU 607 DISTRICT 01 AWARDED DATE 02/02/2016 AWARDED AMOUNT $1,336,633.00 2 UNSUCCESSFUL BIDDERS

ITEM NO. 086 LORIG CONSTRUCTION COMPANY CONTRACT NO. 62B49 250 EAST TOUHY AVE. COUNTY(S) COOK DES PLAINES, IL 60018 SECTION 2015-067BR PROJECT(S) ROUTE VARIOUS DISTRICT 01 AWARDED DATE 02/02/2016 AWARDED AMOUNT $979,206.20 2 UNSUCCESSFUL BIDDERS

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 ITEM NO. 087 ACURA INC. CONTRACT NO. 62B67 556 COUNTY LINE ROAD COUNTY(S) COOK BENSENVILLE, IL 60106 SECTION (3030.1&.4)BR PROJECT(S) ROUTE FAP 383 DISTRICT 01 AWARDED DATE 02/02/2016 AWARDED AMOUNT $979,823.40 7 UNSUCCESSFUL BIDDERS

ITEM NO. 088 MCGINTY BROS., INC. CONTRACT NO. 62B71 3744 CUBA ROAD COUNTY(S) VARIOUS LONG GROVE, IL 60047-7958 SECTION 2015-076I PROJECT(S) ROUTE VARIOUS DISTRICT 01 AWARDED DATE 02/02/2016 AWARDED AMOUNT $259,025.00 2 UNSUCCESSFUL BIDDERS

ITEM NO. 089 EAGLE PAINTING & MAINTENANCE COMPANY, INC. CONTRACT NO. 64K83 1865 BERNICE ROAD COUNTY(S) WHITESIDE LANSING, IL 60438 SECTION (B&B-1)P PROJECT(S) ROUTE FAU 5571 DISTRICT 02 AWARDED DATE 02/02/2016 AWARDED AMOUNT $279,382.00 5 UNSUCCESSFUL BIDDERS

ITEM NO. 090 VENUS PAINTING CO. CONTRACT NO. 64K84 443 FORESTWOOD DRIVE COUNTY(S) HENRY VALPARAISO, IN 46385 SECTION (37-1HBR)P PROJECT(S) ROUTE FAI 74/280 DISTRICT 02 AWARDED DATE 02/02/2016 AWARDED AMOUNT $716,518.35 5 UNSUCCESSFUL BIDDERS

ITEM NO. 091 DUNN COMPANY CONTRACT NO. 64L01 (TYROLT INCORPORATED) COUNTY(S) ROCK ISLAND 724 NORTH MERCER STREET SECTION D2 MRS 2016-5 DECATUR, IL 62522-1699 PROJECT(S) ROUTE FAU 5845 & FAS 206 DISTRICT 02 AWARDED DATE 02/02/2016 AWARDED AMOUNT $461,797.95 0 UNSUCCESSFUL BIDDERS

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 ITEM NO. 092 MARTIN & COMPANY EXCAVATING CONTRACT NO. 64L07 2456 EAST PLEASANT GROVE ROAD COUNTY(S) WINNEBAGO P.O. BOX 443 SECTION D2 DECK REPAIR 2016-3 OREGON, IL 61061 PROJECT(S) ROUTE FAI 39 DISTRICT 02 AWARDED DATE 02/02/2016 AWARDED AMOUNT $390,739.38 4 UNSUCCESSFUL BIDDERS

ITEM NO. 093 PETROFF TRUCKING COMPANY, INC. CONTRACT NO. 97601 3469 RT. 111 COUNTY(S) ST. CLAIR PONTOON BEACH, IL 62040 SECTION 12-00059-04-PV P.O. BOX 838 PROJECT(S) CMM-5011/378/000 COLLINSVILLE, IL 62234 ROUTE FAU 9170 DISTRICT 08 AWARDED DATE 02/18/2016 AWARDED AMOUNT $672,473.23 8 UNSUCCESSFUL BIDDERS

ITEM NO. 094 KANKAKEE VALLEY CONSTRUCTION CONTRACT NO. 87623 COMPANY, INC. COUNTY(S) KANKAKEE 4356 W. ROUTE 17 SECTION 10-00276-01-BT KANKAKEE, IL 60901 PROJECT(S) TE-00D3/090/000 P.O. BOX 767 ROUTE RIVERFRONT TRAIL KANKAKEE, IL 60901 DISTRICT 03 AWARDED DATE 02/10/2016 AWARDED AMOUNT $2,140,513.92 2 UNSUCCESSFUL BIDDERS

