Planning Applications for Determination
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
New Enfield Local Plan 2041: Level 1 Strategic Flood Risk Assessment ______
London Borough of Enfield New Enfield Local Plan 2041: Level 1 Strategic Flood Risk Assessment _________________________________________________ Draft Report June 2021 New Enfield Local Plan 2041: Level 1 Strategic Flood Risk Assessment London Borough of Enfield Document Control Sheet Report Title Strategic Flood Risk Assessment Revision 1 Status Draft Control Date February 2021 Report Title Strategic Flood Risk Assessment Revision 1.1 Status Final Draft Control Date June 2021 Prepared by Graham Campbell & Jamie Kukadia Checked by Ian Russell & Ismail Mulla London Borough of Enfield B-Block North, Civic Centre, Silver Street, Enfield, EN1 3XA Email [email protected] i New Enfield Local Plan 2041: Level 1 Strategic Flood Risk Assessment London Borough of Enfield CONTENTS PAGE LIST OF TABLES AND FIGURES v SFRA USER GUIDANCE vii EXECUTIVE SUMMARY x 1.0 INTRODUCTION 1 Aims and Objectives 1 Policy Context 4 2.0 FLOOD RISK IN ENFIELD 11 Geography of Enfield 11 Catchment Areas of Main Rivers in Enfield 13 Sources of Flooding 16 History of Flooding in Enfield 18 3.0 STRATEGIC ASSESSMENT OF FLOOD RISK 19 General Methodology 19 Data Collation and Review 19 Fluvial Flooding 20 Groundwater Flooding 27 Surface Water Flooding 30 Sewer Flooding 34 Reservoirs 36 The New River 38 Effects of Climate Change 39 4.0 FLOOD RISK MANAGEMENT INFRASTRUCTURE 41 Flood Defences 41 Flood Alleviation Schemes 43 Catchment Based Approach 45 Flood Warning Systems 47 Emergency Planning 48 ii New Enfield Local Plan 2041: Level 1 Strategic Flood Risk Assessment London -
LONDON METROPOLITAN ARCHIVES Page 1 BRITISH WATERWAYS BOARD
LONDON METROPOLITAN ARCHIVES Page 1 BRITISH WATERWAYS BOARD ACC/2423 Reference Description Dates LEE CONSERVANCY BOARD ENGINEER'S OFFICE Engineers' reports and letter books LEE CONSERVANCY BOARD: ENGINEER'S REPORTS ACC/2423/001 Reports on navigation - signed copies 1881 Jan-1883 Lea navigation Dec 1 volume ACC/2423/002 Reports on navigation - signed copies 1884 Jan-1886 Lea navigation Dec 1 volume ACC/2423/003 Reports on navigation - signed copies 1887 Jan-1889 Lea navigation Dec 1 volume ACC/2423/004 Reports on navigation - signed copies 1890 Jan-1893 Lea navigation Dec 1 volume ACC/2423/005 Reports on navigation - signed copies 1894 Jan-1896 Lea navigation Dec 1 volume ACC/2423/006 Reports on navigation - signed copies 1897 Jan-1899 Lea navigation Dec 1 volume ACC/2423/007 Reports on navigation - signed copies 1903 Jan-1903 Lea navigation Dec 1 volume ACC/2423/008 Reports on navigation - signed copies 1904 Jan-1904 Lea navigation Dec 1 volume ACC/2423/009 Reports on navigation - signed copies 1905 Jan-1905 Lea navigation Dec 1 volume ACC/2423/010 Reports on navigation - signed copies 1906 Jan-1906 Lea navigation Dec 1 volume LONDON METROPOLITAN ARCHIVES Page 2 BRITISH WATERWAYS BOARD ACC/2423 Reference Description Dates ACC/2423/011 Reports on navigation - signed copies 1908 Jan-1908 Lea navigation/ stort navigation Dec 1 volume ACC/2423/012 Reports on navigation - signed copies 1912 Jan-1912 Lea navigation/ stort navigation Dec 1 volume ACC/2423/013 Reports on navigation - signed copies 1913 Jan-1913 Lea navigation/ stort navigation -
Islington U3A Longer Walks Group
Islington U3A Longer Walks Group Walk Title Cuffley - Hertfordshire Chain Walk (see Walk No. 103 Interesting Facts below) Area Hertfordshire Type Circular Date Friday, 5th August 2016 Distance 10.7 miles (16.4km). Timing 5 hours walking time + travel and lunch stops. Say 7 hours in total. Therefore expect to be back in Islington by 5.00pm. Meeting up Meet at 9.40 latest, at the entrance of Highbury & Islington, ready to & travel catch the Great Northern 9.56 direct train to Cuffley (toward Hertford North) from Platform 4 at Highbury & Islington station. It’s about a 30 mins journey. The Freedom Pass/ 60+ Travel card area extends just to Crews Hill so you’ll need a ticket from Crews Hill to Cuffley - 1 stop. Should be able to get an Off Peak Return - £2.20. For our younger members – you’ll