220KV D/C MAINPURI-SIRSAGANJ T/L (UPPTCL) MAINPURI DIST.
54N/2 HT
HT
HT
AURAIYA DIST. HT
HT 54N/7
HT AP145(COMMON POINT) AP143 AP144HT
HT
HT
HT
HT
132KV S/C SAIFAI-MAINPURI T/L (UPPTCL) HT
HT AP142 HT
HT HT HT HT HT HT HT HT HT 400KV S/C KANPUR-BALLABHGARH T/L(PGCIL) HT HT HT
AP141 220KV D/C MAINPURI-LILO AT BAH T/L(UPPTCL) BAH AT MAINPURI-LILO D/C 220KV
AP140A 54I/16
AP140 54N/1
AP135A AP138
U/C YAMUNA EXPRESS WAY (AGRA-LUCKNOW) WAY EXPRESS YAMUNA U/C AP49 (PGCIL) T/L CKT-I FATEHPUR-AGRA S/C 765KV
AP51 AP139 AP52 AP134 ETAWAH DIST. AP137
BHOGNIPUR BRANCH CANAL HT U/C NORTHEN RAILWAY (ETAWAH-MAINPURI)
HT AP53 HT
AP48(COMMON POINT) AP136 HT
54N/2 AP135B
HT
132KV SAIFAI TO TAKHA T/L(UPPTCL) TAKHA TO SAIFAI 132KV AP135 HT
AP50 AP54 HT RAILWAY LINE WITH DFCC CORRIDOR DFCC WITH LINE RAILWAY
132KV D/C BHARTANA-BIDHUNA T/L (UPPTCL) T/L BHARTANA-BIDHUNA D/C 132KV AP132
AP131 HT HT
AP133 HT
AP56 400KV D/C AURAIYA-AGRA T/L(PGCIL) AURAIYA-AGRA D/C 400KV HT
AP55 HT
AP130 HT HT
54N/6
HT HT
54N/1 AP129
HT HT
HT HT
HT HT HT
HT HT HT
HT HT HT HT HT HT HT HT
HT ±8 AP125 00KV HVDC CHAMPA-KURUKSHETRA T/L(PGCIL)
HT AP128
HT AP124A AP59 AP65
HT
HT AP67 AP57
AP60 HT
HT AP60A AP127 HT AP68
HT
HT HT
AP122
HT HT
HT
HT AP121
HT
HT
HT HT
AP58 AP64 AP126A
HT HT HT HT
HT AP126 HT
AP106 AP117 HT
HT HT
AP66
HT HT
AP107 HT
HT
HT
AP61 HT AP63 AP120 HT HT
HT HT
HT
AP110 400KV D/C ORAI-MAINPURI T/L(UPPTCL) HT
AP111
HT
AP70 HT HT
HT HT
HT AP124 AP62
765KV S/C FATEHPUR-AGRA CKT-II T/L (PGCIL) T/L CKT-II FATEHPUR-AGRA S/C 765KV
HT
AP62A HT
HT HT
AP103A AP123 HT
400KV S/C KANPUR-AGRA T/L (PGCIL) T/L KANPUR-AGRA S/C 400KV HT HT HT
HT
AP112A HT
HT
HT
AP102 HT
HT AP104 HT HT
AP71 HT HT
HT
HT
HT
HT
HT
AP103 HT HT
HT
HT HT HT HT
HT 54M/4
HT
HT
HT HT HT
HT
HT
HT HT
AP84 HT
HT
HT HT
AP71A
HT HT S.NO. LEGENDS HT
HT HT
AP119 HT
HT HT
HT
HT AP83 AP113
HT
HT HT
AP108 AP118
HT HT HT
HT
HT
HT
HT HT
HT HT
HT AP87 HT HT
HT 1. HT DETAIL ROUTE
HT AP82 AP109 220KV D/C PARICHA-MAINPURI T/L(UPPTCL) HT HT
HT
HT
HT HT HT
HT
HT
HT
HT HT HT HT
AP112
HT 220KV D/C AURAIYA-AGRA T/L(PGCIL) HT POWER LINE
AP105 HT 2. HT
AP101 HT
HT HT
HT
HT
HT HT
AP73 HT
HT
HT HT
HT AP102A RAILWAY LINE
HT HT 3. HT
AP89 AP103B HT
HT
HT
HT HT
HT
HT
AP85
HT HT AP116
AP72 HT NATIONAL H.
HT 4.