ITEM NO. 096 T.M.F. CONSTRUCTION COMPANY CONTRACT NO. 46387 803 PRINCETON AVENUE COUNTY(S) MCLEAN SPRINGFIELD, IL 62703 SECTION D-5 OVD SIN STR REPL 16-29 P.O. BOX 3555 PROJECT(S) SPRINGFIELD, IL 62708-3555 ROUTE FAI 55 DISTRICT 05 AWARDED DATE 02/02/2016 AWARDED AMOUNT $141,537.00 2 UNSUCCESSFUL BIDDERS

ITEM NO. 097 MARKING SPECIALISTS CORPORATION CONTRACT NO. 46389 1622 S. PRINCETON COUNTY(S) VARIOUS ARLINGTON HEIGHTS, IL 60005 SECTION D 1 GRVD INT PVMNT MRK 16-31 P.O. BOX 745 PROJECT(S) ARLINGTON HEIGHTS, IL 60006 ROUTE VARIOUS DISTRICT 01 AWARDED DATE 02/02/2016 AWARDED AMOUNT $659,329.50 1 UNSUCCESSFUL BIDDER

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 ITEM NO. 098 MAINTENANCE COATINGS CO. CONTRACT NO. 46390 543 WOODBURY STREET COUNTY(S) VARIOUS SOUTH ELGIN, IL 60177 SECTION D-1 REFLECTOR REPL 16-32(INT) PROJECT(S) ROUTE VARIOUS DISTRICT 01 AWARDED DATE 02/02/2016 AWARDED AMOUNT $804,205.00 0 UNSUCCESSFUL BIDDERS

ITEM NO. 099 SUPERIOR ROAD STRIPING, INC. CONTRACT NO. 46391 1980 HAWTHORNE AVENUE COUNTY(S) VARIOUS MELROSE PARK, IL 60160 SECTION D 1 H-T PVMNT MRK RPR 16-33 PROJECT(S) ROUTE VARIOUS DISTRICT 01 AWARDED DATE 02/02/2016 AWARDED AMOUNT $665,177.50 2 UNSUCCESSFUL BIDDERS

ITEM NO. 100 MARKING SPECIALISTS CORPORATION CONTRACT NO. 46393 1622 S. PRINCETON COUNTY(S) VARIOUS ARLINGTON HEIGHTS, IL 60005 SECTION D 3 REFLECTOR REPL 16-35 P.O. BOX 745 PROJECT(S) ARLINGTON HEIGHTS, IL 60006 ROUTE VARIOUS DISTRICT 03 AWARDED DATE 02/02/2016 AWARDED AMOUNT $248,567.50 3 UNSUCCESSFUL BIDDERS

ITEM NO. 101 P & P CONSTRUCTION CO. CONTRACT NO. 46394 1132 EAST LINCOLN COUNTY(S) VARIOUS RIVERTON, IL 62561-9532 SECTION D 3 REFLECTOR REPL 16-36 PROJECT(S) ROUTE VARIOUS DISTRICT 03 AWARDED DATE 02/02/2016 AWARDED AMOUNT $247,913.98 3 UNSUCCESSFUL BIDDERS

ITEM NO. 102 ROADSAFE TRAFFIC SYSTEMS, INC. CONTRACT NO. 46395 12225 DISK DR. COUNTY(S) VARIOUS ROMEOVILLE, IL 60446 SECTION D 3 REFLECTOR REPL 16-37 PROJECT(S) ROUTE VARIOUS DISTRICT 03 AWARDED DATE 02/02/2016 AWARDED AMOUNT $380,000.00 2 UNSUCCESSFUL BIDDERS

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 ITEM NO. 103 ROADSAFE TRAFFIC SYSTEMS, INC. CONTRACT NO. 46396 12225 DISK DR. COUNTY(S) VARIOUS ROMEOVILLE, IL 60446 SECTION D 3 H-T PVMNT MRK RPR 16-38 PROJECT(S) ROUTE VARIOUS DISTRICT 03 AWARDED DATE 02/02/2016 AWARDED AMOUNT $1,399,300.00 1 UNSUCCESSFUL BIDDER