need a ticket to Cuffley (£7.90 cheap day return). Route From Cuffley station we turn right & immediately right again into Tolmers Rd. Follow this windy road through the back streets of Cuffley (nice houses!!) for about a kilometre along the Hertfordshire Way on to the Hertfordshire Chain Walk and into Home Wood. Through the wood turning right at the end onto ‘Newgate Street’. Although part of the Hertfordshire Chain Way unfortunately there is no pavement for about 1km on this busy main road until we get to a T junction (2.8km). Nice church here! Take the right road but immediately cut off left down a track towards Home Farm – pleasant quiet going here now. We pass a remote golf course. -
Level 1 and 2 Strategic Flood Risk Assessment
Welwyn Hatfield Council Level 1 and 2 Strategic Flood Risk Assessment Final Report May 2016 Welwyn Hatfield Council Council Offices The Campus Welwyn Garden City Hertfordshire AL8 8AE This page is intentionally left blank 2015s2849_WHBC_SFRA_FINAL_Report_v4.0 i JBA Project Manager Joanne Chillingworth The Library St Philip’s Courtyard Church End COLESHILL B46 3AD Revision History Revision Ref / Amendments Issued to Date Issued Draft v1.0 / Submitted Level 1 SFRA only. Some sections were still Andrew Turner 10th July 2015 incomplete whilst awaiting data. (Welwyn Hatfield Council) Draft v2.0 / Submitted Level 1 and Level 2 draft report, pending Andrew Turner 3rd September 2015 additional sites summary tables. (Welwyn Hatfield Council) Final v1.0 Submitted Level 1 and Level 2 reports with alterations Andrew Turner 5th November 2015 based on WHC, HCC & EA comments. (Welwyn Hatfield Council) Final v2.0 Submitted Level 1 and Level 2 reports with alterations Andrew Turner 18th November 2015 based on WHC comments. (Welwyn Hatfield Council) Final v3.0 Submitted Level 1 and Level report with minor amendments Andrew Turner 3nd December 2015 and alterations regarding phasing. (Welwyn Hatfield Council) Final v4.0 Amendments relating to the new climate change guidance, Andrew Turner 10th May 2016 published February 2016 (Welwyn Hatfield Council) Contract This report describes work commissioned by Welwyn Hatfield Council. The Council’s representative for the contract was Andrew Turner. Prepared by .................................................. Andrew Waite BSc MRes Analyst ....................................................................... Joanne Chillingworth BSc MSc C.WEM MCIWEM Chartered Senior Analyst Reviewed by ................................................. Claire Gardner BSc MSc C.WEM MCIWEM Chartered Senior Analyst Purpose This document has been prepared as a Final Level 1 and 2 Strategic Flood Risk Assessment Report for Welwyn Hatfield Council. -
Planning and Licensing Committee
PLANNING AND REGULATORY COMMITTEE 30 July 2014 REPORT OF THE CHIEF EXECUTIVE PLANNING APPLICATIONS FOR DETERMINATION Item 1: 07/13/0899/O Location: Land to the west of Hoddesdon and east of the A10 incorporating land to the north and south of the Link Road between Hertford Road and Lord Street and land to the south of Lord Street Description: An outline planning application for a residential/mixed use development incorporating housing up to 523 Units (with delivery of a 1FE Primary School) or up to 485 Units (with delivery of a 2FE Primary School), a shop, an hotel (with ancillary gym/restaurant), commercial floor space, public open space and allotments, with all matters reserved except for means of access from the A1170 Link Road Applicants: Lands Improvement Holdings, Landmatch Sarl & Hubert C Leach Ltd Date Received: 14/10/2013 Date of Committee: 30/07/14 Expiry Date: 28/01/2014 Officer Contact: Andrew MacDougall RECOMMENDED that subject to the applicants first entering into a planning obligation under Section 106 of the Town and Country Planning Act 1990 (as amended) and the application first being submitted to the Secretary of State, planning permission be granted subject to the conditions set out at the end of this report. 1. CONSULTATIONS 1.1 Hertfordshire County Council Highways - No objection subject to conditions, a section 106 agreement and a section 278 agreement to contain mitigation measures. 1.2 Highways Agency – No objection. 1.3 Environment Agency – No objection subject to conditions and the need for a detailed drainage scheme for the entire site. -