HT
HT
HT AP75 HT HT HT
HT
HT
AP81E AP86 HT
HT
HT HT HT HT
AP114
HT HT HT ANGLE POINT HT HT HT
AP74 HT
S.NO. LEGENDS HT HT
HT
HT HT
132KV S/C AURAIYA-BHARTHANAHT T/L(UPPTCL) HT HT HT HT HT HT HT
HT AP91
HT HT HT HT HT HT
HT HT AP100 HT HT
HT HT HT HT
HT
HT 6. FOREST STRIP HT HT HT HT AP92 HT
HT
1. HT
DETAIL ROUTE HT
HT HT HT HT HT AP115
HT AP88 HT HT HT
AP76 HT HT
HT HT HT 7. CANAL
HT HT HT HT NATIONAL HIGHWAY-92 (ETAWAH TO FARKKABAD) HT HT
HT
HT 2. POWER LINE HT
HT HT
HT HT
HT HT HT
HT
HT
HT
HT
HT
HT AP90 HT 3. RAILWAY LINE AP81D 132KV S/C AURAIYA-BHARTHANA T/L(UPPTCL) HT
AP77 HT NATIONAL HIGHWAY-91A (BELA-BIDHUNA) HIGHWAY-91A NATIONAL
HT HT
AP78 HT CLIENT
NATIONAL H. HT
4. AP81A HT AP99 POWER GRID CORPORATION OF INDIA LIMITED
5. ANGLE POINT HT
HT EPC TATA PROJECTS LIMITED CONTRACTOR:
6. FOREST STRIP HT GROUND FLOOR,TOWER-B,GREEN BOULEVARD,PLOT NO.B-9/A,SECTOR-62,NOIDA-201307,U.P. HT
AP95 HT
7. CANAL HT PROJECT
AP79 HT
HT 765 KV D/C ORAI- ALIGARH TRANSMISSION LINE (PKG.-E-07)
HT AP98
NORTHERN RAILWAY (HOWRAH-DELHI) (HOWRAH-DELHI) RAILWAY NORTHERN HT
AP93 765KV S/C KANPUR-JHATIKARA T/L(PGCIL)
HT
HT DRAWING: AP81C ± FOREST PROPOSALS MAINPURI DISTRICT FOR THE
CLIENT AP80 DESCRIPTION
HT
POWER GRID CORPORATION OF INDIA LIMITED 8 AP97 765 KV D/C ORAI- ALIGARH TRANSMISSION LINE (PKG.-TE-7)
AP81
AP81B
HT 0 400KV D/C KANPUR-BALLABHGARH T/L(PGCIL)
0 54N/6 AP94 G.T.S SHEETS
EPC HT USED 54N1,54M4,54I16 TATA PROJECTS LIMITED KV HT 54M/4 CONTRACTOR: GROUND FLOOR,TOWER-B,GREEN BOULEVARD,PLOT NO.B-9/A,SECTOR-62,NOIDA-201307,U.P. AP96
HT REVISION
400KV S/C KANPUR-ETAH T/L(PGCIL) SCALE - 1 : 50,000 DRG. NO.:-TPL/PGCIL/FOREST PROPOSAL/003 PROJECT HT
765 KV D/C ORAI- ALIGARH TRANSMISSION LINE (PKG.-E-07) HVDC R0 HT
DRAWING: HT M/S TATA PROJECTS LIMITED POWER GRID CORPORATION OF INDIA LIMITED
FOREST PROPOSALS AURAIYA DISTRICT FOR THE HT DESCRIPTION
765 KV D/C ORAI- ALIGARH TRANSMISSION LINE (PKG.-TE-7) HT 400KV S/C UNNAO-AGRA T/L (UPPTCL) T/L UNNAO-AGRA S/C 400KV
G.T.S SHEETS BI
54N2,54N6,54N7 RAHUL USED SWANATH- ETAWAH BRANCH CANAL KUMAR REVISION SCALE - 1 : 50,000 DRG. NO.:- TPL/PGCIL/FOREST PROPOSAL/001 PREPARED BY. SUBMITTED BY. CHECKED BY. RECOMMENDED BY. APPROVED BY. R0
M/S TATA PROJECTS LIMITED POWER GRID CORPORATION OF INDIA LIMITED RAHUL CHARI KUMAR S.NO. LEGENDS PREPARED BY. SUBMITTED BY. CHECKED BY. RECOMMENDED BY. APPROVED BY.
1. DETAIL ROUTE AL
2. POWER LINE HT HT
I
- AG 3. RAILWAY LINE
54N/5 4. NATIONAL H.
RA RA ANGLE POINT
T/ 6. FOREST STRIP
L 7. CANAL ( PG
CI CLIENT POWER GRID CORPORATION OF INDIA LIMITED L ) EPC TATA PROJECTS LIMITED CONTRACTOR: GROUND FLOOR,TOWER-B,GREEN BOULEVARD,PLOT NO.B-9/A,SECTOR-62,NOIDA-201307,U.P.
PROJECT 765 KV D/C ORAI- ALIGARH TRANSMISSION LINE (PKG.-E-07)
DRAWING: FOREST PROPOSALS ETAWAH DISTRICT FOR THE DESCRIPTION 765 KV D/C ORAI- ALIGARH TRANSMISSION LINE (PKG.-TE-7) G.T.S SHEETS USED 54N1,54N2,54N5,54N6,54M4 REVISION SCALE - 1 : 50,000 DRG. NO.:-TPL/PGCIL/FOREST PROPOSAL/002 R0 M/S TATA PROJECTS LIMITED POWER GRID CORPORATION OF INDIA LIMITED
RAHUL KUMAR
PREPARED BY. SUBMITTED BY. CHECKED BY. RECOMMENDED BY. APPROVED BY.