ITEM NO. 104 NETTLE CREEK NURSERY, INC. CONTRACT NO. 60Y67 320 OTTAWA STREET COUNTY(S) COOK MORRIS, IL 60450 SECTION 2014-051LS PROJECT(S) ROUTE FAI 90/94/290 DISTRICT 01 AWARDED DATE 02/02/2016 AWARDED AMOUNT $337,750.00 1 UNSUCCESSFUL BIDDER

ITEM NO. 105 A LAMP CONCRETE CONTRACTORS, INC. CONTRACT NO. 61B33 1900 WRIGHT BOULEVARD COUNTY(S) DUPAGE SCHAUMBURG, IL 60193 SECTION 13-00300-00-PK PROJECT(S) CMM-4003/287/000 ROUTE STATION BOULEVARD DISTRICT 01 AWARDED DATE 02/02/2016 AWARDED AMOUNT $5,560,853.64 4 UNSUCCESSFUL BIDDERS

ITEM NO. 106 ROADSAFE TRAFFIC SYSTEMS, INC. CONTRACT NO. 61B71 12225 DISK DR. COUNTY(S) COOK ROMEOVILLE, IL 60446 SECTION 15-00163-00-BT PROJECT(S) TE-00D1/998/000 ROUTE VARIOUS DISTRICT 01 AWARDED DATE 02/02/2016 AWARDED AMOUNT $62,987.50 1 UNSUCCESSFUL BIDDER

ITEM NO. 107 H & H ELECTRIC CO. CONTRACT NO. 61C00 2830 COMMERCE STREET COUNTY(S) COOK FRANKLIN PARK, IL 60131-2927 SECTION 14-00034-00-TL PROJECT(S) M-4003/474/000 ROUTE VARIOUS DISTRICT 01 AWARDED DATE 02/10/2016 AWARDED AMOUNT $180,830.20 4 UNSUCCESSFUL BIDDERS

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 ITEM NO. 109 D. CONSTRUCTION, INC. CONTRACT NO. 61C06 1488 S. BROADWAY COUNTY(S) DUPAGE COAL CITY, IL 60416 SECTION 10-00292-00-WR PROJECT(S) M-CMM-4003/296/000 ROUTE FAU 2531 DISTRICT 01 AWARDED DATE 02/10/2016 AWARDED AMOUNT $10,299,929.88 5 UNSUCCESSFUL BIDDERS

ITEM NO. 110 K-FIVE CONSTRUCTION CORPORATION CONTRACT NO. 61C08 13769 MAIN STREET COUNTY(S) DUPAGE LEMONT, IL 60439-9733 SECTION 14-00275-05-RS PROJECT(S) M-4003/337/000 ROUTE FAU 1551 DISTRICT 01 AWARDED DATE 02/09/2016 AWARDED AMOUNT $2,222,222.22 6 UNSUCCESSFUL BIDDERS

ITEM NO. 111 J. NARDULLI CONCRETE, INC. CONTRACT NO. 61C14 3517 SOUTH 60TH CT. COUNTY(S) COOK CICERO, IL 60804 SECTION 15-00128-00-RS PROJECT(S) M-4003/500/000 ROUTE FAU 1365 DISTRICT 01 AWARDED DATE 02/02/2016 AWARDED AMOUNT $1,173,765.50 14 UNSUCCESSFUL BIDDERS

ITEM NO. 112 CIVIL CONSTRUCTORS, INC. CONTRACT NO. 64F84 2283 BUSINESS HIGHWAY 20 EAST COUNTY(S) HENRY FREEPORT, IL 61032 SECTION 101VBR P.O. BOX 750 PROJECT(S) ACRS-0223/002/000 FREEPORT, IL 61032-0750 ROUTE FAS 223 DISTRICT 02 AWARDED DATE 02/10/2016 AWARDED AMOUNT $3,891,111.92 3 UNSUCCESSFUL BIDDERS

ITEM NO. 113 LAVERDIERE CONSTRUCTION, INC. CONTRACT NO. 72H65 4055 W. JACKSON ST. COUNTY(S) ADAMS MACOMB, IL 61455-7723 SECTION (1ZB)I-7 PROJECT(S) ACNHPP-0063/063/000 ROUTE FAP 63 DISTRICT 06 AWARDED DATE 02/04/2016 AWARDED AMOUNT $2,230,340.00 3 UNSUCCESSFUL BIDDERS