M25 Junction 23 to 27 - Section 5 Managed Motorways – All Lanes Running Stage 3 - Preliminary Design
M25 Junction 23 to 27 - Section 5 Managed Motorways – All Lanes Running Stage 3 - Preliminary Design Environmental Assessment Report Document No: 5084755-S5-DO-EN-251 November 2012 Volume 1 M25 Junction 23 to 27 - Section 5 Revision: E Environmental Assessment Report Volume: 1 Contents Section Page 1. Introduction 8 1.1 Project Identification 8 1.2 Purpose of this Report 8 1.3 Scope and Content 9 1.4 The Overseeing Organisation 10 1.5 The DBFO Contractor 10 2. The Project 11 2.1 Background to the Project 11 2.2 History of the Project 11 2.3 Regulatory Framework 12 2.4 Project Objectives 12 2.5 Any Further Support of Government Policies 14 2.6 Project Description 14 2.7 Land Use Setting and Land Take 15 2.8 Construction, Operation and Long Term Management 15 3. Alternatives Considered 18 3.1 Design Options 18 4. Environmental Impact Assessment Methodology 20 4.1 Scoping 20 4.2 Surveys and Predictive Techniques, Method and Constraints 21 4.3 Changes to DMRB 22 4.4 Significance Criteria 22 4.5 Mitigation and Enhancement 22 5. Air Quality 23 5.1 Introduction 23 5.2 Study Area 23 5.3 Baseline Conditions 24 5.4 Methodology 38 5.5 Regulatory/Policy Framework 49 5.6 Design, Mitigation and Enhancement Measures 58 5.7 Magnitude of Impacts (Change) 59 5.8 Supplementary Information 73 5.9 Indication of Any Difficulties Encountered 73 5.10 Summary 73 6. Cultural Heritage 75 6.1 Study Area 75 6.2 Baseline Conditions 75 6.3 Methodology 75 6.4 Value (Sensitivity of Resource) 76 6.5 Regulatory/Policy Framework 76 6.6 Design, Mitigation and Enhancement Measures 81 Document No: 5084755-S5-DO-EN-251 Page 1 M25 Junction 23 to 27 - Section 5 Revision: E Environmental Assessment Report Volume: 1 6.7 Magnitude of Impacts (Change) and Significant Effects 81 6.8 Significance of Effects on Plans and Policies 92 6.9 Indication of Any Difficulties Encountered 92 6.10 Recommendations 92 6.11 Summary 92 7. -
Landscape Character Assessment
CHRIS BLANDFORD ASSOCIATES environment landscape planning Broxbourne Borough Council Broxbourne Landscape Character Assessment October 2008 CONTENTS PREFACE 1 EXECUTIVE SUMMARY 3 1.0 INTRODUCTION 5 1.1 Background 5 1.2 Study Aims and Objectives 5 1.3 The Importance of Landscape Character 6 1.4 Planning Policy Framework 7 1.5 Approach and Methodology 12 2.0 THE SHAPING OF THE LANDSCAPE 21 2.1 General 21 2.2 Physical Influences 21 2.3 Historical Influences 23 2.4 Forces for Change in the Landscape 26 3.0 LANDSCAPE CHARACTER TYPE PROFILES 31 3.1 General 31 3.2 Landscape Character Context 31 3.3 Landscape Character Types and Areas 33 TYPE A: PLATEAU RIDGES AND SLOPES: WOODED RIDGE 35 TYPE B: PLATEAU RIDGES AND SLOPES: WOODED FARMLAND 41 TYPE C: PLATEAU RIDGES AND SLOPES: WOODED PARKLAND AND FARMLAND 49 TYPE D: RIVER VALLEY FLOODPLAIN: FLOODED GRAVEL PITS AND MARSHES 57 TYPE E: RIVER VALLEY FLOODPLAIN: FARMLAND 63 4.0 MONITORING LANDSCAPE CHANGE 69 4.1 Introduction 69 4.2 The National Approach to Monitoring Landscape Change 69 4.3 Indicators for Monitoring Change in Broxbourne 74 October 2008 CONTENTS Final Report Chris Blandford Associates 5.0 CONCLUSIONS AND RECOMMENDATIONS 77 5.1 General 77 5.2 Conclusions 77 5.3 Recommendations for Further Work 80 APPENDICES A Sources of Information B Glossary List of Figures 1.1 Study Area 2.1 Geology 2.2 Landform and Drainage 3.1 National Joint Character Areas 3.2 Landscape Character Types and Areas in Broxbourne Borough 3.3a Historic Landscape Character (HLC) Codes 3.3b Historic Landscape Character (HLC) Codes R1 3.3c Historic Landscape Character (HLC) Codes R2 October 2008 CONTENTS Final Report Chris Blandford Associates PREFACE This Technical Study was commissioned by Broxbourne Borough Council. -
MARCH-2015-UPDATE.Pdf