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 ITEM NO. 114 CIVIL COATINGS AND CONSTRUCTION INC. CONTRACT NO. 72H88 1651 WEST LINCOLNWAY COUNTY(S) SANGAMON SCOTT VALPARAISO, IN 46385 SECTION D6 BDGE PAINTING 2016-1 PROJECT(S) ROUTE VARIOUS DISTRICT 06 AWARDED DATE 02/02/2016 AWARDED AMOUNT $481,346.00 3 UNSUCCESSFUL BIDDERS

ITEM NO. 116 WILLIAM CHARLES CONSTRUCTION COMPANY, LLC CONTRACT NO. 85618 5290 NIMTZ ROAD COUNTY(S) WINNEBAGO LOVES PARK, IL 61111 SECTION 14-P4000-00-SW P.O. BOX 2071 PROJECT(S) TE-00D2/157/000 LOVES PARK, IL 61130 ROUTE SHARED-USE PATH DISTRICT 02 AWARDED DATE 02/10/2016 AWARDED AMOUNT $97,999.96 5 UNSUCCESSFUL BIDDERS

ITEM NO. 117 MARTIN & COMPANY EXCAVATING CONTRACT NO. 85627 2456 EAST PLEASANT GROVE ROAD COUNTY(S) WINNEBAGO P.O. BOX 443 SECTION 12-00529-00-BR OREGON, IL 61061 PROJECT(S) BRM-5099/113/000 ROUTE FAU 5200 DISTRICT 02 AWARDED DATE 02/02/2016 AWARDED AMOUNT $736,535.70 4 UNSUCCESSFUL BIDDERS

ITEM NO. 118 STARK EXCAVATING, INC. CONTRACT NO. 87584 1805 WEST WASHINGTON ST. COUNTY(S) BUREAU BLOOMINGTON, IL 61701 SECTION 14-00244-00-BR PROJECT(S) BRS-0244/106/000 ROUTE FAS 244 DISTRICT 03 AWARDED DATE 02/02/2016 AWARDED AMOUNT $1,326,628.00 5 UNSUCCESSFUL BIDDERS

ITEM NO. 119 STARK EXCAVATING, INC. CONTRACT NO. 90951 1805 WEST WASHINGTON ST. COUNTY(S) CHAMPAIGN BLOOMINGTON, IL 61701 SECTION 10-33HVBR PROJECT(S) ACNHPP-0057/317/000 ROUTE FAI 57 DISTRICT 05 AWARDED DATE 02/22/2016 AWARDED AMOUNT $2,274,286.24 4 UNSUCCESSFUL BIDDERS

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 ITEM NO. 120 CROSS CONSTRUCTION, INC. CONTRACT NO. 91520 3615 N. COUNTRYVIEW RD. COUNTY(S) CHAMPAIGN URBANA, IL 61802 SECTION 08-F3000-02-BT PROJECT(S) TE-00D5/115/000 ROUTE KICKAPOO TRAIL DISTRICT 05 AWARDED DATE 02/24/2016 AWARDED AMOUNT $2,742,189.37 4 UNSUCCESSFUL BIDDERS

ITEM NO. 121 A. J. WALKER CONSTRUCTION COMPANY CONTRACT NO. 95764 421 S. 21ST STREET COUNTY(S) CRAWFORD MATTOON, IL 61938 SECTION 11-00074-00-PV P.O. BOX 118 PROJECT(S) M-5060/009/000 MATTOON, IL 61938-0118 ROUTE FAU 8311 & FAU 8326 DISTRICT 07 AWARDED DATE 02/17/2016 AWARDED AMOUNT $2,012,973.08 4 UNSUCCESSFUL BIDDERS

ITEM NO. 122 A. J. WALKER CONSTRUCTION COMPANY CONTRACT NO. 95772 421 S. 21ST STREET COUNTY(S) JASPER MATTOON, IL 61938 SECTION 13-00047-00-SW P.O. BOX 118 PROJECT(S) TE-00D7/060/000 MATTOON, IL 61938-0118 ROUTE VARIOUS DISTRICT 07 AWARDED DATE 02/02/2016 AWARDED AMOUNT $1,042,300.00 2 UNSUCCESSFUL BIDDERS

ITEM NO. 123 DEPEW AND OWEN BUILDERS, INC. CONTRACT NO. 95775 511 SOUTH OAK STREET COUNTY(S) FAYETTE P.O. BOX 1252 SECTION 14-12124-00-BR CENTRALIA, IL 62801 PROJECT(S) BROS-0051/099/000 ROUTE TR 19 DISTRICT 07 AWARDED DATE 02/10/2016 AWARDED AMOUNT $188,168.00 4 UNSUCCESSFUL BIDDERS

ITEM NO. 124 PETROFF TRUCKING COMPANY, INC. CONTRACT NO. 97440 3469 RT. 111 COUNTY(S) MADISON PONTOON BEACH, IL 62040 SECTION 06-00088-00-TL P.O. BOX 838 PROJECT(S) CMM-5011/235/000 COLLINSVILLE, IL 62234 ROUTE FAU 9122 & FAU 9135 DISTRICT 08 AWARDED DATE 02/23/2016 AWARDED AMOUNT $1,067,812.47 5 UNSUCCESSFUL BIDDERS

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 ITEM NO. 125 ROOTER'S AMERICAN MAINTENANCE, INC. CONTRACT NO. 97605 350 CARTER STREET COUNTY(S) MADISON BECKEMEYER, IL 62219 SECTION 12-00102-00-RS 350 CARTER STREET PROJECT(S) M-5011/385/000 P.O. BOX 175 ROUTE FAU 8891 BECKEMEYER, IL 62219 DISTRICT 08 AWARDED DATE 02/16/2016 AWARDED AMOUNT $357,890.05 4 UNSUCCESSFUL BIDDERS

ITEM NO. 126 PERRY COUNTY CONSTRUCTION COMPANY CONTRACT NO. 99562 3170 HERRIN ROAD COUNTY(S) WILLIAMSON CARTERVILLE, IL 62918 SECTION 14-00117-00-SW P.O. BOX 396 PROJECT(S) SRTS-4009/319/000 HERRIN, IL 62948 ROUTE VARIOUS DISTRICT 09 AWARDED DATE 02/02/2016 AWARDED AMOUNT $134,746.00 3 UNSUCCESSFUL BIDDERS

ITEM NO. 127 CHICAGOLAND PAVING CONTRACTORS, INC. CONTRACT NO. 61A19 225 TELSER ROAD COUNTY(S) COOK LAKE ZURICH, IL 60047 SECTION 09-00052-00-BT PROJECT(S) CMM-9003/543/000 ROUTE PEDESTRIAN PATH DISTRICT 01 AWARDED DATE 03/03/2016 AWARDED AMOUNT $1,039,907.80 9 UNSUCCESSFUL BIDDERS

ITEM NO. 128 HECKER AND COMPANY, INC. CONTRACT NO. 61A67 250 E. INDUSTRIAL LANE COUNTY(S) DUPAGE WHEELING, IL 60090 SECTION 13-00078-00-TL PROJECT(S) CMM-4003/295/000 ROUTE VARIOUS DISTRICT 01 AWARDED DATE 02/02/2016 AWARDED AMOUNT $197,971.10 4 UNSUCCESSFUL BIDDERS

ITEM NO. 129 D. CONSTRUCTION, INC. CONTRACT NO. 61A88 1488 S. BROADWAY COUNTY(S) KANE COAL CITY, IL 60416 SECTION 07-00068-00-BR PROJECT(S) BRM-9003/276/000 ROUTE FAU 2327 DISTRICT 01 AWARDED DATE 02/10/2016 AWARDED AMOUNT $1,548,296.44 9 UNSUCCESSFUL BIDDERS

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 ITEM NO. 130 MYS, INCORPORATED CONTRACT NO. 61B76 7801 W. DEERWOOD DRIVE COUNTY(S) COOK PALOS PARK, IL 60464-2153 SECTION 07-00165-00-TL PROJECT(S) HSIP-8003/848/000 ROUTE FAU 2937 DISTRICT 01 AWARDED DATE 02/10/2016 AWARDED AMOUNT $889,921.60 3 UNSUCCESSFUL BIDDERS