MARCH 2015 MIASSRUCE H5 2 2015 ISSUE 52 IN THIS EASTEREASTER ISSUE ISSUE OF OF UPDATE UPDATE: : Breaking News! Northaw Country Music Festival Postponed for at least one year, i.e. until August 2016 [Promoter’s decision] NORTHAW & CUFFLEY VILLAGE DAY 2015 UPDATE FROM THE CLERK IN PICTURES NORTHAW & CUFFLEY VILLAGE DAY 2015 UPDATE FROM THE CLERK IN PICTURES CALL CHRIS: 01992 630333 [email protected] FREE COLLECTION AND DELIVERY FROM CUFFLEY, NORTHAW AND SURROUNDING AREAS By Cycle ROAD, HYBRID & MOUNTAINBIKES SALES, ACCESSORIES, & SERVICING REGULAR SPECIAL OFFERS BOXED bikes built FROM £25 PART EXCHANGE CONSIDERED PICK UP AND DELIVERY SERVICE AVAILABLE 160 Darkes Lane, Potters Bar tel: 01707 651460 2 There are over 1,500 species of pollinators in Britain, including the honey, bumble & solitary Therebees; butterflies,are over 1,500 moths, species hoverflies, of pollinators beetles, in flies, Britain, and including wasps, all the of honey,which play bumble an essential & solitary bees;role in butterflies, the fertilisation moths, of hoverflies,flowering planbeetles,ts. They flies, are and however wasps, underall of which threat play from an a essential number of rolefactors, in the particularly fertilisation climate of flow changeering planand thabitats. They loss.are however under threat from a number of factors, particularly climate change and habitat loss. Pollinators in the UK have lost 95% of their foraging habitat since the 1930’s. The Pollinatorsurbanisation in ofthe our UK countryside have lost 95% and of the their massive foraging growth habitat of intensivesince the farming1930’s. Thehave urbanisationcontributed to of this our losscountryside of vital habitat. and the Another massive major growth concern of intensive has been farming the increasedhave use contributedof pesticides, to and this in loss recent of vital years habitat. -
Strategic Flood Risk Assessment Final Level 1
Welwyn Hatfield Borough Council Strategic Flood Risk Assessment Final Level 1 Final Report May 2009 Prepared for: Welwyn Hatfield Borough Council Level 1 Strategic Flood Risk Assessment Revision Schedule Welwyn Hatfield Strategic Flood Risk Assessment Rev Date Details Prepared by Reviewed by Approved by 01 16/11/07 WHBC Draft Anna Samuel Stephen Riley Jon Robinson Level 1 Hydrology Specialist Senior Consultant Associate Director SFRA_rev01 Gemma Costin Assistant Flood Risk Specialist Gemma Hoad Assistant Water Scientist 02 03/0708 WHBC FINAL Anna Samuel Stephen Riley Jon Robinson Level 1 Hydrology Specialist Senior Consultant Associate Director SFRA_rev 2 issued 01-08-08 03 08/01/09 WHBC FINAL Anna Samuel Jon Robinson Jon Robinson Level 1 Hydrology Specialist Associate Director Associate Director SFRA_rev 3 issued 08-01- Clare Postlethwaite 09.doc Consultant Water Scientist Gemma Hoad Assistant Water Scientist 04 19/05/09 WHBC FINAL Helen Judd Jon Robinson Jon Robinson SFRA_rev 4 Assistant Hydrologist Associate Director Associate Director Scott Wilson Scott House Alençon Link Basingstoke This document has been prepared in accordance with the scope of Scott Wilson's RG21 7PP appointment with its client and is subject to the terms of that appointment. It is addressed Tel 01256 310200 to and for the sole and confidential use and reliance of Scott Wilson's client. Scott Wilson accepts no liability for any use of this document other than by its client and only for the Fax 01256 310201 purposes for which it was prepared and provided. No person other than the client may copy (in whole or in part) use or rely on the contents of this document, without the prior written permission of the Company Secret ary of Scott Wilson Ltd. -
Brook Farm, Cuffley, Potters Bar, En6 4Ex
Part I Executive Member: Councillor Perkins WELWYN HATFIELD BOROUGH COUNCIL DEVELOPMENT MANAGEMENT COMMITTEE – 26 MAY 2016 REPORT OF THE DIRECTOR (GOVERNANCE) 6/2015/2388/FULL BROOK FARM, CUFFLEY, POTTERS BAR, EN6 4EX CHANGE OF USE OF LAND FOR HOLDING UP TO AND INCLUDING 15 WEDDING RECEPTIONS DURING THE MONTHS FROM 1 MARCH TO 30 SEPTEMBER EACH YEAR, WITH CAMPING FOR A MAXIMUM OF 50 WEDDING GUESTS TO TAKE PLACE ON THE SAME DATE THAT A WEDDING RECEPTION TAKES PLACE APPLICANT: Ms L Widdowson (Northaw and Cuffley) 1 Site Description 1.1 Brook Farm occupies approximately 182 hectares of land that lies within the Green Belt to the east of Cuffley. The land in this area