ITEM NO. 131 HOME TOWNE ELECTRIC, INC. CONTRACT NO. 61C18 35220 RT. 83 COUNTY(S) LAKE LAKE VILLA, IL 60046 SECTION 11-00092-01-TL P.O. BOX 863 PROJECT(S) M-4003/611/000 LAKE VILLA, IL 60046 ROUTE FAU 1257 DISTRICT 01 AWARDED DATE 02/16/2016 AWARDED AMOUNT $239,878.80 4 UNSUCCESSFUL BIDDERS

ITEM NO. 132 CIVIL CONSTRUCTORS, INC. CONTRACT NO. 85599 2283 BUSINESS HIGHWAY 20 EAST COUNTY(S) WINNEBAGO FREEPORT, IL 61032 SECTION 04-00359-00-BR P.O. BOX 750 PROJECT(S) BRM-5099/072/000 FREEPORT, IL 61032-0750 ROUTE FAU 5148 DISTRICT 02 AWARDED DATE 02/10/2016 AWARDED AMOUNT $2,174,937.62 3 UNSUCCESSFUL BIDDERS

ITEM NO. 133 STARK EXCAVATING, INC. CONTRACT NO. 91522 1805 WEST WASHINGTON ST. COUNTY(S) MCLEAN BLOOMINGTON, IL 61701 SECTION 14-00252-00-RP PROJECT(S) M-5227/057/000 ROUTE FAU 6435 DISTRICT 05 AWARDED DATE 02/10/2016 AWARDED AMOUNT $1,529,836.00 2 UNSUCCESSFUL BIDDERS

ITEM NO. 134 NEWELL CONSTRUCTION CO., INC. CONTRACT NO. 91527 647 NEWELL LANE COUNTY(S) VERMILION DANVILLE, IL 61832 SECTION 13-00202-00-BR P.O. BOX 1097 PROJECT(S) BRS-0331/120/000 DANVILLE, IL 61834-1097 ROUTE FAS 331 DISTRICT 05 AWARDED DATE 02/10/2016 AWARDED AMOUNT $597,882.81 4 UNSUCCESSFUL BIDDERS

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 ITEM NO. 135 NE-CO ASPHALT CO., INC. CONTRACT NO. 95766 812 ADKINS DRIVE COUNTY(S) MOULTRIE CHARLESTON, IL 61920 SECTION 05-00064-00-RS P.O. BOX 25 PROJECT(S) FLAP-1663/102/000 CHARLESTON, IL 61920-0025 ROUTE FAS 1663 DISTRICT 07 AWARDED DATE 02/18/2016 AWARDED AMOUNT $1,815,139.07 2 UNSUCCESSFUL BIDDERS

ITEM NO. 136 ROOTER'S AMERICAN MAINTENANCE, INC. CONTRACT NO. 97571 350 CARTER STREET COUNTY(S) ST. CLAIR BECKEMEYER, IL 62219 SECTION 06-00058-00-PV 350 CARTER STREET PROJECT(S) CMM-5011/266/000 P.O. BOX 175 ROUTE FAU 9166 BECKEMEYER, IL 62219 DISTRICT 08 AWARDED DATE 02/18/2016 AWARDED AMOUNT $689,349.63 6 UNSUCCESSFUL BIDDERS

ITEM NO. 137 STUTZ EXCAVATING, INC. CONTRACT NO. 97610 3837 FOSTERBURG ROAD COUNTY(S) MADISON ALTON, IL 62002 SECTION 11-00017-00-BT PROJECT(S) SRTS-4009/100/000 ROUTE MCT NATURE TRAIL DISTRICT 08 AWARDED DATE 02/10/2016 AWARDED AMOUNT $254,208.66 4 UNSUCCESSFUL BIDDERS

ITEM NO. 138 DEES, INC. CONTRACT NO. 99561 2045 WINERY ROAD COUNTY(S) WHITE WEST FRANKFORT, IL 62896 SECTION 11-07122-00-BR PROJECT(S) BROS-0193/067/000 ROUTE TR 349 DISTRICT 09 AWARDED DATE 02/02/2016 AWARDED AMOUNT $190,389.00 4 UNSUCCESSFUL BIDDERS