is strongly undulating with a mixture of open farmland and wooded areas. Cuffley Brook runs north-south along the western boundary of the farmland. Parts of the farm lie within flood zones 2 and 3. Public footpaths situated on higher land provide access to the countryside providing views across Brook Farm. 1.2 The farm is an agricultural holding. Dairy and beef farming previously operated at the site but this use has been replaced by arable farming, together with the provision of facilities for a range of leisure activities, including game and clay pigeon shooting, hiring of land for events, and leasing of farm buildings for storage to several separate companies. 1.3 Cuffley Hill, which is a busy B classified road linking Cheshunt and Cuffley, bisects Brook Farm. The farmhouse and a number of large barns lie on the northern side of the highway, and open grassland and fields of crops on the southern side. -
Broxbourne Surface Water Management Plan WSP | Parsons Brinckerhoff Hertfordshire County Council Project No 70009115 March 2017
BROXBOURNE BOROUGH SURFACE WATER MANAGEMENT PLAN FINAL REPORT REPORT NO 70009115 – B_SWMP – 0-1 2017-03-16 BROXBOURNE BOROUGH SURFACE WATER MANAGEMENT PLAN FINAL REPORT Hertfordshire County Council Final Project no: 70009115 Date: March 2017 – WSP | Parsons Brinckerhoff Unit 9 The Chase John Tate Road Hertford, SG13 7NN Tel: +44 01992 526000 Fax: +44 01992 526001 www.wsp-pb.co.uk QUALITY MANAGEMENT ISSUE/REVISION FIRST ISSUE REVISION 1 REVISION 2 REVISION 3 Remarks DRAFT Version 2 Date November 2016 March 2017 Sarah Foreman and Prepared by Sarah Foreman others Signature Checked by James Berryman James Berryman Signature Authorised by Andy Smith Andy Smith Signature Project number 70009115 70009115 Report number V01 V02 File reference ii TABLE OF CONTENTS KEY DEFINITIONS ......................................................................................1 1 EXECUTIVE SUMMARY ..............................................................2 1.1 Background ......................................................................................... 2 1.2 Identification of Hotspots ..................................................................... 2 1.3 Detailed Phase of SWMP.................................................................... 3 1.4 Habitats Regulation Assessment (HRA) ............................................. 6 1.5 Action Plan .......................................................................................... 6 2 INTRODUCTION ...........................................................................7 2.1 Background -
London Water Supply [Electronic Resource] : a Retrospect and a Survey
THE ROYAL SOCIETY OF HEALTH LIBRARY ROYAL SANITARY INSTITUTE LIBRARY REGULATIONS 1. Books may be borrowed by Fellows, Members and Associ- ates personally or by a messenger producing a written order. The person to whom books are delivered shall sign a receipt for them in a book provided for that purpose. 2. Books may be sent through the post, or by some equivalent means of carriage, upon a written order. All charges of carriage to the Institute shall be defrayed by the borrower. 3. A borrower may not have more than tlH3e& volumes in his possession at one time. 4. A borrower will be considered liable for the value of any book lost or damaged while on loan to him, and if it be a separate volume, for the value of the whole work rendered imperfect. Marking or writing in the volumes is not permitted, and borrowers are requested to call attention to damage of this character. 5. Books may be retained for 28 days. Periodicals may be retained for 14 days. Applications for extension of the loan period must be made in writing before its expiry. No book may be kept longer than 3 months. New books will not be lent until after the expiration of one month from the date of their having been received by the Institute. The current number of a periodical may not be borrowed. 6. Borrowers retaining books longer than the time specified, and neglecting to return them when demanded, forfeit the right to borrow books until the volume or volumes be returned, and for such further time as may be ordered.