ITEM NO. 139 THE DALTONS INC. CONTRACT NO. 72I15 936 LITTLE EAGLE DRIVE COUNTY(S) SANGAMON WARSAW, IN 46580 SECTION D6 WEED SPRAYING 2016 P.O. BOX 1274 PROJECT(S) WARSAW, IN 46581-1274 ROUTE FAI 55 DISTRICT 06 AWARDED DATE 02/08/2016 AWARDED AMOUNT $68,641.50 2 UNSUCCESSFUL BIDDERS

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 ITEM NO. 140 THE DALTONS INC. CONTRACT NO. 72I16 936 LITTLE EAGLE DRIVE COUNTY(S) SANGAMON WARSAW, IN 46580 SECTION D6 WEED SPRAYING 2016-1 P.O. BOX 1274 PROJECT(S) WARSAW, IN 46581-1274 ROUTE FAI 72 DISTRICT 06 AWARDED DATE 02/08/2016 AWARDED AMOUNT $85,478.10 2 UNSUCCESSFUL BIDDERS

ITEM NO. 141 ILLINI EXCAVATION & RECLAMATION, INC. CONTRACT NO. 76H52 800 NORTH DELMAR COUNTY(S) VARIOUS HARTFORD, IL 62048-1034 SECTION DIST 8 GUARDRAIL 2016-1 P.O. BOX 87159 PROJECT(S) SOUTH ROXANA, IL 62087 ROUTE VARIOUS DISTRICT 08 AWARDED DATE 02/02/2016 AWARDED AMOUNT $1,894,890.00 0 UNSUCCESSFUL BIDDERS

------CONTRACTS REJECTED ------THE FOLLOWING REJECTIONS HAVE BEEN MADE SINCE THE PREVIOUS TRANSPORTATION BULLETIN

DESCRIPTION CONTRACTOR ------ITEM NO. 003 LORIG CONSTRUCTION COMPANY CONTRACT NO. 61C17 250 EAST TOUHY AVE. COUNTY(S) KANE DES PLAINES, IL 60018 SECTION 13-00043-00-BR PROJECT(S) TE-00D1/927/000 ROUTE FAU 1343 DISTRICT 01 REJECTED AMOUNT $2,122,132.75

ITEM NO. 010 ALL STATES PAINTING, INC. CONTRACT NO. 68C81 507 EAST OLD ROUTE 36 COUNTY(S) TAZEWELL MARSHALL MASON ALEXANDER, IL 62601 SECTION D4 BRIDGE WASHING 2016 P.O. BOX 110 PROJECT(S) ALEXANDER, IL 62601 ROUTE VARIOUS DISTRICT 04 REJECTED AMOUNT $494,499.00

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016 ITEM NO. 108 J. A. JOHNSON PAVING COMPANY CONTRACT NO. 61C04 1025 EAST ADDISON COURT COUNTY(S) DUPAGE ARLINGTON HEIGHTS, IL 60005 SECTION 15-07126-00-RS PROJECT(S) M-4003/544/000 ROUTE FAU 1369 DISTRICT 01 REJECTED AMOUNT $336,890.00

ITEM NO. 115 ALL STATES PAINTING, INC. CONTRACT NO. 72I06 507 EAST OLD ROUTE 36 COUNTY(S) PIKE ALEXANDER, IL 62601 SECTION D6 BRIDGE CLEANING 2016-2 P.O. BOX 110 PROJECT(S) ALEXANDER, IL 62601 ROUTE FAI 72 DISTRICT 06 REJECTED AMOUNT $226,540.00

------MARCH 04, 2016 LETTING

DESCRIPTION CONTRACTOR ------ITEM NO. 001 ROADSAFE TRAFFIC SYSTEMS, INC. CONTRACT NO. 46392 12225 DISK DR. COUNTY(S) VARIOUS ROMEOVILLE, IL 60446 SECTION D4 & D7 RPM SPECIFIC SITES 16- PROJECT(S) ROUTE VARIOUS DISTRICT 04 REJECTED AMOUNT $251,914.89

ITEM NO. 038 LAVERDIERE CONSTRUCTION, INC. CONTRACT NO. 68C75 4055 W. JACKSON ST. COUNTY(S) FULTON MACOMB, IL 61455-7723 SECTION (123B)I-1 PROJECT(S) ROUTE FAP 687 DISTRICT 04 REJECTED AMOUNT $142,860.00

Notice of Letting Bulletin April 22, 2016 Letting Published March 18, 2016